W912HY20R0001-Specs Vol. 1.pdf
PDF 4 MB Posted
- Attached to
- Corpus Christi Ship Channel, Texas, Lower Bay Reach in Nueces County, Texas, Channel Improvement Project.
- Solicitation number
- W912HY20R0001
About this file
This document is a request for proposal for a channel improvement project in Corpus Christi, Texas. The solicitation seeks proposals for dredging and maintenance of the Corpus Christi Ship Channel to deepen it from the current authorized depth of 47 feet to a new authorized depth of 54 feet. Additional work includes reconstruction of an upland placement area, construction of berms using hydraulic dredged material, armoring of the berms with rock, and removal of abandoned pipelines. Proposals are due by January 13, 2020. Award will be made to the lowest-priced technically acceptable proposal in accordance with the evaluation criteria and LPTA source selection process defined in the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. W912HY20R0001
CORPUS CHRISTI SHIP CHANNEL, TEXAS
LOWER BAY REACH
IN NUECES COUNTY, TEXAS
VOLUME I
PROJECT MANUAL FOR
CHANNEL IMPROVEMENT PROJECT
DECEMBER 2019
DEPARTMENT OF THE ARMY
GALVESTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1229
GALVESTON, TEXAS
"INCREASE PROFIT - SUBMIT VECP'S"
This project was designed by the Galveston District of the U.S. Army Corps of Engineers.
The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
ROBERT C. THOMAS, P.E.
CHIEF, ENGINEERING AND CONSTRUCTION DIVISION
SWG FILE NO.: NUECES 803-356 SOLICITATION NO.: W912HY20R0001
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 00 00 SOLICITATION, OFFER AND AWARD, SF-1442
00 11 00.00 45 BID SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
00 31 32.13 45 SUBSURFACE DRILLING AND SAMPLING INFORMATION
00 45 00 REPRESENTATION AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD
00 73 46 WAGE RATES
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 10 SUMMARY OF WORK
01 10 00.01 45 NON-REGULATED SPECIAL CONTRACT REQUIREMENTS
01 22 00.10 MEASUREMENT AND PAYMENT
01 32 01.01 45 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.01 45 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 01.00 QUALITY CONTROL
01 50 00.00 45 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 45 ENVIRONMENTAL PROTECTION
01 58 13.04 45 BULLETIN BOARD
01 78 00.00 45 CLOSEOUT SUBMITTALS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00.10 45 DEMOLITION OF ABANDONED DROP-OUTLET STRUCTURE
DI VI SI ON 03 - CONCRETE
03 31 00.00 45 CONCRETE FOR MINOR STRUCTURES
DI VI SI ON 05 - METALS
05 05 23.00 45 STRUCTURAL WELDING
DI VI SI ON 09 - FI NI SHES
09 97 02 PAINTING: HYDRAULIC STRUCTURES
DI VI SI ON 31 - EARTHWORK
31 09 13.05 45 SETTLEMENT PLATES
31 11 00.10 45 CLEARING, GRUBBING, AND REMOVAL OF DEBRIS
31 14 13.23 45 STRIPPING
31 23 16.18 45 EXCAVATION, FILLING, AND BACKFILLING FOR STRUCTURE
31 41 16.17 45 PLACEMENT AREA SHEET PILING
DI VI SI ON 33 - UTI LI TI ES
33 41 00.10 45 STEEL DRAINAGE PIPE
33 46 13.00 45 GEOTEXTILES
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
PROJECT TABLE OF CONTENTS Page 1
35 12 13.15 45 POST AND PANEL SIGNAGE
35 20 23.13 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW -
MONITORING PROFILE
35 20 23.16 45 DREDGING
35 20 23.33 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM PIPELINE
HYDRAULIC DREDGE
35 20 30.00 45 DROP-OUTLET STRUCTURE
35 31 10.10 45 BUS FILLING, BERM BREAKWATER, AND SURVEYS
35 31 19.32 45 RIPRAP AND BLANKET STONE
35 41 00.01 45 EMBANKMENT CONSTRUCTION UPLAND DMPA NO. 6
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
W45VAK91002193
This requirement is an Unrestricted Procurement, Request for Proposal, Lowest Price Technically Acceptable for Corpus Christi Ship Channel, Texas, Lower Bay Reach in Nueces County, Texas, Channel Improvement Project.
Per AFARS 5132.702 (a)(ii)(B) “Funds are not presently available for this acquisition. No contract award w ill be made until appropriated funds are made available."
Disclosure of Magnitude of Construciton Projects (DFARS 236.204) - The estimated price range of the proposed construction is betw een $100,000,000.00 and $250,000,000.00.
LUCILLE R SMITH 409 766 3845
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
NEGOTIATED
12-Dec-2019
(RFP)
(IFB)
X
CALL:
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________562 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________00 73 00.01 45
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________13 Jan 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY CORPS OF ENGINEERS
2000 POINT FORT ROAD
P.O. BOX 1229
GALVESTON TX 77553-1229
W912HY
PAGE OF PAGES
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
010383-1
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 409 766 3850 TEL: FAX:
W912HY20R0001 5 OF 2,410
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
U.S. Army Corps of Engineers Galveston District Office PO Box 1229 Galveston, Texas 77553-1229
USAED, Finance Center
ATTN: CEFC-AO-P
5722 Integrity Drive Millington, TN 38054-5000
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 11 00.00 45
BID SCHEDULE
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1
1.2 Option No. 1
1.3 Option No. 2
1.4 Option No. 3
1.5 Option No. 4
1.6 Option No. 5
1.7 Option No. 6
1.8 Option No. 7
1.9 Option No. 8
1.10 Option No. 9
1.11 Option No. 10
1.12 Option No. 11
1.13 Option No. 12
1.14 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
-- End of Section Table of Contents --
DOCUMENT 00 11 00.00 45 Page 1
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 11 00.00 45 Page 2
SECTION 00 11 00.00 45
BID SCHEDULE
PART 1 GENERAL
1.1 BID SCHEDULE
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.1 Schedule No. 1
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0001 Mobilization and Demobilization
1 JOB SUM $___________
0002 Pre-Dredging Hazard Survey
1 JOB SUM $___________
0003 Removal and Disposal of Pipelines A5 Thru A9, (Assume 900-LF/Each)
4,500 LF $_________ $___________
0004 Dredging Maintenance, Current Authorized -47Ft Channel Template (Section No. 1 thru 10)*
587,113 CY $_________ $___________
0005 Dredging New Work, New Work Authorized -54Ft Channel Template (Section No. 1 thru 10)*
7,080,264 CY $_________ $___________
0006 Pipeline Management (Associated with Dredge Pipe) 1 JOB SUM $___________
0007 DMPA No. 6, Semi-compacted Containment Dike (Upland Embankment Construction)
380,000 CY $_________ $___________
DOCUMENT 00 11 00.00 45 Page 3
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0008 DMPA No. 6, New Drop-Outlet
1 JOB SUM $___________
0009 BUS-I Filling Dikes, Hydraulically Constructed Exterior Dike to Initial Target Elevation +8.0 MLLW minimum
8,212 LF $_________ $___________
0010 BUS-I Filling Dikes, Install Settlement Plates and Conduct Survey Settlement Monitoring for 6-Months
1 JOB SUM $___________
0011 Final As-Built Drawings
1 JOB SUM $___________
TOTAL SCHEDULE NO. 1 $___________
NOTE: Completion time stated in SECTION 00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.
*Contract Line Items 0004 and 0005 excludes the Estimated Amount from Dredging Sections 1a, 5a, 7a and 8a as shown on Drawings and specified below in Option Nos. 9, 10, 11 and 12 respectively.
DOCUMENT 00 11 00.00 45 Page 4
BID SCHEDULE (CONT'D)
(TO BE ATTACHED TO STANDARD FORM 1442)
1.2 Option No. 1
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 1
0012 Mobilization and Demobilization 1 JOB SUM $___________
0013 Dredging Maintenance, Current Authorized -47Ft Channel Template (Section No. 11 thru 13)
134,726 CY $_________ $___________
0014 Dredging New Work, New Work Authorized -54Ft Channel Template (Section No. 11 thru 13)
3,704,339 CY $_________ $___________
0015 BUS-CQ Filling Dikes, Hydraulically Constructed Exterior Dike to Initial Target Elevation +8.0 MLLW minimum
8,068 LF $_________ $___________
0016 BUS-CQ Filling Dikes, Install Settlement Plates and Conduct Survey Settlement Monitoring for 6-Months
1 JOB SUM $___________
TOTAL OPTION NO. 1 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NOs. 1 $___________
NOTE FOR OPTI ON NO. 1: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k.
Awar d of Opt i on No. 1 i s cont i ngent upon avai l abi l i t y of f unds. An addi t i onal t i me of 218 cal endar days wi l l be added t o t hi s Cont r act f or
DOCUMENT 00 11 00.00 45 Page 5 compl et i on of t hi s Opt i on.
DOCUMENT 00 11 00.00 45 Page 6
(TO BE ATTACHED TO STANDARD FORM 1442)
1.3 Option No. 2
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 2
0017 Mobilization and Demobilization 1 JOB SUM $___________
0018 BUS-I, Construct Dike Revetment Armoring Shoreline Protection Berm (STA. 18+00 to STA. 82+00)
6,300 LF $_________ $___________
0019 BUS-I, Rip-Rap Wave Break Structure (STA. 18+00 to STA.
82+00)
6,300 LF $_________ $___________
TOTAL OPTION NO. 2 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NOs. 1 AND 2 $___________
NOTE FOR OPTI ON NO. 2: The Gover nment may exer ci se Opt i ons No. 2 by wr i t t en not i ce t o t he Cont r act or , s i ngl y or i n combi nat i on wi t h Opt i on No.
3, at any t i me pr i or t o compl et i on of al l aut hor i zed wor k. Awar d of t hi s Opt i on i s cont i ngent upon avai l abi l i t y of f unds. An addi t i onal t i me of 90 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on whet her awar ded si ngl y or i n combi nat i on.
DOCUMENT 00 11 00.00 45 Page 7
(TO BE ATTACHED TO STANDARD FORM 1442)
1.4 Option No. 3
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 3
0020 BUS-I, Construct Dike Revetment Armoring Shoreline Protection Berm (STA. 0+00 to STA. 18+00)
1,800 LF $_________ $___________
0021 BUS-I, Rip-Rap Wave Break Structure (STA. 0+00 to
STA. 18+00)
1,800 LF $_________ $___________
TOTAL OPTION NO. 3 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NOs. 1, 2 AND 3 $___________
NOTE FOR OPTI ON NO. 3: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k.
Awar d of t hi s Opt i on i s cont i ngent upon bot h avai l abi l i t y of f unds and awar d of OPTI ON No. 2. An addi t i onal t i me of 30 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.
DOCUMENT 00 11 00.00 45 Page 8
(TO BE ATTACHED TO STANDARD FORM 1442)
1.5 Option No. 4
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 4
0022 Mobilization and Demobilization 1 JOB SUM $___________
0023 BUS-CQ, Construct Dike Revetment Armoring Shoreline Protection Berm (STA. 23+00 to STA. 61+00)
3,800 LF $_________ $___________
0024 BUS-CQ, Rip-Rap Wave Break Structure (STA. 23+00 to
STA. 61+00)
3,800 LF $_________ $___________
TOTAL OPTION NO. 4 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NOs. 1,2,3 AND 4 $___________
NOTE FOR OPTI ON NO. 4: The Gover nment may exer ci se Opt i ons No. 4 by wr i t t en not i ce t o t he Cont r act or , s i ngl y or i n combi nat i on wi t h Opt i on No.
5, at any t i me pr i or t o compl et i on of al l aut hor i zed wor k. Awar d of t hi s Opt i on i s cont i ngent upon avai l abi l i t y of f unds. An addi t i onal t i me of 90 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on whet her awar ded si ngl y or i n combi nat i on.
DOCUMENT 00 11 00.00 45 Page 9
(TO BE ATTACHED TO STANDARD FORM 1442)
1.6 Option No. 5
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 5
0025 BUS-CQ, Construct Dike Revetment Armoring Shoreline Protection Berm ("STA. 0+00 to STA.
23+00" AND "STA. 61+00 to
STA. 80+69")
4,269 LF $_________ $___________
0026 BUS-CQ, Rip-Rap Wave Break Structure ("STA.
0+00 to STA. 23+00" AND "STA. 61+00 to STA.
80+69")
4,269 LF $_________ $___________
TOTAL OPTION NO. 5 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NOs. 1,2,3,4 AND 5 $___________
NOTE FOR OPTI ON NO. 5: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k.
Awar d of t hi s Opt i on i s cont i ngent upon bot h avai l abi l i t y of f unds and awar d of OPTI ON No. 4. An addi t i onal t i me of 30 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.
DOCUMENT 00 11 00.00 45 Page 10
(TO BE ATTACHED TO STANDARD FORM 1442)
1.7 Option No. 6
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 6
0027 Mobilization and Demobilization 1 JOB SUM $___________
0028 DMPA No. 6, Emergent Wavebreak Constructed to Elevation +3.0 MLLW
7,357 LF $_________ $___________
TOTAL OPTION NO. 6 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NOs. 1,2,3,4,5 AND 6 $___________
NOTE FOR OPTI ON NO. 6: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k. Awar d of t hi s Opt i on i s cont i ngent upon avai l abi l i t y of f unds. An addi t i onal t i me of 120 cal endar days wi l l be added t o t hi s Cont r act f or
DOCUMENT 00 11 00.00 45 Page 11
(TO BE ATTACHED TO STANDARD FORM 1442)
1.8 Option No. 7
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 7
0029 Mobilization and Demobilization 1 JOB SUM $___________
0030 Nearshore DMPA No.6, Demolish and Dispose Drop-Outlet Structure
1 JOB SUM $___________
TOTAL OPTION NO. 7 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NOs. 1,2,3,4,5,6 AND 7 $___________
NOTE FOR OPTI ON NO. 7: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or at any t i me pr i or t o t he compl et i on of al l aut hor i zed wor k. I n t hi s s i t uat i on, t he ACO on si t e wi l l be r equi r ed t o ensur e t hi w Opt i on i s exer ci sed wi t hi n 365 days af t er NTP. I f t he Opt i on i s not exer ci sed wi t hi n 365 days af t er t he NTP, USACE cannot awar d t hi s Opt i on. Awar d of t hi s Opt i on i s cont i ngent upon avai l abi l i t y of f unds.
No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Option.
DOCUMENT 00 11 00.00 45 Page 12
(TO BE ATTACHED TO STANDARD FORM 1442)
1.9 Option No. 8
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 8
0031 POCCA, Removal and Disposal of Pipelines A5 Thru A9, (Assume Addt'l. at 4,100-LF/Each)
20,500 LF $_________ $___________
TOTAL OPTION NO. 8 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NOs. 1,2,3,4,5,6,7
AND 8
NOTE FOR OPTI ON NO. 8: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or at any t i me pr i or t o t he compl et i on of al l aut hor i zed Wor k. Awar d of t hi s Opt i on i s cont i ngent upon t he avai l abi l i t y of f unds. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or
DOCUMENT 00 11 00.00 45 Page 13
(TO BE ATTACHED TO STANDARD FORM 1442)
1.10 Option No. 9
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 9
0032 Mobilization and Demobilization 1 JOB SUM $___________
0033 Dredging Maintenance, (Dredge Section 1a) Crossing For Pipeline ID "A2 & A3", (Volume to be added to Section No. 1) Sta. 7+000 to Sta. 7+200
4,903 CY $_________ $___________
0034 Dredging New Work, (Dredge Section 1a) Crossing For Pipeline ID "A2 & A3", (Volume to be added to Section No. 1) Sta. 7+000 to Sta. 7+200
30,487 CY $_________ $___________
TOTAL OPTION NO. 9 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NOs. 1,2,3,4,5,6,7
8 AND 9
NOTE FOR OPTI ON NO. 9: The Gover nment may exer ci se Opt i ons No. 9 by wr i t t en not i ce t o t he Cont r act or at any t i me pr i or t o compl et i on of al l aut hor i zed wor k. Awar d of Opt i on No. 9 i s cont i ngent upon avai l abi l i t y of f unds. An addi t i onal t i me of 30 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of Opt i on No. 9.
DOCUMENT 00 11 00.00 45 Page 14
(TO BE ATTACHED TO STANDARD FORM 1442)
1.11 Option No. 10
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 10
0035 Mobilization and Demobilization 1 JOB SUM $___________
0036 Dredging Maintenance, (Dredge Section 5a) Crossing For Pipeline ID "A4", (Volume to be added to Section No. 5) Sta.
30+727 to Sta. 30+927
4,642 CY $_________ $_________
0037 Dredging New Work, (Dredge Section 5a) Crossing For Pipeline ID "A4", (Volume to be added to Section No.
5) Sta. 30+727 to Sta.
30+927
32,921 CY $_________ $___________
TOTAL OPTION NO. 10 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NOs. 1,2,3,4,5,6,7
8,9, AND 10
NOTE FOR OPTI ON NO. 10: The Gover nment may exer ci se Opt i ons No. 10 t hr ough No. 12 by wr i t t en not i ce t o t he Cont r act or , s i ngl y or i n combi nat i on, t he ACO on si t e wi l l be r equi r ed t o ensur e t hi s Opt i on i s exer ci sed wi t hi n any t i me up t o 30 days pr i or t o compl et i on of al l aut hor i zed wor k. I f t he Opt i on i s not exer ci sed wi t hi n 30 days pr i or t o t he compl et i on of wor k, USACE cannot awar d t hi s Opt i on. Awar d of Opt i ons No. 10 t hr ough No. 12 i s cont i ngent upon avai l abi l i t y of f unds. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of Opt i ons No. 10 t hr ough No. 12 whet her opt i ons ar e awar ded si ngl y or i n combi nat i on.
DOCUMENT 00 11 00.00 45 Page 15
(TO BE ATTACHED TO STANDARD FORM 1442)
1.12 Option No. 11
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 11
0038 Mobilization and Demobilization 1 JOB SUM $___________
0039 Dredging Maintenance, (Dredge Section 7a) Crossing For Pipeline ID "A10", (Volume to be added to Section No. 7) Sta.
