W912HV-22-B-0010 AM-0002 Specifications.pdf
PDF 5 MB Posted
- Solicitation number
- W912HV-22-B-0010
About this file
This is a solicitation for a construction project. The solicitation is for the construction of a new Defense Logistics Agency Operations Support Facility on the Chibana Compound at Kadena Air Base in Okinawa, Japan. The project will provide a modern operations headquarters to replace eight existing administrative buildings. The scope of work includes mobilization, demolition, abatement work, disposal, construction of the operations support building and supporting facilities, and associated electrical, communication, water, sewer and site utilities. The project will have planned phasing as existing facilities will remain occupied during construction of the new facility.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 78 PAGES
FY22 Operations Support Facility, Chibana Compound
01 11 00.00 10 SD-01 Preconstruction Submittals
1.11Initial Site Conditions Photos
1.7 GKey Personnel Qualifications
1.10.2Conformed Drawings Submittal
SD-07 Certificates
1.11Monthly Progress Photos
01 22 00.00 10 SD-07 Certificates
3.2 GBill Of Lading
3.2 GBill Of Lading
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
1.8.1 GSubmittal Register Monthly
Update
01 33 29 SD-01 Preconstruction Submittals
1.4 GQualifications for the
Sustainability Professional
3.1.1 GSustainability Implementation
Plan
2.2 GSustainability Notebook
SD-11 Closeout Submittals
3.1.4 GFinal Sustainability Notebook
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
(AM-0002)
W912HV-22-B-0010
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 78 PAGES
01 35 26 SD-01 Preconstruction Submittals
1.7.2.2 GStandard Lift Plan
1.7 GAccident Prevention Plan (APP)
1.7.2.3 GCritical Lift Plan
3.1.2 GEquipment Containing
Radioactive Materials
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.3 GCrane Operators/Riggers
1.8 GActivity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
1.4 GIndoor Air Quality (IAQ)
Management Plan
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.2Written Practices
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
(AM-0002)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 78 PAGES
01 45 35 SD-06 Test Reports
3.1.2Daily Reports
3.1.2Biweekly Reports
SD-07 Certificates
1.5 GSpecial Inspector
SD-11 Closeout Submittals
3.1.2Interim Final Report
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
3.3.2 GTemporary Utility Connections
Plan
01 57 19.01 SD-01 Preconstruction Submittals
1.8.1Preconstruction Survey
1.9.12.1 GSolid Waste Management Permit
1.8.2Regulatory Notifications
1.9 GEnvironmental Protection Plan
1.9.8.2 GDirt and Dust Control Plan
1.8.4 GEmployee Training Records
3.8.1 GWaste Determination
Documentation
1.8.3 GLicenses/Permits/Notifications
1.9.9.1 GStormwater Pollution Prevention
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 78 PAGES
01 57 19.01 1.9.9.1 GStormwater Pollution Prevention
Plan
SD-06 Test Reports
3.8.1.1.2Laboratory Analysis
3.2.2Inspection Reports
3.8.2.1 GSolid Waste Management Report
3.7.2Nonhazardous Solid Waste
Diversion Report
1.9.11.2Hazardous Waste Analysis
Report
SD-07 Certificates
1.8.4 GEmployee Training Records
1.9.12.1Solid Waste Management
License
1.7.1Asbestos Certification
1.7.2Lead Certification
3.11 GWritten Assessment Of Friable
Asbestos Disturbance
SD-11 Closeout Submittals
3.8.1 GWaste Determination
Documentation
3.8.3.5 GDisposal Documentation for
Hazardous and Regulated Waste
1.8.4 GAssembled Employee Training
Records
1.9.12.1 GSolid Waste Management Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 78 PAGES
01 57 19.01 3.8.2.1 GSolid Waste Management Report
3.8.3.1 GHazardous Waste/Debris
Management
