This solicitation is for the construction of an 845 square meter Simulator Facility at Yokota Air Base in Japan. The project includes a concrete foundation and floor slab, concrete walls, concrete roof slab, steel beam structure to support a composite metal deck roof over the high bay area, steel structure, sloping metal roof, fire alarm panels, fire suppression system, and all necessary support areas. Functional spaces include a flight simulator high bay, small training device spaces, computer room, supply and spares storage, maintenance area, briefing rooms, administration areas, and common areas. Supporting facilities include utilities, pavements, site improvements, communications, and all other necessary support. The project magnitude is between 1 and 2.5 billion Japanese yen. Interested local Japanese contractors must be registered in the System for Award Management and submit required documentation to the U.S. Army Corps of Engineers, Japan Engineering District by the time of bid submission to be eligible for award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 54 PAGES
W912HV-20-B-0013
AFSOC Simulator Facility
01 11 00.00 10 SD-01 Preconstruction Submittals 1.10Initial Site Conditions Photos
1.6 GKey Personnel Qualifications
SD-07 Certificates 1.10Monthly Progress Photos
SD-11 Closeout Submittals 1.10Construction Completion Photos
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
1.8.1 GSubmittal Register Monthly
Update 01 33 29 SD-01 Preconstruction Submittals
1.4 GQualifications for the
Sustainability Professional
3.1.1 GSustainability Implementation
Plan
SD-07 Certificates
2.2 GSustainability Notebook
SD-11 Closeout Submittals
3.1.4 GFinal Sustainability Notebook
3.1.5 GFinal Sustainability Notebook
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 54 PAGES
AFSOC Simulator Facility
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
1.7.2.3 GCritical Lift Plan
SD-06 Test Reports 1.4Monthly Exposure Reports
1.12.2 GAccident Reports
SD-07 Certificates
1.6.1.4 GCrane Operators/Riggers
1.8 GActivity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit
01 45 00 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan SD-06 Test Reports
3.9.2Verification Statement 01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
3.1.1 GProject Manual
3.1.1Written Practices 3.1.3Written Practices 3.1.1NDT Procedures and Equipment
Calibration Records 3.1.3NDT Procedures and Equipment
Calibration Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
j2ee9gsg Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 54 PAGES
AFSOC Simulator Facility
01 45 35 SD-06 Test Reports 3.1.1Daily Reports 3.1.3Daily Reports 3.1.1Biweekly Reports 3.1.2Biweekly Reports
SD-07 Certificates 2.1Fabrication Plant 2.1AC472 Accreditation 2.1Certificate of Compliance
1.5 GSpecial Inspector of Record
1.5 GSpecial Inspector
3.1.1 GQualification Records
3.1.3 GQualification Records
SD-11 Closeout Submittals 3.1.1Interim Final Report
3.1.1 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
3.3.2 GTemporary Utility Connections
Plan 01 57 19 SD-01 Preconstruction Submittals
1.7.1Preconstruction Survey 1.10Environmental Protection Plan 1.7.4Environmental Manager
Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 54 PAGES
AFSOC Simulator Facility
01 57 19 1.7.5Employee Training Records 3.8.1Waste Determination
Documentation 1.10.10.1Solid Waste Management Permit
SD-06 Test Reports 3.8.1.1.2Laboratory Analysis Reports 1.10.9.2Hazardous Waste Analysis
Report 3.7.2Nonhazardous Solid Waste
Diversion Report 1.10.7.1Inspection Reports;
1.10.7.1Inspection Reports;
3.2.1Inspection Reports;
3.2.2Inspection Reports;
3.2.2Inspection Reports;
