A-11_Solicitation_W912J2-16-R-4000-0002_SF30.docx
DOCX document 1 MB Posted
- Solicitation number
- W912J2-16-R-4000
About this file
Amendment 0002 SF30. Although FBO is calling this Amendment 3 there are only two SF30s to return with your proposal and I only need the signed first page of each SF30 to show your acknowledgment of the changes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A__2_W912J2-16-R-4000.docx | DOCX document | |
| A-11_Solicitation_W912J2-16-R-4000-0003_SF30.docx | DOCX document | |
| A-11_Solicitation_W912J2-16-R-4000-0003_Conform.docx | DOCX document | |
| A-11_MATOC_Exhibit_E_Prototypical_Project.docx | DOCX document | |
| A-11_Solicitation_SF1442_Conform_Copy_W912J2-16-R-4000-0001.docx | DOCX document | |
| Q A__1_W912J2-16-R-4000.docx | DOCX document | |
| A-11_Solicitation_W912J2-16-R-4000-0001.docx | DOCX document | |
| MATOC_EXHIBIT__F.pdf | ||
| MATOC_Preproposal_Conference_26_apr.pptx | PPTX presentation | |
| Pre-Proposal_Conference_Sign-In_roster.pdf | ||
| A-11_MATOC_Exhibit_D_Oct_2013.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912J2-16-R-4000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 20 00 - INSTRUCTIONS FOR PROCUREMENT
The following have been modified:
SECTION 00100
Section 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. INTRODUCTION
1.1. SCOPE: You are invited to submit a proposal in response to our Request for Proposal (RFP) entitled, “Wisconsin National Guard MATOC Solicitation” for construction services for National Guard locations throughout the State of Wisconsin. As a result of this solicitation, the Government intends that a minimum of nine (9) indefinite-delivery, indefinite-quantity, (IDIQ) Task Order Contracts will be awarded, providing sufficient qualified contractors present offers. All awards will be to small businesses pursuant to a 100% small business set-aside. The contracting officer may set-aside task orders for SBA Certified 8(a) participants; Certified HUBZone Small Business Concerns, Service Disabled Veteran Owned Small Business and Women Owned Small Businesses Concerns provided 2 or more qualified contractors in each category present conforming offers and are awarded a MATOC.
1.1.1. Awards will be made to offerors whose proposals are in compliance and conforming to the RFP and are determined to be most advantageous to the Government in terms of Technical, Past Performance and Price.
1.1.2. Work to be performed under the MATOC contracts will include, but are not limited to, construction, demolition/remediation services. Projects will be bid build type from already completed designs, and/or projects specified by a Statement of Work using the Master Specification. It should be noted that the majority of work under these contracts will be for sustainment, repair and maintenance (SRM) at or under the $1M dollar level. However, occasionaly large SRM and MILCON type projects will be performed under this contract.
1.1.3. The Government reserves the right to issue additional solicitations and award additional contracts within the activities covered by this contract. In this event, new MATOC contractors, in accordance with the terms of their contracts, may compete for Task Orders with the Contractors selected under this solicitation. This is not a solicitation for a Requirements Contract.
1.2. PROJECT CATEGORIES: Work performed under these Multi-Discipline Contracts will generally be of, but are not limited to, the following general project categories:
1.2.1. Construction, repair and alteration of various facilities.
1.2.2. Construction, repairs and alteration of Electrical Systems (ES)
1.2.3. Construction, repair and alteration of Mechanical Systems (e.g. HVAC systems, and controls.)
1.2.4. Concrete and/or Asphalt Paving.
1.2.5. Demolition of facilities when required. Note: Demolition projects that are stand-alone, not part of a rebuild, fall under the Service Contract Act, and the Davis Bacon Act is not applicable, nor is bonding. FAR 52.222-41, Services Contract Act of 1965, and FAR 52.246-13, Inspection—Dismantling, Demolition, or Removal of Improvements clauses and requirements apply. Note that the applicable clauses for Prompt Payment, Value Engineering, and Termination are likewise different from such clauses applicable to all other requirements under this contract.
1.2.6. Construction of new facilities
1.3. CONTRACT DURATION, LIMITS, AND AMOUNTS: Each of the resulting contracts will include a two-year base period and three one-year option periods. The maximum value of each contract will not exceed $20 million over the life of the contract. The Minimum and Maximum values for a single Task Order are $5000.00 and $5 million, respectively. The minimum guaranteed order for each contract is one (1) task order valued at $5,000 with a guaranteed fee of $5,000.00 for the life of the contract. At time of award of the basic contract, a task order for $5,000.00 will be issued. If the awarded contractor does not receive another task order in the base period of two years, this $5,000 will be paid out. If they are awarded another task order, the $5,000 will be removed from the initial task order an be placed towards the project task order received. See Section 00800 for details.
1.4. TASK ORDERS
1.4.1. As requirements develop, Task Orders will be competed among the MATOC awardees, or negotiated on a sole source basis as described in Section 00800. Section 00800 describes the Task Order process in detail. Offerors are highly encouraged to read Section 00800 before submitting a proposal.
1.4.2. The basic contract will be administered, (e.g. issuing modifications, exercising options), by the Contracting Office, USPFO for Wisconsin, 1 Williams Street, Camp Douglas, WI 54618-5002.
1.4.3. Individual Task Orders will be awarded and administered by federally appointed contracting officers, and may be issued by any Army or Air National Guard location in the State of Wisconsin. Organizations outside of the issuing office of the basic contract will be responsible for the complete administration of Task Orders issued.
1.4.4. Construction performance requirements will be specified for each project in the Task Order Request for Proposal. MATOC Awardees will compete for Task Orders among themselves. The majority of all Task Orders shall be awarded based on competitive proposals received in response to the agency request for quotation.
1.5. NOTICE OF PRE-PROPOSAL CONFERENCE:
1.5.1. A pre-proposal conference will be conducted on April 26, 2016 at 1000 hours for the purposes of briefing on the proposal requirements and making clarifications regarding this solicitation. This conference will be held at Bldg 430, Truax Field, Madison, WI 53704. Interested Contractors are highly encouraged to attend the pre-proposal conference.
Due to security conditions, all offerors must register to attend this conference.. Email the following information for all attendees to Dianne Graham and copy Maj Dan Statz at the following addresses: dianne.m.graham4.nfg@mail.mil and daniel.p.statz.mil@mail.mil respectively.
Firm Name and Telephone Number Visitor’s Full Name (if no middle initial put NMI): last, first middel initial Date of Birth Gender (M/F) Drivers License with State of issue Home Address
1.1.1. This information must be provided in advance, not later than 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
1.1.2. Visitors must pick up their passes at the Installation’s Main Entry Gate upon arrival. You may be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection or Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
1.1.3. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
1.1.4. A record of the conference shall be made and furnished to all prospective offerors via posting to our web site at https://www.fbo.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
1.2. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS
1.2.1. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, for proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.
1.2.2. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed responsive and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to closing and will be posted not later than two working days prior to closing. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.
1.2.3. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to https://www.fbo.gov
1.2.3.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.
1.2.4. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. FedBizOpps registration requires the following information:
1.2.4.1. To register for SAM go to: https://www.sam.gov/portal/public/SAM/. You will need your DUNS number to register. Instructions for registering are on the web page. The solicitation and associated information and the plans and specifications will be available only from the Federal Business Opportunities (FedBizOpps) website on-line at https://www.fbo.gov/ . FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. FedBizOpps registration requires the following information: 1) Central Contractor Registration (CCR) Marketing Partner Identification Number (MPIN), 2) DUNS Number and CAGE Code, 3) Telephone Number, 4) Email address. Registration instructions can be found on the FedBizOpps website at www.fbo.gov. (Please note the registration for access to the secure site takes approximately 15 business days. PLAN ACCORDINGLY.) Reference paragraph 4.7 of the Vendor Guide for instructions to obtain a MPIN to retrieve the specification and drawing documents. Contractors who do not already have a MPIN are advised that the normal processing is 7 to 15 business days to obtain a MPIN password that will give them access to the plans and specifications, which are located in the controlled access location on FBO. See video in vendor guide at 3.3 on advanced functions for other information. . Bidders/offerors who have registered with FedBizOpps must access the data for this solicitation with their MPIN. Bidders/Offerors cannot log into the FedBizOpps home page and search for data.
1.2.5. Submit request for information, by email to the contracting office at the address show below. REQUEST FOR INFORMATION- INQUIRY FORMAT
Subject Line: Reference No. W912J2-16-R-4000 Email: zachary.r.tevis.mil@mail.mil and lisa.m.braund.mil@mail.mil Date of Inquiry: _______________ From: Company Name:
Address:
Phone Number: Email address:
Question: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document)
1.3. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS: The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted on the following website: https://www.fbo.gov
1.3.1. Though every effort will be made to provide email notification when a change is posted such notification is NOT guaranteed and should not be expected. Offerors are strongly cautioned to check this site frequently and to “refresh” their web page to ensure they have the latest information.
1.4. HAND CARRIED PROPOSALS/INVITATIONS:
1.4.1. A bid repository is provided for hand carried proposals and is located at USPFO for Wisconsin, 1 Williams Street, Rm 220, Camp Douglas, WI 54618-5002. Hand carried proposals must be deposited in the repository prior to the time established for receipt of proposals.
Offerors are cautioned that approval to enter the base must be obtained prior to the closing date for receipt of proposals. Follow the procedures outlined in the instructions in the paragraph above titled “Notice of Pre Proposal Conference“ for entry. Delays are probable at the entry point and should be accommodated for. Late receipt of proposals due to base entry delays may not be deemed excusable and the Contracting Officer may declare the proposal late and remove it from consideration.
1.5. WAGE DETERMINATION:
1.5.1. Davis Bacon Wage Rates are applicable to the prototypical project. Prevailing wage determination information, current at time of issuance of solicitation, is found in the prototypical offering form, Exhibit E. In the event the current prevailing Wage Determination is changed by the Department of Labor prior to closing date of this solicitation it is the offeror’s responsibility to ensure the most recent determination is used in preparing the proposal. An Amendment may not be issued prior to closing to change Wage Determination dates and/or numbers. Applicable wage rates can be found at: http://www.wdol.gov/wdol/scafiles/davisbacon/WI.html
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS: This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.
1.7. REMOVAL OF SECTIONS AT TIME OF AWARD. Sections 00100, 00110, 00120, 00600 and 00010 Areas of Consideration will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.
1.8. DISPOSITION OF UNSUCCESSFUL PROPOSALS AND EXTRA SUCCESSFUL PROPOSALS: In compliance with FAR Subpart 4.8, the Government will retain one copy of all proposals. The Government will destroy extra copies of proposals. No destruction certificate will be provided.
1.9. PROPOSAL ACCEPTABILITY: Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and eliminated from consideration for award. The offeror is hereby advised that its proposal is presumed to represent its best and final offer in response to this solicitation.
1.10. CLARIFICATIONS: Offeror may, at the discretion of the Government, be asked to provide information for clarification purposes regarding their proposals. Requests for such clarification information do not constitute discussions.
1.11. EXCEPTIONS: If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00120) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.
1.12. CLAUSES
1.12.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
1.12.2. Clauses and provisions in this document may not appear in consecutive order.
1.13 Contractor Manpower Reporting (CMR).
1.13.1. For Task Orders awarded for Army National Guard service personnel support, the Army requires contractors to report on the number of personnel employed by major unit/command on an annual basis. The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://cmra.army.mil/. The contractor shall ensure that all Task Orders are entered in the CMR system within 5 business days of award. Instructions can be found at the CMR website. The required information includes:
· Contracting office, Contracting Officer, Contracting Officer’s Technical Representative;
· Contract number, including task and delivery order number
· Beginning and ending dates covered by reporting period
· Contractor name, address, phone number, email address, identity of contractor employee entering data;
· Estimated direct labor hours (including sub-contractors);
· Estimated direct labor dollars paid this reporting period (including sub-contractors);
· Total payments (including sub-contractors);
· Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each subcontractor if different);
· Estimated data collection cost;
· Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information;
· Locations where contractor and subcontractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
· Presence of deployment or contingency contract language; and
· Number of contractor and subcontractor employees deployed in theater this reporting period (by country)
1.13.2. As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor’s systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.
SECTION 00120 PROPOSAL EVALUATIONS AND BASIS FOR AWARD
1. GENERAL INFORMATION
1.1. This solicitation is for a Multiple Award Task Order (MATOC) Indefinite Delivery Indefinite Quantity (IDIQ) . The Government intends to award contracts to a minimum of three qualified offerors deemed responsible in accordance with the Federal Acquisition Regulation (FAR) whose proposal conforms to all of the RFP's requirements and are judged to represent the Best Value to the Government. The Best Value is the most advantageous offer, price and other factors considered, and consistent with the Government’s stated importance of evaluation criteria. The award will be made based on the best overall (i.e. best value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the three (3) evaluation factors: Technical, Present/Past Performance, and Price. To arrive at a Best Value decision, the Source Selection Authority will integrate the evaluation of Past/Present Performance, Technical and Price as set out in the solicitation. In terms of the relative importance of the factors, the Technical factor is somewhat more important than Present/Past Performance and when combined, however, the non-cost factors are approximately equal to the Price Factor. The firms that represent best value to the Government will be selected for award in accordance with FAR 15.1 Source Selection Processes and Techniques.
1.2. To arrive at a Best Value decision this acquisition will utilize the FAR Part 15.101-1 tradeoff process unless the lowest priced offeror (with a price deemed reasonable and realistic) is also deemed to be the highest rated in terms of non-price evaluation criteria. If the lowest priced offeror is also the highest rated in terms of non-Price Factors, no tradeoff is necessary. Further, there is no tradeoff necessary between any offer that is lower priced and higher rated in terms of non-Price Factors with respect to any other offers that are higher priced and lower rated for the non-Price Factors. While the Government and the Source Selection Authority will strive for maximum objectivity, the evaluation process, by its nature, is subjective and therefore, professional judgment is implicit throughout the entire evaluation process.
1.3. The source selection process will be conducted in accordance with FAR Subpart 15.3, Source Selection procedures and the DoD Source Selection Procedures dated March 31, 2016. Offers will be evaluated using the criteria listed in “Evaluation Factors for Award”. Noncompliance with the RFP requirements may raise serious questions regarding an offeror’s technical ability, past performance and/or pricing and may be grounds to eliminate the proposal from consideration for contract award. Failure to include all information requested may adversely affect the evaluation. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.
1.4. The Contracting Officer will begin the evaluation process by conducting a proposal compliance review for all timely-received proposals for determination of basic proposal adequacy prior to providing the proposals to the evaluators. Failure to provide a complete proposal may result in the proposal being removed from further consideration for award. Failure to address any factor Technical, Present/Past Performance and Price or any technical subfactor shall be grounds for elimination from evaluation and consideration for award.
1.5. Offerors must ensure that no pricing information is displayed in Volume 2, Technical and Past Performance Proposal.
1.6. Although the assessment of Present/Past Performance as a specific evaluation factor is separate and distinct from the Determination of Responsibility required by FAR Part 9, Past Performance information obtained herein will be used during the Government’s responsibility determination. The Government also reserves the right to obtain additional information solely for the purpose of making a responsibility determination from all offerors after receipt of proposals. Requests for responsibility information do not constitute discussions.
1.7. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer, in his/her sole discretion, later determines them to be necessary or appropriate. Further, the Government reserves the right to create or not to create a competitive range.
1.8. ENFORCEABILITY OF PROPOSAL: The proposal must set forth full, accurate and complete information as required by this solicitation. By submission of the offer, the Offeror agrees that all items proposed (if applicable e.g., key personnel, subcontractors, etc.) will be utilized for the duration of the contract and any substitutions shall require prior Contracting Officer's approval.
1.9. The offeror shall be held responsible for the validity of all information supplied in his/her proposal, including that provided by potential subcontractors. Should subsequent investigation disclose that the facts and conditions were not as stated, the proposal may be rejected and removed from the competition.
1.10. The Government reserves the right to reject any or all proposals at any time prior to award if such action is in the Government's best interest; negotiate with any or all offerors; award a contract to other than the offeror submitting the lowest price(s) or highest technically rated; and award contracts to offerors submitting a proposal determined by the Government to be the most advantageous to the Government.
1.11. Upon conclusion of evaluations the names of the apparent successful offerors, who are being considered for future task orders as an 8(a) set-aside will be provided to the , US Small Business Administration (SBA), Chicago, IL for an eligibility determination unless adequate documentation is provided with the proposal. The SBA must approve the joint venture agreement prior to award of an 8(a) contract to the Joint Venture.
