W912HV-20-B-0013-AM0001 Revised Specifications.pdf

PDF 3 MB Posted

Attached to
AFSOC103010 Simulator Facility, Yokota AB, Japan
Solicitation number
W912HV-20-B-0013
Issued by

About this file

This solicitation is for the construction of an 845 square meter Simulator Facility at Yokota Air Base in Japan. The project includes a concrete foundation and floor slab, concrete walls, concrete roof slab, steel beam structure to support a composite metal deck roof over the high bay area, steel structure, sloping metal roof, fire alarm panels, fire suppression system, and all necessary support areas. Functional spaces include a flight simulator high bay, small training device spaces, computer room, supply and spares storage, maintenance area, briefing rooms, administration areas, and common areas. Supporting facilities include utilities, pavements, site improvements, communications, and all other necessary support. The project magnitude is between 1 and 2.5 billion Japanese yen. Interested local Japanese contractors must be registered in the System for Award Management and submit required documentation to the U.S. Army Corps of Engineers, Japan Engineering District by the time of bid submission to be eligible for award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 54 PAGES

W912HV-20-B-0013

AFSOC Simulator Facility

01 11 00.00 10 SD-01 Preconstruction Submittals 1.10Initial Site Conditions Photos

1.6 GKey Personnel Qualifications

SD-07 Certificates 1.10Monthly Progress Photos

SD-11 Closeout Submittals 1.10Construction Completion Photos

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

1.8.1 GSubmittal Register Monthly

Update 01 33 29 SD-01 Preconstruction Submittals

1.4 GQualifications for the

Sustainability Professional

3.1.1 GSustainability Implementation

Plan

SD-07 Certificates

2.2 GSustainability Notebook

SD-11 Closeout Submittals

3.1.4 GFinal Sustainability Notebook

3.1.5 GFinal Sustainability Notebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 54 PAGES

AFSOC Simulator Facility

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

1.7.2.3 GCritical Lift Plan

SD-06 Test Reports 1.4Monthly Exposure Reports

1.12.2 GAccident Reports

SD-07 Certificates

1.6.1.4 GCrane Operators/Riggers

1.8 GActivity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit

01 45 00 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan SD-06 Test Reports

3.9.2Verification Statement 01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

3.1.1 GProject Manual

3.1.1Written Practices 3.1.3Written Practices 3.1.1NDT Procedures and Equipment

Calibration Records 3.1.3NDT Procedures and Equipment

Calibration Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

j2ee9gsg Line

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 54 PAGES

AFSOC Simulator Facility

01 45 35 SD-06 Test Reports 3.1.1Daily Reports 3.1.3Daily Reports 3.1.1Biweekly Reports 3.1.2Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1AC472 Accreditation 2.1Certificate of Compliance

1.5 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1 GQualification Records

3.1.3 GQualification Records

SD-11 Closeout Submittals 3.1.1Interim Final Report

3.1.1 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

3.3.2 GTemporary Utility Connections

Plan 01 57 19 SD-01 Preconstruction Submittals

1.7.1Preconstruction Survey 1.10Environmental Protection Plan 1.7.4Environmental Manager

Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 54 PAGES

AFSOC Simulator Facility

01 57 19 1.7.5Employee Training Records 3.8.1Waste Determination

Documentation 1.10.10.1Solid Waste Management Permit

SD-06 Test Reports 3.8.1.1.2Laboratory Analysis Reports 1.10.9.2Hazardous Waste Analysis

Report 3.7.2Nonhazardous Solid Waste

Diversion Report 1.10.7.1Inspection Reports;

1.10.7.1Inspection Reports;

3.2.1Inspection Reports;

3.2.2Inspection Reports;

3.2.2Inspection Reports;

SD-07 Certificates 1.6.1Asbestos Certification 1.6.2Lead Certification

SD-11 Closeout Submittals 3.8.3.3Disposal Documentation for

Hazardous and Regulated Waste 3.8.2.1Solid Waste Management Report 1.9Environmental Records Binder

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 54 PAGES

AFSOC Simulator Facility

01 74 19 1.7Records 01 78 00 SD-03 Product Data

1.7.1 GWarranty Management Plan

1.7.5Warranty Tags 3.8Final Cleaning 1.5Spare Parts Data

SD-08 Manufacturer’s Instructions 1.7.1Instructions

SD-10 Operation and Maintenance Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

