This is a Notice of Procurement (NOP) for Architect-Engineer (A-E) services issued by the U.S. Army Corps of Engineers, Japan District on March 27, 2026, with amendments issued on April 16 and May 11, 2026. The solicitation number is W912HV26RA012, and responses are due by May 28, 2026 at 2:00 PM Japan Standard Time. The procurement seeks A-E services under the Brooks A-E Act and FAR Part 36 to support the Host Nation construction program and Japan District internal requirements at various locations throughout Japan. The acquisition will have a total aggregate capacity of $49 million shared among all awardees, with a target of 10 to 15 multiple Indefinite Delivery Contracts (IDCs) to be awarded to the most qualified firms. The period of performance is five years from contract award, with services implemented through negotiated firm-fixed price task orders ranging from $2,500 to $500,000. This is a full and open competition with NAICS Code 541330 (Engineering Services).
Only local sources physically located in Japan and licensed to perform A-E work in Japan are eligible. Prime contractors must be fully registered in the System for Award Management (SAM) with an active JCAGE code and a Japan physical address that matches the SF330 submission, and must maintain Cybersecurity Maturity Model Certification (CMMC) Level 1 certification. Firms will be evaluated based on five criteria in descending order of importance: specialized experience and technical competence in Japan Host Nation construction programs and Japanese construction methods; professional qualifications of 12 key personnel disciplines (Project Manager, Architect, Civil Engineer, Structural Engineer, Mechanical Engineer, Electrical Engineer, Communications Engineer, Fire Protection Engineer, Geotechnical Engineer, Cost Engineer, Surveyor, and Facilitator); past performance for quality of work, schedule compliance, and management effectiveness; capacity to accomplish up to four simultaneous task orders at separate locations; and volume of Department of War contract awards within 24 months (secondary criterion). Submissions must include SF330 Parts I and II, SAM registration documentation, and not exceed 120 pages. Submissions are electronic only via email or DoD SAFE drop-off link.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 NOP RFI Questions.pdf | ||
| NOP New POJ HN MATOC 2026_ Amd 1_April 16 2026.pdf | ||
| PPQ Form.pdf | ||
| Notice of Procurement_Host Nation AE IDC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 1, 16 April 2026 Amendment 2, 11 May 2026
Subject: Notice of Procurement for Multiple Indefinite Delivery / Indefinite Quantity for Architect-Engineer Services to Support the Host Nation Construction Program and Japan District Internal Requirements, Various Locations, Japan
Amendment 1 – April 16, 2026 The purpose of this amendment is to extend the response due date to May 27, 2026. This extension will provide the government additional time to address the submitted Requests for Information (RFIs) and allow offerors sufficient time to respond to the revised due date. A subsequent amendment (Amendment 2) will be issued to provide the government’s responses to the RFIs.
Amendment 2 – May 11, 2026 The purpose of this amendment is to provide the government’s response to questions that were asked. Please reference the updates for Amendment 2 in red font within this document and “Attachment 1: NOP RFI Questions and Government Response”. The due date remains the same.
Document type: Pre-Solicitation Notice Solicitation Number: W912HV26RA012 Posted date: 27 March 2026 Response date: 29 April 2026, 27 May 2026 28 May 2026 at 2:00 PM Japan Standard Time Classification code: C – Architect and Engineering Services NAICS Code: 541330, Engineering Services Set-aside status: Full and open competition
Contracting Office Address U.S. Army Corps of Engineers, Japan District ATTN: Contracting Division (CECT-POJ-S) Building 250, Room 147, Camp Zama Zama-shi, Kanagawa-ken, Japan 252-8511
Synopsis:
Only local sources will be considered under this Notice of Procurement. Local sources are sources (e.g. corporations or partnerships) that are physically located in Japan and authorized (i.e. licensed and registered) to perform the type of work specified in this solicitation in Japan.
Specifically, a prospective offeror must be duly authorized to operate and conduct business in Japan and must fully comply with all laws, decrees, labor standards, and regulations of Japan during the performance of the resulting contracts. To be considered a local source which is eligible to compete for this requirement an offeror must meet all of the following conditions:
a. The Prime Contractor within the firm must be fully registered with an active record in the System for Award Management (SAM), showing a JCAGE code and a physical address of the company’s location in Japan. Records that are pending completion or approval in SAM are not considered fully registered.
b. The physical address of the Prime Contractor within the firm as shown on the submitted Standard Form 330 (SF330) must be the same physical address shown in the active SAM record.
c. The record in SAM for the Prime Contractor within the firm must be complete and active at the time of receipt by the Government.
d. The Prime Contractor/Joint Venture shall be Cybersecurity Maturity Model Certification (CMMC) Level 1 certified within the Procurement Integrated Enterprise Environment (PIEE)/Supplier Performance Risk System (SPRS) at the time of SF330 receipt in order to be evaluated. If selected, contractors will be required throughout the duration of the contract to maintain the CMMC Level 1 certification. Each individual Task Order will state the CMMC Level required for that individual Task Order Please reference the U.S Department of War CMMC requirements in the link below:
CIO - Cybersecurity Maturity Model Certification
Offerors who submit an SF330 for which these conditions are not met will be considered ineligible to compete as a local source and will not be evaluated
Offerors may obtain information on registration and annual confirmation requirements via website at https://www.sam.gov/SAM/
The use of the term “offeror” and “firm” may be used interchangeably and pertains to the prime contractor(s) and all subcontractor(s).
1. DESCRIPTION / CONTRACT INFORMATION. This contract is being procured in accordance with the Brooks Architect-Engineer (A-E) Act and Federal Acquisition Regulations (FAR) Part 36. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. A-E services are required for multiple Indefinite Delivery Contracts (IDCs) to support the Host Nation (HN) construction program and Japan District (POJ) Internal Requirements from non-Military Construction (MILCON) appropriations in Japan. The acquisition will have a total aggregate capacity of $49 Million (M) shared amongst all awardees.
A target of ten (10) to fifteen (15) IDCs will be awarded. Contracts will be awarded to the most highly qualified firms. The period of performance will be five (5) years from the contract award date. Services will be implemented through negotiated firm-fixed price task orders (TOs) having a magnitude ranging from $2,500 to $500,000. TO selections will be determined based on a firm’s qualifications for each specific project as demonstrated by their most recently updated Standard Form 330 or supplements thereto. The Government reserves the right to obtain updates to an A-E firm’s qualifications prior to issuance of each Request for Proposal (RFP) for a TO.
Depending on the competition for this Notice of Procurement the Government may award fewer than the target number of IDCs. The Government is not obligated to award the maximum number of IDCs identified in this solicitation.
2. PROJECT INFORMATION. The anticipated work will support the preparation of criteria documents for the Japan HN funded construction program, and related efforts for U.S.
Department of War (DoW) *** service components and support agencies in Japan. Other https://dodcio.defense.gov/CMMC/ services may include POJ internal requirements for studies, designs, investigations or other professional A-E services which are funded by non-MILCON appropriations and are required to further the mission of POJ or improve facilities where POJ maintains office spaces. Projects are located on U.S. Military Installations throughout Japan. Design criteria will be based on U.S.
DoW requirements. However, deliverables must address local HN construction methods and materials that meet the intent of U.S. criteria in order to facilitate the use of local construction practices. Services and deliverables may include, but are not limited to, criteria packages, studies, investigations, criteria development, design, construction surveillance services, and other general engineering support.
3. SELECTION CRITERIA. For the purposes of evaluating selection criteria, the use of the term “offeror” and/or “firm” means the entity/entities listed as the prime contractor(s), Joint Venture (JV) contractor(s), and all subcontractor(s) in the Architect-Engineer Qualifications – Standard Form 330 (SF330), Part I, Section C. The Government will evaluate an offeror’s qualifications against the selection criteria based on the information presented in their SF330.
The selection criteria are listed below in descending order of importance (first by major criterion and then by sub‐criterion). Criteria “a” through “d” are primary selection criteria. Criteria “e” is considered secondary and will only be used as a “tie‐breaker” among firms that are considered technically equal.
a. SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE.
Sub-criterion (1): Knowledge and experience of the Japan HN construction program including, but not limited to, the preparation of Japan HN criteria documents.
Sub-criterion (2): Knowledge and experience with Japanese construction criteria, methods, materials, and standards. Demonstrate the ability to address U.S. DoW requirements while facilitating and maximizing the use of local materials and construction methods.
Sub-criterion (3): Knowledge and experience with conducting studies, designs, investigations, and other miscellaneous A-E services for U.S. DoW projects. Examples of these services may include, but are not limited to, studies of equivalent materials, products, and construction methods; construction market surveys; and condition assessments/improvements of existing facilities, networks, and/or infrastructure used in Japan.
SF330 requirements for sub-criterion (a)(1) and (a)(2): A maximum of 10 (ten) example projects may be submitted to demonstrate a firm’s specialized experience and technical competence described under sub-criterion (a)(1) and (a)(2). Use a separate, numbered, SF330, Part I, Section F for each project and clearly identify projects that are HN Funded and indicate if the project was a Basic Criteria Package (BCP), Criteria Package (CP), or other. Example projects must have contract completion dates within ten (10) years of the closing date for this announcement.
Ongoing projects may be included as example projects in Section F, but will be evaluated less favorably than completed projects. Ongoing projects must be beyond the Pre-Final Report phase for report preparation or beyond the intermediate design phase for design document preparation as of the closing date for this announcement to be considered. Identify any of the firm’s prime contractor(s) and subcontractor(s) involved with an example project in Section F Block 25 and state the role and approximate level of effort (percentage of total contract value) for each. HN funded projects may be evaluated more favorably than non-HN funded projects and higher complexity efforts may be rated more favorably than lower complexity efforts. In addition, a firm’s history of prior working relationships amongst prime(s) and subcontractor(s), and the overall level of involvement of the firm for the experience presented may be considered in the rating.
For purposes of evaluating selection criteria, the use of the term “project” means a single undertaking executed via a single-award contract or task order. A “project” is not considered a cumulative effort of single-award contracts or task orders. An IDC / Indefinite Delivery Indefinite Quantity (IDIQ) contract is not considered a project on its own, but a task order awarded under an IDC or IDIQ would be considered to be a single “project”. Additional information pertaining to sub-criterion (a)(1) and (a)(2) may be provided under SF330 Part I, Section H. The offeror may also include additional example projects in SF330 Part I, Section H, but the information shall be limited to the project title, location, completion date, project owner, and project summary.
SF330 requirements for sub-criterion (a)(3): Describe the firm’s specialized experience and technical competence related to Studies, Designs, Investigations, and other miscellaneous A-E services for sub-criterion (a)(3). Provide relevant information under SF330 Part I, Section H.
Offerors that provide documentation in all categories will be considered favorably.
b. PROFESSIONAL QUALIFICATIONS.
Provide two (2) key personnel for each discipline. Failure to provide two (2) key personnel for each discipline identified below may result in an unfavorable rating. Key personnel in each discipline must be registered, licensed, or certified in the appropriate professional field. The Government will evaluate each individual’s education, training, registrations, certifications, overall and relevant experience, and longevity with the firm. Emphasis will be placed on longevity with the firm and participation in the example projects provided under SF330, Part I, Section F. This criterion focuses on the qualifications of key personnel for the contract and not the quantity of personnel, which is addressed under the "capacity to accomplish the work" criterion.
Key Personnel:
1) Project Manager
2) Architect: 1st Class Kenchikushi or U.S. Registered Architect
3) Civil Engineer: 1 Kyu Dobokusekoukanrigishi w/ Registered Civil Engineering Consulting Manager (RCCM) certification or U.S. Registered Civil Engineer
4) Structural Engineer: 1st Class Kenchikushi or U.S. Registered Structural Engineer
5) Mechanical Engineer: 1st Class Kenchikushi (Setsubi Sekkei); Kenchiku Setsubishi;
1st Class Sekou Kanrigishi or U.S. Registered Mechanical Engineer
6) Electrical Engineer: 1st Class Kenchikushi (Setsubi Sekkei); Kenchiku Setsubishi;
1st Class Sekou Kanrigishi or U.S. Registered Electrical Engineer
7) Communication Engineer: 1st Class Kenchikushi (Setsubi Sekkei) or U.S. Registered
Communications Distribution Designer (RCDD)
8) Fire Protection Engineer: U.S. Registered Professional Engineer (P.E.) who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveying (NCEES) and has relevant fire protection engineering experience
9) Geotechnical Engineer: 1 Kyu Dobokusekoukanrigishi w/ RCCM Doshitsu Oyobi
Kiso Certification or U.S. Registered Geotechnical Engineer
10) Cost Engineer
11) Surveyor: Sokuryo Shi or U.S. Registered Land Surveyor
12) Facilitator: A facilitator is often only required for large or complex projects. A facilitator (when required) shall lead discussions during larger meetings and On- Board Reviews (OBRs). The facilitator shall have a good understanding of the CP and BCP process.
SF330 Requirements for sub-criterion (b): Resumes of key personnel shall be indicated in the SF330, Part I, Section E. Use a separate Section E for each individual. Clearly indicate key personnel's qualifications in block 17 of each Section E entry. The same individual may be considered under different key personnel.
c. PAST PERFORMANCE
Firms will be evaluated on past performance for quality of work products, compliance with project schedules, and effectiveness of management on projects that are considered “Relevant” or higher under Primary Selection Criteria (a)(1). Emphasis will be given to evaluations for example projects presented under SF330, Part I, Section F. Past performance evaluations will be retrieved through the Government’s Past Performance Information Retrieval System (PPIRS) as managed by the Contractor Performance Assessment Reporting System (CPARS). PPIRS is the primary source of information on past performance. Performance evaluations may be queried for all firms including subcontractors. Any credible, documented information on past performance may be considered, but the Government is not required to seek other information on past performance if none is available through PPIRS. Complete evaluations will be reviewed if a board is considering downgrading or eliminating a firm due to adverse past performance evaluations. (Note: Past Performance Questionnaires (PPQ) can be used to provide or supplement a firm’s past performance with other than U.S. Governmental clients. Firms which choose to use the PPQ may obtain it by downloading it from the other documents published with this Notice of Procurement.)
NOTE: If no relevant past performance information is available to evaluate, or if the record is so sparse that no meaningful rating can be reasonably assigned, the offeror will be assigned a rating of neutral and shall not be evaluated favorably or unfavorably.
SF330 requirements for sub-criterion (c): Provide relevant past performance information under SF330 Part I, Section H.
d. CAPACITY TO ACCOMPLISH THE WORK
The Government will consider a firm’s experience with similar size and complexity of projects and the available capacity of resources when evaluating the capacity of a firm to perform the assigned work in the required time. Demonstrate the firm’s capacity to accomplish up to four (4) task orders simultaneously. The ability to execute multiple task orders, at separate locations and simultaneously within Japan, may be considered more favorably. Firms will be evaluated on their capability to perform the assigned work based on a list of the firm’s total number of employees by Branch for each discipline identified under criterion b. Professional Qualifications and on their management approach to accomplish multiple task orders simultaneously.
SF330 requirements for sub-criterion (d): Provide information to demonstrate capacity to accomplish work under SF330, Part I, Section H and SF330, Part II.
e. VOLUME OF DoW CONTRACT AWARDS (SECONDARY CRITERIA)
Specify the total volume of work awarded to the firm by DoW agencies within 24 months of NOP closing. When identifying the total volume of work, include the value of all stand‐alone or Indefinite Delivery Contract (IDC) task orders, including modifications, issued by DoW agencies. Do not include the estimated or actual construction cost of the projects. Do not include the potential value of an IDC, nor options which have not been exercised.
SF330 requirements for sub-criterion (e): Provide requested information under SF330 Part I, Section H.
4. SUBMISSION REQUIREMENTS. Architect-Engineer firms that meet the requirements described in this announcement are invited to submit a copy of:
a. SF330, Part I, Sections A through I, Architect-Engineer Qualifications, Contract-Specific Qualifications for the prime A-E and all proposed sub-consultants.
b. SF330, Part II, Architect-Engineer Qualifications, General Qualifications (the prime A-E and all proposed sub-consultants must submit current SF 330 Part II).
c. Copy of the firms’ SAM registrations to verify that the firm is eligible to compete as a local source.
The submittals must reach the specified office below no later than the response date shown above on this announcement. It is important to allow enough time for submissions to reach the below specified office before the due date. Facsimile submittals will not be accepted. Hard copies will not be accepted. Only electronic submissions will be accepted. Submit electronical to the Government points of contact listed below.
The government’s preference is by email. You may submit a request for a DoD SAFE Drop-off link. Your NOP response will be required to be received by the due date and time per the NOP.
If requesting a DoD SAFE drop-off link, it is recommended that the link be requested by 26 May 2026 at 2:00pm Japan Standard Time. The government is not responsible for system/network issues that may result in late delivery times. Whichever method the contactor uses to provide their NOP responses (by email or DoD SAFE), the NOP response must be received by the NOP Response day/time. DOD SAFE does not guarantee delivery time and has size limitations.
Please see the DoD SAFE website for details: https://safe.apps.mil/
Submissions shall not exceed one hundred twenty (120) standard 8.5” x 11” pages. Only numbered pages will be recognized and evaluated. Use fonts no smaller than ten (10)-point. Do not repeat information from SF 330, Part I, Sections A through G in Section H. For submissions that exceed one hundred twenty (120) pages, only the first one hundred twenty (120) pages may be considered for evaluation. The 120-page limit applies to the SF330, Part I. SF330, Part II is not counted towards the page limit, and the SAM record is not counted towards the page limit.
CPARS reports and PPQs are not counted in the page limit. Tabs and dividers will not count toward the page limit.
Any questions, requests for explanation or interpretation of this NOP must be submitted to the Government point of contacts listed below by 2:00 P.M. Japan Standard Time on 10 April 2026.
Government points of contact at Camp Zama
Mr. Thomas P. Hartman II Contract Specialist 011-81-46-407-8834 (from U.S.)
046-407-8834 (from Japan) thomas.p.hartman@usace.army.mil
Mr. Michael F. Morris Contracting Officer 011-81-46-407-8724 (from U.S) 046-407-8724 (from Japan) michael.f.morris@usace.army.mil
*** Department of Defense (DoD) and Department of War (DoW) refer to the same entity and can be used interchangeably.
Attachment 1: NOP RFI Questions and Government Response
File details come from the government source that posted it. Updated .