1.12. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the SAM (www.sam.gov) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration (IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed the Small Business Administration and not the Contracting Officer.
1.13. The Government reserves the right to contact the SBA at any time during the evaluation process to determine eligibility of an offeror. An offeror found ineligible by the SBA will be eliminated for award under the set-aside.
2. EVALUATION FACTORS FOR AWARD
2.1. The evaluation factors are (1) Technical, (2) Past/Present Performance and (3) Price. To arrive at a Best Value decision, the Source Selection Authority will integrate the evaluation of Past/Present Performance, Technical and Price as set out in the solicitation. In terms of the relative importance of the factors, the Technical factor is somewhat more important than Present/ Past Performance and when combined however, the non-cost factors are approximately equal to the Price Factor. The firm that represents the best value to the Government will be selected for award in accordance with FAR 15.1 Source Selection Processes and Techniques.
2.1.2. The sequential nature of this evaluation. Following the compliance check by the contracting officer, the technical proposal will be rated first. Any offeror receiving a rating “RED” or “YELLOW” rating in the Technical Factor, or any subfactor, may be eliminated from advancing further in this competition unless the Contracting Officer determines discussions are necessary and a revision of the technical proposal may result in the offeror being eligible for award. The Government will evaluate and rate an offeror's Technical proposal at the sub-factor and overall Factor level using a color rating that combines technical merit and proposal risk considering all subfactors identified in this section. The technical proposal assigned rating reflects the degree to which the proposed approach meets or does not meet the minimum performance or capability requirements through an assessment of the strengths, weaknesses, deficiencies, and risks of a proposal. The Government will then evaluate the past performance of all offerors. Price evaluation is the final stage; the Government will examine all prices to see if they are reasonable and realistic.
2.2. TECHNICAL PROPOSAL: TECHNICAL EVALUATION FACTOR RATINGS:
2.2.1. The technical rating reflects the degree to which the proposed approach meets or does not meet the minimum performance or capability requirements through an assessment of the strengths, weaknesses, deficiencies, and risks of a proposal. This is a combined rating that includes risk associated with the technical approach in a single rating. Ratings will be assigned at the subfactor level as well as an overall factor level rating. Based on evaluation results, the Government will assign a technical rating for each of the six (6) subfactors as well as the overall technical proposal. The subfactors, 1-6, will be rated in descending order of importance with Subfactor 1, Experience and Capability being the most important. An offer which fails to provide information in any of the specified areas may be deemed incomplete, and eliminated from the competition and ineligible for further consideration for award.
2.2.2. The Government intends to award without discussions. Due to the evaluation process the Technical Proposal must contain all the required information for a complete evaluation.
| 2.2.3. | The evaluation will be divided into six (6) subfactors. The subfactors are listed in descending order of importance. |
| 1) | Capability and Experience |
| 2) | Key Personnel |
| 3) | Quality Control |
| 4) | Scheduling Methodology |
| 5) | Safety |
| 6) | LEED (Applies only to Offerors requesting projects > $1M) |
2.2.3.1. Subfactor 1. Capability and Experience. The Capability and Experience Proposal is limited to 20 single pages, exclusive of table of contents, tabs, and dividers. Pages in excess of the limit will not be evaluated.
2.2.3.1.1. The Government will evaluate the quality and extent of related experience, and determine if the offeror has the experience to manage multi-disciplined construction projects, which is comparable to the work requirements of this solicitation considering the dollar level and at the locations requested in areas of consideration.
2.2.3.1.2. The proposal must demonstrate that the offeror has experience with management of multi-disciplined construction projects, as well as the capability to perform multiple projects at one time at the dollar levels and locations requested in Areas of Consideration.
2.2.3.1.3. The proposal discussion should address familiarity with construction in the locations selected, relationships with local subcontractors, familiarity with issues pertaining to work in this/these area(s) including involvement of the local workforce.
2.2.3.1.4. Self-performance of a major disciple may offset limited multi-discipline experience. An offeror who has the capability to perform both as a prime contractor for multi-discipline projects and self-perform a major element of construction, for example, Electrical, or Mechanical or Roofing may be afforded additional consideration in the evaluation.
