W912HZ21R00010004.pdf

PDF 424 KB Posted

Attached to
R&D Videos Federal contract opportunity
Solicitation number
W912HZ21R0001
Issued by
Department of the Army Corps of Engineers Engineer Research and Development Center

About this file

This document contains an amendment to a solicitation for a federal contract opportunity with the Department of the Army Corps of Engineers Engineer Research and Development Center. The contractor will be required to produce rapid, persuasive videos and multimedia content to provide targeted messaging to key audiences. Deliverables will include both standard and 360-degree virtual reality videos. Production may take place in biosafety level II and III facilities, requiring appropriate training and clearances. The deadline for questions has been extended to February 11, 2021, with answers provided to clarify requirements such as the need for disposable equipment in biosafety level III labs. Video samples may be submitted via Vimeo link. There is no incumbent contractor. The type of content and production locations indicate a requirement for professionally-produced explainer and promotional videos on scientific research topics.

View the file

Other files for this federal contract opportunity

Other files attached to R&D Videos, newest first.
File Type Posted
W912HZ21R00010006.pdf PDF
W912HZ21R00010005.pdf PDF
W912HZ21R00010002.pdf PDF
W912HZ21R00010003.pdf PDF
W912HZ21R00010001.pdf PDF
B08.02 W912HZ21R0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Provide questions and answ ers as outlined below . Questions w ill be accepted until 5:00 PM Central on 5 February 2021.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Feb-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HZ21R0001

X 9B. DATED (SEE ITEM 11)

21-Jan-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Feb-2021

CODE

ERDC CONTRACTING OFFICE

3909 HALLS FERRY ROAD

VICKSBURG MS 39180-6199

W912HZ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HZ21R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

Q&A

Q1. Are the below the only clearances required? Can the clearances be obtained after Award Notice, but before production begins?

1) OSHA 10 for General Industry

2) OSHA 30

3) TWIC clearance

4) What is the "government secret clearance” referred to on page 7?

A1. All required clearances are outlined in the Performance Work Statement. It would be preferred that the vendor have OSHA 10 and 30 training in advance, but it's not required. TWIC clearance is required in advance. TWIC has background check component that needs to be assured before awarding a contract. The qualifications state TWIC or government secret clearance will be required.

Q2. I am hoping to find out if there is an incumbent contractor currently performing these services, if similar services have been performed in the past, or if this is a new requirement. If this is a follow-on requirement, could you please provide the previous contract or task order number?

A2. This is a new ERDC requirement. Therefore, there is no procurement history for this action.

Q3. Whether companies from Outside USA can apply for this? (like,from India or Canada) A3. Refer to FAR clause 52.225-13.

Q4. Whether we need to come over there for meetings?

A4. Travel requirements are outlined in the Performance Work Statement.

Q5. Can we perform the tasks (related to RFP) outside USA? (like, from India or Canada) A5. Refer to FAR clause 52.225-13.

Q6. Can we submit the proposals via email?

A6. Submission requirements are outlined in the Proposal Prep Instructions.

Q7. Is USACE willing to sponsor the winning contractor to gain Secret clearance? We currently do not have this level of clearance and would like to know if that automatically rules us out of competing for this contract.

A7. See A1.

Q8. Can you please consider extending the RFP deadline date?

A8. The deadline has been extended to 11 February 2021.

Q9. Regarding the 360 VR component of this PWS, will the deliverables be required in 360/VR, standard video, or both?

A9. Both 360/VR and standard video deliverables are needed.

Q10. In regard to Task 1 and Optional Tasks 2 & 3 where it states “All videographers having high-level security training for operations in BSL II and BSL III greenhouse and phytotron facilities.” How would you like us to demonstrate BSL ii and BSL iii training? Is there training specific to each lab and therefore provided on-site prior to entering the facility?

A10. Please include any biosafety training documentation for consideration. Security clearance documentation would also be helpful. Finally, reference/description of any previous work in BSL facility would be helpful information.

Q11. Regarding if the production crew will be entering areas requiring decontamination: What is the decontamination procedure for personnel and equipment? Will protective gear be allowed to cover sensitive electronic equipment and if so, what are the required mil-thickness specs for that protective gear?

A11. Personnel will have to change into full body covering suits before entering the lab and remove the suits before exiting. Any equipment entering the BSL III lab will not be allowed to exit the lab. Bluetooth or wifi file transfer will be required to move video data out of the BSL facility. All equipment will be destroyed as part of the decontamination process.

Q12. Can you please clarify from page 7 “the contractor must use private video hosting platforms, hosting 360 degree views and virtual content that can allow the R&D teams to capture demographics on who is watching their video content, and provide analytics about who is watching and what parts of the video are being viewed.” Are you requesting the creation of 360 video or are you requesting a hosting service that offers analytics?

A12. Secure hosting for both standard video and VR content is required.

Q13. Can you please clarify: Any equipment entering the BSL III lab will not be allowed to exit the lab. Bluetooth or wifi file transfer will be required to move video data out of the BSL facility. All equipment will be destroyed as part of the decontamination process. Are you saying, when filming in a BSL III lab we need to destroy our equipment after filming and transfering footage via bluetooth or wifi?

A13. Any video production equipment that enters the BSL facility will not be allowed out. That equipment must be treated as disposable.

Q14. If the TWIC clearance is in process as of the date of quotation submission, would this be regarded during the review process? And furthermore, considered for contract award?

A14. No. Depending on background check, TWIC clearance is not guaranteed.

Q15. Approximately how much V/R will be involved in the video production? Would you all want the V/R to be integrated within the docu-series videos, or as its own singular production as one of the shorter 5-minute promotional videos?

A15. V/R will be pursued as needed based on communication needs. It can be a stand-alone item.

Q16. Would you please elaborate more on the answer of all equipment being destroyed once the bio lab III has been exited? Being as though cameras will likely be positioned on a mono, tripod, or gimbal, we would need to know exactly how much equipment will need to be disposed of after production.

A16. Tripod and camera should be sufficient.

Q17. How many locations will the bio lab III video production occur? Currently, there are 4 locations that are listed as potential production locations, would we be entering a bio-lab III at each location? or less?

A17. Consider that each location will have a BSL III production requirement.

Q18. Aside from personnel OSHA training and TWIC Card obtainment, will there be any governmental licensing/permits required to film at any of the research sites?

A18. No.

Q19. How do you prefer offerors submit video samples of work? Do we provide a download link to video files posted online to Google Drive, Dropbox or Vimeo?

A19. Vimeo is preferred.

Q20. In Mod 003 the answer to question 11 reads, “Any equipment entering the BSL III lab will not be allowed to exit the lab. Bluetooth or WIFI file transfer will be required to move video data out of the BSL facility. All equipment will be destroyed as part of the decontamination process.” Just to clarify, the actual cameras used to capture HD, 4k or 360 video would need to be brought into the lab, and while transmission of footage to a nearby recorder OUTSIDE of the lab is possible, are you saying that the cameras would not be allowed to be removed from the lab and would need to be destroyed after filming? Should this be included in our budgets? This would add a great deal to the production cost, with an acceptable-quality camera costing several hundred to several thousand dollars, depending upon the specs.

A20. Equipment consumed by the video production process should be included in the production budget.

Q21. Until what date will you be accepting additional questions on this solicitation?

A21. Questions will be accepted until 5:00 PM Central 5 February 2021.

Q22. If we need to have clearance to win the bid, how long does it take to get a TWIC clearance?

A22. You’ll need to contact administrators of TWIC clearance checks for that information.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .