Amend-0003_W912HY19R0004.pdf

PDF 3 MB Posted

Attached to
Corpus Christi Ship Channel, Texas Entrance Channel Jetty Repairs
Solicitation number
W912HY19R0004
Issued by

About this file

Corpus Christi Ship Channel, Texas Entrance Channel in Nueces and Aransas Counties, Texas Jetty repair. Amendment 0003

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W45VAK83469757

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Corpus Christi Ship Channel, Texas Entrance Channel in Nueces and Aransas Counties, Texas Jetty Repairs is hereby amended.

The hour and date specif ied for receipt of Offer is hereby extended to 19 August 2019 at 12:00 CST.

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HY19R0004

X 9B. DATED (SEE ITEM 11)

17-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

A0003

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Aug-2019

CODE

US ARMY CORPS OF ENGINEERS

2000 POINT FORT ROAD

P.O. BOX 1229

GALVESTON TX 77553-1229

W912HY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M3ODXMAN

Text Box

W912HY19R0004

A0003-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. THE SPECIFICATIONS FOR SOLICITATION NO. W912HY19R0004, CORPUS CHRISTI

SHIP CHANNEL, TEXAS, ENTRANCE CHANNEL IN NUECES AND ARANSAS

COUNTIES, TEXAS, JETTY REPAIRS, ARE HEREBY AMENDED AS FOLLOWS:

THE PROPOSAL DUE DATE IS HEREBY EXTENDED TO 19-AUGUST-2019 AT 12:00 P.M.

CDT.

a) Specifications.

(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.

(2) SECTION 01 22 00.10, MEASUREMENT AND PAYMENT – The enclosed (2) SECTION 01 22 00.10 entitled MEASUREMENT AND PAYMENT supersedes that issued with this Solicitation.

(3) SECTION 35 31 19, STONE FOR CCSC JETTY REHABILITATION PAYMENT – The enclosed SECTION 35 31 19 entitled STONE FOR CCSC JETTY REHABILITATION PAYMENT supersedes that issued with this Solicitation.

b) Drawings.

(1) DRAWINGS NO. C-501, C502, C-503, CS-101, CS-102, CN-101, AND CN-102 – The enclosed DRAWINGS NO. C-501, C502, C-503, CS-101, CS-102, CN-101, and CN-102 supersede that issued with this solicitation.

2. This amendment shall be attached to and become a part of the solicitation.

4 Encls:

1. SECTION 00 11 00.00 45, BID SCHEDULE

2. SECTION 01 22 00.10, MEASUREMENT AND PAYMENT

3. SECTION 35 31 19, STONE FOR CCSC JETTY REHABILITATION PAYMENT

4. DRAWINGS NO. C-501, C502, C-503, CS-101, CS-102, CN-101, AND CN-102

SWG FILE NO.: NUECES 802-139 SOLICITATION NO.: W912HY19R0004

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 11 00.00 45

PRICE SCHEDULE AMENDMENT NO. 0003

PART 1 GENERAL

1.1 PRICE SCHEDULE

1.1.1 Schedule No. 1

1.1.2 Option No. 1

1.1.3 Option No. 2

1.1.4 Option No. 3

1.1.5 Option No. 4

1.2 MODIFICATIONS (CESWG)

1.3 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)

-- End of Section Table of Contents --

DOCUMENT 00 11 00.00 45 Page 1

TO ACCOMPANY AMENDMENT NO. 0001 TO W912HY19R0004

THIS PAGE INTENTIONALLY LEFT BLANK

DOCUMENT 00 11 00.00 45 Page 2

SECTION 00 11 00.00 45

PRICE SCHEDULE

AMENDMENT NO. 0003

PART 1 GENERAL

1.1 PRICE SCHEDULE

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.1 Schedule No. 1

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

SCHEDULE NO. 1

0001 Mobilization and Demobilization 1 Job SUM $___________

0002 Pre and Post Construction Surveys

1 Job SUM

0003 South Jetty Concrete Walkway 12' Width (demolition and re-construction) (Sta. 16+00 to Sta.17+30)

130 L.F.

South Jetty Concrete Walkway Overlay (Station 10+32 to Station 16+00, and Station 17+30 to Station 35+15)

2,353 L.F.

South Jetty Armor Stone (Sta. 10+50 to Sta. 48+60)

54,891 Tons $_________ $___________

0006 South Jetty Blanket Stone(Sta. 10+50 to Sta. 48+60)

38,467 Tons $_________ $___________

TOTAL SCHEDULE NO. 1 $___________

NOTE: Completion time stated in SECTION 00 73 00.00 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.

DOCUMENT 00 11 00.00 45 Page 3

DOCUMENT 00 11 00.00 45 Page 4

PRICE SCHEDULE (CONT'D)

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.2 Option No. 1

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 1

0007 South Jetty Armor Stone (Sta. 51+00 to Sta. 53+50)

12,264 Tons $_________ $___________

0008 South Jetty Blanket Stone(Sta.

51+00 to Sta.

53+50)

25,095 Tons

TOTAL OPTION NO. 1 $___________

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 $___________

NOTE FOR OPTION NO. 1: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. Award of this Option is contingent upon availability of funds. An additional time of 95 calendar days will be added to this Contract for completion of this Option.

DOCUMENT 00 11 00.00 45 Page 5

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.3 Option No. 2

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 2

0009 South Jetty Armor Stone (Sta. 53+50 to Sta. 58+00)

17,796 Tons $_________ $___________

0010 South Jetty Blanket Stone(Sta.

53+50 to Sta.

58+00)

48,827

Tons

TOTAL OPTION NO. 2 $___________

TOTAL SCHEDULE NO. 1 AND OPTION NOS. 1 AND 2 $___________

NOTE FOR OPTION NO. 2: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. Award of this Option is contingent upon availability of funds. An additional time of 155 calendar days will be added to this Contract for completion of this Option.

DOCUMENT 00 11 00.00 45 Page 6

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.4 Option No. 3

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 3

0011 North Jetty Concrete Walkway 12' Width(demolition and re-construction) ( Sta. 44+90 to Sta.

54+00, Sta. 55+00 to Sta. 56+00, Sta.

59+00 to 61+70)

1,280 L.F. $_________ $___________

0012 North Jetty Concrete Walkway 6' Width(demolition and re-construction) (Sta. 15+80 to Sta.

20+50)

470 L.F. $_________ $___________

0013 North Jetty Armor Stone (sta. 15+80 to 33+50)

20,780 Tons $_________ $___________

0014 North Jetty Blanket Stone (sta. 15+80 to 33+50)

20,414 Tons $_________ $___________

TOTAL OPTION NO. 3 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2 AND 3 $___________

NOTE FOR OPTION NO. 3: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. Award of this Option is contingent upon availability of funds. An additional time of 93 calendar days will be added to this Contract for completion of this Option.

DOCUMENT 00 11 00.00 45 Page 7

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.5 Option No. 4

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 4

North Jetty Armor Stone (Sta 46+00 to 57+00)

10,355 Tons $___________ $___________

North Jetty Blanket Stone (Sta 46+00 to 57+00)

2,747 Tons $___________ $___________

TOTAL OPTION NO. 4 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3 AND 4 $___________

NOTE FOR OPTION NO. 4: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. Award of this Option is contingent upon availability of funds. An additional time of 31 calendar days will be added to this Contract for completion of this Option.

DOCUMENT 00 11 00.00 45 Page 8

(TO BE ATTACHED TO STANDARD FORM 1442)

1.2 MODIFICATIONS (CESWG)

If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment of each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

1.3 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

-- End of Document --

DOCUMENT 00 11 00.00 45 Page 9

DOCUMENT 00 11 00.00 45 Page 10

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.10

MEASUREMENT AND PAYMENT AMENDMENT NO. 0003

PART 1 GENERAL

1.1 SUBMITTALS

1.2 LUMP SUM PAYMENT ITEMS

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.2 Pre and Post Construction Surveys

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.3 UNIT PRICE PAYMENT ITEMS

1.3.1 STONE

1.3.1.1 Payment

1.3.1.2 Measurement

1.3.2 CONCRETE WALKWAY

1.3.2.1 Payment (AM#3)

1.3.2.2 Measurement

1.3.2.3 Unit of Measure

1.3.3 SOUTH JETTY CONCRETE WALKWAY OVERYLAY

1.3.3.1 Payment

1.3.3.2 Measurement

1.3.3.3 Unit of Measure

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section Table of Contents --

SECTION 01 22 00.10 Page 1

SECTION 01 22 00.10 Page 2

SECTION 01 22 00.10

MEASUREMENT AND PAYMENT

AMENDMENT NO. 0003

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Gaging Table Data

Weight Certificates

Weigh Scale Certification

Certified Weight Scale Tickets

Submit certified weight certificates for verification and payment.

1.2 LUMP SUM PAYMENT ITEMS

Payment items for the work of this Contract for which Contract lump sum payments will be made are listed in the BID SCHEDULE and specified below.

All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, will be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed will constitute full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing the work required for which separate payment is not otherwise provided.

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

The Contract price for "Mobilization and Demobilization" in Schedule No. 1 will include the costs in connection with mobilization and demobilization of the plant necessary to perform work under the various bid items. The Contract price shall include transportation and other costs incidental to delivery of the plant and other equipment to the general work area in condition ready for operation and, after the completion of the work, for removal of the plant and equipment from the work site(s). Payment for mobilization and demobilization will be pursuant to the conditions as defined in the SECTION 00 72 00 CONTRACT CLAUSES.

SECTION 01 22 00.10 Page 3

1.2.1.2 Unit of Measure

Unit of measure: Job.

1.2.2 Pre and Post Construction Surveys

1.2.2.1 Payment

The Contract price for "Pre and Post Construction Surveys" in Schedule No.

1 will include the costs necessary to perform multibeam hydrographic surveys along with the side scan sonar imagery collection, topographic LiDAR and aerial imagery surveys of the CCSC entrance channel jetties.

1.2.2.2 Unit of Measure

Unit of Measure: Job

1.3 UNIT PRICE PAYMENT ITEMS

Payment items for the work in this Contract on which the Contract unit price payments will be made are listed in the BID SCHEDULE and specified below. The unit price and payment made for each item listed will constitute full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing the work required for each of the unit price items.

1.3.1 STONE

Stone is designated as a general term for all the stone materials such as armor stone, core stone, bedding stone, filler stone and other necessary stone will are used for the jetty rehab construction.

1.3.1.1 Payment

Payment for satisfactorily placed stone will be made at the applicable contract unit price for:

Sechedule #1:

"Armor Stone" with bid Item No. 0005, "Blanket Stone" of bid Item No. 0006;

Option No. 1:

"Armor Stone" with bid Item No. 0007, "Blanket Stone" with bid Item No. 0008;

Option No. 2

"Armor Stone" with Item No. 0009, "Blanket Stone" with bid Item No. 0010

Option No. 3

"Armor Stone" with bid Item No. 0013, "Blanket Stone" with bid Item No. 0014 in Option No. 3.

SECTION 01 22 00.10 Page 4

Option No. 4

"Armor Stone" with bid Item No. 0015, in Option No. 4.

"Blanket Stone" with bid Item No. 0016, in Option No. 4.

Price(s) and payment(s) shall constitute full compensation for furnishing, transporting, hauling, handling, placing, reworking the stone if necessary, and maintaining the stone until final acceptance by the Government. No separate payment will be made for the stockpiling of stone, filler stone for filling the gaps on the jetty crown, and geotextiles used in shoreline erosion prevention as shown. All cost in connection with stockpiling, filler stone and geotextiles shall be considered as incidentals and shall be included in the contract unit price. Full payment for stone will not be permitted until stone construction has been completed in a satisfactory manner. Twenty (20) percent of the payment for each stone work will be retained until the stone work has been completed in a satisfactory manner.

1.3.1.2 Measurement

Stone will be measured for payment by the tonnage except filler stone.

Filler stone shall not measured for payment, filler stone is considered as an incidental item to cover stone. Quantities will be computed to the nearest whole ton. Stone will be measured for payment, in the presence of the Contracting Officer or authorized representative, by weighing on approved, accurately calibrated scales furnished by and at the expense of the Contractor. The scales shall be capable of printing a weight ticket including time, date, truck number, and weight. Weight certificates furnished by a public weighmaster will be acceptable. Submit Weigh Scale Certification and Certified Weight Scale Tickets, by a copy of the certification from the regulation agency, attesting to the scale's accuracy and a copy of each certified weight scale ticket after 7 working day(s) after weighing.

Stone will be measured for payment by the ton as determined by barge or vessel displacement, certified railroad weights, where direct placement into structure(s) is practicable, or by weighing by the truckload on approved scales meeting the requirements of paragraph TRUCKLOAD.

a. Truckload. Each truck load will be weighed to the nearest 0.1 ton and the final quantity rounded to the nearest whole ton. Stone will be measured for payment by weighing on approved scales before being placed in the work. Scales shall be of sufficient length to permit simultaneous weighing of all axle loads and shall have an accuracy within 0.2 percent throughout the range of the scales. The scale's accuracy shall conform to the applicable requirements of NIST HB 44 and shall be certified by an acceptable scales company representative by an inspector of the State Inspection Bureau charged with scales inspection within the state in which the project is located prior to weighing any stone. The scales shall be capable of printing a weight ticket including time, date, truck number, and weight. The Contracting Officer may elect to accept certified railroad weights or weight certificates furnished by a public weighmaster in lieu of scale weights at the jobsite. Quarry weights will not be accepted. Scales will be checked and certified before hauling stone and after each 50,000 tons increment of stone weighed under this contract.

b. Barge Load

SECTION 01 22 00.10 Page 5

(1) If delivered by barge, stone will be measured for payment by the Contracting Officer by weight determined by barge displacement.

All measurements for determing gauging tables and for calculating loads are to be made in still water close to the work site. The gauging table shall be based upon 62.4 lb/cf in fresh water and 64 lb/cf in salt water. Furnish the Contracting Officer a barge displacement table not less than 10 work days prior to unloading the stone from any barge. Each table submitted shall show the name and/or number of the barge owner, the name of the fabricator, and the certification and date of certification of the person or firm preparing the table. Furnish with the barge displacement tables a drawing or sketch of each barge, dimensioned in sufficient detail to permit checking of the tables. The drawings shall show, as a minimum, the length, width, depth of the barge, and dimensions of the rake or rakes. Each such table shall have its accuracy certified by a person or firm, other than the Contractor, customarily performing this service. Each table submitted shall contain, in parallel columns, the freeboard of the barge in feet and tenths from zero to the full depth of the barge and the corresponding gross displacement to the nearest ton. Each barge shall be suitably marked with three displacement gaging locations on each side near each end of the barge and two amidships on opposite sides. Each gaging location shall be marked by a line perpendicular to the edge of the barge, 4 inches wide and 1 foot long, on both the deck and side of the bargeand two amid ship on opposite sides. Barges with rakes shall have the displacement gaging lines placed at each corner of the box section between the rakes. If a barge has a box end or ends, the gaging locations shall be placed approximately 4 feet from the box end(s). The freeboard will be measured at the six gaging locations and the displacement determined by the use of "STANDARD BARGE TABLES" from the average of these measurements. The displacement will be determined before and after being unloaded and the difference between these values shall be the quantity delivered. Submit the Gaging Table Data, stone hauling vessel, gaging tables and a copy of the data and calculations used for the preparation of the tables. Barges shall be loaded so that the readings taken at the gaging locations do not vary more than 1.5 feet port to starboard fore and aft and do not vary more than 0.5 feet port to starboard. If such is not the case, trim the carrier by shifting the stone until this limit is reached, before the measurement will be accepted. The draft shall be determined from the average of all six readings weighting the readings of the middle gage at double those of the end gages. (G1 + G2 + 2xG3 + 2xG

4 + G5 + G6) divided by 8 = average draft. All carriers used in transporting stone shall be free of leaks such as would render accurate gauging difficult. Facilities for inspecting the hold of each carrier to determine whether leakage is occurring shall be provided. Each carrier shall also be provided with adequate pumping facilities, and if water is found to be accumulating in the hold, the carrier shall be pumped dry before each gaging, both before and after unloading. Lightening by pumping or by transfer of crew or supplies will not be permitted while stone is being transferred. Rejected stone and unacceptable material shall be left aboard the barge until after the final readings have been taken.

SECTION 01 22 00.10 Page 6

1.3.2 CONCRETE WALKWAY

1.3.2.1 Payment (AM#3)

Payment will be made for costs associated with completing the concrete walkway construction which include demolishing and re-constructing the concrete walkway as shown on the south and north jetty. Applicable contract unit price are associated with bid Item 0003 "South Jetty Concrete Walkway (demolition and re-construction)," in schedule #1; and with bid Item No.

0011 "North Jetty Concrete Walkway 12' (demolition and re-construction)" and in bid Item No. 0012 "North Jetty Concrete Walkway 6' (demolition and reconstruction)" of Option No. 3. Price(s) and payment(s) shall constitute full compensations for all materials, installations, labor, equipment, transportation, tools, and all appurtenances to complete the concrete walkway construction as indicated and specifed.

1.3.2.2 Measurement

Jetty concrete walkway will be measured the number of linear feet of each cross section constructed as indicated, measured along the face of the concrete walkway.

1.3.2.3 Unit of Measure

Unit of measure: linear feet.

1.3.3 SOUTH JETTY CONCRETE WALKWAY OVERYLAY

1.3.3.1 Payment

Payment will be made for costs associated with completing "South Jetty Concrete Walkway Overlay" of bid Item No. 0004 in Schedule No. 1. Price(s) and payment(s) shall constitute full compensations for all materials, installations, labor, equipment, transportation, tools, and all appurtenances to complete the concrete walkway construction as indicated and specified.

1.3.3.2 Measurement

South Jetty Concrete Walkway overlay will be measured by the linear foot constructed over the existing concrete walkway.

1.3.3.3 Unit of Measure

Unit of measure: Linear Feet.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section --

SECTION 01 22 00.10 Page 7

SECTION 01 22 00.10 Page 8

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

SECTION 35 31 19

STONE FOR CCSC JETTY REHABILITATION AMENDMENT 0003

PART 1 GENERAL

1.1 SUMMARY

1.2 MEASUREMENT AND PAYMENT

1.3 REFERENCES

1.4 SYSTEM DESCRIPTION

1.4.1 Factors Used for Converting In-Place Volume to Weights

1.5 SUBMITTALS

1.5.1 QUALITY CONTROL

1.5.1.1 General

1.5.1.2 Stone Materials Control (SMC) Plan

1.5.1.3 SMC Field Supervisor Qualifications

1.5.1.4 Revision Of SMC Plan Or Inspection Staffing

1.5.1.5 Stone

1.5.1.5.1 Sources

1.5.1.5.2 Pre Production Reference Stones

1.5.1.5.3 Inspection and Field Tests

1.5.1.5.4 Random Sampling

1.5.1.6 Displacement Gauge Installation Data

1.5.1.7 Certified Stone Hauling Vessel Guaging Table Data

1.5.1.8 Pre Placement Survey

1.5.1.9 Check Surveys

1.5.1.10 Equipment

1.5.1.11 Weigh Scale Certification

1.5.1.12 Certified Weight Scale Tickets

1.5.1.13 Stone Placement Records

1.6 CONSTRUCTION TOLERANCES

1.6.1 QUALITY ASSURANCE

PART 2 PRODUCTS

2.1 STONE

2.1.1 General

2.1.2 Evaluation of Stone

2.1.3 Gradation

2.1.3.1 Armor Stone

2.1.3.2 Blanket Stone

2.1.3.3 Filler Stone

2.1.3.4 Proportional Dimension Limitations

2.2 Visual Examination

2.2.1 Drop Test

2.3 Quarry Operations

PART 3 EXECUTION

3.1 General

SECTION 35 31 19 Page 1

3.2 Demonstration Section

3.2.1 Methods and Equipment

3.2.2 Demonstration Section Evaluation

3.2.3 Removal of Demonstration Section

3.3 NEW BLANKET STONE

3.3.1 General

3.3.2 Placement

3.4 Armor STONE

3.4.1 General

3.4.2 Placement

3.4.3 Pick Up and Reset Existing Armor Stone Next to New Stone

3.4.4 Filler Stone Placement

3.5 CONTRACTOR QUALITY CONTROL

3.5.1 Construction Preparations Phase

3.5.2 Compliance Inspection

3.5.2.1 New Blanket Stone

3.5.2.2 New Armor Stone

3.5.3 Check Surveys

3.5.3.1 General

3.5.3.2 Reporting

3.5.3.3 Records

3.6 QUALITY ASSURANCE

ATTACHMENTS:

RIPRAP GRADATION CURVES

-- End of Section Table of Contents --

SECTION 35 31 19 Page 2

SECTION 35 31 19

STONE FOR CCSC JETTY REHABILITATION

AMENDMENT 0003

PART 1 GENERAL

1.1 SUMMARY

The work in this Section includes furnishing labor, equipment, and material for placing blanket stone.

The jetty rehabilitation locations can only be accessed by waterborne transportations. The Contractor shall be aware that the tide elevations vary with winds, currents, ship wakes, weather fronts and hurricanes. The Contractor shall correspond with ship channel authority to coordinate passages of vessels during entire construction period. The Contractor shall not block the routine ship traffic because of on/off loading stone.

1.2 MEASUREMENT AND PAYMENT

Measurements and payments for stone used in jetty rehab will be paid for in accordance with provisions of the SECTION 01 22 00.10 MEASUREMENT AND

PAYMENT.

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C127 (2015) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate

ASTM C170/C170M (2017) Standard Test Method for Compressive Strength of Dimension Stone

ASTM C295/C295M (2012) Petrographic Examination of Aggregates for Concrete

ASTM C535 (2016) Standard Test Method for Resistance to Degradation of Large-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine

ASTM C88/C88M (2013) Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate

ASTM D3740 (2012a) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering

SECTION 35 31 19 Page 3

Design and Construction

ASTM D4992 (2014; E 2015) Evaluation of Rock to be Used for Erosion Control

ASTM D5313/D5313M (2012; R 2013) Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions

ASTM D6092 (2014I Specifying Standard Sizes of Stone for Erosion Control

ASTM D75/D75M (2014) Standard Practice for Sampling Aggregates

U.S. ARMY CORPS OF ENGINEERS (USACE)

COE CRD-C 148 (1969) Method of Testing Stone for Expansive Breakdown on Soaking in Ethylene Glycol

1.4 SYSTEM DESCRIPTION

1.4.1 Factors Used for Converting In-Place Volume to Weights

The following factors were used in estimating the tonnages of the jetty rehabilitation.

BULK STONE MATERIAL Dry Unit Weight (pcf)

PERCENT VOIDS

Armor 165 5-10%

Blanket Stone 155 20%

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Construction Equipment Lists; G

Construction Quality Control (Qc) Plan; G

Construction Operations Plan

Construction Work Sequence Schedule

SECTION 35 31 19 Page 4

Stone Materials Control (SMC) Plan; G, SMC Field Supervisor Qualifications; G, Submit a work plan detailing jetty construction techniques to be utilized, sources of stone materials and transporation methods to the construction area, list of equipment to carryout jetty rehabilitation construction, and surveys for construction quality control.

SD-03 Product Data

Demonstration Section Evaluation

Stone

Revision Of SMC Plan Or Inspection Staffing

SD-04 Samples

Stone;

SD-05 Design Data

Displacement Gauge Installation Data; G, Certified Stone Hauling Vessel Guaging Table Data; G, Pre Placement Survey; G, Check Surveys; G, Equipment; G, CS

Stone Placement Records

SD-06 Test Reports

Gradation

Evaluation of Stone

Submit the laboratory test results reports of gradation and evaluation of stone for blanket stone, filler stone, and Armor stone. Conduct the tests in accordance with applicable ASTM and Corps of Engineers methods of tests, given in the Handbook for Concrete and Cement.

Demonstration Section Evaluation; G

Submit stone placement techniques,construction sequences, survey after the final completion of the 100 feet demonstration, and the Contracting Officer's evaluation report.

SD-07 Certificates

Stone

Certificate of compliance attesting that the stone (blanket, SECTION 35 31 19 Page 5 filler, Armor) meet specification requirements.

Laboratory; G

Provide laboratory and testing facilities. The laboratories performing the tests must be accredited in accordance with ASTM D3740 plus validated by the Government - (ERDC.) The accreditation must be current and must include the required test methods, as specified.

Weigh Scale Certification

A copy of the certification from the regulation agency attesting to the scale's accuracy shall be submitted within 7 working days after weighing.

Certified Weight Scale Tickets

A copy of each certified weight scale ticket 7 working days after weighing.

SD-10 Operation and Maintenance Data

Post Construction Survey

SD-11 Closeout Submittals

Records; G;

Submit multi-beams hydrographic survey which include raw data and processed files in CAD-DGN formatto SWG engineering record keeping office for evaluation and acceptance for the final approval of the construction.

1.5.1 QUALITY CONTROL

1.5.1.1 General

All stone and materials described in this Contract shall be of a quality to insure permanence of the structure in the climate in which it is to be used. All other criteria notwithstanding, only sources of crystalline igneous or metamorphic rock will be acceptable for Armor stone, limestone will be accepted for blanket stone. dolomite and other sedimentary rock will not be acceptable for this contract. Stone gradations shall be from stone sources approved in accordance with applicable paragraphs of this Section. Regardless of source, the stone shall be durable, sound, and free of features, which may tend to increase deterioration from natural causes or breakage during handling, transportation, or placement. These features may include, but are not limited to fractures, seams, vugs, bedding, stylolites, planes of separation, weathering, argillaceous material, and micaceous minerals. Inclusions of any dirt, sand, clay, shale, chert, oil and oil-stained stones and rock fines and bituminous or any organic or other deleterious material will not be permitted. Stone exhibitting vugs totaling not more than five percent of the total surface area of any face and less than 4-inches in maximum diameter, provided that they are not aligned along bedding planes or planes of weakness will be acceptable, other provisions of this specification withstanding. All stone shall be highly resistant to weathering and disintegration under wetting / drying conditions. The Contractor shall perform all quality control in accordance

SECTION 35 31 19 Page 6 with "CONTRACTOR QUALITY CONTROL" of this specification. It is the Contractor's responsibility to assure that quality control for all work performed at the quarry or quarries and the delivery site comply with all contract requirements. Contractor shall insure that records are maintained of quality control tests, inspections and corrective actions.

1.5.1.2 Stone Materials Control (SMC) Plan

The Contractor shall submit a written Stone Materials Control (SMC) Plan that describes the means and methods to be used for production, handling, transporting and placement and the effective inspection of material quality and gradation testing of stone materials in a manner which will result in a satisfactory quality of in-place stone construction. Written procedures shall be included for guiding and instructing the Contractor's SMC inspectors and construction workers in the techniques and criteria to be used for examining stone for acceptability and for the proper production gradation, handling, transporting, and placement of stone. Procedures shall be described for tracking armor stones used in conducting gradation tests, and for reporting the performance and results of the tests on Quality Control reports. Procedures shall be described for monitoring and recording the dates and locations of stone blasting, and tracking and documenting that furnished stone complies with the applicable quarrying period and curing restrictions, if any. This submittal shall be made not less than 30 calendar days in advance of the date stone materials are to be shipped from the source. The stone material control plan submittal shall designate a Stone Material Control Field Supervisor (SMCFS) who shall be responsible for implementation of all functions of the stone material control program. The stone material control plan submittal shall also include a sample daily SMC Quality Control inspection report, which shall be used during stone material production. The SMCFS shall not have collateral project duties or responsibilities assigned by the Contractor except those specified in the stone material control plan submittal. If the prime Contractor acquires stone products required for this project through a subcontractor, the SMCFS shall not be an employee of the subcontracted company or subcontracted corporation producing the stone material or products. Government approval of the submittal will not be provided until after the contractor has produced satisfactory set of Pre-Production Reference Stones, but not later than five calendar days after all the requirements for the Pre-Production Reference Stones have been met, including the Contractor's laboratory testing results and prior stone source submittal.

1.5.1.3 SMC Field Supervisor Qualifications

The Contractor shall submit the name(s) and evidence that the SMCFS is a Graduate Geologist (minimum Bachelor's Degree) with not less than two years experience in geology and stone inspection; or is a Licensed Professional Geologist with not less than one year experience in stone inspection; or is an experienced SMCF supervisor with a minimum three years experience in stone inspection. This experience shall be in assessing stone quality for the size and type of armor stone and other stone specified in the contract, and in the project conditions to which the stone will be subjected. The SMCF Supervisor shall be responsible for preparing a daily SMC inspection report for the proper execution of the SMC plan, and shall oversee the work of all SMC inspectors. The SMC Field Supervisor Qualifications submittal shall include data on applicable experience (names and locations of projects), training (names and locations of courses) and education (names and locations of schools, with names addresses and phone numbers of references for verification of each item of data. This submittal shall be

SECTION 35 31 19 Page 7 made not less than 30 calendar days in advance of the date stone materials are to be shipped from the source. Government approval of the submittal will not be provided until after the Contractor has produced satisfactory Pre-Production Reference Stones, but not later than five calendar days after all the requirements for the Pre-Production Reference Stones have been met, including Government laboratory testing if applicable.

1.5.1.4 Revision Of SMC Plan Or Inspection Staffing

If the Contractor elects to initiate a proposal to revise the SMC Plan or Inspection Staffing, the Contractor shall submit the proposed Revision of SMC Plan or Inspection Staffing not later than seven calendar days prior to the date it proposes to implement the revision and shall not implement the revision prior to the Contracting Officer's Representative's (COR's) approval. Changes to SMC inspector staffing levels or employees shall likewise be submitted for approval. Government required revisions of the SMC plan or Contractor staffing shall follow the procedures prescribed elsewhere in this Section.

1.5.1.5 Stone

Acceptability is based on the criteria in this Section and as determined by the COR by visual inspections, evaluation of service records, and applicable laboratory test results. All off-site materials shall meet the minimum quality requirements in PART 2, based on field examination and applicable laboratory testing. Laboratory results shall be representative of the same lithologic unit as the corresponding stones or materials.

Laboratory test results shall be from a Government or Government-validated laboratory capable of handling sample sizes described in PART 2, and shall be less than five years old at the time of submittal, unless otherwise accepted by the COR. If test results are more than five years old, or are not representative of the material proposed under this Contract, the COR may select samples from the Pre-Production Reference Stones or materials designated by the Contractor as proposed sources, and direct the Contractor to have selected stones tested at no additional cost to the Government by a Government or Government-approved laboratory in accordance with the requirements of PART 2. Field and Laboratory tests to which the material may be subjected are listed in the paragraph titled REFERENCES. The COR may waive the requirement for laboratory testing of stone, based on the results of visual inspections and service records in projects similar to this project. Under no circumstances will the Contractor be allowed a Contract extension for the time necessary to evaluate materials for acceptability.

1.5.1.5.1 Sources

a. Selection of Source. Designate in writing only one source or one combination of sources from which he proposes to furnish stone. It is the Contractor's responsibility to determine that the stone source or combination of sources selected is capable of providing the quality, quantities and gradation needed and at the rate needed to maintain the scheduled progress of the work. Samples for acceptance testing shall be provided in accordance with paragraph EVALUATION TESTING below. If a source for stone so designated by the Contractor is not accepted for use by the Contracting Officer, the Contractor may not propose other sources but shall furnish the stone from a source listed at the end of this Section with no additional payment.

c. Acceptance of Materials. Acceptance of a source of stone is not to be

SECTION 35 31 19 Page 8 construed as acceptance of all material from that source. The right is reserved to reject materials from certain localized areas, zones, strata, or channels, when such materials are unsuitable for stone as determined by the Contracting Officer. The Contracting Officer also reserves the right to reject individual units of produced specified materials in stockpiles at the quarry, all transfer points, and at the project construction site when such materials are determined to be unsuitable. During the course of the work, the stone may be tested by the Government, if the Contracting Officer determines that testing is necessary. If such tests are determined necessary, the testing will be done in the Government's testing laboratory or commercial laboratory selected by the Government. Materials produced from a listed or unlisted source shall meet all the requirements herein. The cost of testing will be at the Government's expense. During the contract period, both prior to and after materials are delivered to the job site, visual inspections and measurements of the stone materials may be performed by the Contracting Officer. If the Contracting Officer, during the inspections, finds that the stone quality, gradation or weights of stone being furnished are not as specified or are questionable, re-sampling and re-testing is required. Sampling of the delivered stone for testing and the manner in which the testing is to be performed shall be as directed by the Contracting Officer. This additional sampling and testing shall be performed at the Contractor's expense when test results indicate that the materials do not meet specified requirements. When test results indicate that materials meet specified requirements, an equitable adjustment in the contract price will be made for the sampling and testing. Any material rejected shall be removed or disposed of as specified and at the Contractor's expense.

1.5.1.5.2 Pre Production Reference Stones

Before selecting a source for preparation of Pre-Production Reference Stones, the Contractor shall be reasonably certain that the source is capable of meeting the quality, quantity and source requirements specified in PART 2 - PRODUCTS below.

1.5.1.5.3 Inspection and Field Tests

At the quarry and project site, visual inspections shall be made of each Stone randomly by a SMC inspector. The visual inspections shall check size, gradation, elongation, fractures, deterioration and other defects to assure that handling during loading, transporting, unloading and placement has not caused damage to the materials and to assure they are placed in accordance with the requirements of this Section. Weighing of stones or re-measuring them shall be performed to verify computed weights when the COR brings the size of specific stones into question or the SMC inspector observes the need to do so. Except as allowed by gradation tolerances, any material broken, cracked, out of gradation or weight limitation or improperly placed in the work shall be removed and replaced with satisfactory stones and corrective action taken at no additional expense to the Government. Rejected material shall be promptly removed from the project site. Such materials are excluded from measurement for payment.

1.5.1.5.4 Random Sampling

The stone produced by each source maybe sampled by the Government for Quality Assurance testing on the basis of a maximum once each year. The samples will be evaluated based upon petrographic analysis, specific gravity, unit weight, and absorption, or such tests as determined necessary by the COR.

SECTION 35 31 19 Page 9

1.5.1.6 Displacement Gauge Installation Data

Complete information on the stone hauling vessel displacement gauge installation data shall be submitted.

1.5.1.7 Certified Stone Hauling Vessel Guaging Table Data

Submit certified stone hauling vessel gauging table data and a copy of the data and calculations used for the preparation of the tables.

1.5.1.8 Pre Placement Survey

A copy of the record of the Pre-Placement Survey data shall be submitted within 30 calendar after the survey.

1.5.1.9 Check Surveys

A copy of the record of each check survey data shall be submitted within one business day after the survey.

1.5.1.10 Equipment

Prior to starting work, a list of all equipment data, tools, machines, including their sizes, capacities and operating speeds, to be used in the performance of the work shall be submitted. All the plant shall be maintained in satisfactory working condition at all times.

1.5.1.11 Weigh Scale Certification

If an on-site scale is used, prior to the use thereof, submit details on the location and construction of the scale and a copy of the weigh scale certification of the scale's accuracy from the local weights and measures regulating agency.

1.5.1.12 Certified Weight Scale Tickets

A copy of each weigh bill, including certified weight scale tickets that certify exact weight, time of weighing and delivery and certification of proper placement in the work shall be submitted within one business work day after weighing.

1.5.1.13 Stone Placement Records

At the time of completion of stone placement operations, the Contractor shall submit stone placement records. The Contractor shall prepare a document that graphically shows, for each layer of stone, the source of the stone for each reach and the time periods during which it was quarried and during which it was placed. Attachments to the document shall include a copy of the Contractor's gradation data and test results for each gradation range as well as a copy of the Government's evaluation and test results that will have been furnished to the Contractor.

1.6 CONSTRUCTION TOLERANCES

The finished surface and stone layer thickness shall not deviate from the lines and grades shown by more than the tolerances listed below.

Tolerances are measured perpendicular to the indicated neatlines. Extreme limits of the tolerances given shall not be continuous in any direction for

SECTION 35 31 19 Page 10 more than five times the nominal stone dimension nor for an area greater than 1000 square feet of the structure surface.

NEATLINE TOLERANCES

MATERIAL ABOVE NEATLINE (inches) BELOW NEATLINE (inches)

Bedding / blanket

12 0

Underlayer for concrete walkway

3 0

Jetty Armor Stone(2 to 8 tons)

12 6

Jetty Armor Stone(8 to 18 tons)

12 12

The intention is that the work shall be built generally to the required elevations, slope and grade and that the outer surfaces shall be even and present a neat appearance. Placed material not meeting these limits shall be removed or reworked as directed by the Contracting Officer. Payment will not be made for excess material which the Contracting Officer permits to remain in place.

1.6.1 QUALITY ASSURANCE

During the contract period, both prior to and after material are delivered to the job site/storage site, visual inspections and measurements of the stone materials may be performed by the COR. If the COR, during the inspections, finds that the stone quality, gradation or weights of stone being furnished are not as specified or are questionable, re-sampling and retesting by the contractor will be required. Sampling and the manner in which the testing of the delivered stones/stockpiled stone at the source or dock for shipment is to be performed, shall be directed by the COR. The contractor shall pay the cost of this additional testing of stone, if the evaluation of the tests by the government determines the stone does not meet the specification. If the test evaluation by the government determines that the stone meets the specifications then the government will pay the cost. However, the final acceptability of the stone will depend on meeting the requirements for visual inspection and service records, as stated in the specifications. Any material rejected shall be removed or disposed off as specified or directed by the COR. Removal of rejected stone shall be at contractor's expense.

SECTION 35 31 19 Page 11

PART 2 PRODUCTS

2.1 STONE

2.1.1 General

Stone for use in this Contract shall be durable natural stone as specified in this section. The sources from which the Contractor proposes to obtain the material shall be selected well in advance of the time when the material will be required in the work.

Freshly quarried stone shall be cured to allow the stone to release stored energy and moisture and to allow the stone to demonstrate that it will not fracture during the energy release and drying-out phase. Stones of sizes which are individually picked shall be temporarily stockpiled at the quarry site a minimum of 90 calendar days before being shipped to the project site, unless this requirement is waived by the Contracting Officer. Such waiver will be granted only if the stone has characteristics that make curing unnecessary.

2.1.2 Evaluation of Stone

The quarry investigation shall be performed by a registered geologist.

The tests to which the stone shall be subjected include petrographic examination (ASTM C295/C295M), dry unit weight, absorption (ASTM C127), resistance of stone to degradation by abrasion and impact (ASTM C535), and if argillaceous limestone are used, resistance to wetting and drying ( ASTM D5313/D5313M). The laboratory to perform the required testing shall be validated based on relevant paragraphs of ASTM D3740, and no work requiring testing shall be permitted until the laboratory has been inspected and validated. A copy of the documents, provided by the Materials Testing Center (MTC) at CEWES, that validates that the laboratory can perform the required tests. The individual tests shall be listed for which the validation Armors along with the date of the inspection.

Required Tests for CCSC Jetty Rehab

List Desinated ASTM Standards Armor Stone

Other Stone

Sampling. Stone sampling shall be performed in accordance with ASTM D75/D75M

See related paragaraph

See related paragaraph

2 Specific Gravity(3) ASTM C127 2.64

SECTION 35 31 19 Page 12

Required Tests for CCSC Jetty Rehab

2a Dry Unit Weight and Absorption. Stone shall weigh more than 155 pounds per cubic foot. Dry unit weight of Armor stone and other stone to be used are specified within this section. The stone shall have an absorption less than 2 percent unless other tests and service records show that the stone is satisfactory. The method of test for dry unit weight and absorption shall be

ASTM C170/C170M.

165 pcf to 170 pcf

155 pcf to 163 pcf

Petrographic Examination. Stone shall be evaluated in accordance with ASTM C295/C295M which shall include information required by ASTM D4992, paragraph 10.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.