1.7.1 GAs-Built Record of Equipment

and Materials

3.6 GAs-Built Record of Equipment

and Materials

3.4 GFinal Approved Shop Drawings

3.5 GConstruction Contract

Specifications

3.9 GInterim DD FORM 1354

3.9 GChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 54 PAGES

AFSOC Simulator Facility

01 78 23 1.4 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 91 00.00 40 SD-01 Preconstruction Submittals

1.7 GCommissioning Firm

1.7.1Lead Commissioning Specialist 1.7.2Technical Commissioning

Specialists 1.7Commissioning Firm's Contract

SD-06 Test Reports

3.1.2.1 GInterim Construction Phase

Commissioning Plan

3.1.2.2 GFinal Construction Phase

Commissioning Plan

3.1.5.2 GBuilding Envelope Inspection

Checklists

3.1.5.3 GPre-Functional Checklists

1.9Issues Log

3.2 GCommissioning Report

3.3.1 GPost-Construction Trend Log

Report SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 54 PAGES

AFSOC Simulator Facility

01 91 00.00 40 1.10 GCertificate of Readiness SD-10 Operation and Maintenance Data

3.1.6 GTraining Plan

3.1.6Training Attendance Rosters

3.1.7 GSystems Manual

3.1.8Maintenance and Service Life

Plans SD-11 Closeout Submittals

3.1.2.1 GConstruction Phase

Commissioning Plan

3.2 GFinal Commissioning Report

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 GFormwork

3.1.1 GFormwork

2.2.1 GForm Removal Schedule

SD-03 Product Data 2.2Form Materials

SD-04 Samples

1.4 GSample Panels

SD-05 Design Data 2.1Calculations

SD-06 Test Reports 3.2Inspection

03 15 00.00 10 SD-02 Shop Drawings

2.4 GWaterstops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 54 PAGES

AFSOC Simulator Facility

03 15 00.00 10 SD-04 Samples 2.3.2Lubricant for Preformed

Compression Seals 2.3.3Field-Molded Type 2.4Waterstops

2.5.2 GSplicing Waterstops

03 20 00.00 10 SD-01 Preconstruction Submittals

3.1.3.2 GButt-Splices

SD-02 Shop Drawings

3.1 GReinforcement

SD-03 Product Data

2.3.1 GMechanical Butt-Splices

2.3 GReinforcing Steel

SD-06 Test Reports

2.7 GTests, Inspections, and

Verifications SD-07 Certificates

1.4.1Qualified Welders 1.4.2Qualification of Gas Pressure

Welded Splicers 03 30 00.00 10 SD-01 Preconstruction Submittals

1.6.2 GQuality Control Plan

1.6.1Laboratory Accreditation

3.8.5.6 GSampling Plan

SD-05 Design Data

2.1.1 GMixture Proportions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 54 PAGES

AFSOC Simulator Facility

03 30 00.00 10 SD-06 Test Reports

2.1.1 GMixture Proportions

3.8 GTesting and Inspection for CQC

2.2.3Fly Ash 2.2.4Ground Granulated Blast-Furnace

(GGBF) Slag 2.3Aggregates 3.8.5.1Air Content 3.8.5.3Slump 3.8.5.6Compressive Strength 2.5Water

03 33 00 SD-02 Shop Drawings 1.5.1Detail Drawings

SD-04 Samples 2.1Materials 1.5.2Panels

03 35 00.00 10 SD-04 Samples 1.4.1Field Test Panels 1.4.1.1Sample Wall Panels

03 39 00.00 10 SD-06 Test Reports 3.2Testing and Inspection for CQC

05 12 00 SD-01 Preconstruction Submittals

1.7.1.1 GErection Drawings

SD-02 Shop Drawings

1.7.2 GFabrication drawings

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 54 PAGES

AFSOC Simulator Facility

05 12 00 2.6.2Class A coating 2.3Bolts, nuts, and washers 3.7.1.2Weld Inspection Reports 3.7.2.1Direct Tension Indicator Washer

Inspection Reports 3.7.3.1Bolt Testing Reports

05 30 00 SD-02 Shop Drawings

1.4.5 GFabrication Drawings

SD-04 Samples 2.1.1Metal Roof Deck Units 2.2.4Flexible Closure Strips

SD-05 Design Data

2.1 GDeck Units

05 50 13 SD-02 Shop Drawings 2.3Access doors and panels 2.5Cover plates and frames 2.9angles and plates

05 51 33 SD-02 Shop Drawings 2.4Ladders

05 52 00 SD-02 Shop Drawings

1.3.1 GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars And

Strips SD-03 Product Data

2.3.3 GHot-Rolled Carbon Steel Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

j2ee9gsg Line

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 54 PAGES

AFSOC Simulator Facility

05 52 00 SD-07 Certificates

1.5.1 GWelding Procedures

1.5.1.1 GWelding Qualifications

06 41 16 SD-02 Shop Drawings 1.6.2Shop Drawings 2.10Shop Drawings 3.1Installation

SD-04 Samples 2.4Plastic Laminates

2.6 GCabinet Hardware

06 61 16 SD-02 Shop Drawings 1.6.2Detail Drawings 3.1Installation

SD-04 Samples 2.2Material

2.4.5 GCounter Tops

SD-10 Operation and Maintenance Data

3.2Clean-up 07 05 23 SD-01 Preconstruction Submittals

1.5 GWork Plan

SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-06 Test Reports

3.5 GPressure Test Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 54 PAGES

AFSOC Simulator Facility

07 05 23 3.5.7 GAir Leakage Test Report

3.6.5 GDiagnostic Test Report

SD-07 Certificates 1.7.2.1Pressure Test Agency

07 14 00 SD-11 Closeout Submittals 3.6Information Card 3.5Instructions To Government

Personnel 07 27 10.00 10 SD-04 Samples

3.1.2 GMock-up

SD-06 Test Reports

1.9 G DODesign Review Report

3.1.3 GTesting and Inspection

SD-07 Certificates

1.8 GAir Barrier Inspector

07 41 13 SD-02 Shop Drawings

1.5.5 GRoofing Panels

1.5.5 GFlashing and Accessories

1.5.5 GGutter/Downspout Assembly

SD-04 Samples

2.2 GRoof Panels

1.5.5 GFactory-applied Color Finish

2.5Accessories

1.5.5 GFasteners

1.5.5 GGaskets and Sealant/Insulating

Compounds

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 54 PAGES

AFSOC Simulator Facility

07 41 13 SD-05 Design Data

1.3.1.2 GWind Uplift Resistance

SD-06 Test Reports

1.3.1.1 GLeakage Test Report

1.3.1.2 GWind Uplift Test Report

2.3 GFactory Finish and Color

Performance Requirements 3.8Fall protection

SD-07 Certificates

1.5.1 GQualification of Manufacturer

1.5.2 GQualification of Applicator

SD-08 Manufacturer’s Instructions

1.5.5 GInstallation Manual

SD-09 Manufacturer’s Field Reports

3.11.1 GManufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.9 GWarranties

3.12 GInformation Card

3.13 GDate Of Installation Wall-Mounted

Placard 07 52 00 SD-02 Shop Drawings

1.5.6Roof plan SD-11 Closeout Submittals

1.10Warranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 54 PAGES

AFSOC Simulator Facility

07 52 00 3.9Information Card 3.8Instructions To Government

Personnel 07 60 00 SD-02 Shop Drawings

2.2.1Exposed sheet metal 3.1.12Gutters 3.1.13Downspouts 2.2.1Gravel stops and fascias 3.1.14Flashing for roof drains 3.1.15Metal Soffit Panels 3.1.7Base flashing 3.1.8Counterflashing 3.1.20Flashing at roof penetrations 3.1.9Reglets 3.1.16Scuppers 3.1.22Copings 3.1.11Drip edge

SD-11 Closeout Submittals 3.5Quality Control Plan

07 84 00 SD-02 Shop Drawings

2.2 GFirestopping Materials

08 11 13 SD-02 Shop Drawings 2.2Doors 2.2Doors 2.6Frames 2.6Frames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 54 PAGES

AFSOC Simulator Facility

08 11 13 SD-04 Samples 2.10.4Factory-applied enamel finish

08 33 23 SD-02 Shop Drawings 2.3.1Overhead Coiling Doors 2.3.3Counterbalancing Mechanism 2.3.4Manual Door Operators 2.3.5Electric Door Operators 2.3.1.4Bottom Bars 2.2.1.1Guides 2.3.3.1Mounting Brackets 2.3.1.9Overhead Drum 3.3.2Hood 2.2.1.1Installation Drawings

SD-03 Product Data

2.3.1 GOverhead Coiling Doors

SD-05 Design Data 2.3.1Overhead Coiling Doors

SD-10 Operation and Maintenance Data

3.3.2Operation and Maintenance Manuals

3.3.2Materials 3.3.2Devices 3.3.2Procedures 3.3.2Manufacture's Brochures 3.3.2Parts Lists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 54 PAGES

AFSOC Simulator Facility

08 33 23 SD-11 Closeout Submittals 3.3.1Warranty

08 41 13 SD-01 Preconstruction Submittals 1.3.1Sample Warranty 1.3.1List of Product Installations

SD-02 Shop Drawings 3.3Installation Drawings 2.3Fabrication Drawings

SD-04 Samples

1.3.1 GFinish and Color Samples

SD-06 Test Reports 1.3.1Certified Test Reports 3.4.3Deflection 3.4.1Air Infiltration 3.4.5Condensation Resistance and

Thermal Transmittance 3.4.6Water Infiltration

SD-11 Closeout Submittals 3.6Manufacturer's Product Warranty

08 71 00 SD-02 Shop Drawings 1.4Hardware schedule 2.3.7Keying system

SD-11 Closeout Submittals 1.5Key Bitting

08 81 00 SD-04 Samples 1.7.1Insulating Glass

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 54 PAGES

AFSOC Simulator Facility

08 81 00 2.4.2Glazing Compound 2.4.6Tape 2.4.3.1Sealant

08 91 00 SD-02 Shop Drawings 1.5Wall louvers 1.6Wall louvers 1.6Equipment Screen Louvers 2.4Equipment Screen Louvers

SD-04 Samples 1.5Wall louvers 1.6Wall louvers 1.6Equipment Screen Louvers 2.4Equipment Screen Louvers

09 22 00 SD-02 Shop Drawings 2.2Metal support systems

09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-04 Samples

2.2 GTile

2.2 GAccessories

2.2 GTransition Strips

2.7 GTransition Strips

2.5 GGrout

SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 54 PAGES

AFSOC Simulator Facility

09 30 10 SD-10 Operation and Maintenance Data

3.2 GInstallation

SD-11 Closeout Submittals

1.3LEED Documentation 09 51 00 SD-02 Shop Drawings

1.3Approved Detail Drawings SD-03 Product Data

1.3.1 G SAcoustical Ceiling Systems

SD-04 Samples

2.2Acoustical Units 2.2.1Acoustic Ceiling Tiles

SD-07 Certificates 2.2Acoustical Units 2.2.1Acoustic Ceiling Tiles

09 65 00 SD-02 Shop Drawings 2.11Resilient Flooring and

Accessories SD-04 Samples

2.11Resilient Flooring and Accessories

SD-06 Test Reports 3.3Moisture, Alkalinity and Bond

Tests SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 54 PAGES

AFSOC Simulator Facility

09 65 00 2.11Resilient Flooring and Accessories

SD-11 Closeout Submittals 1.4LEED Documentation

09 67 23.13 SD-02 Shop Drawings 2.2Installation Drawings

SD-04 Samples 1.6.2Hardboard Mounted Epoxy

Flooring

3.1.4 GFloor Topping

SD-11 Closeout Submittals 1.7Warranty

09 68 00 SD-02 Shop Drawings 3.4Installation Drawings 2.5Moldings

SD-04 Samples

2.2 GCarpet

2.5 GMoldings

SD-06 Test Reports 3.2Moisture and Alkalinity Tests

SD-10 Operation and Maintenance Data

2.2Carpet 3.5Cleaning and Protection

SD-11 Closeout Submittals

1.3.1 SLocal/Regional Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 54 PAGES

AFSOC Simulator Facility

09 68 00 1.9Warranty 09 90 00 SD-02 Shop Drawings

3.10Piping identification 3.10stencil

SD-04 Samples

1.12 GColor

1.5.2Spray Tile Finish System 1.5.3Sample Spray Tile Wall Coating

System Mock-Up SD-10 Operation and Maintenance Data

2.2 SCoatings

10 11 00 SD-03 Product Data

2.3 GMarkerboard

2.6 GMonitors

10 14 00.10 SD-02 Shop Drawings 3.1Approved Detail Drawings

SD-04 Samples

1.3 GExterior Signage

SD-10 Operation and Maintenance Data

3.1.2Protection and Cleaning 10 14 00.20 SD-02 Shop Drawings

1.7.2Detail Drawings SD-04 Samples

1.7.1 GInterior Signage

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 54 PAGES

AFSOC Simulator Facility

10 14 00.20 1.6Software SD-10 Operation and Maintenance Data

3.1Approved Manufacturer's Instructions

3.1.1Protection and Cleaning 10 21 13 SD-02 Shop Drawings

2.2Fabrication Drawings 3.2Installation Drawings

SD-04 Samples

2.7 GColors and Finishes

2.3.4Hardware and Fittings 2.3.2Anchoring Devices and Fasteners

10 22 39 SD-01 Preconstruction Submittals 1.3Manufacturer's Qualifications 1.3Manufacturer's Sample Warranty

