W912HY19R0004_Specs_Signed.pdf
PDF 2 MB Posted
- Solicitation number
- W912HY19R0004
About this file
CORPUS CHRISTI SHIP CHANNEL, TEXAS ENTRANCE CHANNEL IN NUECES AND ARANSAS COUNTIES, TEXAS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend-0005_W912HY19R0004.pdf | ||
| Jetty_North_ground_only_MG_edit_dcmtd.xyz | XYZ file | |
| Amendment_A0004_W912HY19R0004_08072019.pdf | ||
| Jetty_South_ground_only_MG_edit_dcmtd.xyz | XYZ file | |
| Amend-0003_W912HY19R0004.pdf | ||
| CCSC_Jetty_Repairs_Survey_Data.zip | ZIP file | |
| Amendment_1_for_W912HY19R0004.pdf | ||
| W912HY19R0004_Plans_Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. W912HY19R0004
CORPUS CHRISTI SHIP CHANNEL, TEXAS
ENTRANCE CHANNEL
IN NUECES AND ARANSAS COUNTIES, TEXAS
PROJECT MANUAL FOR
JETTY REPAIRS
JULY 2019
DEPARTMENT OF THE ARMY
GALVESTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1229
GALVESTON, TEXAS
"INCREASE PROFIT - SUBMIT VECP'S"
This project was designed by the Galveston District of the U.S. Army Corps of Engineers.
The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
ROBERT C. THOMAS, P.E.
CHIEF, ENGINEERING AND CONSTRUCTION DIVISION
M3ECXJLK
Typewritten Text for
SWG FILE NO.: NUECES 802-139 SOLICITATION NO.: W912HY19R0004
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 00 00 SOLICITATION, OFFER AND AWARD, SF-1442
00 11 00.00 45 PRICE SCHEDULE
00 21 00 BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
00 22 16 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA,
AND BASIS FOR AWARD
00 45 00 REPRESENTATION AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00.00 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD
00 73 46 WAGE RATES
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 10 00.00 45 NON-REGULATED SPECIAL CONTRACT REQUIREMENTS
01 22 00.10 MEASUREMENT AND PAYMENT
01 32 01.00 45 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.02 45 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 01.00 QUALITY CONTROL
01 50 00.00 45 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 45 ENVIRONMENTAL PROTECTION
01 58 13.01 45 PROJECT IDENTIFICATION
01 78 00.00 45 CLOSEOUT SUBMITTALS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 21 00.10 45 CONSTRUCTION SURVEYING
DI VI SI ON 03 - CONCRETE
03 15 00.00 45 CONCRETE WALKWAY JOINTS IN CONCRETE
03 31 00.00 45 CONCRETE FOR JETTY WALKWAY
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 31 19 STONE FOR CCSC JETTY REHABILITATION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 2
W45VAK83469757
This Request for Proposal (RFP) is issued as an UNRESTRICTED solicitation.
FY19 Corpus Christi Ship Channel (CCSC) Jetty Repairs
Per AFARS 5132.702 (a)(ii)(B) “Funds are not presently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available."
JACQUELINE B ADEKANBI 409.766.3100
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
17-Jul-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________208 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section 00 73
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USAED, GALVESTON
CONTRACTING DIVISION
2000 FORT POINT ROAD
GALVESTON TX 77553-1229
W912HY
PAGE OF PAGES
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
409 766 3010FAX:TEL: 409 766 3850 TEL: FAX:
W912HY19R0004 3 OF 336
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
SWG FILE NO.:NUECES 802-139 SOLICITATION NO.:W912HY19R0004
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 11 00.00 45
PRICE SCHEDULE
PART 1 GENERAL
1.1 PRICE SCHEDULE
1.1.1 Schedule No. 1
1.1.2 Option No. 1
1.1.3 Option No. 2
1.1.4 Option No. 3
1.2 MODIFICATIONS (CESWG)
1.3 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
-- End of Section Table of Contents --
DOCUMENT 00 11 00.00 45 Page 1
SECTION 00 11 00.00 45
PRICE SCHEDULE
PART 1 GENERAL
1.1 PRICE SCHEDULE
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.1 Schedule No. 1
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0001 Mobilization and Demobilization 1 Job SUM $___________
0002 Pre and Post Construction Surveys
1 Job SUM
0003 South Jetty Concrete Walkway (demolition and re-construction)
130 L.F.
South Jetty Concrete Walkway Overlay (Station 1032 to Station 16+00, and Station 17+30 to Station 35+15)
2,353 L.F.
South Jetty Armor Stone (Sta. 10+50 to Sta. 48+50)
54,891, Tons $_________ $___________
0006 South Jetty Blanket Stone(Sta. 10+50 to Sta. 48+50)
38,467 Tons $_________ $___________
TOTAL SCHEDULE NO. 1 $___________
NOTE: Completion time stated in SECTION 00 73 00.00 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.
DOCUMENT 00 11 00.00 45 Page 2
PRICE SCHEDULE (CONT'D)
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.2 Option No. 1
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 1
0007 South Jetty Armor Stone (Sta. 51+00 to Sta. 58+00)
25,548 Tons $_________ $___________
0008 South Jetty Blanket Stone(Sta.
51+00 to Sta.
58+00)
73,904 Tons
TOTAL OPTION NO. 1 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 $___________
NOTE FOR OPTION NO. 1: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. Award of this Option is contingent upon availability of funds. An additional time of 250 calendar days will be added to this Contract for completion of this Option.
DOCUMENT 00 11 00.00 45 Page 3
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.3 Option No. 2
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 2
0009 North Jetty Concrete Walkway 12' Width(demolition and re-construction) ( Sta. 44+90 to Sta.
54+00, Sta. 55+00 to Sta. 56+00, Sta.
59+00 to 61+70)
1,280 L.F. $_________ $___________
0010 North Jetty Concrete Walkway 6' Width(demolition and re-construction) (Sta. 15+80 to Sta.
20+50)
470 L.F. $_________ $___________
0011 North Jetty Armor Stone (sta. 15+80 to 33+50)
20,780 Tons $_________ $___________
0012 North Jetty Blanket Stone (sta. 15+80 to 33+50)
20,414 Tons $_________ $___________
TOTAL OPTION NO. 2 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1 AND 2 $___________
NOTE FOR OPTION NO. 2: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. Award of this Option is contingent upon availability of funds. An additional time of 93 calendar days will be added to this Contract for completion of
DOCUMENT 00 11 00.00 45 Page 4
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.4 Option No. 3
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 3
North Jetty Armor Stone (Sta 46+00 to 57+00)
10,355 Tons SUM $___________
North Jetty Blanket Stone (Sta 46+00 to 57+00)
2,747 Tons SUM
TOTAL OPTION NO. 3 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, AND 3 $___________
NOTE FOR OPTION NO. 3: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. Award of this Option is contingent upon availability of funds. An additional time of 31 calendar days will be added to this Contract for completion of
DOCUMENT 00 11 00.00 45 Page 5
(TO BE ATTACHED TO STANDARD FORM 1442)
1.2 MODIFICATIONS (CESWG)
If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment of each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
1.3 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
-- End of Document --
DOCUMENT 00 11 00.00 45 Page 6
Document 00 21 00 - Page 1
Section 00 21 00 - Instructions, Conditions and Notices to Offerors
1.1 ESTIMATED CONSTRUCTION
The estimated price range of the proposed construction is over $25,000,000- $100,000,000.
1.2 AVAILABILITY OF PLANS AND
1.2 AVAILABILITY OF PLANS AND SPECIFICATIONS ON THE FEDERAL BUSINESS
OPPORTUNITIES WEBISTE (FBO) (FAR 5.102(a)(1)
After solicitation issuance, contractors may register to be placed on a plan holders list, view and/or download this solicitation and all amendments at the following internet addresses:
http://www.fbo.gov/
Plans and specifications will not be available in paper format or on compact disc. It is the offeror’s responsibility to monitor the FBO website daily (using the above links) for amendments to the solicitation. You must be registered in the System for Award Management (SAM) to receive a government contract award. You may register with SAM at https://www.sam.gov
1.3 TECHNICAL INFORMATION
1.3 TECHNICAL INFORMATION (FAR 14.211)
For technical information regarding the plans and specifications submit questions in PROJNET, see paragraph 1.6 of this section for details.
1.5 SPECIAL INSTRUCTIONS
1.5 SPECIAL INSTRUCTIONS PERTAINING TO ELECTRONIC Offer SUBMISSION: (FAR
14.302 & 14.304)
SENDING FILES:
The Federal Business Opportunities bid package submission application can be accessed via https://www.fbo.gov/ under the Solicitation Number W912HY19R0004, Jacqueline Adekanbi.
• A note will be visible within the "Notice Details" sub-tab. The “Electronic Response” sub-tab indicates that the opportunity allows for electronic responses. Note, a vendor must login to the system to be able to submit electronic responses for opportunities.
• There are two types of electronic response submissions possible:
1. Line Item Builder form (CLIN) - This can serve as a template for the items that vendors are sometimes requested to quote.
2. Document upload. Multiple documents with attachments can be loaded here.
• Choose “Document Upload”
• The Documents section allows the user to submit files as part of their electronic response to the opportunity.
a. The user can enter a description for every file to be uploaded, note this is optional.
http://www.fbo.gov/
Document 00 21 00 - Page 2
b. To select a file for upload, the user clicks on the Browse button.
(Note for files over 10 Mb, please use the large upload (JAVA) button). This will allow the user to select a file located on their computer for upload.
3. After selecting the file, the user can click and Add New button to select additional files for upload.
4. The user can delete any file(s) previously selected for upload by clicking on the Delete button.
5. The user has three options at the bottom of the Response page:
a. Submit saves and electronically submits the response to the government point of contact for that opportunity in the system.
Note, the system will send an email to the email address on file for the user confirming the electronic submission;
b. Save as Draft saves the response created, but does not submit it to the government point of contact for the opportunity in the system;
if selected, the system returns to the Notice Details tab and there is a note at the top indicating that the user has saved a draft response for the opportunity. The user can click on the blue Click here link in the note to review/submit a response.
After clicking the link to review/submit, the system opens the Electronic Response tab and displays the draft response for review.
There is a note at the top which will advise the user whether or not the response deadline has passed. If not, the user can click on the blue Click here link to make changes to the draft response and submit if ready.
c. Return does not save the response and takes the user back to the Notice Details tab for the opportunity.
1.6 BIDDER INQUIRY
1.6 BIDDER INQUIRY – PROJNET (FAR 14.211)
1. Prospective Offerors should submit questions concerning this solicitation via Bidder Inquiry in ProjNet at www.projnet.org/projnet .
A. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
***Please Note: Offerors shall only submit one question per inquiry.
Inquiries containing multiple questions may be rejected.
B. From this page, you may view all bidder inquiries or add inquiry.
C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
D. The Solicitation Number is: W912HY19R0004
The Bidder Inquiry Key is: 97T6SH-MSC6HE http://www.projnet.org/projnet
Document 00 21 00 - Page 3
2. The Bidder Inquiry System will be unavailable for new inquires fifteen
(15) calendar days prior to offer submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
5. Offers will be publicly opened at the date/time stated in the solicitation.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-18 Commercial and Government Entity Code
Maintenance
JUL 2016
52.215-16 Facilities Capital Cost of Money JUN 2003 52.215-20 Requirements for Certified Cost or
Pricing Data or Information Other Than Certified Cost or Pricing Data
OCT 2010
52.217-5 Evaluation Of Options JUL 1990 52.225-12 Notice of Buy American Requirement -
Construction Materials Under Trade Agreements
MAY 2014
52.232-13 Notice Of Progress Payments APR 1984 52.232-14 Notice Of Availability Of Progress
Payments Exclusively For Small Business Concerns
APR 1984
52.232-38 Submission of Electronic Funds Transfer Information with Offer
JUL 2013
CLAUSES INCORPORATED BY FULL TEXT
52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2017)
(a) Definitions. As used in this provision--
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.
“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
Document 00 21 00 - Page 4
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show--
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal.
Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, or revision, of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for
Document 00 21 00 - Page 5 receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals.
Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are
Document 00 21 00 - Page 6 effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall--
(1) Mark the title page with the following legend: This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed--in whole or in part--for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of--or in connection with-- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award.
(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and sub factors in the solicitation.
(2) The Government may reject any or all proposals if such action is in the Government's interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's
Document 00 21 00 - Page 7 best interest to do so.
(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a FIRM-FIXED PRICE contract resulting from this solicitation.
Document 00 21 00 - Page 8
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR
1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within See Price Schedule, Section 00 11 00.00 45.
Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
Nueces County 41.7%
Aransas County 44.2%
6.9
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR
Document 00 21 00 - Page 9
60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is None-SMSA Aransas County, Texas.
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING
(AUG 2011)
(a) Definitions. As used in this clause--
Driving—
(1) Means operating a motor vehicle on an active roadway with the motor running, including while temporarily stationary because of traffic, a traffic light, stop sign, or otherwise.
(2) Does not include operating a motor vehicle with or without the motor running when one has pulled over to the side of, or off, an active roadway and has halted in a location where one can safely remain stationary.
Text messaging means reading from or entering data into any handheld or other electronic device, including for the purpose of short message service texting, e-mailing, instant messaging, obtaining navigational information, or engaging in any other form of electronic data retrieval or electronic data communication. The term does not include glancing at or listening to a navigational device that is secured in a commercially designed holder affixed to the vehicle, provided that the destination and route are programmed into the device either before driving or while stopped in a location off the roadway where it is safe and legal to park.
(b) This clause implements Executive Order 13513, Federal Leadership on Reducing Text Messaging while Driving, dated October 1, 2009.
(c) The Contractor is encouraged to--
Document 00 21 00 - Page 10
(1) Adopt and enforce policies that ban text messaging while driving--
(i) Company-owned or -rented vehicles or Government-owned vehicles; or
(ii) Privately-owned vehicles when on official Government business or when performing any work for or on behalf of the Government.
(2) Conduct initiatives in a manner commensurate with the size of the business, such as--
(i) Establishment of new rules and programs or re-evaluation of existing programs to prohibit text messaging while driving; and
(ii) Education, awareness, and other outreach to employees about the safety risks associated with texting while driving.
(d) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts that exceed the micro-purchase threshold.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the Contracting Officer, US Army Corps of Engineers, Galveston District, PO Box 1229, Galveston, Texas 77553-1229, submitting the protest at SWG-CT-protests@usace.army.mil
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.233-3 PROTEST AFTER AWARD (AUG. 1996)
(a) Upon receipt of a notice of protest (as defined in FAR 33.101) or a determination that a protest is likely (see FAR 33.102(d)), the Contracting Officer may, by written order to the Contractor, direct the Contractor to stop performance of the work called for by this contract. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Upon receipt of the final decision in the protest, the Contracting Officer shall either--
Document 00 21 00 - Page 11
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled either before or after a final decision in the protest, the Contractor shall resume work.
The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if--
(1) The stop-work order results in an increase in the time required for, or in the Contractor's cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to an adjustment within 30 days after the end of the period of work stoppage; provided, that if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon a proposal at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
(e) The Government's rights to terminate this contract at any time are not affected by action taken under this clause.
(f) If, as the result of the Contractor's intentional or negligent misstatement, misrepresentation, or miscertification, a protest related to this contract is sustained, and the Government pays costs, as provided in FAR 33.102(b)(2) or 33.104(h)(1), the Government may require the Contractor to reimburse the Government the amount of such costs. In addition to any other remedy available, and pursuant to the requirements of Subpart 32.6, the Government may collect this debt by offsetting the amount against any payment due the Contractor under any contract between the Contractor and the Government.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
Document 00 21 00 - Page 12
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Andrew Smith Address: 1920 N Chaparral St. Corpus Christi, TX., 78401 Telephone: 361 884 3385
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
[Insert one or more Internet addresses]
(End of provision
Document 00 22 16 - Page 1
SECTION 00 21 16
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, AND BASIS FOR AWARD
1.0 GENERAL REQUIREMENTS
The intent of this Request for Proposal (RFP) is to solicit proposals for the Corpus Christi Ship Channel, Texas Entrance Channel Jetty Repairs in Nueces and Aransas Counties, Texas. The Government reserves the right to award a contract without discussions in accordance with (IAW) FAR 52.215-1.
Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a technical and cost/price standpoint. Offerors shall organize their proposals as described herein. Proposals may be determined non-responsive for failure to follow this format.
The proposal shall describe the capability of the Offeror to perform the requirements of the plans and specifications. The proposal should be specific and complete in every detail; and should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. The proposal should be practical, legible, clear, and coherent.
In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failure to submit and organize proposals as requested may adversely affects an Offeror's evaluation.
Proposals shall not exceed the page limits described. Provide all information in tabbed sections.
2.0 SUBMISSION FORMAT
a. COVER SHEET & TABLE OF CONTENTS. Proposals shall consist of two (2) volumes. A cover sheet identifying the Offeror (name, address, point of contact), project description, and solicitation number shall be provided. The second sheet shall be a table of contents. The proposals shall contain a detailed table of contents. If more than one binder is used, the complete table of contents shall be included in each. Offers that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. Neither the cover sheet nor the table of contents count toward the page limitations.
b. TABS. Proposals shall be tabbed and labeled as specified in a manner to afford easy identification from a Table of Contents.
c. FONT SIZE. Shall not be less than 10 point. Pages will be double-sided and each page shall be identified with the appropriate page number centered at the bottom of the page.
d. SHEET SIZE. Shall be 8-1/2 inches x 11 inches; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11
Document 00 22 16 - Page 2 inches x 17 inches and folded to 8-1/2 inches x 11 inches shall be used. Each 11 x17 sheet will count as one (1) page. All sheets shall be dated and numbered.
e. PAGE LIMITS. The proposal shall not exceed the specified page limits.
The Government will not review any information in excess of the page limits or information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.
f. NUMBER OF COPIES. The following volumes of material shall be submitted:
**DIGITAL MAXIMUM
VOLUME/TITLE COPIES PAGES
VOLUME 1: Technical Proposal 1 15*
VOLUME 2: Price Proposal
N/A*
* Past Performance Questionnaires, Representations and Certifications, performance recognition documents and Small Business Participation Past Performance documents are excluded from the page count.
** Provide files on FBO.gov in two separate volumes. Reference SECTION 00 21 00 paragraph 1.5.
3.0 SUBMISSION REQUIREMENTS, PROPOSAL CONTENTS AND RELATED EVALUATION
FACTORS AND SUBFACTORS
Offerors shall submit their proposals in accordance with the following:
VOLUME 1 – TECHNICAL PROPOSAL
Factor/ Subfact or/ Element
LOCATION DESCRIPTION RELATIVE IMPORTANCE
Listed in Descending Order of Importance
FACTOR 1 Vol 1 TECHNICAL More Important than Non Price Factors 2, 3 and 4
Subfactor A
Vol 1 Tab
Key Personnel Most Important Subfactor
Subfactor B
Vol 1 Tab
Technical Approach 2nd Most Important Subfactor
FACTOR 2 Vol 1 Tab
PROPOSED DURATION
AND SUMMARY
SCHEDULE
2nd in Importance of the Non-Price Factors
FACTOR 3 Vol 1 Tab
PAST PERFORMANCE 3rd in Importance of the Non-Price Factors
Document 00 22 16 - Page 3
FACTOR 4 Vol 1 Tab
EXTENT OF SMALL
BUSINESS PARTICIPATION
Least Important Non Price Factor
VOLUME 2 – PRICE PROPOSAL
Factor/ Subfact or/ Element
LOCATION
DESCRIPTION
RELATIVE IMPORTANCE
N/A Vol 2 Tab
Proposal Cover Sheet Not Rated
N/A Vol 2 Tab
Signed SF1442 and Acknowledgement of Amendments
Not Rated
FACTOR 5 Vol 2 Tab
SECTION 00 11
00.00 45, PRICE
SCHEDULE
All Non-Price Factors when Combined are Significantly More Important than Price/Cost
N/A Vol 2 Tab
Bid Guarantee (Bid Bond)
Not Rated
N/A Vol 2 Tab
Representations & Certifications/SAM
Not Rated
N/A Vol 2 Tab
Financials and Financial Standing Questionnaire
Not Rated
N/A Vol 2 Tab
Small Business Subcontracting Plan (Applicable to Large Business Only)
Acceptable/ Unacceptable
N/A Vol 2 Tab
JV Agreement or Teaming Agreement (if applicable) and/or Corporate, Partnership, Joint Venture Certificate
Not Rated
ALL NON-PRICE FACTORS/SUB-FACTORS COMBINED ARE SIGNIFICANTLY MORE IMPORTANT
THAN COST/PRICE.
3.0.1 Where the word “project(s)” appears, it is understood to mean a project(s), contract(s), task order(s), or any other contract document provided for in the Federal Acquisition Regulation (FAR 2.101). Examples of projects submitted by the Prime Construction Contractor may be projects performed for a State or Federal Government Agency; or for a commercial or private sector customer.
3.0.2 Where the word “recent” appears it is understood to mean a construction type project for which construction is at least 70% complete (measured by performance period days) as of the RFP closing date or a construction type project that has been completed within 7 years of the RFP closing date. Projects completed more than 7 years before the RFP closing date will not be considered for evaluation purposes.
Document 00 22 16 - Page 4
3.0.3 Where the word “relevant” appears it is understood to mean that project experience submitted is similar to the context of this solicitation in terms of scope and magnitude of effort and complexity as described and required in this RFP. For this RFP, “relevant” projects are defined as projects that are similar in terms of:
• Scope (demolish, salvage of existing jetty stone, placement of natural stone material for construction and repair of jetty, placement of concrete on top of jetty for walkway construction)
• Type (coastal structure constructed of natural stone material),
• Complexity (placement of stone material of varying size and weight in varying sea and wind conditions along a navigation channel)
• Magnitude ($10 Million to $40 Million)
4.0 FACTOR 1: TECHNICAL -- SUBFACTOR A: KEY PERSONNEL
4.1 SUBMISSION REQUIREMENTS:
4.1.1 Provide information that describes the offeror’s key personnel within the organization for executing the construction contract per the detailed requirements herein. Clearly but concisely identify key personnel, and their roles and responsibilities and describe the organizational approach to project management, quality control, safety, scheduling, and execution. At a minimum, the narrative MUST address the key points below and include an organizational chart indicating lines of authority:
a. Clearly, but concisely describe the organizational approach to project management, quality control, safety, scheduling, and execution. The Offeror’s narrative should demonstrate the Offeror has an understanding of the specifications staffing requirements to include, Site Superintendent, Site Safety and Health Officer (SSHO), Quality Control (CQC) Manager, Scheduler, and Field Supervisor.
4.2 EVALUATION CRITERIA
4.2.1 The Government will evaluate the strengths, weaknesses and any deficiencies in the plan. The offeror MUST, at minimum, address the key points listed above. The Government will evaluate the firm’s understanding of the specification’s staffing requirements described in the Division 01 and the technical specifications.
5.0 FACTOR 1: TECHNICAL -- SUBFACTOR B: TECHNICAL APPROACH
5.1 SUBMISSION REQUIREMENTS:
5.1.1 Provide information to include a narrative that describes the Offeror’s intended technical approach to executing the construction contract per the detailed requirements herein. At a minimum, the narrative MUST address the key points below:
a. Describe the sequencing and phasing of construction activities to include testing, delivery of materials, placement of stone material types and concrete for walkway construction to repair the jetties, identify the types
Document 00 22 16 - Page 5 of equipment to be utilized to accomplish the work given the work environment. The discussion should include quality control effort to include surveys.
b. Describe how Contractor’s staff will perform quality inspections during construction process.
c. Describe the Offeror’s understanding of site access, and external conditions such as sea and tide conditions that may affect the construction.
d. Discuss coordination and interface with the public, to include recreational users, tourists, and navigation during the construction and repair of the jetties.
5.2 EVALUATION CRITERIA:
5.2.1 The Government will evaluate the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.