SD-07 Certificates 1.6.1Asbestos Certification 1.6.2Lead Certification
SD-11 Closeout Submittals 3.8.3.3Disposal Documentation for
Hazardous and Regulated Waste 3.8.2.1Solid Waste Management Report 1.9Environmental Records Binder
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 54 PAGES
AFSOC Simulator Facility
01 74 19 1.7Records 01 78 00 SD-03 Product Data
1.7.1 GWarranty Management Plan
1.7.5Warranty Tags 3.8Final Cleaning 1.5Spare Parts Data
SD-08 Manufacturer’s Instructions 1.7.1Instructions
SD-10 Operation and Maintenance Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
1.7.1 GAs-Built Record of Equipment
and Materials
3.6 GAs-Built Record of Equipment
and Materials
3.4 GFinal Approved Shop Drawings
3.5 GConstruction Contract
Specifications
3.9 GInterim DD FORM 1354
3.9 GChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 54 PAGES
AFSOC Simulator Facility
01 78 23 1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 91 00.00 40 SD-01 Preconstruction Submittals
1.7 GCommissioning Firm
1.7.1Lead Commissioning Specialist 1.7.2Technical Commissioning
Specialists 1.7Commissioning Firm's Contract
SD-06 Test Reports
3.1.2.1 GInterim Construction Phase
Commissioning Plan
3.1.2.2 GFinal Construction Phase
Commissioning Plan
3.1.5.2 GBuilding Envelope Inspection
Checklists
3.1.5.3 GPre-Functional Checklists
1.9Issues Log
3.2 GCommissioning Report
3.3.1 GPost-Construction Trend Log
Report SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 54 PAGES
AFSOC Simulator Facility
01 91 00.00 40 1.10 GCertificate of Readiness SD-10 Operation and Maintenance Data
3.1.6 GTraining Plan
3.1.6Training Attendance Rosters
3.1.7 GSystems Manual
3.1.8Maintenance and Service Life
Plans SD-11 Closeout Submittals
3.1.2.1 GConstruction Phase
Commissioning Plan
3.2 GFinal Commissioning Report
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 GFormwork
3.1.1 GFormwork
2.2.1 GForm Removal Schedule
SD-03 Product Data 2.2Form Materials
SD-04 Samples
1.4 GSample Panels
SD-05 Design Data 2.1Calculations
SD-06 Test Reports 3.2Inspection
03 15 00.00 10 SD-02 Shop Drawings
2.4 GWaterstops
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 54 PAGES
AFSOC Simulator Facility
03 15 00.00 10 SD-04 Samples 2.3.2Lubricant for Preformed
Compression Seals 2.3.3Field-Molded Type 2.4Waterstops
2.5.2 GSplicing Waterstops
03 20 00.00 10 SD-01 Preconstruction Submittals
3.1.3.2 GButt-Splices
SD-02 Shop Drawings
3.1 GReinforcement
SD-03 Product Data
2.3.1 GMechanical Butt-Splices
2.3 GReinforcing Steel
SD-06 Test Reports
2.7 GTests, Inspections, and
Verifications SD-07 Certificates
1.4.1Qualified Welders 1.4.2Qualification of Gas Pressure
Welded Splicers 03 30 00.00 10 SD-01 Preconstruction Submittals
1.6.2 GQuality Control Plan
1.6.1Laboratory Accreditation
3.8.5.6 GSampling Plan
SD-05 Design Data
2.1.1 GMixture Proportions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 54 PAGES
AFSOC Simulator Facility
03 30 00.00 10 SD-06 Test Reports
2.1.1 GMixture Proportions
3.8 GTesting and Inspection for CQC
2.2.3Fly Ash 2.2.4Ground Granulated Blast-Furnace
(GGBF) Slag 2.3Aggregates 3.8.5.1Air Content 3.8.5.3Slump 3.8.5.6Compressive Strength 2.5Water
03 33 00 SD-02 Shop Drawings 1.5.1Detail Drawings
SD-04 Samples 2.1Materials 1.5.2Panels
03 35 00.00 10 SD-04 Samples 1.4.1Field Test Panels 1.4.1.1Sample Wall Panels
03 39 00.00 10 SD-06 Test Reports 3.2Testing and Inspection for CQC
05 12 00 SD-01 Preconstruction Submittals
1.7.1.1 GErection Drawings
SD-02 Shop Drawings
1.7.2 GFabrication drawings
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 54 PAGES
AFSOC Simulator Facility
05 12 00 2.6.2Class A coating 2.3Bolts, nuts, and washers 3.7.1.2Weld Inspection Reports 3.7.2.1Direct Tension Indicator Washer
Inspection Reports 3.7.3.1Bolt Testing Reports
05 30 00 SD-02 Shop Drawings
1.4.5 GFabrication Drawings
SD-04 Samples 2.1.1Metal Roof Deck Units 2.2.4Flexible Closure Strips
SD-05 Design Data
2.1 GDeck Units
05 50 13 SD-02 Shop Drawings 2.3Access doors and panels 2.5Cover plates and frames 2.9angles and plates
05 51 33 SD-02 Shop Drawings 2.4Ladders
05 52 00 SD-02 Shop Drawings
1.3.1 GFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars And
Strips SD-03 Product Data
2.3.3 GHot-Rolled Carbon Steel Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
j2ee9gsg Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 54 PAGES
AFSOC Simulator Facility
05 52 00 SD-07 Certificates
1.5.1 GWelding Procedures
1.5.1.1 GWelding Qualifications
06 41 16 SD-02 Shop Drawings 1.6.2Shop Drawings 2.10Shop Drawings 3.1Installation
SD-04 Samples 2.4Plastic Laminates
2.6 GCabinet Hardware
06 61 16 SD-02 Shop Drawings 1.6.2Detail Drawings 3.1Installation
SD-04 Samples 2.2Material
2.4.5 GCounter Tops
SD-10 Operation and Maintenance Data
3.2Clean-up 07 05 23 SD-01 Preconstruction Submittals
1.5 GWork Plan
SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-06 Test Reports
3.5 GPressure Test Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 54 PAGES
AFSOC Simulator Facility
07 05 23 3.5.7 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
SD-07 Certificates 1.7.2.1Pressure Test Agency
07 14 00 SD-11 Closeout Submittals 3.6Information Card 3.5Instructions To Government
Personnel 07 27 10.00 10 SD-04 Samples
3.1.2 GMock-up
SD-06 Test Reports
1.9 G DODesign Review Report
3.1.3 GTesting and Inspection
SD-07 Certificates
1.8 GAir Barrier Inspector
07 41 13 SD-02 Shop Drawings
1.5.5 GRoofing Panels
1.5.5 GFlashing and Accessories
1.5.5 GGutter/Downspout Assembly
SD-04 Samples
2.2 GRoof Panels
1.5.5 GFactory-applied Color Finish
2.5Accessories
1.5.5 GFasteners
1.5.5 GGaskets and Sealant/Insulating
Compounds
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 54 PAGES
AFSOC Simulator Facility
07 41 13 SD-05 Design Data
1.3.1.2 GWind Uplift Resistance
SD-06 Test Reports
1.3.1.1 GLeakage Test Report
1.3.1.2 GWind Uplift Test Report
2.3 GFactory Finish and Color
Performance Requirements 3.8Fall protection
SD-07 Certificates
1.5.1 GQualification of Manufacturer
1.5.2 GQualification of Applicator
SD-08 Manufacturer’s Instructions
1.5.5 GInstallation Manual
SD-09 Manufacturer’s Field Reports
3.11.1 GManufacturer's Field Inspection
Reports
SD-11 Closeout Submittals
1.9 GWarranties
3.12 GInformation Card
3.13 GDate Of Installation Wall-Mounted
Placard 07 52 00 SD-02 Shop Drawings
1.5.6Roof plan SD-11 Closeout Submittals
1.10Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 54 PAGES
AFSOC Simulator Facility
07 52 00 3.9Information Card 3.8Instructions To Government
Personnel 07 60 00 SD-02 Shop Drawings
2.2.1Exposed sheet metal 3.1.12Gutters 3.1.13Downspouts 2.2.1Gravel stops and fascias 3.1.14Flashing for roof drains 3.1.15Metal Soffit Panels 3.1.7Base flashing 3.1.8Counterflashing 3.1.20Flashing at roof penetrations 3.1.9Reglets 3.1.16Scuppers 3.1.22Copings 3.1.11Drip edge
SD-11 Closeout Submittals 3.5Quality Control Plan
07 84 00 SD-02 Shop Drawings
2.2 GFirestopping Materials
08 11 13 SD-02 Shop Drawings 2.2Doors 2.2Doors 2.6Frames 2.6Frames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 54 PAGES
AFSOC Simulator Facility
08 11 13 SD-04 Samples 2.10.4Factory-applied enamel finish
08 33 23 SD-02 Shop Drawings 2.3.1Overhead Coiling Doors 2.3.3Counterbalancing Mechanism 2.3.4Manual Door Operators 2.3.5Electric Door Operators 2.3.1.4Bottom Bars 2.2.1.1Guides 2.3.3.1Mounting Brackets 2.3.1.9Overhead Drum 3.3.2Hood 2.2.1.1Installation Drawings
SD-03 Product Data
2.3.1 GOverhead Coiling Doors
SD-05 Design Data 2.3.1Overhead Coiling Doors
SD-10 Operation and Maintenance Data
3.3.2Operation and Maintenance Manuals
3.3.2Materials 3.3.2Devices 3.3.2Procedures 3.3.2Manufacture's Brochures 3.3.2Parts Lists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 54 PAGES
AFSOC Simulator Facility
08 33 23 SD-11 Closeout Submittals 3.3.1Warranty
08 41 13 SD-01 Preconstruction Submittals 1.3.1Sample Warranty 1.3.1List of Product Installations
SD-02 Shop Drawings 3.3Installation Drawings 2.3Fabrication Drawings
SD-04 Samples
1.3.1 GFinish and Color Samples
SD-06 Test Reports 1.3.1Certified Test Reports 3.4.3Deflection 3.4.1Air Infiltration 3.4.5Condensation Resistance and
Thermal Transmittance 3.4.6Water Infiltration
SD-11 Closeout Submittals 3.6Manufacturer's Product Warranty
08 71 00 SD-02 Shop Drawings 1.4Hardware schedule 2.3.7Keying system
SD-11 Closeout Submittals 1.5Key Bitting
08 81 00 SD-04 Samples 1.7.1Insulating Glass
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 54 PAGES
AFSOC Simulator Facility
08 81 00 2.4.2Glazing Compound 2.4.6Tape 2.4.3.1Sealant
08 91 00 SD-02 Shop Drawings 1.5Wall louvers 1.6Wall louvers 1.6Equipment Screen Louvers 2.4Equipment Screen Louvers
SD-04 Samples 1.5Wall louvers 1.6Wall louvers 1.6Equipment Screen Louvers 2.4Equipment Screen Louvers
09 22 00 SD-02 Shop Drawings 2.2Metal support systems
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-04 Samples
2.2 GTile
2.2 GAccessories
2.2 GTransition Strips
2.7 GTransition Strips
2.5 GGrout
SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 54 PAGES
AFSOC Simulator Facility
09 30 10 SD-10 Operation and Maintenance Data
3.2 GInstallation
SD-11 Closeout Submittals
1.3LEED Documentation 09 51 00 SD-02 Shop Drawings
1.3Approved Detail Drawings SD-03 Product Data
1.3.1 G SAcoustical Ceiling Systems
SD-04 Samples
2.2Acoustical Units 2.2.1Acoustic Ceiling Tiles
SD-07 Certificates 2.2Acoustical Units 2.2.1Acoustic Ceiling Tiles
09 65 00 SD-02 Shop Drawings 2.11Resilient Flooring and
Accessories SD-04 Samples
2.11Resilient Flooring and Accessories
SD-06 Test Reports 3.3Moisture, Alkalinity and Bond
Tests SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 54 PAGES
AFSOC Simulator Facility
09 65 00 2.11Resilient Flooring and Accessories
SD-11 Closeout Submittals 1.4LEED Documentation
09 67 23.13 SD-02 Shop Drawings 2.2Installation Drawings
SD-04 Samples 1.6.2Hardboard Mounted Epoxy
Flooring
3.1.4 GFloor Topping
SD-11 Closeout Submittals 1.7Warranty
09 68 00 SD-02 Shop Drawings 3.4Installation Drawings 2.5Moldings
SD-04 Samples
2.2 GCarpet
2.5 GMoldings
SD-06 Test Reports 3.2Moisture and Alkalinity Tests
SD-10 Operation and Maintenance Data
2.2Carpet 3.5Cleaning and Protection
SD-11 Closeout Submittals
1.3.1 SLocal/Regional Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 54 PAGES
AFSOC Simulator Facility
09 68 00 1.9Warranty 09 90 00 SD-02 Shop Drawings
3.10Piping identification 3.10stencil
SD-04 Samples
1.12 GColor
1.5.2Spray Tile Finish System 1.5.3Sample Spray Tile Wall Coating
System Mock-Up SD-10 Operation and Maintenance Data
2.2 SCoatings
10 11 00 SD-03 Product Data
2.3 GMarkerboard
2.6 GMonitors
10 14 00.10 SD-02 Shop Drawings 3.1Approved Detail Drawings
SD-04 Samples
1.3 GExterior Signage
SD-10 Operation and Maintenance Data
3.1.2Protection and Cleaning 10 14 00.20 SD-02 Shop Drawings
1.7.2Detail Drawings SD-04 Samples
1.7.1 GInterior Signage
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 54 PAGES
AFSOC Simulator Facility
10 14 00.20 1.6Software SD-10 Operation and Maintenance Data
3.1Approved Manufacturer's Instructions
3.1.1Protection and Cleaning 10 21 13 SD-02 Shop Drawings
2.2Fabrication Drawings 3.2Installation Drawings
SD-04 Samples
2.7 GColors and Finishes
2.3.4Hardware and Fittings 2.3.2Anchoring Devices and Fasteners
10 22 39 SD-01 Preconstruction Submittals 1.3Manufacturer's Qualifications 1.3Manufacturer's Sample Warranty
SD-02 Shop Drawings 3.1Installation 3.1.1Layouts 1.3Fabrication Drawings
SD-04 Samples 1.3Folding Panel Finishes
SD-06 Test Reports 3.2.2Acoustical Test 1.3.2.1Flame and Smoke Development
Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 54 PAGES
AFSOC Simulator Facility
10 22 39 SD-10 Operation and Maintenance Data
2.2Folding Panel Partitions 10 26 00 SD-02 Shop Drawings
2.3.1 GWall Guards
SD-04 Samples
2.5 GFinish
10 28 13 SD-04 Samples
2.2.2 GFinishes
2.3Accessory Items
SD-10 Operation and Maintenance Data
2.3.10Electric Hand Dryer 10 71 13 SD-01 Preconstruction Submittals
1.3.1Sample Warranty 1.3.1List of Product Installations
SD-02 Shop Drawings 2.4Exterior Sun Shades
SD-04 Samples 2.6.1Aluminum Finish
1.3.1 GFinish And Color Samples
11 31 13 SD-10 Operation and Maintenance Data
2.1Kitchen equipment 12 24 13 SD-02 Shop Drawings
3.2Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 54 PAGES
AFSOC Simulator Facility
12 24 13 SD-04 Samples
2.2 GWindow Shades
SD-06 Test Reports 2.2Window Shades
SD-10 Operation and Maintenance Data
2.2Window Shades 12 48 13 SD-02 Shop Drawings
3.2Installation Drawings 3.2Detail Drawings 3.2Custom Graphics Drawings
SD-04 Samples
2.2 GEntrance Floor Mats and Frames
2.2Custom Graphics
SD-10 Operation and Maintenance Data
3.2Protection, Maintenance, and Repair Information
13 48 00 SD-02 Shop Drawings
3.1 GBracing
3.4 GResilient Vibration Isolation
Devices
2.1 GEquipment Requirements
SD-03 Product Data
3.1 GBracing
2.1 GEquipment Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 54 PAGES
AFSOC Simulator Facility
13 48 00 SD-06 Test Reports
3.3 GAnchor Bolts
13 48 00.00 10 SD-02 Shop Drawings 3.1Coupling and Bracing 3.3Flexible Couplings or Joints 2.1Equipment Requirements
1.3.4 GContractor Designed Bracing
SD-03 Product Data
3.1 GCoupling and Bracing
2.1 GEquipment Requirements
1.3.4 GContractor Designed Bracing
SD-07 Certificates 2.3Flexible Ball Joints
21 13 13.00 10 SD-02 Shop Drawings
1.6.3 GShop Drawings
3.9 GAs-Built Drawings
SD-03 Product Data
1.6.1 GFire Protection Related
Submittals
2.3 GMaterials and Equipment
1.8 GSpare Parts
3.8 GPreliminary Tests
3.9 GFinal Acceptance Test
3.10 GOnsite Training
1.6.1 GFire Protection Specialist
1.6.2 GSprinkler System Installer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 54 PAGES
AFSOC Simulator Facility
21 13 13.00 10 SD-05 Design Data
1.6.3 GSway Bracing
1.4.1.3 GHydraulic Calculations
SD-06 Test Reports
3.8 GPreliminary Test Report
3.9 GFinal Acceptance Test Report
SD-07 Certificates
3.3 GInspection by Fire Protection
Specialist SD-10 Operation and Maintenance Data
3.10 GOperating and Maintenance
Manuals
22 00 00 SD-03 Product Data
2.11 GWater Heaters
3.12.1.1 GBackflow Prevention Assemblies
SD-06 Test Reports 3.12Tests, Flushing and Disinfection
3.12.1.1 GTest of Backflow Prevention
Assemblies 3.3Test and Adjustments of Water
Temperature Maintenance Cable System
SD-10 Operation and Maintenance Data
3.12.1Plumbing System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 54 PAGES
AFSOC Simulator Facility
22 15 14.00 40 SD-02 Shop Drawings
2.1 GInstallation Drawings
SD-03 Product Data
2.2.2 GAir Compressors
SD-05 Design Data 2.1.1Design Analysis and Calculations
SD-06 Test Reports 3.2.1.1Hydrostatic Testing
3.2.1 GCompressed Air Systems Testing
3.2.1.1Valve-Operating Tests 3.2.1.1Drainage Tests
3.2.1.1 GPneumatic Testing
SD-10 Operation and Maintenance Data
3.4 GOperation and Maintenance
Manuals
22 15 26.00 20 SD-02 Shop Drawings 1.5.2High pressure compressed air system SD-03 Product Data
2.1Air compressor SD-06 Test Reports
3.1.1Non-Destructive Examination (NDE) report for welding of piping
3.4.2.2Leak tightness test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 54 PAGES
AFSOC Simulator Facility
22 15 26.00 20 SD-10 Operation and Maintenance Data
2.1Air compressor 2.2Air dryer
SD-11 Closeout Submittals 2.1air compressor 2.2air dryer 1.5compressed air systems
23 00 00 SD-02 Shop Drawings
1.5.5 GDetail Drawings
SD-03 Product Data 2.12Air Handling Units 2.13.2.1Constant Volume, Single Duct
Terminal Units 2.13.2.2Variable Volume, Single Duct
Terminal Units 2.14Energy Recovery Devices 2.10.1Double-Wall Round Ductwork
SD-10 Operation and Maintenance Data
3.15.1Operation and Maintenance Manuals
2.10.4Manual Balancing Dampers 2.11.1.3Centrifugal Type Power Roof
Ventilators 2.12Air Handling Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 54 PAGES
AFSOC Simulator Facility
23 00 00 2.13.2.1Constant Volume, Single Duct Terminal Units
2.13.2.2Variable Volume, Single Duct Terminal Units
2.14Energy Recovery Devices 2.11.1.6Circulation Fans - High Volume
Low Speed (HVLS) 23 05 93 SD-01 Preconstruction Submittals
1.6.1 GIndependent TAB Agency and
Personnel Qualifications
1.6.3.2 GTAB Design Review Report
1.6.1.2 GTAB Firm
1.3 GTAB Team Assistants
1.3 GTAB Team Engineer
1.6.1.2 GTAB Specialist
1.3 GTAB Team Field Leader
SD-02 Shop Drawings
1.4.3 GTAB Schematic Drawings and
Report Forms SD-03 Product Data
1.4 GEquipment and Performance
Data
1.6.1.3 GTAB Related HVAC Submittals
1.4.3 GSystems Readiness Check
1.6.2.3 GTAB Verification
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 54 PAGES
AFSOC Simulator Facility
23 05 93 3.3.5 GCompleted Pre-Final DALT Report
3.3.8 GCertified Final DALT Report
1.6.3.3 GPrerequisite HVAC Work
Checkout List
3.4.6.1 GProportional Balancing
3.4.6.2 GSeason 1
3.4.6.2 GSeason 2
1.6.3.2 GTAB Design Review Report
1.6.6.2 GTAB Report for Season 1
1.6.6.2 GTAB Report for Season 2
SD-07 Certificates
1.6.3.2 GDALT and TAB Submittal and
Work Schedule
1.6.3.3 GTAB Pre-Field Engineering
Report
1.6.4 GInstrument Calibration
Certificates
3.7 GDALT and TAB Procedures
Summary
3.7 GCompleted Pre-Final DALT Work
Checklist
3.3.2 GAdvance Notice of Pre-Final
DALT Field Work
3.4.6.1 GProportional Balancing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 54 PAGES
AFSOC Simulator Facility
23 05 93 1.6.2.3 GPre-field DALT Preliminary Notification
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.4Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
23 09 00 SD-02 Shop Drawings
3.2 GDDC Contractor Design Drawings
3.2 GFinal As-Built Drawings
SD-06 Test Reports
3.4.2 GStart-Up Testing Report
3.5.1 GPVT Procedures
3.5.3 GPVT Report
1.9.1 GPre-Construction Quality Control
(QC) Checklist
1.9.2 GPost-Construction Quality Control
(QC) Checklist SD-10 Operation and Maintenance Data
3.6 GOperation and Maintenance
(O&M) Instructions
3.8.1 GTraining Documentation
SD-11 Closeout Submittals
2.5 GEnclosure Keys
3.1.6.1 GPassword Summary Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 54 PAGES
AFSOC Simulator Facility
23 09 00 1.9.3 GCloseout Quality Control (QC) Checklist
23 11 25 SD-02 Shop Drawings
1.5.3 GGas Piping System
SD-06 Test Reports
3.17 GTesting
3.17.1 GPressure Tests
3.17.2 GTest with Gas
SD-07 Certificates
1.5.1 GWelders Procedures and
Qualifications
1.5.1 GAssigned Number, Letter, or
Symbol SD-10 Operation and Maintenance Data
1.3.1Gas Facility System and Equipment Operation
1.3.2Gas Facility System Maintenance 1.3.3Gas Facility Equipment
Maintenance 23 23 00 SD-02 Shop Drawings
2.3Refrigerant Piping System SD-06 Test Reports
3.5Refrigerant Piping Tests SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 54 PAGES
AFSOC Simulator Facility
23 23 00 1.6Maintenance 3.4Operation and Maintenance
Manuals 3.4Demonstrations
23 25 00 SD-03 Product Data 3.5Tests 3.4Training Course
SD-10 Operation and Maintenance Data
3.5.3Water Treatment System 23 52 00 SD-02 Shop Drawings
1.6Detail Drawings SD-06 Test Reports
3.10Heating System Tests 3.13Fuel System Tests
SD-10 Operation and Maintenance Data
3.12Operation and Maintenance Instructions
23 64 10 SD-03 Product Data 2.5Water Chiller
SD-06 Test Reports 3.5Field Acceptance Testing 3.5.2Water Chiller - Field Acceptance
Test Report 3.6System Performance Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 54 PAGES
AFSOC Simulator Facility
23 64 10 SD-07 Certificates
3.2.8 GRefrigeration System
SD-10 Operation and Maintenance Data
3.7Operation and Maintenance Manuals
23 64 26 SD-06 Test Reports 3.1.1.3Piping Welds NDE Report 3.4.2Pressure Tests Reports
SD-10 Operation and Maintenance Data
2.5.8Calibrated Balancing Valves 2.5.9Automatic Flow Control Valves 2.5.10Pump Discharge Valve 2.5.11Water Temperature Mixing Valve 2.5.12Water Temperature Regulating
Valves 2.5.13Water Pressure Reducing Valve 2.5.14Pressure Relief Valve 2.5.15Combination Pressure and
Temperature Relief Valves 2.6.9Expansion Joints 2.7Pumps 2.6.3Combination Strainer and Pump
Suction Diffuser 2.8Expansion Tanks
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 54 PAGES
AFSOC Simulator Facility
23 64 26 2.9Air Separator Tanks 23 81 23.00 20 SD-03 Product Data
2.2Computer room air conditioning units
2.3.2Space temperature control system drawings
SD-06 Test Reports 2.6.2CRAC Production Schedule and
Factory Test Schedule 2.6.1Manufacturer's Factory Test
Plans 2.6.5Factory Test Reports 3.4.2Field Test Schedule 3.4.1Manufacturer's Field Test Plans 3.4.6Field Test Reports
SD-07 Certificates
3.4.3 GCredentials of the Manufacturer's
Field Test Representative 23 82 02.00 10 SD-02 Shop Drawings
1.5Drawings SD-06 Test Reports
3.6 GSystem Performance Tests
SD-10 Operation and Maintenance Data
3.4Operation and Maintenance Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 54 PAGES
AFSOC Simulator Facility
26 05 19.10 10 SD-03 Product Data
2.1.1 GWire and Cable
2.1.3.1 GConductors
26 05 48.00 10 SD-02 Shop Drawings 3.2Lighting Fixtures in Buildings 1.4Equipment Requirements
SD-03 Product Data 3.2Lighting Fixtures in Buildings 1.4Equipment Requirements 1.3.4Contractor Designed Bracing
26 05 71.00 40 SD-01 Preconstruction Submittals
2.1 GConnection Diagrams
SD-02 Shop Drawings
3.1 GControl Devices
3.1 GProtective Devices
SD-03 Product Data
2.2 GMotor Control
2.5 GCircuit Breakers
3.1 GControl Devices
2.7 GTime Switches
2.8 GProtective Relays
SD-06 Test Reports 3.2Dielectric Tests 3.2Final Test Reports
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 54 PAGES
AFSOC Simulator Facility
26 05 71.00 40 2.2.2Magnetic Motor Controllers
2.2.3 GCombination Motor Controllers
2.5 GCircuit Breakers
2.7 GTime Switches
2.8 GProtective Relays
2.9Indicating Instruments
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
26 20 00 SD-02 Shop Drawings
2.13 GPanelboards
2.16 GTransformers
2.3 GCable trays
3.1.10.1 GMarking Strips
SD-03 Product Data
2.13.3 GCircuit breakers
2.10 GSwitches
2.16 GTransformers
2.14 GEnclosed circuit breakers
2.18 GMotor controllers
2.19 GManual motor starters
2.28 GSurge protective devices
SD-06 Test Reports 3.5.2600-volt wiring test 3.5.5Grounding system test 3.5.3Transformer tests 3.5.4Ground-fault receptacle test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 54 PAGES
AFSOC Simulator Facility
26 20 00 SD-10 Operation and Maintenance Data
1.6.1Electrical Systems 26 24 13 SD-02 Shop Drawings
1.6.2 GSwitchboard Drawings
SD-03 Product Data
2.2 GSwitchboard
SD-06 Test Reports
3.5.1 GAcceptance Checks and Tests
SD-10 Operation and Maintenance Data
1.7.1Switchboard Operation and Maintenance
SD-11 Closeout Submittals
1.7.2 SAssembled Operation and
Maintenance Manuals 2.5.1Equipment Test Schedule
3.5 G SRequest for Settings
2.8 GService Entrance Available Fault
Current Label 26 24 16.00 40 SD-02 Shop Drawings
2.1.1 GDetail Drawings
SD-03 Product Data
2.1.1 GPanelboards
SD-06 Test Reports
3.2 GContinuity Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 54 PAGES
AFSOC Simulator Facility
26 24 16.00 40 3.2 GInsulation Tests 26 28 01.00 10 SD-03 Product Data
2.9 SFault Current Analysis
2.9 SProtective Device Coordination
Study
3.3.5 SProtective Relays
SD-06 Test Reports 3.3Field Testing
26 29 23 SD-02 Shop Drawings
1.6.1 GSchematic diagrams
1.6.2Interconnecting diagrams 1.6.3Installation drawings
SD-03 Product Data
2.1 GVariable frequency drives
SD-06 Test Reports 3.2.1VFD Test 3.2.2Performance Verification Tests 3.2.3Endurance Test
SD-10 Operation and Maintenance Data
2.1Variable frequency drives 26 41 00 SD-02 Shop Drawings
1.5.1.1 GOverall lightning protection
system
1.5.1.2Each major component SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
j2ee9gsg Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 54 PAGES
AFSOC Simulator Facility
26 41 00 3.5.1Lightning Protection and Grounding System Test
26 51 00 SD-02 Shop Drawings
1.6.1 GLuminaire Drawings
1.6.2 GOccupancy/Vacancy Sensor
Coverage Layout SD-06 Test Reports
1.6.8Occupancy/Vacancy Sensor Verification Tests
26 52 00.00 40 SD-03 Product Data
1.3.1 GMaterial, Equipment, and Fixture
Lists
2.2.1 GEmergency Lighting Egress Units
SD-06 Test Reports 3.2System Operational Tests
26 53 00.00 40 SD-01 Preconstruction Submittals
1.3.1 GMaterial, Equipment, and Fixture
Lists SD-02 Shop Drawings
1.3.1 GExit Lighting Units
1.3.1Exit Lighting Units Outline
Drawings SD-03 Product Data
1.3.1 GExit Lighting Units
1.3.1 GAccessories
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 54 PAGES
AFSOC Simulator Facility
26 53 00.00 40 3.2.1Operational Tests 26 56 00 SD-02 Shop Drawings
1.6.1.1 GLuminaire drawings
SD-06 Test Reports
3.2Operating test SD-10 Operation and Maintenance Data
1.9Operational Service 27 05 28.36 40 SD-02 Shop Drawings
1.3.1Fabrication Drawings 3.1.2Installation Drawings
27 05 29.00 10 SD-02 Shop Drawings
1.3.3 GPDS Design
1.3.4 GPDS Design Technical Review
1.3.5 GPDS Design Approval
27 10 00 SD-02 Shop Drawings 1.7.1.1Telecommunications drawings 1.7.1.2Telecommunications Space
Drawings SD-03 Product Data
2.5.1 GBuilding Protector Assemblies
2.5.2 GProtector Modules
2.5.5 GConnector Blocks
SD-06 Test Reports 3.5.1Telecommunications cabling testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B (AM-0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 54 PAGES
AFSOC Simulator Facility
27 10 00 SD-10 Operation and Maintenance Data
1.11.1Telecommunications cabling and pathway system
27 13 23.00 40 SD-01 Preconstruction Submittals 1.4.1Quality Assurance Plan
SD-02 Shop Drawings 1.4.1Fiber Optic System Contract
Drawings 1.4.1Detailed Shop Drawings 3.3Record (As-Built) Drawings
SD-06 Test Reports 3.2.1.1Single OTDR Test 3.2.1.2End-to-End Attenuation Tests 3.2.1.3End-to-End Bandwidth Tests
1.6.5 GFiber Optic Field Tests Plan
28 05 26.00 40 SD-06 Test Reports 3.2.1.1Bond Resistance Test…