This abstract of offers summarizes bids received in response to Solicitation Number W912HY21B0009 for pipeline dredging of the Houston Ship Channel between Bayport and Morgan's Cut with Bayport and Barbours Flare in Harris County, Texas. Five contractors submitted bids for the base work and four option periods to be performed between April 2021 and May 2028. The apparent low bidder was Inland Dredging Company at 30.31% below the government's estimate of $31,874,882 for the total project. Bids ranged from Inland Dredging's low of $24,236,800 to Orion Marine Construction's high of $34,700,000. The work includes pipeline dredging of specified sections of the ship channel, dredging of dock areas at Bayport and Barbours, debris removal, and management and protection measures over the duration of the contract.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT
PRICE TOTAL
1 JB 2,306,800.00 $2,306,800.00
1 JB $762,300.00 $762,300.00
1,022,300 CY 7.61$ $7,779,703.00
1,833,300 CY $6.37 $11,678,121.00
1 JB $76,000.00 $76,000.00
1 JB 99,000.00 $99,000.00
$22,701,924.00
182,700 CY $8.69 $1,587,663.00
30 TON $2,560.00 $76,800.00
100 HOUR $2,500.00 $250,000.00
$1,914,463.00
169,600 CY $10.23 $1,735,008.00
$1,735,008.00
153,700 CY $13.91 $2,137,967.00
30 TON $2,560.00 $76,800.00
100 HOUR $2,500.00 $250,000.00
$2,464,767.00
423,000 CY $6.64 $2,808,720.00
1 JOB $250,000.00 $250,000.00
$3,058,720.00
$31,874,882.00
0008 Debris Removal
ABSTRACT OF OFFERS Page 1 of 6
Solicitation No.: W912HY21B0009 Date Issued: 16 Apr 2021 Date Opened: 27 May 2021 Issuing Office: USAED-Galveston Project Title: FY 21 Pipeline Dredging Deep Draft Houston Ship Channel Bayport to Morgan’s with Bayport and Barbours Flare Harris, County, Texas Unrestricted Procurement
TOTAL OPTION NO. 1
0001 Mobilization and Demobilization
Pipeline Management
Dredging, HSC, Section 1 through 7
Number of Amendments Issued: 0001, 0002, 0003 and 0004
Government Estimate (Without Profit)
OPTION NO. 1
TOTAL SCHEDULE NO. 1
OPTION NO. 3
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1
THRU 4
Dredging PHA Docks at Bayport Section 15
0010 Dredging Barbours Flare, Section 14
Pipeline Management
OPTION NO. 4
* The apparent low bidder is, *INLAND DREDGING COMPANY, L.L.C. at 30.31 % below the Government's Estimate.
TOTAL OPTION NO. 3
TRACI D. ROBICHEAUX
CONTRACTING OFFICER
DESCRIPTION QUANTITY
SCHEDULE NO. 1ITEM
0004 Dredging Bayport Channel, Sections 8 through 13
Sound Protection Measures
Site Management
NO.
TOTAL OPTION NO. 2
Standby for Docks
Standby for Docks
Dredging PHA Docks at Barbours Sections 16 and 17
Debris Removal
Re-Dredging Bayport Flare, Section 8
TOTAL OPTION NO. 4
OPTION NO. 2
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.
1 JB 4,300,000.00 $4,300,000.00
1 JB $1,600,000.00 $1,600,000.00
1,022,300 CY $8.48 $8,669,104.00
1,833,300 CY $4.22 $7,736,526.00
1 JB $15,000.00 $15,000.00
1 JB 1,250,000.00 $1,250,000.00
$23,570,630.00
182,700 CY $5.75 $1,050,525.00
30 TON $15,000.00 $450,000.00
100 HOUR $3,550.00 $355,000.00
$1,855,525.00
169,600 CY $4.51 $764,896.00
$764,896.00
153,700 CY $13.16 $2,022,692.00
30 TON $15,000.00 $450,000.00
100 HOUR $3,550.00 $355,000.00
$2,827,692.00
423,000 CY $6.94 $2,935,620.00
1 JOB $950,000.00 $950,000.00
$3,885,620.00
$32,904,363.00
TOTAL OPTION NO. 2
Dredging Barbours Flare, Section 14
TOTAL OPTION NO. 1
OPTION NO. 3
0011 Dredging PHA Docks at Barbours Sections 16 and 17
OPTION NO. 4
Re-Dredging Bayport Flare, Section 8
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1
THRU 4
NO.
0009 Standby for Docks
Mobilization and Demobilization
DESCRIPTION
ITEM SCHEDULE NO. 1
Pipeline Management
TOTAL OPTION NO. 3
OPTION NO. 1
Dredging, HSC, Section 1 through 7
Debris Removal
QUANTITY
Project Title: FY 21 Pipeline Dredging Deep Draft Houston Ship Channel Bayport to Morgan’s with Bayport and Barbours Flare Harris, County, Texas Unrestricted Issuing Office: USAED-Galveston
0013 Standby for Docks
Dredging PHA Docks at Bayport Section 15
Debris Removal
Offeror 1: Crosby Dredging, LLC, 17771 Highway 3235 Galliano, Louisiana 70354-3578, United States Business Size: Large
Solicitation No.: W912HY21B0009 Date Issued: 16 Apr 2021 Date Opened: 27 May 2021
Dredging Bayport Channel, Sections 8 through 13
Sound Protection Measures
TOTAL OPTION NO. 4
OPTION NO. 2
Pipeline Management
TOTAL SCHEDULE NO. 1
0006 Site Management
ABSTRACT OF OFFERS (CONT'D) Page 2 of 6
1 JB 2,150,000.00 $2,150,000.00
1 JB $1,835,000.00 $1,835,000.00
1,022,300 CY $4.50 $4,600,350.00
1,833,300 CY $4.00 $7,333,200.00
1 JB $120,000.00 $120,000.00
1 JB 64,000.00 $64,000.00
$16,102,550.00
182,700 CY $4.95 $904,365.00
30 TON $1,000.00 $30,000.00
100 HOUR $2,150.00 $215,000.00
$1,149,365.00
169,600 CY $5.00 $848,000.00
$848,000.00
153,700 CY $10.90 $1,675,330.00
30 TON $1,000.00 $30,000.00
100 HOUR $2,150.00 $215,000.00
$1,920,330.00
423,000 CY $4.75 $2,009,250.00
1 JOB $185,000.00 $185,000.00
$2,194,250.00
$22,214,495.00
TOTAL OPTION NO. 2
DESCRIPTION
OPTION NO. 3
Dredging Barbours Flare, Section 14
OPTION NO. 2
TOTAL OPTION NO. 1
0002 Pipeline Management
0003 Dredging, HSC, Section 1 through 7
0004 Dredging Bayport Channel, Sections 8 through 13
0005 Sound Protection Measures
0006 Site Management
0001 Mobilization and Demobilization
SCHEDULE NO. 1
Business Size: Large
ITEM
NO. QUANTITY
ABSTRACT OF OFFERS (CONT'D) Page 3 of 6
Solicitation No.: W912HY21B0009 Date Issued: 16 Apr 2021 Date Opened: 27 May 2021
Issuing Office: USAED-Galveston Project Title: FY 21 Pipeline Dredging Deep Draft Houston Ship Channel Bayport to Morgan’s with Bayport and Barbours Flare Harris, County, Texas Unrestricted Procurement
Offeror 2: *INLAND DREDGING COMPANY, L.L.C. 103 N King AVE Dyersburg, Tennessee 38024-4609, United States
TOTAL SCHEDULE NO. 1
0007 Dredging PHA Docks at Bayport Section 15
Standby for Docks
TOTAL OPTION NO. 4
0012 Debris Removal
0013 Standby for Docks
TOTAL OPTION NO. 3
0008 Debris Removal
OPTION NO. 1
OPTION NO. 4
0011 Dredging PHA Docks at Barbours Sections 16 and 17
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1
THRU 4
0014 Re-Dredging Bayport Flare, Section 8
0015 Pipeline Management