SD-02 Shop Drawings 3.1Installation 3.1.1Layouts 1.3Fabrication Drawings

SD-04 Samples 1.3Folding Panel Finishes

SD-06 Test Reports 3.2.2Acoustical Test 1.3.2.1Flame and Smoke Development

Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 54 PAGES

AFSOC Simulator Facility

10 22 39 SD-10 Operation and Maintenance Data

2.2Folding Panel Partitions 10 26 00 SD-02 Shop Drawings

2.3.1 GWall Guards

SD-04 Samples

2.5 GFinish

10 28 13 SD-04 Samples

2.2.2 GFinishes

2.3Accessory Items

SD-10 Operation and Maintenance Data

2.3.10Electric Hand Dryer 10 71 13 SD-01 Preconstruction Submittals

1.3.1Sample Warranty 1.3.1List of Product Installations

SD-02 Shop Drawings 2.4Exterior Sun Shades

SD-04 Samples 2.6.1Aluminum Finish

1.3.1 GFinish And Color Samples

11 31 13 SD-10 Operation and Maintenance Data

2.1Kitchen equipment 12 24 13 SD-02 Shop Drawings

3.2Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 54 PAGES

AFSOC Simulator Facility

12 24 13 SD-04 Samples

2.2 GWindow Shades

SD-06 Test Reports 2.2Window Shades

SD-10 Operation and Maintenance Data

2.2Window Shades 12 48 13 SD-02 Shop Drawings

3.2Installation Drawings 3.2Detail Drawings 3.2Custom Graphics Drawings

SD-04 Samples

2.2 GEntrance Floor Mats and Frames

2.2Custom Graphics

SD-10 Operation and Maintenance Data

3.2Protection, Maintenance, and Repair Information

13 48 00 SD-02 Shop Drawings

3.1 GBracing

3.4 GResilient Vibration Isolation

Devices

2.1 GEquipment Requirements

SD-03 Product Data

3.1 GBracing

2.1 GEquipment Requirements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 54 PAGES

AFSOC Simulator Facility

13 48 00 SD-06 Test Reports

3.3 GAnchor Bolts

13 48 00.00 10 SD-02 Shop Drawings 3.1Coupling and Bracing 3.3Flexible Couplings or Joints 2.1Equipment Requirements

1.3.4 GContractor Designed Bracing

SD-03 Product Data

3.1 GCoupling and Bracing

2.1 GEquipment Requirements

1.3.4 GContractor Designed Bracing

SD-07 Certificates 2.3Flexible Ball Joints

21 13 13.00 10 SD-02 Shop Drawings

1.6.3 GShop Drawings

3.9 GAs-Built Drawings

SD-03 Product Data

1.6.1 GFire Protection Related

Submittals

2.3 GMaterials and Equipment

1.8 GSpare Parts

3.8 GPreliminary Tests

3.9 GFinal Acceptance Test

3.10 GOnsite Training

1.6.1 GFire Protection Specialist

1.6.2 GSprinkler System Installer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 54 PAGES

AFSOC Simulator Facility

21 13 13.00 10 SD-05 Design Data

1.6.3 GSway Bracing

1.4.1.3 GHydraulic Calculations

SD-06 Test Reports

3.8 GPreliminary Test Report

3.9 GFinal Acceptance Test Report

SD-07 Certificates

3.3 GInspection by Fire Protection

Specialist SD-10 Operation and Maintenance Data

3.10 GOperating and Maintenance

Manuals

22 00 00 SD-03 Product Data

2.11 GWater Heaters

3.12.1.1 GBackflow Prevention Assemblies

SD-06 Test Reports 3.12Tests, Flushing and Disinfection

3.12.1.1 GTest of Backflow Prevention

Assemblies 3.3Test and Adjustments of Water

Temperature Maintenance Cable System

SD-10 Operation and Maintenance Data

3.12.1Plumbing System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 54 PAGES

AFSOC Simulator Facility

22 15 14.00 40 SD-02 Shop Drawings

2.1 GInstallation Drawings

SD-03 Product Data

2.2.2 GAir Compressors

SD-05 Design Data 2.1.1Design Analysis and Calculations

SD-06 Test Reports 3.2.1.1Hydrostatic Testing

3.2.1 GCompressed Air Systems Testing

3.2.1.1Valve-Operating Tests 3.2.1.1Drainage Tests

3.2.1.1 GPneumatic Testing

SD-10 Operation and Maintenance Data

3.4 GOperation and Maintenance

Manuals

22 15 26.00 20 SD-02 Shop Drawings 1.5.2High pressure compressed air system SD-03 Product Data

2.1Air compressor SD-06 Test Reports

3.1.1Non-Destructive Examination (NDE) report for welding of piping

3.4.2.2Leak tightness test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 54 PAGES

AFSOC Simulator Facility

22 15 26.00 20 SD-10 Operation and Maintenance Data

2.1Air compressor 2.2Air dryer

SD-11 Closeout Submittals 2.1air compressor 2.2air dryer 1.5compressed air systems

23 00 00 SD-02 Shop Drawings

1.5.5 GDetail Drawings

SD-03 Product Data 2.12Air Handling Units 2.13.2.1Constant Volume, Single Duct

Terminal Units 2.13.2.2Variable Volume, Single Duct

Terminal Units 2.14Energy Recovery Devices 2.10.1Double-Wall Round Ductwork

SD-10 Operation and Maintenance Data

3.15.1Operation and Maintenance Manuals

2.10.4Manual Balancing Dampers 2.11.1.3Centrifugal Type Power Roof

Ventilators 2.12Air Handling Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 54 PAGES

AFSOC Simulator Facility

23 00 00 2.13.2.1Constant Volume, Single Duct Terminal Units

2.13.2.2Variable Volume, Single Duct Terminal Units

2.14Energy Recovery Devices 2.11.1.6Circulation Fans - High Volume

Low Speed (HVLS) 23 05 93 SD-01 Preconstruction Submittals

1.6.1 GIndependent TAB Agency and

Personnel Qualifications

1.6.3.2 GTAB Design Review Report

1.6.1.2 GTAB Firm

1.3 GTAB Team Assistants

1.3 GTAB Team Engineer

1.6.1.2 GTAB Specialist

1.3 GTAB Team Field Leader

SD-02 Shop Drawings

1.4.3 GTAB Schematic Drawings and

Report Forms SD-03 Product Data

1.4 GEquipment and Performance

Data

1.6.1.3 GTAB Related HVAC Submittals

1.4.3 GSystems Readiness Check

1.6.2.3 GTAB Verification

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 54 PAGES

AFSOC Simulator Facility

23 05 93 3.3.5 GCompleted Pre-Final DALT Report

3.3.8 GCertified Final DALT Report

1.6.3.3 GPrerequisite HVAC Work

Checkout List

3.4.6.1 GProportional Balancing

3.4.6.2 GSeason 1

3.4.6.2 GSeason 2

1.6.3.2 GTAB Design Review Report

1.6.6.2 GTAB Report for Season 1

1.6.6.2 GTAB Report for Season 2

SD-07 Certificates

1.6.3.2 GDALT and TAB Submittal and

Work Schedule

1.6.3.3 GTAB Pre-Field Engineering

Report

1.6.4 GInstrument Calibration

Certificates

3.7 GDALT and TAB Procedures

Summary

3.7 GCompleted Pre-Final DALT Work

Checklist

3.3.2 GAdvance Notice of Pre-Final

DALT Field Work

3.4.6.1 GProportional Balancing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 54 PAGES

AFSOC Simulator Facility

23 05 93 1.6.2.3 GPre-field DALT Preliminary Notification

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.4Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems

23 09 00 SD-02 Shop Drawings

3.2 GDDC Contractor Design Drawings

3.2 GFinal As-Built Drawings

SD-06 Test Reports

3.4.2 GStart-Up Testing Report

3.5.1 GPVT Procedures

3.5.3 GPVT Report

1.9.1 GPre-Construction Quality Control

(QC) Checklist

1.9.2 GPost-Construction Quality Control

(QC) Checklist SD-10 Operation and Maintenance Data

3.6 GOperation and Maintenance

(O&M) Instructions

3.8.1 GTraining Documentation

SD-11 Closeout Submittals

2.5 GEnclosure Keys

3.1.6.1 GPassword Summary Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 54 PAGES

AFSOC Simulator Facility

23 09 00 1.9.3 GCloseout Quality Control (QC) Checklist

23 11 25 SD-02 Shop Drawings

1.5.3 GGas Piping System

SD-06 Test Reports

3.17 GTesting

3.17.1 GPressure Tests

3.17.2 GTest with Gas

SD-07 Certificates

1.5.1 GWelders Procedures and

Qualifications

1.5.1 GAssigned Number, Letter, or

Symbol SD-10 Operation and Maintenance Data

1.3.1Gas Facility System and Equipment Operation

1.3.2Gas Facility System Maintenance 1.3.3Gas Facility Equipment

Maintenance 23 23 00 SD-02 Shop Drawings

2.3Refrigerant Piping System SD-06 Test Reports

3.5Refrigerant Piping Tests SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 54 PAGES

AFSOC Simulator Facility

23 23 00 1.6Maintenance 3.4Operation and Maintenance

Manuals 3.4Demonstrations

23 25 00 SD-03 Product Data 3.5Tests 3.4Training Course

SD-10 Operation and Maintenance Data

3.5.3Water Treatment System 23 52 00 SD-02 Shop Drawings

1.6Detail Drawings SD-06 Test Reports

3.10Heating System Tests 3.13Fuel System Tests

SD-10 Operation and Maintenance Data

3.12Operation and Maintenance Instructions

23 64 10 SD-03 Product Data 2.5Water Chiller

SD-06 Test Reports 3.5Field Acceptance Testing 3.5.2Water Chiller - Field Acceptance

Test Report 3.6System Performance Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 54 PAGES

AFSOC Simulator Facility

23 64 10 SD-07 Certificates

3.2.8 GRefrigeration System

SD-10 Operation and Maintenance Data

3.7Operation and Maintenance Manuals

23 64 26 SD-06 Test Reports 3.1.1.3Piping Welds NDE Report 3.4.2Pressure Tests Reports

SD-10 Operation and Maintenance Data

2.5.8Calibrated Balancing Valves 2.5.9Automatic Flow Control Valves 2.5.10Pump Discharge Valve 2.5.11Water Temperature Mixing Valve 2.5.12Water Temperature Regulating

Valves 2.5.13Water Pressure Reducing Valve 2.5.14Pressure Relief Valve 2.5.15Combination Pressure and

Temperature Relief Valves 2.6.9Expansion Joints 2.7Pumps 2.6.3Combination Strainer and Pump

Suction Diffuser 2.8Expansion Tanks

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 54 PAGES

AFSOC Simulator Facility

23 64 26 2.9Air Separator Tanks 23 81 23.00 20 SD-03 Product Data

2.2Computer room air conditioning units

2.3.2Space temperature control system drawings

SD-06 Test Reports 2.6.2CRAC Production Schedule and

Factory Test Schedule 2.6.1Manufacturer's Factory Test

Plans 2.6.5Factory Test Reports 3.4.2Field Test Schedule 3.4.1Manufacturer's Field Test Plans 3.4.6Field Test Reports

SD-07 Certificates

3.4.3 GCredentials of the Manufacturer's

Field Test Representative 23 82 02.00 10 SD-02 Shop Drawings

1.5Drawings SD-06 Test Reports

3.6 GSystem Performance Tests

SD-10 Operation and Maintenance Data

3.4Operation and Maintenance Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 54 PAGES

AFSOC Simulator Facility

26 05 19.10 10 SD-03 Product Data

2.1.1 GWire and Cable

2.1.3.1 GConductors

26 05 48.00 10 SD-02 Shop Drawings 3.2Lighting Fixtures in Buildings 1.4Equipment Requirements

SD-03 Product Data 3.2Lighting Fixtures in Buildings 1.4Equipment Requirements 1.3.4Contractor Designed Bracing

26 05 71.00 40 SD-01 Preconstruction Submittals

2.1 GConnection Diagrams

SD-02 Shop Drawings

3.1 GControl Devices

3.1 GProtective Devices

SD-03 Product Data

2.2 GMotor Control

2.5 GCircuit Breakers

3.1 GControl Devices

2.7 GTime Switches

2.8 GProtective Relays

SD-06 Test Reports 3.2Dielectric Tests 3.2Final Test Reports

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 54 PAGES

AFSOC Simulator Facility

26 05 71.00 40 2.2.2Magnetic Motor Controllers

2.2.3 GCombination Motor Controllers

2.5 GCircuit Breakers

2.7 GTime Switches

2.8 GProtective Relays

2.9Indicating Instruments

26 08 00 SD-06 Test Reports

3.1 GAcceptance tests and inspections

26 20 00 SD-02 Shop Drawings

2.13 GPanelboards

2.16 GTransformers

2.3 GCable trays

3.1.10.1 GMarking Strips

SD-03 Product Data

2.13.3 GCircuit breakers

2.10 GSwitches

2.16 GTransformers

2.14 GEnclosed circuit breakers

2.18 GMotor controllers

2.19 GManual motor starters

2.28 GSurge protective devices

SD-06 Test Reports 3.5.2600-volt wiring test 3.5.5Grounding system test 3.5.3Transformer tests 3.5.4Ground-fault receptacle test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 54 PAGES

AFSOC Simulator Facility

26 20 00 SD-10 Operation and Maintenance Data

1.6.1Electrical Systems 26 24 13 SD-02 Shop Drawings

1.6.2 GSwitchboard Drawings

SD-03 Product Data

2.2 GSwitchboard

SD-06 Test Reports

3.5.1 GAcceptance Checks and Tests

SD-10 Operation and Maintenance Data

1.7.1Switchboard Operation and Maintenance

SD-11 Closeout Submittals

1.7.2 SAssembled Operation and

Maintenance Manuals 2.5.1Equipment Test Schedule

3.5 G SRequest for Settings

2.8 GService Entrance Available Fault

Current Label 26 24 16.00 40 SD-02 Shop Drawings

2.1.1 GDetail Drawings

SD-03 Product Data

2.1.1 GPanelboards

SD-06 Test Reports

3.2 GContinuity Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 54 PAGES

AFSOC Simulator Facility

26 24 16.00 40 3.2 GInsulation Tests 26 28 01.00 10 SD-03 Product Data

2.9 SFault Current Analysis

2.9 SProtective Device Coordination

Study

3.3.5 SProtective Relays

SD-06 Test Reports 3.3Field Testing

26 29 23 SD-02 Shop Drawings

1.6.1 GSchematic diagrams

1.6.2Interconnecting diagrams 1.6.3Installation drawings

SD-03 Product Data

2.1 GVariable frequency drives

SD-06 Test Reports 3.2.1VFD Test 3.2.2Performance Verification Tests 3.2.3Endurance Test

SD-10 Operation and Maintenance Data

2.1Variable frequency drives 26 41 00 SD-02 Shop Drawings

1.5.1.1 GOverall lightning protection

system

1.5.1.2Each major component SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

j2ee9gsg Line

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 54 PAGES

AFSOC Simulator Facility

26 41 00 3.5.1Lightning Protection and Grounding System Test

26 51 00 SD-02 Shop Drawings

1.6.1 GLuminaire Drawings

1.6.2 GOccupancy/Vacancy Sensor

Coverage Layout SD-06 Test Reports

1.6.8Occupancy/Vacancy Sensor Verification Tests

26 52 00.00 40 SD-03 Product Data

1.3.1 GMaterial, Equipment, and Fixture

Lists

2.2.1 GEmergency Lighting Egress Units

SD-06 Test Reports 3.2System Operational Tests

26 53 00.00 40 SD-01 Preconstruction Submittals

1.3.1 GMaterial, Equipment, and Fixture

Lists SD-02 Shop Drawings

1.3.1 GExit Lighting Units

1.3.1Exit Lighting Units Outline

Drawings SD-03 Product Data

1.3.1 GExit Lighting Units

1.3.1 GAccessories

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 54 PAGES

AFSOC Simulator Facility

26 53 00.00 40 3.2.1Operational Tests 26 56 00 SD-02 Shop Drawings

1.6.1.1 GLuminaire drawings

SD-06 Test Reports

3.2Operating test SD-10 Operation and Maintenance Data

1.9Operational Service 27 05 28.36 40 SD-02 Shop Drawings

1.3.1Fabrication Drawings 3.1.2Installation Drawings

27 05 29.00 10 SD-02 Shop Drawings

1.3.3 GPDS Design

1.3.4 GPDS Design Technical Review

1.3.5 GPDS Design Approval

27 10 00 SD-02 Shop Drawings 1.7.1.1Telecommunications drawings 1.7.1.2Telecommunications Space

Drawings SD-03 Product Data

2.5.1 GBuilding Protector Assemblies

2.5.2 GProtector Modules

2.5.5 GConnector Blocks

SD-06 Test Reports 3.5.1Telecommunications cabling testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 54 PAGES

AFSOC Simulator Facility

27 10 00 SD-10 Operation and Maintenance Data

1.11.1Telecommunications cabling and pathway system

27 13 23.00 40 SD-01 Preconstruction Submittals 1.4.1Quality Assurance Plan

SD-02 Shop Drawings 1.4.1Fiber Optic System Contract

Drawings 1.4.1Detailed Shop Drawings 3.3Record (As-Built) Drawings

SD-06 Test Reports 3.2.1.1Single OTDR Test 3.2.1.2End-to-End Attenuation Tests 3.2.1.3End-to-End Bandwidth Tests

1.6.5 GFiber Optic Field Tests Plan

28 05 26.00 40 SD-06 Test Reports 3.2.1.1Bond Resistance Test…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .