This document is an amendment to a solicitation for pipeline dredging services for the Corpus Christi Ship Channel, Texas, Channel Improvement Project, Upper Bay Reach in Nueces County, Texas. The amendment revises the bid schedule to include additional dredging sections and project areas. Bids are due on July 20, 2021 at 2:00 P.M. for the base work and eleven options to perform maintenance and new work dredging using a hydraulic pipeline system. Dredging quantities and locations are specified for the initial requirements and each option. Pricing is to be provided per cubic yard or lump sum as indicated for each work item. The U.S. Army Corps of Engineers Galveston District is the contracting agency.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W45VAK01292342 014340
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Bay Reach in Nueces County, Texas, Channel Improvement Project is hereby amended as follows:
Continued on Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HY21B0001
X 9B. DATED (SEE ITEM 11)
16-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jul-2021
CODE
US ARMY CORPS OF ENGINEERS
2000 FORT POINT ROAD
P.O. BOX 1229
GALVESTON TX 77553-1229
W912HY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HY21B0001
A0005-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. THE SPECIFICATIONS FOR SOLICITATION NO. W912HY21B0001, CORPUS CHRISTI
SHIP CHANNEL, TEXAS UPPER BAY REACH CHANNEL IMPROVEMENT PROJECT in NUECES County, Texas, PROJECT FOR WHICH BIDS ARE DUE ON 30 JULY 2021 AT 2:00
P.M. CDT, ARE HEREBY AMENDED AS FOLLOWS:
a) Specifications.
(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.
2. This amendment shall be attached to and become a part of the solicitation.
1 Encl:
1. SECTION 00 11 00.00 45, BID SCHEDULE
SWG FILE NO.: CCSC 803-360 SOLICITATION NO.: W912HY21B0001
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 11 00.00 45
BID SCHEDULE AMENDMENT NO. 0005
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1 AM#4
1.1.2 Option No. 1
1.1.3 Option No. 2
1.1.4 Option No. 3 AM#4
1.1.5 Option No. 4 AM#4
1.1.6 Option No. 5 AM#5
1.1.7 Option No. 6
1.1.8 Option No. 7 AM#4
1.1.9 Option No. 8 AM#4
1.1.10 Option No. 9
1.1.11 Option No. 10
1.1.12 Option No. 11
1.2 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
-- End of Section Table of Contents --
DOCUMENT 00 11 00.00 45 Page 1
(TO ACCOMPANY AMENDMENT NO. 0005 TO THIS SOLICITATION)
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 11 00.00 45 Page 2
SECTION 00 11 00.00 45
BID SCHEDULE
AMENDMENT NO. 0005
PART 1 GENERAL
1.1 BID SCHEDULE
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.1 Schedule No. 1 AM#4
Item No.
Description Estimated Quantity Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0001 Mobilization and Demobilization - Dredging Equipment
1 JOB SUM $___________
0002 Pre-Dredging Hazard Survey 1 JOB SUM $___________
0003 Dredging Pipeline Management 1 JOB SUM $___________
0004 Dredging - Maintenance, Current Authorized -47Ft Channel Template (Sections No. 1 thru 22, Section No. 4A, and Section No. 22A)
1,592,510 CY $_________ $___________
0005 Dredging - New Work, New Work Authorized -54Ft Channel Template (Sections No. 1 thru 22)
11,487,640 CY $_________ $___________
0006 Dredging - Barge Lanes - Green Side, New Work (Section No. 30 thru 38)
679,360
CY $_________ $_________
0007 Dredging - Barge Lanes - Red Side, New Work (Section No. 39 thru 49)
382,810 CY $_________ $_________
0008 Pipeline Profile 4 Ea
DOCUMENT 00 11 00.00 45 Page 3
Item No.
Description Estimated Quantity Unit Unit Price Estimated Amount
SCHEDULE NO. 1
TOTAL SCHEDULE NO. 1 $___________
NOTE: Completion time stated in SECTION 00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.
DOCUMENT 00 11 00.00 45 Page 4
BID SCHEDULE (CONT'D)
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.2 Option No. 1
Item No.
Description Estimated Quantity Unit Unit Price Estimated Amount
OPTION NO. 1
0009 Dredging Pipeline Management 1 JOB SUM $___________
0010 Dredging - New Work, New Work Authorized -54Ft Channel Template (Section No. 4B)
257,690
CY $_________ $___________
TOTAL OPTION NO. 1 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 $___________
NOTE FOR OPTI ON NO. 1: The Gover nment may exer ci se Opt i on No. 1 by wr i t t en not i ce t o t he Cont r act or no l at er t han 60 days pr i or t o t he compl et i on of al l ot her dr edgi ng wor k. Addi t i onal t i me of 12 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of Opt i on No. 1.
DOCUMENT 00 11 00.00 45 Page 5
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.3 Option No. 2
Item No. Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 2
0011 Dredging Pipeline Management 1 JOB SUM $___________
0012 Dredging - New Work, New Work Authorized -54Ft Channel Template (Section No. 22B)
100,640 CY $_________ $___________
TOTAL OPTION NO. 2 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NO. 1 AND 2 $___________
NOTE FOR OPTI ON NO. 2: The Gover nment may exer ci se Opt i on No. 2 by wr i t t en not i ce t o t he Cont r act or no l at er t han 60 days pr i or t o t he compl et i on of al l ot her dr edgi ng wor k. Addi t i onal t i me of 7 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of Opt i on No. 2.
DOCUMENT 00 11 00.00 45 Page 6
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.4 Option No. 3 AM#4
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 3
0013 Dredging Pipeline Management 1 JOB SUM $___________
0014 Dredging - Maintenance, Current Authorized -47Ft Channel Template (Sections No. 23 thru 27, Section No. 26A, Section No. 26B, and Section No. 27A)
45,990
CY $_________ $___________
0015 Dredging - New Work, New Work Authorized -54Ft Channel Template (Sections No. 23 thru 27)
1,958,770
CY $_________ $___________
0016 Dredge Standby (Section 23 thru 27) 50 HR $_________ $___________
TOTAL OPTION NO. 3 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NO. 1,2, AND 3 $___________
NOTE FOR OPTI ON NO. 3: The Gover nment may exer ci se Opt i on No. 3 by wr i t t en not i ce t o t he Cont r act or no l at er t han 60 days pr i or t o t he compl et i on of al l ot her dr edgi ng wor k. Addi t i onal t i me of 80 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of Opt i on No. 3. Thi s addi t i onal t i me wi l l not ext end t he al l owed cal endar days f or compl et i on of Schedul e No. 1 i ndi cat ed i n SECTI ON 00 73 00. 01 45 SPECI AL CONTRACT
REQUI REMENTS, STANDARD.
DOCUMENT 00 11 00.00 45 Page 7
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.5 Option No. 4 AM#4
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 4
0017 Dredging Pipeline Management 1 JOB SUM $___________
0018 Dredging - New Work, New Work Authorized -54Ft Channel Template (Section No. 26C)
59,870 CY $_________ $___________
TOTAL OPTION NO. 4 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NO. 1,2,3, AND 4 $___________
NOTE FOR OPTI ON NO. 4: The Gover nment may exer ci se Opt i on No. 4 by wr i t t en not i ce t o t he Cont r act or no l at er t han 60 days pr i or t o t he compl et i on of al l ot her dr edgi ng wor k. Addi t i onal t i me of 6 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of Opt i on No. 4. Thi s addi t i onal t i me wi l l not ext end t he al l owed cal endar days f or compl et i on of Schedul e No. 1 i ndi cat ed i n SECTI ON 00 73 00. 01 45 SPECI AL CONTRACT
REQUI REMENTS, STANDARD.
DOCUMENT 00 11 00.00 45 Page 8
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.6 Option No. 5 AM#5
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 5
0019 Dredging Pipeline Management 1 JOB SUM $___________
0020 Dredging - New Work, New Work Authorized -54Ft Channel Template (Section No. 26D)
83,560
CY $_________ $___________
TOTAL OPTION NO. 5 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NO. 1,2,3,4, AND 5 $___________
NOTE FOR OPTI ON NO. 5: The Gover nment may exer ci se Opt i on No. 5 by wr i t t en not i ce t o t he Cont r act or no l at er t han 60 days pr i or t o t he compl et i on of al l ot her dr edgi ng wor k. Addi t i onal t i me of 7 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of Opt i on No. 5. Thi s addi t i onal t i me wi l l not ext end t he al l owed cal endar days f or compl et i on of Schedul e No. 1 i ndi cat ed i n SECTI ON 00 73 00. 01 45 SPECI AL CONTRACT
REQUI REMENTS, STANDARD.
DOCUMENT 00 11 00.00 45 Page 9
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.7 Option No. 6
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 6
0021 Dredging Pipeline Management 1 JOB SUM $___________
0022 Dredging - New Work, New Work Authorized -54Ft Channel Template (Section No. 27B)
62,920 CY $_________ $___________
TOTAL OPTION NO. 6 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NO. 1,2,3,4,5, AND 6 $___________
NOTE FOR OPTI ON NO. 6: The Gover nment may exer ci se Opt i on No. 6 by wr i t t en not i ce t o t he Cont r act or no l at er t han 60 days pr i or t o t he compl et i on of al l ot her dr edgi ng wor k. Addi t i onal t i me of 6 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of Opt i on No. 6. Thi s addi t i onal t i me wi l l not ext end t he al l owed cal endar days f or compl et i on of Schedul e No. 1 i ndi cat ed i n SECTI ON 00 73 00. 01 45 SPECI AL CONTRACT
REQUI REMENTS, STANDARD.
DOCUMENT 00 11 00.00 45 Page 10
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.8 Option No. 7 AM#4
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 7
0023 Dredging Pipeline Management 1 JOB SUM $___________
0024 Dredging - Maintenance, Current Authorized -47Ft Channel Template (Sections No. 28 and 29)
73,130 CY $_________ $___________
0025 Dredging - New Work, New Work Authorized -54Ft Channel Template (Sections No. 28 and 29)
1,085,850 CY $_________ $___________
0026 Dredge Standby (Section 28 and 29) 50 HR $_________ $___________
TOTAL OPTION NO. 7 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NO. 1,2,3,4,5,6, AND 7 $___________
NOTE FOR OPTI ON NO. 7: The Gover nment may exer ci se Opt i on No. 7 by wr i t t en not i ce t o t he Cont r act or no l at er t han 60 days pr i or t o t he compl et i on of al l ot her dr edgi ng wor k. Addi t i onal t i me of 47 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of Opt i on No. 7. Thi s addi t i onal t i me wi l l not ext end t he al l owed cal endar days f or compl et i on of Schedul e No. 1 i ndi cat ed i n SECTI ON 00 73 00. 01 45 SPECI AL CONTRACT REQUI REMENTS, STANDARD or t he al l owed cal endar days f or compl et i on of any ot her dr egdi ng opt i on above t hat has been exer ci sed.
DOCUMENT 00 11 00.00 45 Page 11
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.9 Option No. 8 AM#4
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 8
0027 Mobilization and Demobilization PA 1-2 1 JOB SUM $___________
0028 Mobilization and Demobilization PA 3A 1 JOB SUM $___________
0029 Final As-Built Drawings PA 1-2 1 JOB SUM $___________
0030 Final As-Built Drawings PA 3A 1 JOB SUM $___________
0031 PA 1-2 Existing Drop-Outlet Structure Modification
1 JOB SUM $___________
0032 PA 3A Existing Drop-Outlet Structure Modification
1 JOB SUM $___________
0033 PA 1-2 Training Dike Weirs 1 JOB SUM $___________
0034 PA 1-2 Turfing
1 JOB SUM $___________
0035 PA 3A Turfing
1 JOB SUM $___________
0036 Stripping at PA 1-2
1 JOB SUM $___________
0037 Stripping at PA 3A
1 JOB SUM $___________
0038 PA 1-2 Site Management
1 JOB SUM $___________
DOCUMENT 00 11 00.00 45 Page 12
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 8
0039 PA 3A Site Management
1 JOB SUM $___________
0040 PA 1-2 Final Surveys
1 JOB SUM $___________
0041 PA 3A Final Surveys
1 JOB SUM $___________
0042 PA 1-2 Dike Raise
534,878 CY $_________ $___________
0043 PA 3A Dike Raise
408,765 CY $_________ $___________
TOTAL OPTION NO. 8 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NO. 1,2,3,4,5,6,7, AND 8 $___________
NOTE FOR OPTI ON NO. 8: The Gover nment may exer ci se Opt i on No. 8 by wr i t t en not i ce t o t he Cont r act or no l at er t han 30 days af t er t he Cont r act or r ecei ves t he Not i ce t o Pr oceed. No addi t i onal t i me wi l l be added t o t hi s cont r act f or compl et i on of Opt i on No. 8.
DOCUMENT 00 11 00.00 45 Page 13
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.10 Option No. 9
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 9
0044 PA 1-2 Additional Turfing 1 JOB SUM $___________
0045 PA 1-2 Additional Stripping 1 JOB SUM $___________
0046 PA 1-2 3 Foot Additional Dike Raise
(PCCA)
365,749 CY $_________ $___________
TOTAL OPTION NO. 9 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NO. 1,2,3,4,5,6,7,8, AND 9 $___________
NOTE FOR OPTI ON NO. 9: The Gover nment may exer ci se Opt i on No. 9 by wr i t t en not i ce t o t he Cont r act or no l at er t han 30 days af t er t he Cont r act or r ecei ves t he Not i ce t o Pr oceed. No addi t i onal t i me wi l l be added t o t hi s cont r act f or compl et i on of Opt i on No. 9.
DOCUMENT 00 11 00.00 45 Page 14
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.11 Option No. 10
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 10
0047 PA 1-2 Additional Turfing 1 JOB SUM $___________
0048 PA 1-2 Additional Stripping 1 JOB SUM $___________
0049 PA 1-2 1 Foot Additional Dike Raise (O&M)
138,476 CY $_________ $___________
TOTAL OPTION NO. 10 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NO. 1,2,3,4,5,6,7,8,9, AND 10 $___________
NOTE FOR OPTI ON NO. 10: The Gover nment may exer ci se Opt i on No. 10 by wr i t t en not i ce t o t he Cont r act or no l at er t han 30 days af t er t he Cont r act or r ecei ves t he Not i ce t o Pr oceed. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of Opt i on No. 10.
DOCUMENT 00 11 00.00 45 Page 15
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.12 Option No. 11
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 11
0050 Mobilization and Demobilization PA 3B 1 JOB SUM
0051 Final As-Built Drawings PA 3B 1 JOB SUM
0052 PA 3B Existing Drop-Outlet Structure Modification
1 JOB SUM $___________
0053 PA 3B Turfing
1 JOB JOB $___________
0054 Stripping at PA 3B
1 JOB SUM $___________
0055 PA 3B Site Management
1 JOB SUM $___________
0056 PA 3B Final Surveys
1 JOB SUM $___________
0057 PA 3B Dike Raise
432,363 CY $_________ $___________
TOTAL OPTION NO. 11 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NO. 1,2,3,4,5,6,7,8,9,10, AND 11
NOTE FOR OPTI ON NO. 11: The Gover nment may exer ci se Opt i on No. 11 by wr i t t en not i ce t o t he Cont r act or no l at er t han 240 days af t er t he Cont r act or r ecei ves t he Not i ce t o Pr oceed. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of Opt i on No. 11.
DOCUMENT 00 11 00.00 45 Page 16
(TO BE ATTACHED TO STANDARD FORM 1442)
1.2 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
-- End of Document --
DOCUMENT 00 11 00.00 45 Page 17
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 11 00.00 45 Page 18
| Amend-0005-W912HY21B0001 |
| Amend 0005 page-2 |
| 00 11 00.00 45 |
| 00 11 00.00 45 - BID SCHEDULE AMENDMENT NO. 0005 |
| 00 11 00.00 45 - BID SCHEDULE |
| PART 1 GENERAL |
| 1.1 BID SCHEDULE |
| 1.1.1 Schedule No. 1 AM#4 |
| 1.1.2 Option No. 1 |
| 1.1.3 Option No. 2 |
| 1.1.4 Option No. 3 AM#4 |
| 1.1.5 Option No. 4 AM#4 |
| 1.1.6 Option No. 5 AM#5 |
| 1.1.7 Option No. 6 |
| 1.1.8 Option No. 7 AM#4 |
| 1.1.9 Option No. 8 AM#4 |
| 1.1.10 Option No. 9 |
| 1.1.11 Option No. 10 |
| 1.1.12 Option No. 11 |
1.2 EVALUATION OF OPTIONS July 1990 FAR 52.217-5