1 JB 1,150,000.00 $1,150,000.00
1 JB $750,000.00 $750,000.00
1,022,300 CY $7.00 $7,156,100.00
1,833,300 CY $4.50 $8,249,850.00
1 JB $175,000.00 $175,000.00
1 JB 45,000.00 $45,000.00
$17,525,950.00
182,700 CY $6.50 $1,187,550.00
30 TON $1,600.00 $48,000.00
100 HOUR $2,000.00 $200,000.00
$1,435,550.00
169,600 CY $7.00 $1,187,200.00
$1,187,200.00
153,700 CY $13.00 $1,998,100.00
30 TON $1,600.00 $48,000.00
100 HOUR $2,000.00 $200,000.00
$2,246,100.00
423,000 CY $4.00 $1,692,000.00
1 JOB $150,000.00 $150,000.00
$1,842,000.00
$24,236,800.00
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1
THRU 4
0014 Re-Dredging Bayport Flare, Section 8
0015 Pipeline Management
TOTAL OPTION NO. 4
0012 Debris Removal
0013 Standby for Docks
TOTAL OPTION NO. 3
OPTION NO. 4
0010 Dredging Barbours Flare, Section 14
TOTAL OPTION NO. 2
OPTION NO. 3
0011 Dredging PHA Docks at Barbours Sections 16 and 17
0008 Debris Removal
0009 Standby for Docks
TOTAL OPTION NO. 1
OPTION NO. 2
Site Management
TOTAL SCHEDULE NO. 1
OPTION NO. 1
0007 Dredging PHA Docks at Bayport Section 15
Mobilization and Demobilization
0002 Pipeline Management
0003 Dredging, HSC, Section 1 through 7
0004 Dredging Bayport Channel, Sections 8 through 13
ABSTRACT OF OFFERS (CONT'D) Page 4 of 6
Solicitation No.: W912HY21B0009 Date Issued: 16 Apr 2021 Date Opened: 27 May 2021
Issuing Office: USAED-Galveston Project Title: FY 21 Pipeline Dredging Deep Draft Houston Ship Channel Bayport to Morgan’s with Bayport and Barbours Flare Harris, County, Texas Unrestricted Procurement
Offeror 3: ORION MARINE CONSTRUCTION, INC. 1715 N West Shore BLVD STE 875 Tampa, Florida 33607-3919, United States Business Size: Large
ITEM SCHEDULE NO. 1
NO. DESCRIPTION QUANTITY
0005 Sound Protection Measures
1 JB 5,536,600.00 $5,536,600.00
1 JB $500,000.00 $500,000.00
1,022,300 CY $8.30 $8,485,090.00
1,833,300 CY $5.30 $9,716,490.00
1 JB $30,000.00 $30,000.00
1 JB 15,165.00 $15,165.00
$24,283,345.00
182,700 CY $7.85 $1,434,195.00
30 TON $3,600.00 $108,000.00
100 HOUR $6,675.00 $667,500.00
$2,209,695.00
169,600 CY $7.80 $1,322,880.00
$1,322,880.00
153,700 CY $16.90 $2,597,530.00
30 TON $3,600.00 $108,000.00
100 HOUR $6,675.00 $667,500.00
$3,373,030.00
423,000 CY $8.20 $3,468,600.00
1 JOB $42,450.00 $42,450.00
$3,511,050.00
$34,700,000.00
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1
THRU 4
0014 Re-Dredging Bayport Flare, Section 8
0015 Pipeline Management
TOTAL OPTION NO. 4
0012 Debris Removal
0013 Standby for Docks
TOTAL OPTION NO. 3
OPTION NO. 4
0010 Dredging Barbours Flare, Section 14
TOTAL OPTION NO. 2
OPTION NO. 3
0011 Dredging PHA Docks at Barbours Sections 16 and 17
0008 Debris Removal
0009 Standby for Docks
TOTAL OPTION NO. 1
OPTION NO. 2
0006 Site Management
TOTAL SCHEDULE NO. 1
OPTION NO. 1
0007 Dredging PHA Docks at Bayport Section 15
0001 Mobilization and Demobilization
0002 Pipeline Management
0003 Dredging, HSC, Section 1 through 7
0004 Dredging Bayport Channel, Sections 8 through 13
0005 Sound Protection Measures
Issuing Office: USAED-Galveston Project Title: FY 21 Pipeline Dredging Deep Draft Houston Ship Channel Bayport to Morgan’s with Bayport and Barbours Flare Harris, County, Texas Unrestricted Procurement
Offeror 4: GREAT LAKES DREDGE & DOCK COMPANY, LLC 9811 Katy Fwy STE 1200 Houston, Texas 77024-1273, United States Business Size: Large
ITEM SCHEDULE NO. 1
NO. DESCRIPTION QUANTITY
ABSTRACT OF OFFERS (CONT'D) Page 5 of 6
Solicitation No.: W912HY21B0009 Date Issued: 16 Apr 2021 Date Opened: 27 May 2021
1 JB 4,250,000.00 $4,250,000.00
1 JB $1,750,000.00 $1,750,000.00
1,022,300 CY $8.00 $8,178,400.00
1,833,300 CY $6.75 $12,374,775.00
1 JB $150,000.00 $150,000.00
1 JB 150,000.00 $150,000.00
$26,853,175.00
182,700 CY $9.00 $1,644,300.00
30 TON $2,500.00 $75,000.00
100 HOUR $5,000.00 $500,000.00
$2,219,300.00
169,600 CY $6.00 $1,017,600.00
$1,017,600.00
153,700 CY $12.00 $1,844,400.00
30 TON $2,500.00 $75,000.00
100 HOUR $5,000.00 $500,000.00
$2,419,400.00
423,000 CY $5.00 $2,115,000.00
1 JOB $10,000.00 $10,000.00
$2,125,000.00
$34,634,475.00TOTAL SCHEDULE NO. 1 & OPTION NOS. 1
ABSTRACT OF OFFERS Page 6 of 6
Project Title: FY 21 Pipeline Dredging Deep Draft Houston Ship Channel Bayport to Morgan’s with Bayport and Barbours Flare Harris, County, Texas Unrestricted
Offeror 5: Weeks Marine, Inc. 304 Gaille Drive Covington, LA 70433 Business Size: Large
QUANTITY
0001 Mobilization and Demobilization
0006 Site Management
OPTION NO. 4
Re-Dredging Bayport Flare, Section 8 Pipeline Management
TOTAL OPTION NO. 4
OPTION NO. 3
0011 Dredging PHA Docks at Barbours Sections 16 and 17 0012 Debris Removal 0013 Standby for Docks
TOTAL OPTION NO. 3
OPTION NO. 2
0010 Dredging Barbours Flare, Section 14
TOTAL OPTION NO. 2
OPTION NO. 1
0007 Dredging PHA Docks at Bayport Section 15
0009 Standby for Docks
TOTAL OPTION NO. 1
0008 Debris Removal
0003 Dredging, HSC, Section 1 through 7 0004 Dredging Bayport Channel, Sections 8 through 13
TOTAL SCHEDULE NO. 1
0005 Sound Protection Measures
DESCRIPTION
Pipeline Management
ITEM SCHEDULE NO. 1
NO.
Solicitation No.: W912HY21B0009 Date Issued: 16 Apr 2021 Date Opened: 27 May 2021 Issuing Office: USAED-Galveston
| 2021-05-28T08:39:17-0500 | |
| ROBICHEAUX.TRACI.D.1260353990 |