DLA DESC21E1 Compound_As-Built Drawings - Vol 2.pdf

PDF 36 MB Posted

Attached to
Operations Support Facility Chibana Compound, Kadena Air Base, Okinawa, Japan
Solicitation number
W912HV-22-B-0010
Issued by

About this file

This solicitation is for the construction of a new Defense Logistics Agency Operations Support Facility on the Chibana Compound at Kadena Air Base in Okinawa, Japan. The scope of work includes mobilization, demolition, abatement work, disposal, construction of the operations support building and supporting facilities, electrical and communication utilities, water and sewer utilities, site preparation, roads, sidewalks, parking, site improvements, landscaping, low impact development, environmental mitigation, and demobilization. The Department of the Army Corps of Engineers Engineering District Japan is the contracting agency. Responses are due as specified in the complete solicitation package attached to the document.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR IN

FORMATIO

N O

NLY

CONTRACT DRAWINGS

KADENA AIR BASE, OKINAWA, JAPAN

KADENA AIR BASE

MAP OF OKINAWA

PROJECT AREA

PETROLEUM LAB B53140

LXFB 07-2810

718th CIVIL ENGINEER SQUADRON

U.S. AIR FORCE

LXFB 07-2810

505TH. QUARTERMASTER BN

REPAIR HVAC SYSTEM, B53140

08-034

AS-BUILT

FOR IN

FORMATIO

718th CIVIL ENGINEER SQUADRON

U.S. AIR FORCE

LXFB 07-2810

505TH. QUARTERMASTER BN

REPAIR HVAC SYSTEM, B53140

08-034

AS-BUILT

FOR IN

FORMATIO

LXFB 07-2810

505TH. QUARTERMASTER BN

REPAIR HVAC SYSTEM, B53140

08-034

AS-BUILT

FOR IN

FORMATIO

LXFB 07-2810

505TH. QUARTERMASTER BN

REPAIR HVAC SYSTEM, B53140

08-034

AS-BUILT

FOR IN

FORMATIO

LXFB 07-2810

505TH. QUARTERMASTER BN

REPAIR HVAC SYSTEM, B53140

08-034

AS-BUILT

1 2 3

4 5

2 3

4 532

1 2 3 4

7 8

AHU-1 (EX-FAN) SCHEMATIC CONTROL DIAGRAM ("PANEL DDC-1")

DDC SYSTEM POINT DESCRIPTION

COMPONENT LIST

1 2 3

4 5

2 3

4 532

1 2 3 4

7 8

AHU-1 SCHEMATIC CONTROL DIAGRAM ("PANEL DDC-1")

DDC SYSTEM POINT DESCRIPTION

COMPONENT LIST

FOR IN

FORMATIO

LXFB 07-2810

505TH. QUARTERMASTER BN

REPAIR HVAC SYSTEM, B53140

08-034

AS-BUILT

FOR IN

FORMATIO

LXFB 07-2810

VAV BOX

NO.

DISCHARGE

PRIMARY NC (dB)

ROOM SERVED

PRIMARY AIRFLOW

INLET

SIZE,

DIA. IN.

ELEC

REHEAT

kW

OUTLET

SIZE (WxH)

INCH

CARRIER

35E UNIT

SIZE

MIN.

(CFM)

MAX. (CFM)

VAV-1 20

OFFICE/SAMPLE & BREAKRM

330 1420 1.5 10

VAV-4 16

CHEMICAL ANALYSIS

2.0 16 x 15

VAV-5 18

FILTRATION

1.0

12 x 8

VAV-6 18

BALANCE & FLASH ROOMS

1.0

REMARKS

NOTES:

REHEAT COIL:

DISCHARGE SP (IN. WG) =0.20

TYPE: ELECTRIC, 120 V, 1PH, 60 Hz

ALL VAV TERMINAL SHALL BE PRESSURE INDEPENDENT TYPE

ALL VAV TERMINAL SHALL BE CARRIER OR APPROVED EQUAL

10 14 x 12.5

3.0

24 x 18

1.0

12 x 10

VAV-2 16

LABORATORY

750 2860

VAV-3 20

WASHING ROOM

240 900

505TH. QUARTERMASTER BN

REPAIR HVAC SYSTEM, B53140

12 x 8

EF-1

EF-2

ITEM

NO.

SERVICE

CFM CMH

QTY

NOTES:

(mmAq)

LOCATION/TYPE

ROOF

ROOF

ROOF

WALL

08-034

REHEAT CONTROLS SHALL BE SSR (SOLID STATE RELAY)

W/ MODULATING DDC CONTROL-TYPE

CAPACITY PUMP CONDENSER FANS

LOAD

BTUH

WATER

LEAVING

TEMP

(GPM)

FLOW

WATER

HEAD

TOTAL

(FT)

CKT#

(-/FLA)

QTY/

FAN

(RPM)

PUMP

SPEED

VOLT/PH/Hz

28.3340,000 42

208/3/60

3/5.3 1/8.4

TONS

DIFF.

TEMP

EQPT

( T)

COMPRESSOR

32.7/40.8/48.7

QTY

3 2/3

REMARKS

AMB

TEMP

AS-BUILT

FOR IN

FORMATIO

LXFB 07-2810

505TH. QUARTERMASTER BN

REPAIR HVAC SYSTEM, B53140

08-034

AS-BUILT

FOR IN

FORMATIO

LXFB 07-2810

505TH. QUARTERMASTER BN

REPAIR HVAC SYSTEM, B53140

08-034

AS-BUILT

FOR IN

FORMATIO

LXFB 07-2810

505TH. QUARTERMASTER BN

REPAIR HVAC SYSTEM, B53140

08-034

AS-BUILT

FOR IN

FORMATIO

LXFB 07-2810

505TH. QUARTERMASTER BN

REPAIR HVAC SYSTEM, B53140

08-034

AS-BUILT

FOR IN

FORMATIO

As-Built Drawings
Table of Contents
1. Building 53115 and Lab As-Built
2. Electrical - Kadena Building Area Road Expansion – March 1979
3. Electrical - Petroleum Lab 53140 & Building 53115 Office - As Built – March 1979
4. Petroleum Lab 53140 & Building 53115 Office Addition - 1st Revision – September 1979
5. Mechanical - Petroleum Lab 53140 & Building 53115 Office Addition - 1st Revision – 19 October 1979
6. Civil - Office Addition 53115 & Petroleum Lab 54140 Chibana - As Built – November 1979
7. Electrical - Petroleum Lab 53140 & Building 53115 Office - Revision 1 – November 1979
8. Construct Guard Houses 53185 & Storage Buildings - 20 July 1984
9. Repair & Upgrade Multi-Purpose Recreation Court - Building 53110 - 6 August 1984
10. Construct Sign Board – 6 April 1987
11. Replace Security Fence – 23 April 1988
12. Renovation of Barracks Bldgs. 4246 (53155) & 4247 (53145) - Project P70017 - 11 July 1989
13. Const. Chemical Storage - Building 53186 – 19 July 1989
14. Construct Arms Room - Building 53165 – 22 October 1990
15. Install Perimeter Security Lights – 29 March 1992
16. Inst Fire Det System, Var Fac. – 2 June 1995
17. Repair HVAC System, Building 53140 505th. Quartermaster Bn - PN LXFB07-2810 - As-Built – 16 March 2009
18. Repairs to 505th Fuels Laboratory - As Built – 21 January 2015
19. Repair Water Main Line - LXFB 16-1330 – 22 June 2016
20. Repair Water Main Line - LXFB 16-1330 – 13 June 2017
21. Repair Water Main - LXFB 16-1330 – 31 March 2018
22. DLA Energy – Okinawa, Japan , Chibana Compound Design, Access Control Point 40720 – Interim Design Submittal – 30 April 2018
23. DLA Energy – Okinawa, Japan , Chibana Compound Design, Building 53110 – Interim Design Submittal – 30 April 2018
24. DLA Energy – Okinawa, Japan , Chibana Compound Design, Building 53115 – Interim Design Submittal – 30 April 2018
25. DLA Energy – Okinawa, Japan , Chibana Compound Design, Building 53117 – Interim Design Submittal – 30 April 2018
26. DLA Energy – Okinawa, Japan , Chibana Compound Design, Building 53125 – Interim Design Submittal – 30 April 2018

File details come from the government source that posted it. Updated .