Preliminary-Abstract-W912HY21B0001-Corpus Christi Ship Channel.pdf

PDF 321 KB Posted

Attached to
Corpus Christi Ship Channel, Texas, Channel Improvement Project, Upper Bay Reach in Nueces County, Texas, Pipeline Dredging.
Solicitation number
W912HY21B0001
Issued by

About this file

This abstract of offers summarizes bids received in response to Solicitation Number W912HY21B0001 for pipeline dredging of the Corpus Christi Ship Channel in Nueces County, Texas. The solicitation was issued by the U.S. Army Corps of Engineers Galveston District and bids were due on July 20, 2021. Three offers were received for the base work and 11 options to dredge a total of over 23 million cubic yards of material. Offerors provided unit pricing for dredging and associated tasks such as mobilization and demobilization, as-built drawings, and site work. Pricing ranged from $151.9 million for the apparent low offeror to $370.2 million for another offeror. The government estimate without profit was $206 million. The apparent low bidder's price was 26.26% below the independent government estimate.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT

PRICE TOTAL

1 JOB SUM $4,700,000.00

1 JOB SUM $198,640.00

1 JOB SUM $5,270,000.00

1,592,510 CY $6.50 $10,351,315.00

11,487,640 CY $9.71 $111,544,984.40

679,360 CY $18.40 $12,500,224.00

382,810 CY $19.51 $7,468,623.10

4 EA $9,201.00 $36,804.00

$152,070,590.50

1 JOB SUM $72,000.00

257,690 CY $5.56 $1,432,756.40

$1,504,756.40

1 JOB SUM $49,000.00

100,640 CY $8.05 $810,152.00

$859,152.00

1 JOB SUM $587,000.00

45,990 CY $6.39 $293,876.10

1,958,770 CY $7.49 $14,671,187.30

50 HR $2,250.00 $112,500.00

$15,664,563.40

1 JOB SUM $35,000.00

59,870 CY $9.70 $580,739.00

$615,739.00

1 JOB SUM $33,000.00

83,560 CY $6.57 $548,989.20

$581,989.20

1 JOB SUM $39,000.00

62,920 CY $6.10 $383,812.00

$422,812.00

1 JOB SUM $271,000.00

73,130 CY $5.92 $432,929.60

1,085,850 CY $6.22 $6,753,987.00

50 HR $2,250.00 $112,500.00

$7,570,416.60

1 JOB SUM $359,246.00

1 JOB SUM $62,914.00

1 JOB SUM $108,931.00

1 JOB SUM $108,931.00

1 JOB SUM $156,303.00

1 JOB SUM $142,597.00

1 JOB SUM $94,320.00

1 JOB SUM $194,538.00

1 JOB SUM $134,056.00

1 JOB SUM $117,863.00

1 JOB SUM $64,071.00

1 JOB SUM $231,368.00

1 JOB SUM $211,891.00

1 JOB SUM $27,144.00

1 JOB SUM $27,144.00

534,878 CY $0.00 $6,766,206.70

408,765 CY $0.00 $5,215,841.40

$14,023,365.10

1 JOB SUM $153,300.00

1 JOB SUM $81,249.00

365,749 CY $11.88 $4,345,098.12

$4,579,647.12

1 JOB SUM $136,307.00

1 JOB SUM $81,249.00

138,476 CY $11.88 $1,645,094.88

$1,862,650.88

1 JOB SUM $134,814.00

1 JOB SUM $108,931.00

1 JOB SUM $143,364.00

1 JOB SUM $89,371.00

1 JOB SUM $58,268.00

1 JOB SUM $146,317.00

1 JOB SUM $27,144.00

432,363 CY $12.76 $5,516,951.88

$6,225,160.88

$205,980,843.08

TOTAL OPTION NO. 11

* The apparent low bidder, Great Lakes Dredge & Dock Company is -26.26% below the Government's Estimate.

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

TOTAL SCHEDULE NO. 1 AND OPTIONS 1 - 11

0053 PA 3B Turfing

0054 Stripping at PA 3B

0055 PA 3B Site Management

0056 PA 3B Final Surveys

0057 PA 3B Dike Raise

TOTAL OPTION NO. 10

OPTION NO. 11

0050 Mobilization and Demobilization PA 3B

0051 Final As-Built Drawings PA 3B

0052 PA 3B Existing Drop-Outlet Structure Modification

TOTAL OPTION NO. 9

OPTION NO. 10

0047 PA 1-2 Additional Turfing

0048 PA 1-2 Additional Stripping

0049 PA 1-2 1 Foot Additional Dike Raise (O&M)

OPTION NO. 9

0044 PA 1-2 Additional Turfing

0045 PA 1-2 Additional Stripping

0046 PA 1-2 3 Foot Additional Dike Raise (PCCA)

TOTAL OPTION NO. 8

0041 PA 3A Final Surveys

0032 PA 3A Existing Drop-Outlet Structure Modification

0033 PA 1-2 Training Dike Weirs

0034 PA 1-2 Turfing

0035 PA 3A Turfing

0036 Stripping at PA 1-2

0028 Mobilization and Demobilization PA 3A

0029 Final As-Built Drawings PA 1-2

0030 Final As-Built Drawings PA 3A

0031 PA 1-2 Existing Drop-Outlet Structure Modification

0040 PA 1-2 Final Surveys

0042 PA 1-2 Dike Raise

TOTAL OPTION NO. 6

OPTION NO. 7

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Sections No. 28 and 29)

0026 Dredge Standby (Section 28 and 29)

TOTAL OPTION NO. 7

0023 Dredging Pipeline Management

Dredging - Maintenance, Current Authorized -47 Ft Channel Template (Sections No. 28 and 29)

0037 Stripping at PA 3A

OPTION NO. 8

0039 PA 3A Site Management

0027 Mobilization and Demobilization PA 1-2

0013 Dredging Pipeline Management

Dredging - Maintenance, Current Autorized -47 Ft Channel Template (Sections No. 23 thru 27, Section No.

26A, Section No. 26B, and Section No. 27A)

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Sections No. 23 thru 27)

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Setion No. 26D)

TOTAL OPTION NO. 5

OPTION NO. 6

0021 Pipeline Management

Dredging - New Work, New Work Authorized -54Ft Channel Template (Section No. 27B)

0043 PA 3A Dike Raise

0038 PA 1-2 Site Management

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Section No. 22B)

OPTION NO. 2

0001 Mobilization and Demobilization - Dredging Equipment

0002 Pre-Dredging Hazard Survey

0003 Dredging Pipeline Management

Dredging-Maintenance, Current Authorized -47Ft Channel Template (Sections Nos. 1 thru 22, Section No.

4A, and Section No. 22A)

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Sections No. 1 thru 22)

Dredging - Barge Lanes - Green Side, New Work (Section No. 30 thru 38)

Dredging - Barge Lanes - Red Side, New Work (Section No. 39 thru 49)

0008 Pipeline Profile

0009 Dredging Pipeline Management

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Section No. 4B)

OPTION NO. 3

OPTION NO. 4

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Section No. 26C)

TOTAL OPTION NO. 4

OPTION NO. 5

0019 Dredging Pipeline Management

SCHEDULE NO. 1ITEM

Dredging Pipeline Management

TOTAL OPTION NO. 2

Dredging Pipeline Management

TOTAL OPTION NO. 3

Dredging Standby (Section 23 thru 27)

ABSTRACT OF OFFERS Page 1 of 4

Solicitation No.: W912HY21B0001 Date Issued: 16 June 2021 Date Opened: 30 July 2021

Issuing Office: USAED-Galveston Project Title: Unrestricted Procurement - Corpus Christi Ship Channel, Texas, Upper Bay Reach in Nueces County, Texas, Channel Improvement Project.

TOTAL OPTION NO. 1

Number of Amendments Issued: 0001 - 0005

Government Estimate (Without Profit)

NO. DESCRIPTION QUANTITY

OPTION NO. 1

TOTAL SCHEDULE NO. 1

CURTIS COLE, JR.

CONTRACTING OFFICER

1 JOB SUM $10,500,000.00

1 JOB SUM $100,000.00

1 JOB SUM $4,500,000.00

1,592,510 CY $4.70 $7,484,797.00

11,487,640 CY $5.50 $63,182,020.00

679,360 CY $5.65 $3,838,384.00

382,810 CY $13.80 $5,282,778.00

4 EA $7,500.00 $30,000.00

$94,917,979.00

1 JOB SUM $75,000.00

257,690 CY $4.80 $1,236,912.00

$1,311,912.00

1 JOB SUM $50,000.00

100,640 CY $12.35 $1,242,904.00

$1,292,904.00

1 JOB SUM $3,100,000.00

45,990 CY $8.50 $390,915.00

1,958,770 CY $9.90 $19,391,823.00

50 HR $6,000.00 $300,000.00

$23,182,738.00

1 JOB SUM $10,000.00

59,870 CY $9.00 $538,830.00

$548,830.00

1 JOB SUM $10,000.00

83,560 CY $10.50 $877,380.00

$887,380.00

1 JOB SUM $10,000.00

62,920 CY $12.90 $811,668.00

$821,668.00

1 JOB SUM $550,000.00

73,130 CY $7.70 $563,101.00

1,085,850 CY $10.00 $10,858,500.00

50 HR $6,000.00 $300,000.00

$12,271,601.00

1 JOB SUM $180,000.00

1 JOB SUM $20,000.00

1 JOB SUM $10,000.00

1 JOB SUM $10,000.00

1 JOB SUM $30,000.00

1 JOB SUM $30,000.00

1 JOB SUM $130,000.00

1 JOB SUM $35,000.00

1 JOB SUM $170,000.00

1 JOB SUM $130,000.00

1 JOB SUM $100,000.00

1 JOB SUM $25,000.00

1 JOB SUM $80,000.00

1 JOB SUM $40,000.00

1 JOB SUM $40,000.00

534,878 CY $8.00 $4,279,024.00

408,765 CY $8.00 $3,270,120.00

$8,579,144.00

1 JOB SUM $25,000.00

1 JOB SUM $40,000.00

365,749 CY $8.00 $2,925,992.00

$2,990,992.00

1 JOB SUM $35,000.00

1 JOB SUM $90,000.00

138,476 CY $8.00 $1,107,808.00

$1,232,808.00

1 JOB SUM $13,000.00

1 JOB SUM $10,000.00

1 JOB SUM $30,000.00

1 JOB SUM $150,000.00

1 JOB SUM $105,000.00

1 JOB SUM $55,000.00

1 JOB SUM $40,000.00

432,363 CY $8.00 $3,458,904.00

$3,861,904.00

$151,899,860.00

TOTAL OPTION NO. 11

0027 Mobilization and Demobilization PA 1-2

0028 Mobilization and Demobilization PA 3A

0029 Final As-Built Drawings PA 1-2

OPTION NO. 11

0031 PA 1-2 Existing Drop-Outlet Structure Modification

0032 PA 3A Existing Drop-Outlet Structure Modification

PA 1-2 Additional Turfing

0045 PA 1-2 Additional Stripping

0046 PA 1-2 3 Foot Additional Dike Raise (PCCA)

0033 PA 1-2 Training Dike Weirs

PA 3A Site Management0039

PA 1-2 Site Management

0023 Dredging Pipeline Management

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Sections No. 28 and 29)

0026 Dredge Standby (Section 28 and 29)

TOTAL OPTION NO. 7

OPTION NO. 8

ABSTRACT OF OFFERS (CONT'D) Page 2 of 4

Solicitation No.: W912HY21B0001 Date Issued: 16 June 2021 Date Opened: 30 July 2021 Project Title: Unrestricted Procurement - Corpus Christi Ship Channel, Texas, Upper Bay Reach in Nueces County, Texas, Channel Improvement Project.

TOTAL OPTION NO. 10

OPTION NO. 10

0052 PA 3B Existing Drop-Outlet Structure Modification

0053 PA 3B Turfing

0054 Stripping at PA 3B

0055 PA 3B Site Management

0056 PA 3B Final Surveys

0057 PA 3B Dike Raise

TOTAL SCHEDULE NO. 1 AND OPTIONS 1 - 11

Dredging - Barge Lanes - Green Side, New Work (Section No. 30 thru 38)

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Section No. 4B)

Mobilization and Demobilization - Dredging Equipment

0008 Pipeline Profile

Dredging - Barge Lanes - Red Side, New Work (Section No. 39 thru 49)

TOTAL SCHEDULE NO. 1

OPTION NO. 3

TOTAL OPTION NO. 1

TOTAL OPTION NO. 2

OPTION NO. 2

Dredging Pipeline Management

NO.

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Section No. 22B)

Dredging Pipeline Management

TOTAL OPTION NO. 3

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Setion No. 26D)

OPTION NO. 4

0017 Dredging Pipeline Management

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Section No. 26C)

OPTION NO. 5

0019 Dredging Pipeline Management

TOTAL OPTION NO. 5

Dredging-Maintenance, Current Authorized -47Ft Channel Template (Sections Nos. 1 thru 22, Section No.

4A, and Section No. 22A)

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Sections No. 1 thru 22)

TOTAL OPTION NO. 4

ITEM SCHEDULE NO. 1

Pre-Dredging Hazard Survey

Dredging Pipeline Management

OPTION NO. 1

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Sections No. 23 thru 27)

Dredging Pipeline Management

Dredging - Maintenance, Current Autorized -47 Ft Channel Template (Sections No. 23 thru 27, Section No.

26A, Section No. 26B, and Section No. 27A)

0016 Dredging Standby (Section 23 thru 27)

QUANTITYDESCRIPTION

*Offeror: #1 - Great Lakes Dredge & Dock Company, llC, 9811 Katy Freeway, Suite 1200, Houston, TX 77024 **APP LOW BIDDER** Business Size: Large Business

TOTAL OPTION NO. 6

Dredging - Maintenance, Current Authorized -47 Ft Channel Template (Sections No. 28 and 29)

OPTION NO. 6

0021 Pipeline Management

OPTION NO. 7

Dredging - New Work, New Work Authorized -54Ft Channel Template (Section No. 27B)0022

0051 Final As-Built Drawings PA 3B

Mobilization and Demobilization PA 3B

TOTAL OPTION NO. 9

PA 1-2 Dike Raise

0043 PA 3A Dike Raise

TOTAL OPTION NO. 8

OPTION NO. 9

0049 PA 1-2 1 Foot Additional Dike Raise (O&M)

0047 PA 1-2 Additional Turfing

0048 PA 1-2 Additional Stripping

0030 Final As-Built Drawings PA 3A

0041 PA 3A Final Surveys

0040 PA 1-2 Final Surveys

0034 PA 1-2 Turfing

0035 PA 3A Turfing

Stripping at PA 3A

0036 Stripping at PA 1-2

1 JOB SUM $25,000,000.00

1 JOB SUM $250,000.00

1 JOB SUM $2,500,000.00

1,592,510 CY $5.00 $7,962,550.00

11,487,640 CY $19.00 $218,265,160.00

679,360 CY $10.00 $6,793,600.00

382,810 CY $19.00 $7,273,390.00

4 EA $50,000.00 $200,000.00

$268,244,700.00

1 JOB SUM $250,000.00

257,690 CY $10.00 $2,576,900.00

$2,826,900.00

1 JOB SUM $100,000.00

100,640 CY $20.00 $2,012,800.00

$2,112,800.00

1 JOB SUM $1,000,000.00

45,990 CY $5.00 $229,950.00

1,958,770 CY $22.50 $44,072,325.00

50 HR $15,000.00 $750,000.00

$46,052,275.00

1 JOB SUM $50,000.00

59,870 CY $20.00 $1,197,400.00

$1,247,400.00

1 JOB SUM $50,000.00

83,560 CY $15.00 $1,253,400.00

$1,303,400.00

1 JOB SUM $50,000.00

62,920 CY $17.50 $1,101,100.00

$1,151,100.00

1 JOB SUM $250,000.00

73,130 CY $5.00 $365,650.00

1,085,850 CY $20.00 $21,717,000.00

50 HR $15,000.00 $750,000.00

$23,082,650.00

1 JOB SUM $1,000,000.00

1 JOB SUM $50,000.00

1 JOB SUM $10,000.00

1 JOB SUM $10,000.00

1 JOB SUM $200,000.00

1 JOB SUM $175,000.00

1 JOB SUM $275,000.00

1 JOB SUM $500,000.00

1 JOB SUM $375,000.00

1 JOB SUM $200,000.00

1 JOB SUM $175,000.00

1 JOB SUM $650,000.00

1 JOB SUM $375,000.00

1 JOB SUM $50,000.00

1 JOB SUM $50,000.00

534,878 CY $10.00 $5,348,780.00

408,765 CY $10.00 $4,087,650.00

$13,531,430.00

1 JOB SUM $25,000.00

1 JOB SUM $50,000.00

365,749 CY $10.00 $3,657,490.00

$3,732,490.00

1 JOB SUM $25,000.00

1 JOB SUM $25,000.00

138,476 CY $10.00 $1,384,760.00

$1,434,760.00

1 JOB SUM $25,000.00

1 JOB SUM $25,000.00

1 JOB SUM $175,000.00

1 JOB SUM $425,000.00

1 JOB SUM $125,000.00

1 JOB SUM $300,000.00

1 JOB SUM $50,000.00

432,363 CY $10.00 $4,323,630.00

$5,448,630.00

$370,168,535.00

TOTAL OPTION NO. 11

TOTAL SCHEDULE NO. 1 AND OPTIONS 1 - 11

0053 PA 3B Turfing

0054 Stripping at PA 3B

0055 PA 3B Site Management

0056 PA 3B Final Surveys

0057 PA 3B Dike Raise

TOTAL OPTION NO. 10

OPTION NO. 11

0050 Mobilization and Demobilization PA 3B

0051 Final As-Built Drawings PA 3B

0052 PA 3B Existing Drop-Outlet Structure Modification

TOTAL OPTION NO. 9

OPTION NO. 10

0047 PA 1-2 Additional Turfing

0048 PA 1-2 Additional Stripping

0049 PA 1-2 1 Foot Additional Dike Raise (O&M)

TOTAL OPTION NO. 8

OPTION NO. 9

0044 PA 1-2 Additional Turfing

0045 PA 1-2 Additional Stripping

0046 PA 1-2 3 Foot Additional Dike Raise (PCCA)

0039 PA 3A Site Management

0040 PA 1-2 Final Surveys

0041 PA 3A Final Surveys

0042 PA 1-2 Dike Raise

0043 PA 3A Dike Raise

0034 PA 1-2 Turfing

0035 PA 3A Turfing

0036 Stripping at PA 1-2

0037 Stripping at PA 3A

0038 PA 1-2 Site Management

0029 Final As-Built Drawings PA 1-2

0030 Final As-Built Drawings PA 3A

0031 PA 1-2 Existing Drop-Outlet Structure Modification

0032 PA 3A Existing Drop-Outlet Structure Modification

0033 PA 1-2 Training Dike Weirs

0026 Dredge Standby (Section 28 and 29)

TOTAL OPTION NO. 7

OPTION NO. 8

0027 Mobilization and Demobilization PA 1-2

0028 Mobilization and Demobilization PA 3A

TOTAL OPTION NO. 5

0023 Dredging Pipeline Management

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Sections No. 28 and 29)

Dredging - Maintenance, Current Authorized -47 Ft Channel Template (Sections No. 28 and 29)

0019 Dredging Pipeline Management

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Setion No. 26D)

OPTION NO. 7

OPTION NO. 6

0021 Pipeline Management

Dredging - New Work, New Work Authorized -54Ft Channel Template (Section No. 27B)

TOTAL OPTION NO. 6

TOTAL SCHEDULE NO. 1

NO. DESCRIPTION

0001 Mobilization and Demobilization - Dredging Equipment

0003 Dredging Pipeline Management

0002 Pre-Dredging Hazard Survey

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Sections No. 1 thru 22)

Dredging-Maintenance, Current Authorized -47Ft Channel Template (Sections Nos. 1 thru 22, Section No.

4A, and Section No. 22A)

Dredging - Barge Lanes - Red Side, New Work (Section No. 39 thru 49)

OPTION NO. 1

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Section No. 4B)

QUANTITY

Dredging - Barge Lanes - Green Side, New Work (Section No. 30 thru 38)

0008 Pipeline Profile

ITEM

SCHEDULE NO. 1

ABSTRACT OF OFFERS (CONT'D) Page 3 of 4

Solicitation No.: W912HY21B0001 Date Issued: 16 June 2021 Date Opened: 30 July 2021 Project Title: Unrestricted Procurement - Corpus Christi Ship Channel, Texas, Upper Bay Reach in Nueces County, Texas, Channel Improvement Project.

Offeror: #2 - Weeks Marine, Inc., 304 Gaille Drive, Covington, LA 70433 Business Size: Large Business

TOTAL OPTION NO. 1

0009 Dredging Pipeline Management

OPTION NO. 2

0011 Dredging Pipeline Management

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Section No. 22B)

TOTAL OPTION NO. 2

OPTION NO. 3

0013 Dredging Pipeline Management

Dredging - Maintenance, Current Autorized -47 Ft Channel Template (Sections No. 23 thru 27, Section No.

26A, Section No. 26B, and Section No. 27A)

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Sections No. 23 thru 27)

TOTAL OPTION NO. 3

0016 Dredging Standby (Section 23 thru 27)

OPTION NO. 4

0017 Dredging Pipeline Management

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Section No. 26C)

TOTAL OPTION NO. 4

OPTION NO. 5

1 JOB SUM $25,567,295.00

1 JOB SUM $134,218.48

1 JOB SUM $2,390,991.00

1,592,510 CY $9.89 $15,749,923.90

11,487,640 CY $5.75 $66,053,930.00

679,360 CY $10.71 $7,275,945.60

382,810 CY $11.33 $4,337,237.30

4 EA $16,630.00 $66,520.00

$121,576,061.28

1 JOB SUM $400,953.00

257,690 CY $4.80 $1,236,912.00

$1,637,865.00

1 JOB SUM $400,953.00

100,640 CY $6.56 $660,198.40

$1,061,151.40

1 JOB SUM $1,102,045.00

45,990 CY $7.00 $321,930.00

1,958,770 CY $7.00 $13,711,390.00

50 HR $8,022.00 $401,100.00

$15,536,465.00

1 JOB SUM $481,343.00

59,870 CY $10.41 $623,246.70

$1,104,589.70

1 JOB SUM $481,343.00

83,560 CY $16.25 $1,357,850.00

$1,839,193.00

1 JOB SUM $481,343.00

62,920 CY $11.75 $739,310.00

$1,220,653.00

1 JOB SUM $1,251,492.00

73,130 CY $21.98 $1,607,397.40

1,085,850 CY $14.36 $15,592,806.00

50 HR $11,295.00 $564,750.00

$19,016,445.40

1 JOB SUM $1,006,928.00

1 JOB SUM $52,100.00

1 JOB SUM $37,511.00

1 JOB SUM $30,217.00

1 JOB SUM $192,768.00

1 JOB SUM $161,508.00

1 JOB SUM $260,497.00

1 JOB SUM $479,315.00

1 JOB SUM $364,696.00

1 JOB SUM $192,768.00

1 JOB SUM $156,298.00

1 JOB SUM $618,942.00

1 JOB SUM $364,696.00

1 JOB SUM $55,590.00

1 JOB SUM $41,679.00

534,878 CY $9.38 $5,017,155.64

408,765 CY $8.36 $3,417,275.40

$12,449,944.04

1 JOB SUM $26,049.00

1 JOB SUM $52,100.00

365,749 CY $9.38 $3,430,725.62

$3,508,874.62

1 JOB SUM $20,840.00

1 JOB SUM $20,840.00

138,476 CY $9.38 $1,298,904.88

$1,340,584.88

1 JOB SUM $15,500.00

1 JOB SUM $45,847.00

1 JOB SUM $161,508.00

1 JOB SUM $412,628.00

1 JOB SUM $114,619.00

1 JOB SUM $291,757.00

1 JOB SUM $46,759.00

432,363 CY $8.36 $3,614,554.68

$4,703,172.68

$184,995,000.00

TOTAL OPTION NO. 11

TOTAL SCHEDULE NO. 1 AND OPTIONS 1 - 11

0053 PA 3B Turfing

0054 Stripping at PA 3B

0055 PA 3B Site Management

0056 PA 3B Final Surveys

0057 PA 3B Dike Raise

TOTAL OPTION NO. 10

OPTION NO. 11

0050 Mobilization and Demobilization PA 3B

0051 Final As-Built Drawings PA 3B

0052 PA 3B Existing Drop-Outlet Structure Modification

TOTAL OPTION NO. 9

OPTION NO. 10

0047 PA 1-2 Additional Turfing

0048 PA 1-2 Additional Stripping

0049 PA 1-2 1 Foot Additional Dike Raise (O&M)

TOTAL OPTION NO. 8

OPTION NO. 9

0044 PA 1-2 Additional Turfing

0045 PA 1-2 Additional Stripping

0046 PA 1-2 3 Foot Additional Dike Raise (PCCA)

0039 PA 3A Site Management

0040 PA 1-2 Final Surveys

0041 PA 3A Final Surveys

0042 PA 1-2 Dike Raise

0043 PA 3A Dike Raise

0034 PA 1-2 Turfing

0035 PA 3A Turfing

0036 Stripping at PA 1-2

0037 Stripping at PA 3A

0038 PA 1-2 Site Management

0029 Final As-Built Drawings PA 1-2

0030 Final As-Built Drawings PA 3A

0031 PA 1-2 Existing Drop-Outlet Structure Modification

0032 PA 3A Existing Drop-Outlet Structure Modification

0033 PA 1-2 Training Dike Weirs

0026 Dredge Standby (Section 28 and 29)

TOTAL OPTION NO. 7

OPTION NO. 8

0027 Mobilization and Demobilization PA 1-2

0028 Mobilization and Demobilization PA 3A

TOTAL OPTION NO. 6

OPTION NO. 7

0023 Dredging Pipeline Management

Dredging - Maintenance, Current Authorized -47 Ft Channel Template (Sections No. 28 and 29)

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Sections No. 28 and 29)

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Setion No. 26D)

TOTAL OPTION NO. 5

OPTION NO. 6

0021 Pipeline Management

Dredging - New Work, New Work Authorized -54Ft Channel Template (Section No. 27B)

0017 Dredging Pipeline Management

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Section No. 26C)

TOTAL OPTION NO. 4

OPTION NO. 5

0019 Dredging Pipeline Management

Dredging - Maintenance, Current Autorized -47 Ft Channel Template (Sections No. 23 thru 27, Section No.

26A, Section No. 26B, and Section No. 27A)

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Sections No. 23 thru 27)

0016 Dredging Standby (Section 23 thru 27)

TOTAL OPTION NO. 3

OPTION NO. 4

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Section No. 22B)

TOTAL OPTION NO. 2

OPTION NO. 3

0013 Dredging Pipeline Management

0009 Dredging Pipeline Management

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Section No. 4B)

TOTAL OPTION NO. 1

OPTION NO. 2

0011 Dredging Pipeline Management

Dredging - Barge Lanes - Red Side, New Work (Section No. 39 thru 49)

0008 Pipeline Profile

TOTAL SCHEDULE NO. 1

OPTION NO. 1

0002 Pre-Dredging Hazard Survey

0003 Dredging Pipeline Management

Dredging-Maintenance, Current Authorized -47Ft Channel Template (Sections Nos. 1 thru 22, Section No.

4A, and Section No. 22A)

Dredging - New Work, New Work Authorized -54 Ft Channel Template (Sections No. 1 thru 22)

Dredging - Barge Lanes - Green Side, New Work (Section No. 30 thru 38)

Business Size: Large Business

ITEM

SCHEDULE NO. 1

NO. DESCRIPTION QUANTITY

0001 Mobilization and Demobilization - Dredging Equipment

ABSTRACT OF OFFERS (CONT'D) Page 4 of 4

Solicitation No.: W912HY21B0001 Date Issued: 16 June 2021 Date Opened: 30 July 2021 Project Title: Unrestricted Procurement - Corpus Christi Ship Channel, Texas, Upper Bay Reach in Nueces County, Texas, Channel Improvement Project.

Offeror: #3 - Callan Marine, LTD, 6800 Harborside Dr., Galveston, TX 77554