2.2.3.1.5. The proposal must demonstrate capability and plans for meeting Government requirements and shall address as a minimum, but not limited to, the following:
Section 00800 SC-4 Ordering Procedures For Competitive Task Orders, including, but not limited to, the emergency response requirements specified in this special contract requirement (SC); Note that response to a task order notice must be made by the prime contractor (Contract holder) or employee of the prime contractor. Response cannot be made by a subcontractor representing the contractor and to propose this method will be found unacceptable; and
2.2.3.1.6. The proposal shall demonstrate understanding of and plan to be in compliance with contract Clause 52.236-6, Superintendence by the Contractor. Proposals that fail to demonstrate understanding and commitment to compliance may be found to be Marginal/Yellow or Unacceptable/Red; and
2.2.3.1.7. The proposal must demonstrate the technical and administrative capabilities that are adequate to meet contract requirements within the offeror’s chosen areas of consideration.
2.2.3.2. Subfactor 2. Key Personnel – The Government will evaluate the quality and extent of related experience for adequacy the offeror’s answers to Exhibit D questions and attachments concerning proposed personnel for the following functions. The proposal must demonstrate the offeror has adequate experienced key personnel to manage multi-disciplined construction projects, which is comparable to the work requirements of this solicitation and at the dollar level and at the locations requested in areas of consideration. Evaluation will consider the following:
2.2.3.2.1. Project management, site superintendence, quality control manager, and safety, as well as the list of major subcontractors who will be utilized throughout the life of the contract. A resume or information provided for each proposed personnel should be included. The detailed background, education, and experience provided are indicative of acceptable experience. Personnel must meet any applicable experience qualifications included in the special contract requirements or specifications. If proposed personnel are not currently on the contractor’s staff, letters of intent are provided where required.
2.2.3.2.2. The proposed subcontractors are verifiable, and information provided indicates a good professional relationship with Electrical, Mechanical, Roofing, Horizontal disciplines, Civil Site Work subcontractors. Subcontractors shall have completed Exhibit B in Volume 2, to be considered.
2.2.3.3. Subfactor 3. Quality Control
2.2.3.3.1. The proposal narrative demonstrates that the quality control staff, with lines of authority, is adequate to meet the contract’s requirements.
2.2.3.3.2. The proposed Quality Control answers should provide a detailed explanation of how quality issues are dealt with on various types of construction projects and as a minimum, meetings, inspections, submittal reviews, correction of non-compliant work and how you intend to ensure non-reoccurrence and reporting of quality problems to Government officials. (Note: A Quality Control Plan is not required with this proposal).
2.2.3.4. Subfactor 4. Scheduling Methodology
2.2.3.4.1The Government will evaluate the offeror’s answers to Exhibit D questions and attachments concerning scheduling methodology to determine if they have scheduling processes that ensure completion and control of the project from beginning to the end of the project.
2.2.3.4.1. The proposal narrative should demonstrate an understanding of the limitations of a schedule as well as an understanding that an appropriate schedule will result in successful completion of projects.
2.2.3.5. Subfactor 5. Safety Activities
2.2.3.5.1. The proposal narrative concerning proposed safety program, includes an adequate discussion of:
2.2.3.5.1.1 Training and documentation.
2.2.3.5.1.2. Proposal demonstrates familiarity with, and/ or plans to adhere to, OSHA standards, USACE EM 385-1-1 (Safety Manual) and standard State OSHA safety requirements, if applicable. (Note: The proposed Safety Plan (if provided) will not be evaluated).
2.2.3.5.1.3. There is an adequate discussion of steps taken to promote safety during construction during the past three (3) years.
2.2.3.6. Subfactor 6: Experience with building to United States Green Building Council (USGBC) LEED® standards. Indicated previous projects that achieved USGBC LEED® certification, any level of recognition. Additionally, indicate the key construction personnel and demonstrate they have experience and required qualifications in assigned roles with building to USGBC LEED® standards. If no experience indicated, the proposal stated in detail how this lack of experience is being overcome. In the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” is also required or the information will not be considered. Offerors requesting consideration for a range of projects < $1M, this subfactor does not apply.
2.3. PAST/PRESENT PERFORMANCE EVALUATION
| 2.3.1. | The Government will evaluate the offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the Plans and Specifications. The Past/Present Performance evaluation will consist of a “relevancy” rating and a “confidence” rating. Although there are subfactors listed below, the “confidence” ratings will be at the factor level only. Stated differently, the subfactors will be considered, but they will not receive individual confidence ratings. The Past/Present Performance evaluation will consider such things as an offeror's business practices, customer relationship, ability to successfully perform as proposed, and other considerations as described in Past/Present Performance Sub-factors, elements and other considerations. Past/Present Performance includes current/on-going (present) performance complete to 70% percent. Projects currently in progress for the National Guard will also be considered regardless of percentage complete. In assessing performance confidence, the evaluator may: (1) evaluate present and past performance information through the use of questionnaires completed by the offeror's references; (2) use data independently obtained from other Government or commercial sources; from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; (3) interviews with Program/Project Managers, Contracting Officers or rely upon personal business experience with the offeror; (4) the information provided in the Offeror’s Past Performance Relevancy Questionnaire; and (5) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. |
| 2.3.2. | The evaluation may take into account Past/Present Performance information regarding predecessor companies, key personnel who have relevant experience or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to this acquisition. The evaluation will also consider information provided relative to corrective actions taken to resolve problems on past or existing, contracts. |
| 2.3..3. | An offeror with no relevant Past/Present Performance may receive a rating based on the evaluation of its predecessor companies, key personnel, and/or subcontractors provided the offeror clearly states in the proposal that the information provided about predecessor companies, key personnel, and/or subcontractors is for the purposes of enhancing the offerors past performance proposal. These ratings may not have the same weight as the ratings of the proposing company. The weight that will be afforded for this type of past performance is within the sole discretion of the Government. If such information is not applicable (i.e., the offeror does not have a predecessor company, key personnel or subcontractors with relevant experience), the offeror shall be evaluated as “Unknown Confidence” (Neutral). However, the proposal of an offeror with no relevant Past/Present Performance history, while rated “Unknown Confidence” (Neutral) in Past/Present Performance, may not represent the most advantageous proposal to the Government and thus, may be an unsuccessful proposal when compared to the proposal of other offerors. |
| 3.2.4. | In accordance with FAR 15.306(a)(2), if award will be made without conducting discussions, offerors may be given the opportunity to clarify certain aspects of their proposals, e.g., the relevance of an offeror's past/present performance information and adverse past/present performance information to which the offeror has not previously had an opportunity to respond or to resolve minor clerical errors. |
| 3.3 | Current, Trends and Relevancy: Evaluators will consider the performance information for currency, relevancy as well as trends in the performance as explained further below. |
| 3.3.1. | “Current” means performance occurring within the last five (5) years for the period beginning five years prior to the solicitation release date. Within this period, performance occurring later in the period may have greater significance than work occurring earlier in the period. |
| 3.3.2. | “Trends” in performance will be considered and may include the following but not limited to: more current performance having greater weight than older performance; patterns or trends in performance issues as relates to, but not limited to, types of projects, work, personnel and similar elements; and does performance show a pattern of improvement or decline over time. |
| 3.3.3. | The Government may also consider similarity of the client type (e.g. federal government) and/or the projects sustainability requirements. The Government will consider United States Green Building Council (USGBC) LEED® certification achievements. The location at which work was performed to the location(s) at which work will be performed will also be considered. Relevancy will affect an offeror’s overall Past Performance rating. |
| 3.3.3.1. | In assessing “relevancy” of an offeror’s previous contracts the Government may evaluate an offeror’s past performance for similarity of the construction methods, size, project scope, cost magnitude and complexity of work performed to those required for the proposed effort. The Government may also consider similarity of the client type (e.g. federal government) and/or the projects sustainability requirements. ANG projects will consider United States Green Building Council (USGBC) LEED®. The location at which work was performed may also be considered. |
Relevancy weight will affect offeror’s overall Past Performance Confidence rating. The more relevant the project is weighted the greater confidence there will be in the past performance assessment as a predictor of future performance.
3.3.3.2. The following apply to weighting relevancy considering all the elements listed above;
VERY RELEVANT - Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
RELEVANT - Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
SOMEWHAT RELEVANT- Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
NOT RELEVANT - Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Offerors who otherwise have satisfactory performance on previous construction projects may be rated “Unknown Confidence” (Neutral) if those projects are not considered relevant to the proposed acquisition and relevancy cannot be obtained through the evaluation of key personnel and/or subcontractors. Projects that are not current will not be considered in the evaluation.
| 3.4. | Past Performance Sub-factors. There are six (6) sub-factors. Of these six, quality control, timely performance and management effectiveness are the most significant subfactors and are of equal value and when combined, are significantly more important than the other three subfactors. The other three subfactors are listed in descending order of importance. An overall evaluation for Past Performance will be at the factor level. |
| Quality Control | |
| Timely Performance | |
| Management Effectiveness | |
| Compliance with Safety Standards | |
| Compliance with Federal laws and regulations | |
| Compliance with utilization of small business concerns requirements (applicable to all); including small business concerns. |
| 3.5. | The elements that may be considered under each subfactor are described below: |
| 3.5.1. | Quality Control (QC): Evaluators may consider such things as: Quality of Workmanship; Adequacy of the contractor QC; Identification/correction of deficient work in a timely manner; Suggested solutions and displayed initiative to implement solutions; Adequacy of Materials; Use of specified materials; Adequacy of |
Submittals and Adequacy of "As-Builts”.
| 3.5.2. | Timely Performance: Evaluators may consider such things as: Met established progress schedule; Timely submission of updated and revised progress schedules; Resolved delays in an expeditious manner; Identification/correction of deficient work in a timely manner; Provided submittals in a timely manner; Completed all contract work prior to requesting final inspection; Timely completion of punch-list items; Left no major discrepancies; Timely submission of close out documents, i.e., “as builts”, “red lines”; Contractor provided timely and satisfactory response to warranty issues after project completion. |
| 3.5.3. | Management Effectiveness: Evaluators may consider such things as: |
3.5.3.1. General Business Practices, including, but not limited to: Contractor provided experienced managers, and supervisors with the ability needed to meet contract requirements; Hired experienced subcontractors; Paid subcontractors/suppliers in a timely manner; The contractor cooperated to resolve problems, attending meetings (as applicable) and maintained communication to assure satisfactory resolution; Overall customer satisfaction and willingness to foster a spirit of partnership with owner. This is a critical element in this subfactor.
3.5.3.2. Pricing, including, but not limited to: The contractor submitted proposals that accurately represented the work required; The contractor's supporting price/cost information for modifications were accurate, complete and reasonable (not over inflated or under estimated); Provided well-substantiated pricing data for change orders;
3.5.3.3. Site Management/Superintendent, including, but not limited to: Site manager ensured compliance to contract requirements & safety regulations; Site manager acted promptly to resolve problems and ensure work quality; Site manager had sufficient authority to make decisions or take actions during project performance; Site manager consistently present on site when work was performed.
3.5.3.4. Sustainability requirement compliance including but not limited to: Extent to which the contract’s sustainability requirements were met. Achievement of USGBC recognition at certified or silver level on completed projects is considered a benefit to the Government and may receive additional consideration. Achievement above the silver level may receive additional consideration.
| 3.5.4. | Compliance with Safety Standards: Evaluators may consider such things as: Adequacy of implementation of safety plan; Acceptable safety history. |
| 3.5.5. | Compliance with Federal laws and regulations: Evaluators may consider such things as: Compliance with labor laws and regulations with specific attention to Davis-Bacon Act including, but not limited to: Submitted payrolls in a timely manner; Payrolls were complete and correct; Compliance with Drug Free Work Place requirements; Compliance with Executive Order 13101, Greening the Government Through Waste Prevention, Recycling, and Federal Acquisition; Use of Recovered Material (Affirmative Procurement); Compliance with Environmental Regulations; Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management. |
| 3.5.6. | Compliance with Small Business Concerns Requirements: (Applicable to all offerors) Generally, offeror demonstrated adequate compliance with the requirements of FAR Clause 52.219-8, “Utilization of Small Business Concerns”. Past performance included adequate utilization of small businesses, small disadvantaged businesses, HUBZone small businesses, women-owned small businesses, and veteran owned and service disabled veteran owned small businesses, on prior Government contracts. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .