Follow_Up_Questions_&_Answers.docx
DOCX document 15 KB Posted
- Attached to
- Repair and Sustainment of POL Pavement
- Solicitation number
- W912J2-17-B-0001
About this file
Follow Up Questions & Answers 23 Jun 17
View the file
Other files
| File | Type | Posted |
|---|---|---|
| XGFG152005_-_DWG_Construction_Phases_v2.pdf | ||
| XGFG152005_-_Questions_and_Answers.docx | DOCX document | |
| A01-Attachment_1_-SOW_Amendment__1.pdf | ||
| W912J2-17-B-0001Solictation_Amendment__1.pdf | ||
| Attachment_3_-_Bid_Schedule.docx | DOCX document | |
| Attachment_1_-SOW.pdf | ||
| W912J2-17-B-0001Solictation.pdf | ||
| Attachment_2_-_Complete_Drawing_Set.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Follow Up Questions & Answers Q1. ) Q&A indicates the existing drainage layer, subbase and compacted subgrade beneath the re-fueling station concrete slab is 14". Can the existing be reused and remain in place - just graded as required to provide 3.25% slope and then compacted? If not, can you clarify what the "drainage layer" is?
A1. No the existing cannot be used. The drainage layer is an existing layer shown in the site as-builts. Primary purpose is to separate the base layers to allow water to drain away from sub-base layers.
Q2. Is it possible to obtain an overall drawing that is to scale?
A2. No a scale drawing is not available at this time.
Q3. Can you post the new diagram for the two phase schedule?
A3. Yes. It will be attached.