Camp Zama Tower B743_Intermediate Design Specifications.pdf
PDF 10 MB Posted
- Solicitation number
- W912HV26Z0011
About this file
This is an Intermediate Design Specification document for the Army Family Housing Renovate Tower B743 project at Camp Zama, Japan (Project Number PN100964, Contract 27AR0001). The specification establishes technical requirements and procedures for renovation of a 68-unit family housing tower including common areas, multi-purpose rooms, and community activities center.
The specification covers comprehensive renovation scope including unit and common area finishes, cabinetry, counter tops, balcony floor repair, roof refinishing with new drains and downspouts, aluminum window and door replacement, new HVAC and plumbing systems with complete distribution piping, new electrical systems including main service switchboard and pad-mounted transformer, standby generator installation, LED lighting, telecommunications infrastructure, complete fire suppression system replacement, and smoke/CO detector upgrades. The work also encompasses asbestos, lead, PCB, and low-level radioactive material abatement. Base contract covers demolition and renovation of Building 743; Option 1 includes demolition of Building S-726 with new parking area and playground construction; Option 2 provides hydronic distribution system upgrade from two-pipe to four-pipe configuration. The specification mandates use of U.S.-tested products for fire protection, fire alarm systems, electrical systems, and potable water fixtures, with Japanese standards accepted as alternatives only where specifically authorized. Key administrative requirements include submission of Quality Control Plans, project schedules using Primavera P6, submittals via RMS (Resident Management System), environmental protection plans, safety plans, waste management documentation, and commissioning procedures. Contractor must provide key personnel including Project Manager, Superintendent, bilingual interpreter, Quality Control System Manager, Site Safety and Health Officer, and specialized quality control personnel for civil, mechanical, electrical, structural, architectural, and fire protection disciplines. Final deliverables require as-built drawings, operations and maintenance manuals, equipment lists, training documentation, and warranty management plans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-605 Material Finish Schedule B743_Final Design_Drawings.pdf | ||
| W912HV26Z0011_Supplemental.docx | DOCX document | |
| Camp Zama Tower B743_Intermediate Design Drawings.pdf | ||
| W912HV-26-Z-0011_Market Survey Questions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERMEDIATE DESIGN
SPECIFICATIONS
Project Title: Army Family Housing Renovate Tower
B743
Camp Zama, Japan
Project Number: PN100964
Program Year: FY27
Installation Name: Camp Zama, Japan
Date: January 29th, 2026
Prepared by: Design Partners Incorporated
U.S. ARMY CORPS OF ENGINEERS (USACE), Japan Engineering District (JED)
Brian E. Vencalek, PE, PMP
Tel +81-46-407-3354
Email Brian.E.Vencalek@usace.army.mil
[ THIS PAGE WAS LEFT INTENTIONALLY BLANK ]
ARMY FAMILY HOUSING RENOVATE TOWER B743 27AR0001
CAMP ZAMA, KANAGAWA, JAPAN 01/28/26
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 SOLICITATION, CONTRACT LINE ITEM
NUMBER (CLIN) SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 10 GENERAL CONTRACT REQUIREMENTS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01.00 10 08/23 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 35 13 11/20, CHG 1: 02/22 SPECIAL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 METRIC MEASUREMENTS
01 45 00.00 10 11/16 QUALITY CONTROL
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 35 02/15 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE
MANAGEMENT
01 78 00 05/19 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 10 05/16 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 82 00 01/24 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 33 01/24 REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 01 00 02/18 REHABILITATION OF CONCRETE
03 30 00 02/19 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 12 00 08/18 STRUCTURAL STEEL
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 52 00 02/18 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 20 00 FINISH CARPENTRY
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
PROJECT TABLE OF CONTENTS Page 1
07 56 00 02/12 FLUID-APPLIED ROOFING AND PEDESTRIAN
TRAFFIC COATING SYSTEM
07 60 00 05/17 FLASHING AND SHEET METAL
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17 ALUMINUM DOORS, FRAMES, ENTRANCES AND
WINDOWS
08 14 00 08/16 WOOD DOORS
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 33 23 08/20 OVERHEAD COILING DOORS
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/17 CERAMIC TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 08/10 RESILIENT FLOORING
09 90 00 05/11 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 08/17 INTERIOR SIGNAGE
10 28 13 08/17 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 21 00 08/17 WINDOW TREATMENTS
DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 05/16, CHG 1: 05/18 ELECTRIC TRACTION PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 12 00 05/11 STANDPIPE SYSTEMS
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 30 00 04/08 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 15 02/14 COMMON PIPING FOR HVAC
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC
23 05 93 05/25 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL
PROJECT TABLE OF CONTENTS Page 2
SYSTEMS
23 08 00 05/23, CHG 1: 08/24 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00 08/24, CHG 1: 08/25 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 08/24 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 23 00 10/07 REFRIGERANT PIPING
23 30 00 05/20 HVAC AIR DISTRIBUTION
23 57 10.00 10 11/19 FORCED HOT WATER HEATING SYSTEMS USING
WATER AND STEAM HEAT EXCHANGERS
23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 74 33 05/24 DEDICATED OUTDOOR AIR SYSTEMS (DOAS)
23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 48 11/23 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 11 16.00 33 08/19 THREE-PHASE, CUBICLE-TYPE PAD-MOUNTED
TRANSFORMER
26 20 00 02/14 INTERIOR DISTRIBUTION SYSTEM
26 24 13 05/15 SWITCHBOARDS
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15 05/24 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 51 00 05/16 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/08 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 20 08/17 BASE COURSE FOR RIGID AND SUBBASES FOR
FLEXIBLE PAVING
32 11 23 08/17 AGGREGATE BASE COURSES
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13 11/16 CHAIN LINK FENCES AND GATES
PROJECT TABLE OF CONTENTS Page 3
32 92 23 04/06, CHG 1: 08/21 SODDING
DIVISION 33 - UTILITIES
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER
PIPING
33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 00 10 00
SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
PART 1 GENERAL
1.1 ITEMS
ITEM
NO.
DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
BASE ITEMS
1 Demolition and construction/renovation of Building 743, including 68 family housing units, common areas, multi-purpose rooms, community activities center, and all associated supporting facilities work, except as specified in Item Nos. 0002 and 0003.
1 JB - ¥________
TOTAL BASE CLIN SCHEDULE ¥________
OPTION ITEMS
2 Demolish Building S-726 and construct new parking area and playground.(OPTION 1)
1 JB - ¥________
3 Upgrade hydronic distribution from a two-pipe system to a four-Pipe system.(OPTION 2)
1 JB - ¥________
TOTAL (BASE + OPTION ITEMS) CLIN SCHEDULE ¥________
NOTES:
1. Failure of the offeror to propose prices for all items in the CLIN Schedule may be cause for rejection of the proposal as unacceptable.
2. See Section 01 20 00 , for additional line item description.
3. Any reference to "bid", bidder, or "bidding schedule" shall be construed to mean "offeror" and "CLIN schedule"
4. The Government reserves the right to exercise option item(s) by written notice to the Contractor either singularly or in any combination for up to ONE-HUNDRED EIGHTY (180) calendar days after award of the Base Schedule at the prices stated in the CLIN Schedule.
Completion of the added option(s) shall continue at the same schedule as the Base Schedule unless otherwise noted in Section 00 70 00 , 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK.
DOCUMENT 00 10 00 Page 1
5. LEGEND: EA = Each, JB = Job
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
-- End of Section --
DOCUMENT 00 10 00 Page 2
SECTION 01 11 00.00 10
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 DEFINITIONS
The term "Government" refers to "United States Government" whenever the term "Government" appears in this Contract, unless otherwise indicated within the Contract.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 189.1 (2017) Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings
ASHRAE 52.2 (2017) Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size
ASTM INTERNATIONAL (ASTM)
ASTM D6245 (2021) Using Indoor Carbon Dioxide Concentrations to Evaluate Indoor Air Quality and Ventilation (2012) Using Indoor Carbon Dioxide Concentrations to Evaluate Indoor Air Quality and Ventilation
ASTM D6345 (2010) Selection of Methods for Active, Integrative Sampling of Volatile Organic Compounds in Air (2010) Standard Guide for Selection of Methods for Active, Integrative Sampling of Volatile Organic Compounds in Air
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2022) Standard for Portable Fire Extinguishers (2022; ERTA 1 2021) Standard for Portable Fire Extinguishers
NFPA 241 (2022) Standard for Safeguarding Construction, Alteration, and Demolition Operations
SECTION 01 11 00.00 10 Page 1
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
ANSI/SMACNA 008 (2007) IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual Safety -- Safety and Health Requirements Manual
U.S. NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)
NAVFAC P-307 (2016) Weight Handling Program Management
U.S. ARMY GARRISON JAPAN (USAG-J)
Regulation 190-13 (2013) Installation Access and Control Procedures
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only submittals not having a "G" designation are for Contractor Quality Control or Designer of Record approval . Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Initial Site Conditions Photos Key Personnel Qualifications ; G
[ Conformed Drawings Submittal ]
[ INDOOR AIR QUALITY (IAQ) MANAGEMENT PLAN ; G]
SD-07 Certificates
Monthly Progress Photos ;
SD-11 Closeout Submittals
[ Construction Completion Photos ; ]
1.4 ACCEPTABLE ALTERNATIVE JAPANESE STANDARDS
Where indicated in the technical specifications REFERENCES paragraphs, acceptable Japanese standards are listed which are considered acceptable alternatives to the US Standards within the Contract Specifications.
Contract specifications authorize the use of specified acceptable alternative Japanese standards. A limited set of modified UFGS incorporating previously identified and accepted Japanese standards and methods (also known as Japan Edited Specifications, or JES) can be found at https://www.poj.usace.army.mil/Business-With-Us/References/. Other portions of the specifications also authorize the use of specified acceptable alternative Japanese standards. The use of products not meeting the applicable US standards of the Contract or alternative Japanese standards specifically authorized by the Contract is prohibited unless authorized by the Contracting Officer. Japanese standards not identified
SECTION 01 11 00.00 10 Page 2 in these specifications as being acceptable alternatives to US standards may be submitted to the Contracting Officer for consideration as acceptable alternatives after award using the variation request process set forth in Section 01 33 00 SUBMITTAL PROCEDURES. Prior to the use of such proposed additional alternative Japanese standards, written approval by the Contracting Officer is required. Incorporation of methods, materials, and equipment that will promote cost-effective and timely maintenance, and that are otherwise authorized by the contract, is highly encouraged.
[ 1.5 GOVERNMENT FURNISHED CONTRACTOR INSTALLED ITEMS
Attachment 01 11 00.00 10-A "Government Furnished Property" provides the items that shall be Government Furnished, Contractor Installed (GFCI).
] 1.5 MANDATORY U.S. TESTED PRODUCTS
The following items shall meet U.S. testing methods (e.g. UL listed, FM approved, ASTM, etc.) and shall be labeled as required. These items shall not be substituted with Japanese testing methods (e.g. JIS, JASS, etc.)
for certification:
a. Fire suppression systems, including valves, alarm valves, sprinklers (pipes and fittings of Japanese manufacturer may meet the function requirements) . Fire suppression systems includes wet chemical, dry chemical, mist, deluge, pre-action, foam, and clean agent, in addition to standard sprinkler systems.
b. Fire pumps, including motors, controllers, drives, and valves.
c. Fire alarm and mass notification systems, including panels, initiating devices, notification appliances, smoke alarms (conductors and conduits of Japanese manufacturer may meet the functional requirements) .
d. Engineering technician requirements for development of fire suppression systems and alarm system shop drawings, calculations, and material submittals.
e. Fire doors, smoke doors, and frames.
f. Fire dampers and smoke dampers.
g. Interior finishes with flame spread and smoke development ratings required for installation of rated assemblies.
h. Insulation with flame spread and smoke development ratings.
i. Fire proofing and fire stopping materials.
j. Plenum rated cables.
k. Domestic water supply piping in the building and plumbing fixtures that directly dispense potable drinking water (NSF stamped and/or labeled). Japanese plumbing fixtures Plumbing fixtures conforming to Japanese standards that do not directly dispense potable drinking water are allowed, such as urinals and water closets , bath and shower faucets, utility/janitor faucets, lavatories and sinks .
SECTION 01 11 00.00 10 Page 3
1.6 KEY PERSONNEL QUALIFICATIONS
The Contractor's Project Key personnel shall not be assigned duties to any other Contracts (excluding the project manager) without approval from the Contracting Officer. [ The Project Superintendent, CQC System Manager, and Site Safety Health Officer shall all be separate persons, and shall not have other duties assigned. ] [One person may be assigned the duties of Project Superintendent and CQC System Manager provided they meet all qualification requirements and maintain presence on site as required for the various duties. The Site Safety Health Officer shall not be assigned other duties.] Within five (5) working days after receipt of the Notice to Proceed, the Contractor shall submit in writing to the Contracting Officer an organizational chart, the qualifications and background history of the proposed Key Personnel for approval. The Contracting Officer shall have the explicit right to determine acceptability (or rejection) of the proposed individuals. In addition, the Contractor shall be responsible to replace said individuals upon notification by the Government should performance become inadequate during the Contract period. Key Personnel shall attend the Preconstruction conference.
[ 1.6.1 Program Manager
The Program Manager is responsible for the overall management of the Contract. The Program Manager shall have a minimum of [ five (5) ] years experience in the administration of construction Contracts on construction projects similar in size and scope to this Contract, and shall have a thorough knowledge of the duties of key management personnel assigned to this Contract.
] 1.6.2 Project Manager
The Project Manager shall have a minimum of [ five (5) ] years experience as a Project Manager on construction projects [containing [___] components ] similar in size and scope to this Contract. And also, Construction Management and experience in building construction and renovation, ideally housing (multi-unit residential housing). The Project Manager shall maintain oversight of Contract proposals prepared by the Contractor staff and be authorized to negotiate Contract terms and sign Contract documents on behalf of the Contractor. The project manager does not need to be present on the site daily, but shall attend weekly progress meetings and be available on site within 24 hours upon request. Project Manager [ shall not have other duties assigned ][Project Manager may have other duties assigned] .
1.6.3 Project Superintendent (Supervisor)
The Project Superintendent shall be on the work site when on-site work is being performed and shall be available to the Contracting Officer or his representatives upon request. The Project Superintendent shall have overall responsibility for all operations at the job site and be authorized to make decisions, negotiate Contract terms and sign Contract documents on behalf of the Contractor. The Project Superintendent shall have a minimum of [ five (5) ] years experience as a superintendent on construction projects [containing [___] components ] similar in size and scope to this Contract [ . ][ And also, Construction Management and experience in building construction and renovation, ideally housing (multi-unit residential housing) , and have at least one the following qualifications: ]
SECTION 01 11 00.00 10 Page 4
[ a. U.S. Registered Structural Engineer or U.S. Registered Architect or 1 Kyu Kenchikushi (1st Class Qualified Architect).
][ b. U.S. Registered Civil Engineer or 1 Kyu Doboku Sekou Kanrigishi (1st Class Civil Engineering Works Management Engineer).
][ c. U.S. Registered Mechanical or Electrical Engineer or 1 Kyu Kankouji Sekou Kanrigishi (1st Class Building Mechanical and Electrical Engineer).
][ d. U.S. Registered Electrical Engineer or 1 Kyu Denkikouji Sekou Kanrigishi (1st Class Electric Construction Management Engineer).
][ e. U.S. Bachelors Degree in Construction Management or 1 Kyu Kenchiku Sekou Kanrigishi (1st Class Building Construction Management Engineer)
][ f. U.S. Bachelors Degree in Construction Management or AI*DD Sougoushu (AI*DD Construction Engineer).
][ g. U.S. Registered Fire Protection Engineer.
] 1.6.4 English Speaking Representative (Interpreter)
At all times during the Contract period the Contractor shall have an employee capable of fluent bilingual speech in the Japanese and English languages at the job site. The bilingual interpreter shall have the capability to receive and issue concise and technical explanation and instructions between the Government representative(s) and Contractor supervisory personnel concerning all aspects of Contract administration and construction. Within fifteen (15) days after receipt of the Notice to Proceed, the Contractor shall submit in writing to the Contracting Officer 's Representative the qualifications and background history of the proposed interpreter for approval. The Contracting Officer shall have the explicit right to determine acceptability or rejection of the proposed individual. In addition, the Contractor shall be responsible to replace said individual upon notification by the Government should performance become inadequate during the Contract period. The interpreter shall attend the preconstruction conference. Interpreter shall not have other duties assigned.
1.6.5 Contractor Quality Control
1.6.5.1 Contractor Quality Control System Manager (CQCSM)
The CQC System Manager is required to be a graduate of an accredited college with an engineering, architecture, or construction management degree, with a minimum of [ 5] years construction experience on construction of similar size and scope to this Contract. Refer to Section 01 45 00.00 10 QUALITY CONTROL, Paragraph "CQC System Manager" for additional requirements.
1.6.5.2 Contractor Quality Control Personnel
The following Contractor Quality Control (CQC) Personnel are required: [ Civil, ][ Mechanical, ][ Electrical, ][ Structural, ][ Architectural, ][ Fire Protection, ][ Communications, ][ Environmental, ][ Submittals, ][Occupied Family Housing, ][ Concrete, Pavements, and Soils, ][ Testing, Adjusting, and Balancing , ][Design Quality Control Manager ] . All other specialties in section 01 45 00.00 10 not identified in this paragraph does not apply
SECTION 01 11 00.00 10 Page 5 to this project.
See Section 01 45 00.00 10 QUALITY CONTROL for qualification requirements for CQC personnel. These individuals or specialized technical companies [ must be directly employed by the prime Contractor and can not be employed by a supplier or subcontractor on this project ][may be employed by the prime contractor or a subcontractor on this project] . These individuals [ shall have no other duties other than quality control ] [can perform other duties but need to be allowed sufficient time to perform the specialized personnel's assigned quality control duties as described in the Quality Control Plan] . [ A single person can cover more than one area provided that the single person is qualified to perform quality control activities in each designated and that workload allows. ][A single person cannot cover more than one area].
1.6.6 Site Safety and Health Officer (SSHO)
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS.
[ 1.6.7 [SUSTAINABILITY REPRESENTATIVE][TPC SUSTAINABILITY PROFESSIONAL]
See Section 01 33 29 SUSTAINABILITY REPORTING.
] 1.6.8 Pass Coordinator
A person on the contractor's staff who is familiar with the requirements of USAG-J Regulation 190-13 , Individual and Vehicle Access Pass Procedures, and USAG-J vehicle security inspection procedures. The Pass Coordinator must be able to obtain a DBIDS access pass with escort privileges and may be required to escort other contract personnel.
Although a TOEIC score is not required, the Pass Coordinator must be able to understand pass requirements and complete pass application forms in the English language.
1.7 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
a. This paragraph specifies the procedure for determination of time extensions for unusually severe weather in accordance with the Contract clause entitled "DEFAULT (FIXED-PRICE CONSTRUCTION)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the Contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
b. The listing below defines the monthly anticipated adverse weather days for the Contract period and is based upon 20th Weather Squadron (MAC), U.S. Air Force; Iwakuni U.S. Marine Corps Air Station, Weather Service; Sasebo Naval Pacific Meteorology and Oceanography Detachment;
JASDF (Japan Air Self Defense Force), or similar data for the geographic location of the project. (More specific information may be obtained as specified under Special Contract Requirements Clause entitled "Physical Data.")
SECTION 01 11 00.00 10 Page 6
MONTHLY ANTICIPATED ADVERSE WEATHER DELAYS
WORK DAYS BASED ON (5) DAY WORK WEEK
Misawa-area Kanto Plain Iwakuni Okinawa Sasebo Osaka
JAN 8 1 2 5 7 4
FEB 9 3 4 7 6 4
MAR 6 6 7 8 7 5
APR 3 6 6 6 7 4
MAY 4 4 6 6 6 4
JUN 5 9 8 6 12 5
JUL 6 6 6 6 9 4
AUG 6 6 5 9 9 3
SEP 6 7 6 7 9 4
OCT 4 5 4 4 8 4
NOV 6 4 4 4 5 3
DEC 7 1 3 5 5 3
The above schedule of anticipated adverse weather days shall constitute the base line for monthly (or portion thereof) weather time evaluations.
c. Upon acknowledgment of the Notice-to-Proceed (NTP) and continuing throughout the Contract, the Contractor shall record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.
d. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph (b), above, the Contracting Officer shall convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the Contract clause entitled "DEFAULT
(FIXED PRICE CONSTRUCTION)".
e. For all work under this Contract, adverse weather is defined as:
(1) Rainfall - Number of occurrences of precipitation greater than or equal to 0.10 inches ( 2.54mm) .
(2) Snowfall - Number of occurrences of precipitation greater than or equal to 1.00 inches ( 25.4mm) . (Not applicable to Okinawa Area)
(3) Cold Temperature - Number of occurrences when daily maximum temperature does not exceed the monthly mean low temperature or 32 degrees Fahrenheit ( 0 degrees Celsius ) , whichever is lower. (Not applicable to Okinawa Area)
(4) Concurrence between snowfall and cold temperature is 80 percent, i.e. 80 percent of the time snow falls, the temperature is "cold".
(5) Wind - Number of occurrences when the wind is gusting 30 knots ( 56 kilometers/hour ) or greater.
SECTION 01 11 00.00 10 Page 7
f. The Contractor's schedule must reflect the above anticipated adverse weather delays on all weather-dependent activities.
1.8 PERMITS AND RESPONSIBILITIES
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any laws, codes, and regulations (including the requirements of material, prefectural, and local Government of Japan, and associated military installation) applicable to the performance of work.
The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence.
These damages shall be repaired or replaced by the Contractor at no cost to the Government. The Contractor shall take proper safety and health precautions to protect all work and workers.
Submit a schedule of planned road closures to the Contracting Officer with the initial project schedule. Notification of specific road closures shall be in writing to the Contracting Officer not less than thirty (30) calendar days in advance of the intended closure. The road closure request shall include the planned traffic control measures as well as the general information about the closure. All road closures shall be coordinated with base officials and are subject to base requirements. No road closure shall be permitted until the Contractor receives written approval from the Contracting Officer. Full road closures is generally not permitted (at least one way traffic shall always be provided).
1.8.1 Naha Port Authority (NPA) Work Permit
The Contractor shall obtain a Harbor Facility Usage Permission Application (Form Number 5), also known as the "Kowan Shisetsu Shiyou Kyoka Shinseisho" permit form addressed to the Naha Port Authority Administrator.
The submission shall include basic information regarding the Contractor's point of contact information, project title, description of work, and usage area information, as well as a work plan (to include scheduling), emergency contact plan, and protection plans. Application shall be hand delivered to:
Naha Port Authority General Affairs Division 2-1 Tondocho (2nd Floor) Naha City, Okinawa Prefecture 900-0035
The NPA will require scheduling coordination and due consideration to all Naha Commercial Port end users and coordination with other stakeholders, such as the Local Fisheries Association, to ensure that stakeholder operations are not negatively impacted by the proposed activity and ensure that appropriate coordination is performed by the construction activity proponent. The final Harbor Facility Usage Permit Application will be authorized by the Okinawa Prefectural Governor's office.
1.8.2 Work Application Package
In accordance with Article 31 of the GOJ Act on Port Regulations "Kou Sokuhou", the Contractor shall submit a Work Application Package known as a "Koji Sagyou Kyoka Shinseisho" for review and approval by the Maritime Traffic Division Office of the Japan Coast Guard (JCG) at Naha. A
SECTION 01 11 00.00 10 Page 8 physical printed out copy shall be hand delivered to the following address:
Japan Coast Guard Naha Coast Guard Office Maritime Traffic Division 2-11-1 Minatomachi Naha City, Okinawa Prefecture 900-8548
This application shall contain project safety information, work planning and scheduling, emergency management information as well as copies of all pertinent certifications and licenses (e.g. boat licenses, commercial diver's certifications, etc.) The minimum application review period is 30 days, although in the case of complicated work sites, review of work permit application packages by the JCG may take longer.
The Naha Coast Guard Office normally does not accept a work permit package from a Contractor until approval of work is formalized first with the NPA. Therefore, ample time must be secured for the dredging Contractor to clear both NPA and JCG Naha Coast Guard Office work permitting processes during the pre-construction phase of the dredging project.
1.8.3 Safety Panel and Committee (SPC)
As part of the work permitting process, the Contractor shall also participate in a Safety Panel and Committee (SPC). This SPC is required by the Japan Coast Guard, and shall be facilitated by a consultant hired by the Okinawa Defense Bureau. Intent of the SPC is to provide a forum under which all stakeholder and port operator concerns can be identified and addressed. The Contractor shall attend and present proposed safety, environmental, and operational plans at the forum.
1.9 SPECIAL CONTRACT REQUIREMENTS
1.9.1 Meetings
a. Predesign Conference. A predesign conference per FAR 42.503 shall be held. The chairperson shall be the Contracting Officer or his/her designee. The chairperson shall be responsible for providing minutes of the meeting.
a. Preconstruction Conference. A Preconstruction Conference per FAR
42.503 shall be held. The chairperson shall be the Contracting Officer or his/her designee. The chairperson shall be responsible for providing minutes of the meeting.
a. Post Award Orientation. A post award orientation (often referred to as a Preconstruction Conference) per FAR 42.503 shall be held. The chairperson shall be the Contracting Officer or his/her designee. The chairperson shall be responsible for providing minutes of the meeting.
b. Weekly Progress Meetings. A weekly progress meeting shall be conducted, with the day, time, and location to be determined at the Preconstruction Conference. The Contractor's Project Manager, Superintendent, Interpreter, and Quality Control Manager shall attend. Representatives from the Government may include, but are not limited to, Director of Public Works/Facilities Engineering personnel, Project's Resident Office personnel, and Project Manager. The Contractor shall be prepared to discuss work completed during the
SECTION 01 11 00.00 10 Page 9 previous week, work currently in progress, and work forecasted for the following week, as well as the status of any construction issues and open action items. Provide the meeting agenda for review 24 hours prior to the meeting, take notes during the meeting, and provide electronic copies of the meeting minutes in English within 24 hours of the progress meeting for review.
c. Red Zone Meeting. A Red Zone meeting shall be conducted for Contracts with a value in excess of 55,000,000 JPY or those deemed sufficiently complex by the Contracting Officer to warrant one. The purpose of the Red Zone meeting is to discuss closeout requirements for the contract and to establish a timeline to get those items completed (see Section 01 78 00 CLOSEOUT SUBMITTALS for typical closeout requirements). The meeting is a good time for the Contractor to gain approval on format for items such as Operations and Maintenance manuals, the equipment-in-place list, the warranty plan, and any other items. The Initial Red Zone is typically scheduled when project reached 75 percent completion milestone. Provide the meeting agenda for review 24 hours prior to the meeting, take notes during the meeting, and provide electronic copies of the meeting minutes in English within 24 hours of the Red Zone meeting.
d. Safety and Quality Control Meetings. Safety and quality control meetings shall be held as needed and determined by the Contractor.
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and Section 01 45 00.00 10 USACE QUALITY CONTROL for specific requirements.
e. Construction Waste Management Meetings. See Section 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT for requirements.
f. Monthly Design Progress Meetings. A monthly design progress meeting shall be conducted, with the day, time, and location to be determined at the project kickoff meeting. The Contractor's Design team, Interpreter, and Design Quality Control manager shall attend.
Representatives from the Government may include, but are not limited to, Client, Project Manager, and POJ Engineering personnel. The Contractor shall be prepared to discuss work completed during the previous week, work currently in progress, and work forecasted for the following week, as well as the status of any design issues and open action items. Provide the meeting agenda for review 24 hours prior to the meeting, take notes during the meeting, and provide electronic copies of the meeting minutes in English within 24 hours of the progress meeting for review.
[ 1.9.2 Conformed Drawings Submittal
Contractor shall submit one (1) hard copy Japanese-style folded and bound set of conformed A3 size drawings. Submittal shall be provided to the Resident Office at the Pre-Construction meeting. Conformed drawings are defined as the original advertised drawings with amended drawing sheets replaced in-kind with the corresponding original sheet number. If applicable, add new sheets and remove deleted sheets in accordance with amendment instructions. If multiple amendments are issued, supersede any previously amended drawing so that only the highest numbered amendment drawing is included.
] 1.9.2 CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT PLAN
Submit an IAQ Management Plan within 15 days after Notice to Proceed and
SECTION 01 11 00.00 10 Page 10 not less than 10 days before the preconstruction meeting. The Plan shall include IAQ management practices implemented during construction and preoccupancy phases and describe how each requirement in ANSI/SMACNA 008 [and TPC requirements ] will be met, addressed, and managed on the job site. The plan shall cover the following additional items:
a. Identify the key players and person(s) responsible for implementing the plan.
b. Specify procedures for protecting stored and installed absorptive materials from moisture damage.
c. Prohibit the use of tobacco products inside the building and within
7.5 meters (50 feet) of the building entrance at all times during construction. Consider prohibiting smoking on the entire job site. If smoking will be allowed, locate on a site plan the designated locations and signage. Comply with the tobacco use policy of the local jurisdiction.
d. Indicate whether air handlers will be operated during construction, and specify compliant filtration procedures for permanent equipment that will be used.
e. Take photographs of each IAQ measure for documentation. Annotate photographs to indicate each IAQ measure depicted and its general location. Provide photographs of the methods employed to protect stored and installed absorptive materials from moisture damage during construction and preoccupancy.
Revise and resubmit the Plan as required by the Contracting Officer. Make copies of the final plan available to all workers on site. Include provisions in the Plan to meet the requirements specified below and to ensure safe, healthy air for construction workers and building occupants.
1.9.2.1 Requirements During Construction
Provide for evaluation of indoor Carbon Dioxide concentrations in accordance with ASTM D6245. Provide for evaluation of volatile organic compounds (VOCs) in indoor air in accordance with ASTM D6345. Use filters with a Minimum Efficiency Reporting Value (MERV) of 8 in permanently installed air handlers during construction.
1.9.2.1.1 Control Measures
Meet or exceed the requirements of ANSI/SMACNA 008 , Chapter 3, to help minimize contamination of the building from construction activities. The five requirements of this manual which must be adhered to are described below:
a. HVAC protection: Isolate return side of HVAC system from surrounding environment to prevent construction dust and debris from entering the duct work and spaces.
b. Source control: Use low emitting paints and other finishes, sealants, adhesives, and other materials as specified. When available, cleaning products must have a low VOC content and be non-toxic to minimize building contamination. Utilize cleaning techniques that minimize dust generation. Cycle equipment off when not needed. Prohibit idling motor vehicles where emissions could be drawn into building.
SECTION 01 11 00.00 10 Page 11
Designate receiving/storage areas for incoming material that minimize IAQ impacts.
c. Pathway interruption: When pollutants are generated use strategies such as 100 percent outside air ventilation or erection of physical barriers between work and non-work areas to prevent contamination.
d. Housekeeping: Clean frequently to remove construction dust and debris. Promptly clean up spills. Remove accumulated water and keep work areas dry to discourage the growth of mold and bacteria. Take extra measures when hazardous materials are involved.
e. Scheduling: Control the sequence of construction to minimize the absorption of VOCs by other building materials.
1.9.2.1.2 Moisture Contamination
a. Remove accumulated water and keep work dry.
b. Use dehumidification to remove moist, humid air from a work area .
c. Do not use combustion heaters or generators inside the building.
d. Protect porous materials from exposure to moisture.
e. Remove and replace items which remain damp for more than a few hours.
1.9.2.2 Requirements after Construction
After construction ends and prior to occupancy, conduct IAQ testing in accordance with ASHRAE 189.1 Section 10.3.1.4.
In the event that IAQ testing fails, conduct a building flush-out in accordance with ASHRAE 189.1 Section 10.3.1.3 [ and TPC requirements] . The space shall be ventilated at a minimum rate of 1.5 Liters per second per square meter of outdoor air while maintaining an internal temperature of at least 15 degrees C (60 degrees F) and no higher than 27 degrees C (80 degrees F) and relative humidity no higher than 60%. Total air volume of outdoor air will be determined by ASHRAE 189.1 Section 10.3.1.4 Equation 10-1. Total volume of outdoor air shall be approved by the Contracting Office prior to building flush-out
Air contamination testing must be consistent with EPA's current Compendium of Methods for the Determination of Air Pollutants in Ambient Air. After building flush-out or testing and prior to occupancy, replace filtration media. Filtration media must have a MERV of 13 as determined by ASHRAE 52.2 .
1.10 PROGRESS AND COMPLETION PHOTOGRAPHS
Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600 by 1200 by 24 bit true color 300 DPI minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of [20] 50 digital photographs each week throughout the entire project [ and [20] 50 digital photographs at completion of project ] . Submit the Initial Site Conditions Photos , Monthly Progress Photos [ , and Construction Completion Photos ] . Indicate photographs demonstrating environmental procedures. Provide photographs for each month in a separate monthly directory and name each file to
SECTION 01 11 00.00 10 Page 12 indicate its location on the view location sketch. Include a date designator in file names. Cross reference submittals in the appropriate daily report. Photographs provided are for unrestricted use by the Government.
1.11 BASE REGULATIONS
The Contractor and Subcontractor(s) shall become familiar with and obey all base regulations, including fire, traffic, safety, and security regulations. All Contractors shall keep within the limits of the work (and avenues of ingress and egress), and shall not enter any restricted areas unless required to do so and are cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.
1.11.1 Request for Contractor's Employee Passes and Vehicle Passes
No employee or representative of the Contractor shall be admitted to the work site without a Contracting Officer's furnished authorized admittance. Refer to USAG-J Regulation 190-13 . Prior to the start of on-site work, submit applications for base passes to the Contracting Officer for key employees (project manager, site supervisor, interpreter, etc.) for long term DBIDS passes. The Contractor (through the employment of a Pass Coordinator) , with assistance from the Resident Office, is responsible for securing sufficient passes for other workers, including subcontractor's employees and vehicles, required to access the base for the project duration. Additional personnel data shall also be furnished.
The Contractor shall use the USAG-J Form 1529 "EZ Pass" as the primary means of obtaining passes for all personnel who do not qualify for DBIDS passes. The USAG-J Form 1529 "EZ Pass" One Time/Multiple Access Roster must be complete and submitted to the Provost Marshall Pass and Vehicle Registration Office a minimum of three (3) U.S. workdays prior to access.
The use of the USAG-J "one day" pass (AJ Form 47) should be avoided, and used only for urgent situations. Applicants for a "one day" pass may be required to wait for several hours for their pass to be issued.
Contractor personnel applying for more than one (1) "one-day" pass within any 15-day period will not be issued multiple one-day passes, and will instead be required to apply for access via the USAG-J Form 1529, and wait three or more days for approval.
Provide all information required for background checks to meet base access requirements to be accomplished by Base Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. The Government reserves the right to make changes to the Contractor security requirements or processes due to a change in the Force Protection Condition (FPCON).
In addition to security requirements, cranes, delivery "unic" trucks, forklifts, backhoes, and other equipment capable of vertical lift operations must comply with NAVFAC rules for access to the base. Refer to NAVFAC P-307 . The operator must submit a P-1 Pass request and submit the equipment, its records, and operator records for inspection by Public Works prior to the initial entry onto base property. Vehicle passes for vertical lift equipment must be renewed monthly with Public Works as long as the equipment remains on base property.
SECTION 01 11 00.00 10 Page 13
Upon completion of this Contract, return all employee and vehicle passes to the base, and obtain a certification of receipt. Final payment shall be withheld until all passes have been returned.
1.11.2 No Smoking Policy
Smoking is prohibited on installations except in designated smoking areas. This applies to existing buildings, buildings under construction, and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer shall identify designated smoking areas.
1.11.3 Munitions and Explosives of Concern (MEC)
Munitions and Explosives of Concern (MEC): Unexploded Ordnance (UXO), Material Presenting a Potential Explosive Hazard (MPPEH), Chemical Agents (CA), or Discarded Military Munitions (DMM) on jobsites shall be treated as extremely dangerous and must be reported immediately. Follow the 3Rs:
RECOGNIZE, RETREAT, and REPORT. In the event MEC are discovered or uncovered, immediately stop work in that area and immediately inform the Contracting Officer's Representative. Contractor shall provide dispatch and Contracting Officer's Representative with specific location of the item. Contractor personnel shall stop work in the immediate vicinity of the discovery and maintain a minimum distance of 300 meters from the item.
Contractor shall maintain flexibility in redirecting personnel and work effort in the event that items possessing an explosive hazard are discovered and construction personnel are excluded from areas during the destruction/removal process.
1.11.3.1 Additional Requirements for Camp Foster
All workers on site involved in the earthwork, in any manner, must attend a UXO brief on Marine Camp Foster. Upon completion of the brief, the worker will receive a laminated card verifying that they attended the brief. The card does not expire and is valid for all USACE construction contracts on Okinawa, but is non-transferrable between workers. The USACE team will help coordinate the training and assist with processing base access requests for Marine Camp Foster as needed. The brief is free of charge, but the contractor is responsible for all other costs associated with transport, labor, and all other costs related to the training. The expected duration of this training is two hours.
1.11.4 Unexploded Ordnance (UXO) Procedures on Kadena Air Base
Kadena Air Base 718 CES/CEN assesses the area as UXO unlikely with a low probability of uncovering UXO's on the site. However, since there is always a possibility of encountering UXOs anywhere on Okinawa, albeit unlikely at this location, excavations and other construction activities related earth work on the project site, require a measure of caution. The Ground Penetrating Radar (GPR) survey specified in 01 35 26 paragraph "Utilities Within and Under Concrete, Bituminous Asphalt, and Other Impervious Surfaces" for the identification of underground utilities will identify anomalies. Best practices of conducting GPR surveys are to repeat them in areas greater than the used method's level of detection (LOD), down to a depth of 2 meters, to ensure no utility lines or other suspicious objects are present. If suspected UXOs are identified, the construction team needs to follow the standard UXO notification procedures per the Kadena policies identified in attachment 01 11 00.00 10-[B] "UXO Emergency Mitigation Steps and Survey Policies." The contact number for
SECTION 01 11 00.00 10 Page 14 the Emergency Dispatch Center for Kadena Air Base is 098-934-5911. See the following website for additional information:
www.kadena.af.mil/About-Us/Emergency-Actions/ .
1.12 ORDER OF WORK
1.12.1 Schedule
Schedule all work to cause the least amount of interference with activity operations. Permission to interrupt any activity or roads shall be requested in writing a minimum of 30 calendar days prior to the desired date of interruption. Interruptions of activities, roads, and utility services shall be allowed only when they will not cause interference with the operations of the activity. The Contractor shall remove and dispose off Government property all Contractor generated debris at the end of each shift, or more frequently if required, to keep the space usable. Upon award of this Contract, the Contractor shall begin and complete all required work; ready for use and including cleanup, within the time period specified on this Contract. All work scheduled in occupied areas shall be accomplished in such a manner as to cause the least possible inconvenience to the occupants.
1.12.2 Working Hours
Normal Working Hours and Days are Monday through Friday, 0800 hours through 1700 hours. Saturday work is allowed on this contract and does not require additional approvals. Notify the Contracting Officer at least three days in advance when scheduling Saturday work.
1.12.3 Noise and Vibration
Noise greater than 70 decibels and vibration producing work in occupied buildings shall be conducted outside core school/business hours (0700 - 1430) unless written permission is given by the Contracting Officer.
1.12.4 Work Outside of Regular Hours
If the Contractor desires to carry on work outside the regular hours, on Sundays, or holidays, a written application shall be submitted to the Contracting Officer or his representative for approval. The Contractor shall allow three working days notice to enable satisfactory arrangements to be made by the Government for inspecting the work in progress. If work is to be accomplished after daylight hours, the Contractor shall illuminate the area in a manner approved by the Contracting Officer or their representative and in accordance with EM 385-1-1 . Unless directed by a Contracting Officer, work accomplished outside regular working hours shall be at no additional cost to the Government.
1.13 NUCLEAR DENSOMETER TESTING
Nuclear densometer testing and all forms of radiography are not permitted on U.S. Navy installations in Japan because such testing may interfere with Government of Japan monitoring activities.
1.13 FIRE PREVENTION DURING CONSTRUCTION
1.13.1 General
Comply with all pertinent fire prevention provisions of the US Army Corps
SECTION 01 11 00.00 10 Page 15 of Engineers Manual EM 385-1-1 , NFPA 241 and shall follow the Installation fire regulations. Prior to commencement of welding or other hot work operations, obtain approval from the Installation Fire Chief.
1.13.2 Supply
No more than one day's supply of paint, paint materials, or compounds shall be allowed within the area of the building, and shall be removed from the job site after each working day.