1.8.2 GRegulatory Notifications
3.8.2.1Sales Documentation
1.11Environmental Records Binder
3.8.2.1Contractor Certification
1.10General Use Permitted
Equipment
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7Records
01 78 00 SD-03 Product Data
1.7.1 GWarranty Management Plan
1.7.5Warranty Tags
3.8Final Cleaning
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 78 PAGES
01 78 00 3.3 GRecord Drawings
1.7.1 GAs-Built Record of Equipment
and Materials
3.6 GAs-Built Record of Equipment
and Materials
3.4 GFinal Approved Shop Drawings
3.5 GConstruction Contract
Specifications
3.9 GInterim DD FORM 1354
3.9 GChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 91 00.15 SD-01 Preconstruction Submittals
1.7 G DOCommissioning Firm
1.7.1 G DOLead Commissioning Specialist
1.7.2 G DOTechnical Commissioning
Specialists
1.7 G DOCommissioning Firm's Contract
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 78 PAGES
01 91 00.15 3.1.3 G DODesign Review Report
3.1.2.1 G DOInterim Construction Phase
Commissioning Plan
3.1.2.2 G DOFinal Construction Phase
Commissioning Plan
3.1.2.1.3 G DOTemplate Building Envelope
Inspection Checklists
3.1.5.2 G DOBuilding Envelope Inspection
Checklists
3.1.5.3 G DOPre-Functional Checklists
1.9Issues Log
3.2 G DOCommissioning Report
3.3.1 G DOPost-Construction Trend Log
Report
SD-07 Certificates
1.10 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.6 G ROTraining Plan
3.1.6 G ROTraining Attendance Rosters
3.1.7 G DOSystems Manual
3.1.8 G DOMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.1.2.1 S DOConstruction Phase
Commissioning Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 78 PAGES
01 91 00.15 3.2 S DOFinal Commissioning Report
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.7 GNotification
SD-11 Closeout Submittals
3.3.1Receipts
02 82 00 SD-03 Product Data
1.2.2Amended Water
1.3.9Safety Data Sheets (SDS) for All
Materials
2.1Encapsulants
3.1.2.1Respirators
3.1.7Local Exhaust Equipment
3.1.7Pressure Differential Automatic
Recording Instrument
3.1.8Vacuums
3.1.10 GGlovebags
SD-06 Test Reports
1.5.6Air Sampling Results
1.5.7Pressure Differential Recordings for Local Exhaust System
3.2.12.2Encapsulation Test Patches
3.2.13.5 GClearance Sampling
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 78 PAGES
02 82 00 3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
1.3.4Employee Training
1.3.5 GNotifications
1.3.7Respiratory Protection Program
1.3.10Asbestos Hazard Abatement Plan
1.3.11Testing Laboratory
1.3.12Landfill Approval
1.3.12Delivery Tickets
1.3.12 GWaste Shipment Records
1.3.13Transporter Certification
1.3.14Medical Certification
1.5.2 GPrivate Qualified Person
Documentation
1.5.3 GCompetent Person
1.5.4Worker's License
1.5.5Contractor's License
1.5.10GOJ, Prefectural or Local
Citations on Previous Projects
2.1Encapsulants
3.1Equipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3Water Filtration Equipment
3.1.8Vacuums
3.1.8Ventilation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 78 PAGES
02 82 00 SD-11 Closeout Submittals
1.3.5Permits and Licenses
1.3.5Notifications
1.3.7.1Respirator Program Records
1.5.9Protective Clothing
Decontamination Facility
Notification
1.7.1Rental Equipment
1.5.8Protective Clothing
Decontamination Quality Control
Records
02 82 13.00 30 SD-01 Preconstruction Submittals
1.5.2.5 GMedical Examinations
3.3 GSampling Plan
3.3.2 GAsbestos Sampling Plan
SD-04 Samples
3.4.3 GAsbestos Sampling/Assessment
Record
SD-06 Test Reports
3.4 GAsbestos Sampling And Analysis
Report
3.2.3 GLaboratory Analysis
3.2.1 GLaboratory Analysis Reports
SD-07 Certificates
1.5.2.11 GCertificate Of Workers
Acknowledgment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 78 PAGES
02 82 13.00 30 3.1 GAsbestos Hazard Abatement Plan
SD-11 Closeout Submittals
1.4.3 GHazardous Waste Manifest
1.5.2.12 GHazardous Waste Manifest
3.2.5 GHazardous Waste Manifest
02 83 00 SD-01 Preconstruction Submittals
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead, Cadmium, Chromium
Waste Management Plan
1.5.4 GLicenses, Permits and
Notifications
1.5.5 GOccupant Protection Plan
1.5.2.2 GLead, Cadmium, Chromium
Compliance Plan (LCCCP)
3.1.1.6 GLead, Cadmium, Chromium
Compliance Plan (LCCCP)
3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1 GRespirators
1.6.4 GVacuum Filters
1.6.7 GNegative Air Pressure System
2.1 GMaterials and Equipment
2.1.1 GExpendable Supplies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 78 PAGES
02 83 00 3.1.1.5 GLocal Exhaust Equipment
3.1.1.5 GPressure Differential Automatic
Recording Instrument
3.1.1.6 GPressure Differential Log
SD-06 Test Reports
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3 GSampling Results
1.5.3 GPressure Differential Recordings
For Local Exhaust System
SD-07 Certificates
3.1.1.1 GNotification of the
Commencement of LBP Hazard
Abatement
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
3.5.2.1 GTurn-In Documents or Weight
Tickets
02 83 19.00 30 SD-01 Preconstruction Submittals
1.4.1.1 GLead Hazard Abatement Plan
SD-06 Test Reports
1.4.1.2.1 GLaboratory Results
1.4.1.2.1 GToxicity Analysis
SD-11 Closeout Submittals
1.4.1.3 GHazardous Waste Manifest
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 78 PAGES
02 84 16 SD-07 Certificates
1.8.1 GQualifications of IH/PQP
1.8.2 GPCB and Lamp Removal and
Disposal Work Plan
1.8.3 GPCB and Lamp Removal and
Disposal Work Plan
3.5.1 GJapan Specially Controlled
Hazardous Waste Disposal Permit
3.5.2 GJapan Industrial Waste Collection
And Transport Permit
SD-11 Closeout Submittals
3.5.5 GTransporter certification
3.2.4Certification of Decontamination
3.5.6.2Disposal Request Form
3.5.3Copy E of the Japan Hazardous
Waste Manifest
3.3.1Signed Ballast Turn-in (at Bldg
3625) Sheet
02 84 16.01 SD-07 Certificates
1.5.2 GQualifications of IH/PQP
1.5.2 GTraining Certification
1.5.4 GPCB and Lamp Removal and
Disposal Work Plan
3.5.1 GJapan Industrial Waste Disposal
Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 78 PAGES
02 84 16.01 3.5.2 GJapan Industrial Waste Collection
And Transport Permit
SD-11 Closeout Submittals
3.5.3Copy E of the JIWM
3.3.1 GSigned Ballast Turn-In (At Bldg
3625) Sheet
03 30 00 SD-01 Preconstruction Submittals
1.6.6 GQuality Control Plan
1.6.7 GQuality Control Personnel
Certifications
1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
SD-02 Shop Drawings
2.1Formwork
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.6Vapor Barrier
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 78 PAGES
03 30 00 2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
2.2.3Biodegradable Form Release
Agent
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.13.2.3 GCompressive Strength Tests
3.13.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.8Welder Qualifications
1.6.3.1Safety Data Sheets
1.6.7.2Field Testing Technician and
Testing Agency
2.4.1Curing Compound
04 20 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 78 PAGES
04 20 00 1.5.1 GHot Weather Procedures
2.2.2.1.1 GCement
2.4.1.1 GCementitious Materials
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
SD-06 Test Reports
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
SD-07 Certificates
1.3.1Special Masonry Inspector
Qualifications
2.2.2.1Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.2.2Admixtures for Grout
2.6.1Anchors, Ties, and Bar
Positioners
SD-08 Manufacturer’s Instructions
2.4.2.2Admixtures for Grout
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 78 PAGES
05 12 00 2.4.2Non-Shrink Grout
SD-07 Certificates