39+813 to Sta. 40+013
949 CY $_________ $___________
0040 Dredging New Work, (Dredge Section 7a) Crossing For Pipeline ID "A10", (Volume to be added to Section No. 7) Sta. 39+813 to Sta. 40+013
30,597 CY $_________ $___________
TOTAL OPTION NO. 11 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NOs. 1,2,3,4,5,6,7
8,9,10, AND 11
NOTE FOR OPTI ON NO. 11: The Gover nment may exer ci se Opt i ons No. 10 t hr ough No. 12 by wr i t t en not i ce t o t he Cont r act or , s i ngl y or i n combi nat i on, t he ACO on si t e wi l l be r equi r ed t o ensur e t hi s Opt i on i s exer ci sed wi t hi n any t i me up t o 30 days pr i or t o compl et i on of al l aut hor i zed wor k. I f t he Opt i on i s not exer ci sed wi t hi n 30 days pr i or t o t he compl et i on of wor k, USACE cannot awar d t hi s Opt i on. Awar d of Opt i ons No. 10 t hr ough No. 12 i s cont i ngent upon avai l abi l i t y of f unds. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of Opt i ons
DOCUMENT 00 11 00.00 45 Page 16
(TO BE ATTACHED TO STANDARD FORM 1442)
1.13 Option No. 12
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 12
0041 Mobilization and Demobilization 1 JOB SUM $___________
0042 Dredging Maintenance, (Dredge Section 8a) Crossing For Pipeline ID "A11", (Volume to be added to Section No. 8) Sta.
45+034 to Sta. 45+234
468 CY $_________ $___________
0043 Dredging New Work, (Dredge Section 8a) Crossing For Pipeline ID "A11", (Volume to be added to Section No. 8) Sta.
45+034 to Sta. 45+234
27,630 CY $_________ $___________
TOTAL OPTION NO. 12 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NOs. 1,2,3,4,5,6,7
8,9,10,11, AND 12
NOTE FOR OPTI ON NO. 12: The Gover nment may exer ci se Opt i ons No. 10 t hr ough No. 12 by wr i t t en not i ce t o t he Cont r act or , s i ngl y or i n combi nat i on, t he ACO on si t e wi l l be r equi r ed t o ensur e t hi s Opt i on i s exer ci sed wi t hi n any t i me up t o 30 days pr i or t o compl et i on of al l aut hor i zed wor k. I f t he Opt i on i s not exer ci sed wi t hi n 30 days pr i or t o t he compl et i on of wor k, USACE cannot awar d t hi s Opt i on. Awar d of Opt i ons No. 10 t hr ough No. 12 i s cont i ngent upon avai l abi l i t y of f unds. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of Opt i ons
DOCUMENT 00 11 00.00 45 Page 17
(TO BE ATTACHED TO STANDARD FORM 1442)
1.14 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
-- End of Document --
DOCUMENT 00 11 00.00 45 Page 18
Section 00 21 00 - Page 1
Section 00 21 00 - Instructions, Conditions and Notices to Offerors
1.1 NON-GOVERNMENT ADVISORS IN THE SOURCE SELECTION PROCESS
a. Offerors are advised that employees of the firms identified below may serve as nongovernment advisors in the source selection process. These individuals will be authorized access only to those portions of the proposal data and discussions that are necessary to enable them to perform their respective duties. Such firms are expressly prohibited from competing on the subject acquisition.
FIRM: Port of Corpus Christi Authority NAME: Dan Koesema, P.E.
ADDRESSES: 222 Power Street, Corpus Christy, TX 78401
TELEPHONE NUMBERS: (361) 882-5633
b. In accomplishing their duties related to the source selection process, the aforementioned firms may require access to proprietary information contained in the offerors' proposals. Therefore, pursuant to FAR 9.505-4, these firms must execute an agreement with each offeror that states that they will (1) protect the offerors’ information from unauthorized use or disclosure for as long as it remains proprietary and (2) refrain from using the information for any purpose other than that for which it was furnished.
To expedite the evaluation process, each offeror must contact the above companies to effect execution of such an agreement prior to the submission of proposals. Each offeror shall submit copies of the agreement with their proposal.
NOTE: This requirement shall flow down to all Subcontractors.
1.2 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS (DFARS 236.204)
The estimated price range of the proposed construction is between $100,000,000 and $250,000,000.
1.3 AVAILABILITY OF PLANS AND SPECIFICATIONS ON THE FEDERAL BUSINESS
OPPORTUNITIES WEBSITE ((FBO) (FAR 5.102(a)(1)
After solicitation issuance, contractors may register to be placed on a plan holders list, view and/or download this solicitation and all amendments at the Federal Business Opportunities (FBO) website at http://www.fbo.gov/
Plans and specifications will not be available in paper format or on compact disc. It is the offeror’s responsibility to monitor the FBO website daily (using the above link) for amendments to the solicitation. You must be registered in the System for Award Management (SAM) to receive a government contract award. The website for SAM https://www.sam.gov/SAM/ .
1.4 TECHNICAL INFORMATION DREDGING (FAR 14.211)
(a) For technical information regarding the plans and specifications submit questions in PROJNET, see paragraph 1.9 of this section for details.
(b) The Contractor [ ] shall [X] shall not be permitted to use self-propelled hopper dredges to perform the work specified herein.
1.5 DISPOSAL OF EXCAVATED MATERIAL
https://www.sam.gov/SAM/
Section 00 21 00 - Page 2
The following owners in the vicinity of the work to be accomplished under this Invitation for Bids are known to desire fill material:
NAME ADDRESS
If any of the areas owned by the above-listed owners are proposed to be utilized by the Contractor in the performance of the work, the provision for use of alternate areas DREDGING: PLACEMENT OF EXCAVATED MATERIAL of the specifications will be applicable.
1.6 BIDDER'S QUALIFICATIONS (FAR 9.105-1)
Before a bid is considered for award, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the work.
1.7 NOTICE TO BIDDERS (FAR 52.214-18)
All information required by the terms of the solicitation must be furnished.
MISTAKES OR OMISSIONS CAN BE COSTLY. Important items for you to check are included in but not limited to, those listed below. This checklist is furnished only to assist you in submitting a proper offer. Check as you read.
Have you acknowledged all amendments?
Have you completed SECTION 00 45 00, REPRESENTATIONS &
CERTIFICATIONS portion of the solicitation package?
Is your offer properly signed?
If a bid guarantee is required, is it included with your offer?
(A late bid guarantee is treated the same as a late offer).
Is your bid guarantee in the proper amount? Bid guarantee shall be in the amount of 20 percent of the amount of the offer, or $3 million, whichever is less.
If your bid guarantee is in the form of a bid bond, is the bond properly signed by both the bidder and surety and are all required seals affixed?
Is the name in which you submitted the offer the same as your bid bond?
If required have you entered a unit price for each item? (The solicitation will specifically state when this is necessary).
Are decimals in unit prices in the proper places? Are your figures legible?
Are the extensions of your unit prices, and your total offer price correct?
Are all erasures or corrections initialed by the person signing the offer?
I have not restricted my offer by altering the provisions of the solicitation.
REMINDER TO BIDDERS
REMINDER #1 - Acknowledge all Amendments on the reverse side of SF 1442, Item 19, Solicitation, Offer, and Award.
Section 00 21 00 - Page 3
REMINDER #2 - The Contracting Officer signing this contract is the Primary Contracting Officer. However, any Contracting Officer assigned to the Galveston District may take formal action. See Section entitled "Specific Project Requirements".
1.8 SPECIAL INSTRUCTIONS PERTAINING TO ELECTRONIC BID SUBMISSION: (FAR
14.302 and 14.304)
Bids and a copy of the SF24 Bid Bond must be submitted through DoD Safe via https://safe.apps.mil/ , not later than the response date and time indicated in the solicitation.
Original copies of the Bid Bond shall be submitted to USACE, Galveston District, ATTN: Lucille R. Smith, 2000 Fort Point Road, Galveston, Texas 77553, on or before the response date and time.
SENDING PROPOSAL FILES:
The DoD Safe application can be accessed via https://safe.apps.mil/ . In order to submit a proposal using this website you must request a “drop off code” by sending an email to Lucille Smith, Contract Specialist at Lucille.r.smith@usace.army.mil and Curtis Cole, Jr., Contracting Officer at Curtis.cole@usace.army.mil at least 10 calendar days before the response date/time. The specialist will provide the code by email. Once you are given a drop off code, this will allow you to use the site for proposal submission.
1.9 BIDDER INQUIRY – PROJNET (FAR 14.211)
1. Prospective Offerors should submit questions concerning this solicitation via Bidder Inquiry in ProjNet at www.projnet.org/projnet .
A. To submit and review bid inquiry items, bidders will need to be a current registered user or self register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
***Please Note: Offerors shall only submit one question per inquiry.
Inquiries containing multiple questions may be rejected.
B. From this page, you may view all bidder inquiries or add inquiry.
C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
D. The Solicitation Number is: W912HY20R0001 The Bidder Inquiry Key is: CF5JKA-IW95M7
2. The Bidder Inquiry System will be unavailable for new inquires fifteen
(15) calendar days prior to offer submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
https://safe.apps.mil/ https://safe.apps.mil/ mailto:Lucille.r.smith@usace.army.mil mailto:Curtis.cole@usace.army.mil http://www.projnet.org/projnet
Section 00 21 00 - Page 4
4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
If the Bidder Inquiry System is unavailable during this period, you can submit your technical questions by email to Lucille R. Smith, Contract Specialist @ Lucille.r.smith@usace.army.mil or Curtis Cole, Jr., Contracting Officer @ Curtis.cole@usace.army.mil .
1.10 CONSTRUCTION WAGE RATE REQUIREMENTS (FAR 52.222-6)
Paragraph entitled CONSTRUCTION WAGE RATE REQUIREMENTS of (CONTRACT CLAUSES - Section 00 72 00, FAR 52.222-6) is applicable to this solicitation. Wage Rates will be incorporated by amendment, if they are not included in this
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code
Reporting
JUL 2016
52.204-18 Commercial and Government Entity Code Maintenance
JUL 2016
52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive
Acquisition
JAN 2017
52.215-16 Facilities Capital Cost of Money JUN 2003 52.215-20 Requirements for Certified Cost or
Pricing Data or Information Other Than Certified Cost or Pricing Data
OCT 2010
52.217-5 Evaluation Of Options JUL 1990 52.232-13 Notice Of Progress Payments APR 1984 52.232-14 Notice Of Availability Of Progress
Payments Exclusively For Small Business Concerns
APR 1984
52.232-38 Submission of Electronic Funds Transfer Information with Offer
JUL 2013
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the mailto:Lucille.r.smith@usace.army.mil mailto:Curtis.cole@usace.army.mil
Section 00 21 00 - Page 5
Affirmative Action Compliance Requirements for Construction clause of this
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
Nueces County – 41.7%
6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is SMSA Nueces County, Texas.
Section 00 21 00 - Page 6
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction
Section 00 21 00 - Page 7 material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the Contracting Officer, US Army Corps of Engineers, Galveston District, PO Box 1229, Galveston, Texas 77553-1229, submitting the protest at SWG-CT-protests@usace.army.mil .
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Mr. Andrew Smith, Resident Engineer Address: US Army Corps of Engineers, Corpus Christi Resident Office, 1920 N. Chaparral, Corpus Christi, Texas 78401-1114 Telephone: 361-884-3385 Ext. 2216
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
mailto:SWG-CT-protests@usace.army.mil mailto:SWG-CT-protests@usace.army.mil
Section 00 21 00 - Page 8
In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/ http://farsite.hill.af.mil/
Section 00 22 11 - Page 1
Section 00 22 11 – Proposal Submission Requirements, Evaluation Criteria, and Basis for Award
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, AND BASIS FOR AWARD
1.0 GENERAL REQUIREMENTS
The intent of this Request for Proposal (RFP) is to solicit proposals for Corpus Christi Ship Channel, Texas, Lower Bay Reach in Nueces County, Texas, Channel Improvement Project. Competition will be full and open under NAICS 237990. The Government reserves the right to award a contract without discussions IAW FAR 52.215-1. Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a technical and cost/price standpoint. Offerors shall organize their proposals as described herein. Proposals may be determined non-responsive for failure to follow this format.
The proposal shall describe the capability of the Offeror to perform the requirements of the Statement of Work (SOW). The proposal should be specific and complete in every detail; and should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. The proposal should be practical, legible, clear, and coherent.
In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failure to submit and organize proposals as requested may adversely affects an Offeror's evaluation.
Proposals shall not exceed the page limits described. Provide all information in tabbed sections.
2.0 SUBMISSION FORMAT
a. COVER SHEET & TABLE OF CONTENTS. Proposals shall consist of two (2) volumes. A cover sheet identifying the Offeror (name, address, point of contact), project description, and solicitation number shall be provided.
The second sheet shall be a table of contents. The proposals shall contain a detailed table of contents. If more than one binder is used, the complete table of contents shall be included in each. Offers that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. Neither the cover sheet nor the table of contents count toward the page limitations.
b. TABS. Proposal shall be a PDF document with bookmarks as specified in a manner to afford easy identification from a Table of Contents.
c. FONT SIZE. Shall not be less than 10 point. Pages will be double-sided and each page shall be identified with the appropriate page number centered at the bottom of the page.
d. SHEET SIZE. Shall be 8-1/2 inches x 11 inches; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches and folded to 8-1/2 inches x 11 inches shall be used. All sheets shall be dated and numbered.
Section 00 22 11 - Page 2
e. PAGE LIMITS. The proposal shall not exceed the specified page limits. The Government will not review any information in excess of the page limits or information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.
f. ELECTRONIC SUBMISSION OF PROPOSALS. Offerors shall submit their proposal through electronic submission in the DoD Safe website at https://safe.apps.mil/ . Reference Section 00 21 00 for further instructions.
3.0 SUBMISSION REQUIREMENTS, PROPOSAL CONTENTS AND RELATED EVALUATION
FACTORS AND SUBFACTORS
Offerors shall submit their proposals in accordance with the following:
VOLUME 1 – TECHNICAL PROPOSAL
Factor/ Subfact or/ Element
LOCATION DESCRIPTION RELATIVE IMPORTANCE
FACTOR 1 TECHNICAL ACCEPTABLE/UNACCEPTABLE
Subfactor A
Vol 1 Tab A Organization and Technical Approach
ACCEPTABLE/UNACCEPTABLE
Subfactor B
Vol 1 Tab B Proposed Contract Duration and Summary Schedule
ACCEPTABLE/UNACCEPTABLE
Subfactor C
Vol 1 Tab C Key Personnel ACCEPTABLE/UNACCEPTABLE
FACTOR 2 Vol 1 Tab D PAST PERFORMANCE ACCEPTABLE/UNACCEPTABLE
VOLUME 2 – PRICE PROPOSAL
Factor/ Subfact or/ Element
LOCATION
DESCRIPTION
RELATIVE IMPORTANCE
N/A Vol 2 Tab 1 Proposal Cover Sheet Not Rated N/A Vol 2 Tab 2 SF1442 and
Acknowledgement of Amendments
Not Rated
FACTOR 3 Vol 2 Tab 3 SECTION 00 11
00, PRICING
SCHEDULE
Award will be made to lowest – priced technically acceptable proposal
N/A Vol 2 Tab 4 Bid Guarantee (Bid Bond)
Not Rated
N/A Vol 2 Tab 5 Representations & Not Rated https://safe.apps.mil/
Section 00 22 11 - Page 3
Certifications N/A Vol 2 Tab 6 Financials and
Financial Standing Questionnaire
Not Rated
N/A Vol 2 Tab 7 JV Agreement (if applicable)
Not Rated
N/A Vol 2 Tab 8 Small Business Subcontracting Plan (Applicable to Large Business Only)
Not Rated
*A RATING OF UNACCEPTABLE ON ANY FACTOR/SUBFACTOR WILL RESULT IN AN OVERALL
RATING OF UNACCEPTABLE.
3.0.1 Where the word “project(s)” appears, it is understood to mean a project(s), contract(s), task order(s), or any other contract document provided for in the Federal Acquisition Regulation (FAR 2.101). Examples of projects submitted by the Prime Construction Contractor may be projects performed for a State or Federal Government Agency; or for a commercial or private sector customer.
3.0.2 Where the word “recent” appears it is understood to mean a construction type project for which construction is at least 70% complete (measured by performance period days) as of the RFP closing date or a construction type project that has been completed within 7 years of the RFP closing date. Projects completed more than 7 years before the RFP closing date will not be considered for evaluation purposes.
Section 00 22 11 - Page 4
3.0.3 Where the word “relevant” appears it is understood to mean that project experience submitted is similar to the context of this solicitation in terms of scope and magnitude of effort and complexity as described and required in this RFP. For this RFP, “relevant” projects are defined as projects that are similar in terms of:
(1) scope (Performance of any of the following construction activities:
deep draft navigation channel dredging, upland placement area creation and/or rehabilitation, open water beneficial use site involving the creation and armoring (with rock) of berms using hydraulic placed fill material and pipeline removals),
(2) type (deep draft navigation channels greater than 30 feet in depth),
(3) complexity (dredging new work and some O&M material and using it to construct a berm in soft sediments. Also grading and armoring the constructed berm per the specifications and removing pipelines under and on either side of the existing channel,
(4) magnitude ($25 Million and greater).
4.0 FACTOR 1: TECHNICAL – SUBFACTOR A: ORGANIZATIONAL AND TECHNICAL APPROACH:
4.1 SUBMISSION REQUIREMENTS
4.1.1 And Provide information that describes the offeror’s organization and intended technical approach to executing the construction contract per the detailed requirements herein. Limit the information to 20 pages or less; clearly but concisely describe the organizational and technical approach to project management and execution. The narrative shall specifically address the below key points:
a. Describe how you will phase the project including, PA work, construction of the BU site berm, channel dredging sequence, rock work, and removal of the pipelines,
b. Describe your traffic control plans specifically LNG tankers and any required delays for vessel passage as it relates to project implementation.
c. Strategy for sourcing, delivery, and placement of rock to the project and removal of the pipelines.
d. How do you plan to separate the fine textured material from the sandy material for BU berm construction (to ensure a predominate sand composite for berm fill)?