PLAN-PROFILE_HDD_6DEG-300R.pdf

PDF 4 MB Posted

Attached to
Horizontal Directional Drill Experimental Site Development for ERDC GSL Federal contract opportunity
Solicitation number
W912HZ23Q9410
Issued by
Department of the Army Corps of Engineers Engineer Research and Development Center

About this file

This file contains engineering design plans for a horizontal directional drill (HDD) project. Key details include specifications for installing 8-inch plastic pipe beneath a critical control point using HDD with a minimum bore radius of 300 feet, entry and exit angles not exceeding 6 degrees from horizontal, maintaining drilling fluid circulation, and securing entry and exit points with concrete utility boxes. The contractor must survey and video the installed pipe, collect pilot bore tracking data every 15 feet, and fuse blind flanges and seals to pressure test and seal the pipe ends.

The related federal contract opportunity is a solicitation from the Department of the Army Corps of Engineers Engineer Research and Development Center to develop an HDD experimental site at their facility in Vicksburg, Mississippi. Services required include installing underground utilities using HDD in accordance with the engineering design plans provided.

View the file

Other files for this federal contract opportunity

Other files attached to Horizontal Directional Drill Experimental Site Development for ERDC GSL, newest first.
File Type Posted
Geotech Info.pdf PDF
Question_and_Answer.pdf PDF
A02 PWS_HDD_Installation_v1.pdf PDF
Performance Work Statement_HDD_Installation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pr oj ec t L oc at io n:

U S

A rm y En gi ne er R es ea rc h an d

D ev el op m en t C en te r (

ER

D

C)

H al ls F er ry

R d.

Vi ck sb ur g, M S

In st al le d Pi pe T yp e:

AutoCAD SHX Text Sheet

AutoCAD SHX Text Scale

AutoCAD SHX Text Project

AutoCAD SHX Text Date

AutoCAD SHX Text Revision/Issue

AutoCAD SHX Text Project Name and Address

AutoCAD SHX Text Firm Name and Address

AutoCAD SHX Text No.

AutoCAD SHX Text Date

AutoCAD SHX Text General Notes

AutoCAD SHX Text fPVC DIPS DR 14 8-INCH

AutoCAD SHX Text Mulock HDD

AutoCAD SHX Text 4/12/2023

AutoCAD SHX Text (1H:2V)

AutoCAD SHX Text 1/2

AutoCAD SHX Text 1/15/2004

AutoCAD SHX Text POINTS.dwg

AutoCAD SHX Text 0+0

AutoCAD SHX Text

CRITICAL CONTROL PT.

AutoCAD SHX Text

1. Min bend radius shall Min bend radius shall be 300' or larger. (TYP ALL) 2. HDD pipe shall be HDD pipe shall be horizontal and flat when boring beneath the Critical Control Point. Bore path shall be a minimum of 10' but no more than 15' below the Critical Control Point identified herein. 3. Entry/Exit angles shall Entry/Exit angles shall be drilled at no greater than 6 degrees from horizontal unless approved in writing prior to installation. 4. Contractor shall Contractor shall maintain full drilling fluid circulation at all times to minimize the risk of inadvertent drilling fluids escaping to the ground surface. 5. Concrete utility boxes Concrete utility boxes shall be used to secure and protect the installed pipes at entry and exit locations. 6. Bland flanges shall be Bland flanges shall be fused to both ends of the installed pipe along with all seals and hardware to pressure test and prevent water intrusion post-testing. 7. Contractor shall survey Contractor shall survey and video the entire length of the installed pipe post-HDD and hydrostatic test. 8. Pilot bore tracking data Pilot bore tracking data shall at minimum be collected every 15' STA to ensure precise line/grade control.

AutoCAD SHX Text

NORTH

Sheets and Views
D-Size

File details come from the government source that posted it. Updated .