1.3MLIT Structural Steel Fabricator
Quality Certification
1.3MLIT Structural Steel Erector
Quality Certification
3.4Welding Procedure Specifications
(WPS)
05 50 13 SD-02 Shop Drawings
2.5 GBollards/Pipe Guards
2.7 GAngles and Plates
2.9 GRoof Hatches
SD-03 Product Data
2.3Corner Guards
2.4Floor Gratings
2.9Roof Hatches
2.6Downspout Terminations
05 51 33 SD-02 Shop Drawings
2.3Ladders
2.3.1Ship's Ladder
SD-03 Product Data
2.3Ladders
2.3.1Ship's Ladder
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 78 PAGES
05 51 33 1.3Fabricator Certification for Ships
Ladder Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
3.2Iron and Steel Hardware
3.2Steel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.3.7Concrete Inserts
2.2.2Protective Coating
2.3.9 GSteel Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 41 16.00 10 SD-02 Shop Drawings
2.9Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
SD-04 Samples
2.3Plastic Laminates
2.6Cabinet Hardware
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 78 PAGES
06 41 16.00 10 SD-07 Certificates
1.5Quality Assurance
1.5.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
2.1 GDetail Fabrication Drawings
3.1 GInstallation
SD-03 Product Data
2.1.1 GSolid Polymer
2.2.2Indoor air quality for solid surface seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.4 GCounter Tops
SD-06 Test Reports
2.1.1Test Report Results
SD-07 Certificates
1.4.1Qualifications
2.1.1Indoor Air Quality for solid surface fabrication products
SD-10 Operation and Maintenance
Data
2.1.1 GSolid Polymer
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 78 PAGES
07 05 23 3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
SD-06 Test Reports
3.5 GPressure Test Procedures
3.5.7 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
07 13 53 SD-06 Test Reports
2.2 GElastomeric Waterproofing Sheet
Material
3.5 GField Quality Control
SD-07 Certificates
2.2Elastomeric Waterproofing Sheet
Material
2.1.1 GCertificates Of Compliance
SD-11 Closeout Submittals
2.1.1 GCertificates Of Compliance
07 21 16 SD-03 Product Data
3.3.1.2Blanket Insulation
2.2Sill Sealer Insulation
3.1Vapor Retarder
2.4Accessories
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 78 PAGES
07 22 00 2.1.2Recycled Content For Insulation
SD-06 Test Reports
1.4.1 GFlame Spread Rating
SD-07 Certificates
2.1.3Indoor Air Quality For Insulation
07 27 10.00 10 SD-06 Test Reports
1.8 GDesign Review Report
3.1.2 GTesting and Inspection
SD-07 Certificates
1.7 G ROAir Barrier Inspector
07 56 00 SD-03 Product Data
2.1Fluid-applied membrane
3.4.1Moisture meter
3.1Installation
3.5Warranty
SD-04 Samples
2.1Fluid-Applied Membrane
2.1.1Color Chips
SD-07 Certificates
1.8Qualifications of Installer
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-06 Test Reports
3.3 GInspection
07 92 00 SD-03 Product Data
2.1 GSealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 78 PAGES
07 92 00 2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
2.1.1Indoor Air Quality For Interior
Sealants
2.5Indoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.5 GFrames
2.5 GFrames
2.4Accessories
08 11 16 SD-02 Shop Drawings
1.5.1 GDoor and Frame Assembly
SD-04 Samples
1.5.2 GFinish Samples
SD-05 Design Data
1.2.1 GCalculations
SD-06 Test Reports
1.2.3 GAir Infiltration
1.2.4 GWater Penetration
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 78 PAGES
08 11 16 1.5.3 GAdjustments, Cleaning, and
Maintenance
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1Doors
2.2Accessories
2.3.7Water-resistant Sealer
1.5Warranty
2.1.2Weighted Sound Reduction Index
(Rw)
SD-04 Samples
2.1Doors
SD-06 Test Reports
2.4Cycle-Slam
2.4Hinge Loading Resistance
SD-07 Certificates
1.3.1Indoor Air Quality
SD-11 Closeout Submittals
1.5Warranty
08 31 00 SD-02 Shop Drawings
1.3Access Doors And Panels
SD-06 Test Reports
1.3.4 GFire-rated Assemblies
08 34 02 SD-02 Shop Drawings
3.3 GInstallation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 78 PAGES
08 34 02 SD-03 Product Data
1.4Bullet Resistant Components
SD-07 Certificates
1.4Bullet Resistant Components
08 34 73 SD-06 Test Reports
2.4.4 GAcoustical Tests
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.5 GHardware Schedule
2.3.7 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
2.3Insulating Glass
1.3Glazing Accessories
2.4.3.1Sealants
2.4.4Joint Backer
SD-04 Samples
2.3Insulating Glass
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 78 PAGES
08 81 00 2.4.2Glazing Compound
2.4.6Tape
2.4.6Sealing Tapes
SD-07 Certificates
2.3Insulating Glass
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
08 91 00 SD-02 Shop Drawings
1.4Wall Louvers
SD-04 Samples
1.5 GWall Louver Samples
09 22 00 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data
2.1Metal Support Systems
09 29 00 SD-03 Product Data
2.1.3Cementitious Backer Units
3.2.3Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.2Abuse Resistant Gypsum Board
2.1.10Accessories
2.1.1Gypsum Board
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
(AM-0002)
W912HV-22-B-0010
j2ee9kny Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 78 PAGES
09 29 00 2.1Asbestos Free Materials
SD-08 Manufacturer’s Instructions
2.1Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.1Manufacturer Maintenance
Instructions
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-04 Samples
2.1Tile
2.1.3Accessories
2.6Transition Strips
2.4.2Grout
SD-10 Operation and Maintenance
Data
3.2 GInstallation
09 51 00 SD-02 Shop Drawings
2.1 GApproved Detail Drawings
SD-03 Product Data
2.3Recycled Content for Suspension
Systems
SD-04 Samples
2.2Acoustical Units
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 78 PAGES
09 51 00 2.1.1Ceiling Attenuation Class and
Test
09 62 38 SD-03 Product Data
2.1 GStatic-Control Resilient Flooring
2.4 GAccessories
2.2 GAdhesives
1.8Warranty
SD-04 Samples
2.1 GStatic-Control Resilient Flooring
2.3 GMoldings
1.3.1.4 GSpecial Treatment Materials
2.4 GAccessories
SD-06 Test Reports
2.7Fire Resistance
3.2Moisture, Alkalinity and Bond
3.7Testing
SD-07 Certificates
2.1.1.1Indoor Air Quality for
Static-Dissipative Rubber Tile
2.2Indoor Air Quality for Adhesives
1.5Qualifications of Applicator
SD-08 Manufacturer’s Instructions
2.1 GStatic-Control Resilient Flooring
2.4 GAccessories
09 65 00 SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 78 PAGES
09 65 00 2.9Resilient Flooring and
Accessories
SD-06 Test Reports
3.3Moisture, Alkalinity and Bond
Tests
SD-10 Operation and Maintenance
Data
2.9 GResilient Flooring and
Accessories
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
SD-04 Samples
2.1Carpet
2.5Moldings
2.3Carpet Cushion
SD-06 Test Reports
3.2Moisture and Alkalinity Tests
SD-10 Operation and Maintenance
Data
3.5Cleaning and Protection
3.7.2Maintenance Service
SD-11 Closeout Submittals
1.6Warranty
09 84 20 SD-02 Shop Drawings
2.3 GDetail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 78 PAGES
09 84 20 3.2Installation
2.3 GAcoustical Wall Panels
2.1.1Recycled Content for Acoustical
Wall Panel Materials
SD-04 Samples
2.3 GAcoustical Wall Panels
SD-11 Closeout Submittals
2.2.1.1Recycled Content for Fabric
Panels
1.4Warranty
2.1.2 SVolatile Organic Compounds
(VOC) (LOW-EMITTING
MATERIALS) for Products
09 90 00 SD-02 Shop Drawings
3.10Piping Identification
SD-03 Product Data
2.1Coating
3.3.5Sealant
SD-04 Samples
1.11 GColor
SD-07 Certificates
1.4Applicator's Qualifications
1.5.1.2Qualification Testing
2.1Indoor Air Quality for Paints and
Primers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 78 PAGES
09 90 00 2.1Indoor Air Quality for
Consolidated Latex Paints
SD-08 Manufacturer’s Instructions
3.7.2Mixing
1.8.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1Coatings
10 14 00.10 SD-02 Shop Drawings
3.1 GApproved Detail Drawings
SD-03 Product Data
3.1Installation
1.2 GExterior Signage
2.1 GExterior Signage
1.2.1Wind Load Requirements
SD-04 Samples
1.2 GExterior Signage
2.1 GExterior Signage
SD-10 Operation and Maintenance
Data
3.1.2 GProtection and Cleaning
10 14 00.20 SD-02 Shop Drawings
1.3.2 GDetail Drawings
SD-04 Samples
1.3.1 GInterior Signage
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 78 PAGES
10 14 00.20 SD-10 Operation and Maintenance
Data
3.1 GApproved Manufacturer's
Instructions
3.1.2 GProtection and Cleaning
10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings
3.3 GInstallation Drawings
SD-03 Product Data
2.1Cleaning and Maintenance
Instructions
2.7Colors And Finishes
2.2.1Galvanized Steel Sheet
2.2.2Sound-Deadening Cores
2.2.3Anchoring Devices and Fasteners
2.2.5Hardware and Fittings
2.2.4Brackets
2.2.6Door Hardware
2.3.1Toilet Enclosures
2.3.2Urinal Screens
2.5Pilaster Shoes
2.2.5.2 GFinishes
SD-04 Samples
2.7 GColors and Finishes
2.2.5Hardware and Fittings
2.2.3Anchoring Devices and Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 78 PAGES
10 21 13 SD-07 Certificates
1.6Warranty
10 22 39 SD-01 Preconstruction Submittals
2.1 GManufacturer's Qualifications
2.1Manufacturer's Sample Warranty
SD-02 Shop Drawings
3.1 GInstallation
2.1 GFabrication Drawings
SD-03 Product Data
2.3 GFolding Panel Partitions
SD-07 Certificates
2.2Materials
2.3Folding Panel Partitions
2.3.2Indoor Air Quality For Finish
Covering
SD-10 Operation and Maintenance
Data
2.3Folding Panel Partitions
10 26 00 SD-02 Shop Drawings
2.2 GCorner Guards
SD-03 Product Data
2.2 GCorner Guards
SD-04 Samples
2.4 GFinish
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 78 PAGES
10 26 00 2.2.1Recycled content for steel component of corner guards
10 28 13 SD-04 Samples
2.1.2 GFinishes
2.2Accessory Items
SD-10 Operation and Maintenance
Data
2.2.15 GElectric Hand Dryer
10 44 16 SD-02 Shop Drawings
1.5 GSchedule
SD-03 Product Data
2.1.1 GFire Extinguishers
Part 2 GAccessories
Part 2 GCabinets
2.2.2 GWall Brackets
3.2.1 GReplacement Parts List
SD-04 Samples
1.3.1 GEquipment Samples
SD-07 Certificates
2.1.1 GFire Extinguishers Certifications
1.4 GManufacturer's Warranty with
Inspection Tag
10 51 13 SD-02 Shop Drawings
2.1Types
1.4Location
3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 78 PAGES
10 51 13 3.2Numbering system
SD-04 Samples
1.5.1 GColor chips
12 24 13 SD-02 Shop Drawings
3.2Detailed Drawings
2.1Location Schedule
SD-04 Samples
2.1 GWindow Shades
SD-06 Test Reports
1.3.2Flammability Requirements
SD-10 Operation and Maintenance
Data
2.1 GWindow Shades
12 48 13 SD-02 Shop Drawings
3.2Installation Drawings
3.2Detail Drawings
SD-10 Operation and Maintenance
Data
3.2Protection, Maintenance, and
Repair Information
13 48 73 SD-02 Shop Drawings
3.1 GBracing
3.4 GResilient Vibration Isolation
Devices
2.1 GEquipment Requirements
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 78 PAGES
13 48 73 3.1 GBracing
2.1 GEquipment Requirements
3.3 GAnchor Bolts
2.1.2 GVibration Isolators
3.4.2 GSnubbers
SD-05 Design Data
1.2.3 GDesign Calculations
SD-06 Test Reports
3.3 GAnchor Bolts
SD-07 Certificates
3.6 GICC ES AC156 Shake Table Test
14 21 23 SD-02 Shop Drawings
2.1 GElevator
1.2.1 GElevator Components
1.2.2 GElevator Components
2.4Elevator Machine
1.2.1Elevator Controller
1.3.4Wiring Diagrams
SD-03 Product Data
2.1 GElevator
1.2.1 GElevator Components
1.2.2 GElevator Components
1.2.2Data Sheets
2.5.2Elevator Microprocessor
Controller
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 78 PAGES
14 21 23 1.2.3.2Emergency Power Systems
1.2.3.1Reaction Loads
SD-07 Certificates
1.3.2 GPrice Lists
1.4Warranty
1.2.4Welders' Qualifications
SD-10 Operation and Maintenance
Data
2.1 GElevator
1.2.5 GMaintenance Control Program
(MCP)
21 13 13.00 10 SD-02 Shop Drawings
1.4.4 GShop Drawings
3.9As-Built Drawings
SD-03 Product Data
1.4.2Fire Protection Related
Submittals
2.3 GMaterials and Equipment
1.6Spare Parts
3.8 GPreliminary Tests
3.9 GFinal Acceptance Test
3.10 GOnsite Training
1.4.2 GFire Protection Specialist
1.4.3 GSprinkler System Installer
SD-05 Design Data
1.4.4 GSway Bracing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 78 PAGES
21 13 13.00 10 1.2.1.3 GHydraulic Calculations
SD-06 Test Reports
3.8Preliminary Test Report
3.9Final Acceptance Test Report
SD-07 Certificates
3.3Inspection by Fire Protection
Specialist
SD-10 Operation and Maintenance
Data
3.10 GOperating and Maintenance
Manuals
22 00 00 SD-02 Shop Drawings
3.9.1Plumbing System
SD-03 Product Data
2.1 SRecycled Content for Cast Iron
Pipe
2.4Fixtures
2.4.3Flush Valve Water Closets
2.4.4Flush Valve Urinals
2.4.5Countertop Lavatories
2.4.6Kitchen Sinks
2.4.7Service Sinks
2.4.8Drinking-Water Coolers
2.4.10Plastic Shower Stalls
2.9Water Heaters
2.11Pumps
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 78 PAGES
22 00 00 3.9.1.1Backflow Prevention Assemblies
2.6.2Shower Faucets
1.5.1Welding
3.4Vibration-Absorbing Features
3.9.1Plumbing System
SD-06 Test Reports
3.9Tests, Flushing and Disinfection
3.9.1.1 GTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
2.1.1Bolts
SD-10 Operation and Maintenance
Data
3.9.1Plumbing System
23 00 00 SD-02 Shop Drawings
1.4.4Detail Drawings
SD-03 Product Data
2.10.1.1Metallic Flexible Duct
2.10.1.2Insulated Nonmetallic Flexible
Duct Runouts
2.10.1.2Duct Connectors
2.10.2Duct Access Doors
2.10.3Fire Dampers
2.10.4Manual Balancing Dampers
2.10.7.1Diffusers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 78 PAGES
23 00 00 2.10.7.2Registers and Grilles
2.10.8Louvers
2.10.9Goosenecks
2.11.1.1In-Line Centrifugal Fans
2.12Air Handling Units
2.13.1.1 GVariable Volume, Single Duct
Terminal Units
2.14Energy Recovery Devices
1.4.5Test Procedures
1.2.1.2Diagrams
2.10.1 SIndoor Air Quality for Duct
Sealants
SD-06 Test Reports
3.13Performance Tests
3.11Damper Acceptance Test
SD-07 Certificates
1.4.3Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.15.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 78 PAGES
23 00 00 3.15.1Operation and Maintenance
Manuals
2.10.3Fire Dampers
2.10.4Manual Balancing Dampers
2.11.1.1In-Line Centrifugal Fans
2.13.1.1Variable Volume, Single Duct
Terminal Units
2.14Energy Recovery Devices
SD-11 Closeout Submittals
3.14 SIndoor Air Quality During
Construction
23 05 48.19 SD-02 Shop Drawings
3.1Coupling and Bracing
3.3Flexible Couplings or Joints
2.2Equipment Restraint
1.2.4 GContractor Designed Bracing
SD-03 Product Data
3.1 GCoupling and Bracing
3.3 GFlexible Couplings Or Joints
2.2 GEquipment Restraint
1.2.4 GContractor Designed Bracing
2.6Snubbers
3.9Anchor Bolts
2.2.2Vibration Isolators
SD-05 Design Data
1.2.4Design Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 78 PAGES
23 05 48.19 SD-06 Test Reports
3.9 GAnchor Bolts
23 05 93 SD-01 Preconstruction Submittals
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.1 GTAB Design Review Report
1.6.2.1 GTAB Design Review Report
1.5.7.1 GTAB Firm
1.2 GTAB Team Assistants
1.2 GTAB Team Engineer
1.5.7.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.1.3 GTAB Related HVAC Submittals
1.5.7.4 GTAB Related HVAC Submittals
1.5.6 GTAB Procedures
1.5.6 GCalibration
1.3.3 GSystems Readiness Check
1.5.8 GTAB…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .