A.1.9 - RTA DWG_W912HV20B0006_IFH North Foster_MAY2020-Vol1.pdf

PDF 32 MB Posted

Attached to
Improve Family Housing – North Foster Towers
Solicitation number
W912HV20B0006
Issued by

About this file

This document outlines a federal contract opportunity for improvements to family housing at Camp Foster in Okinawa, Japan. The solicitation calls for whole house interior and exterior modernization, renovation, and repair of three family housing towers containing 204 total units. Upgrades will include interior and exterior utility and communication infrastructure, energy efficient mini-splits and electric water heaters in all units, and a cooling/dehumidification system for common areas and hallways. Individual units will receive upgraded kitchens, bathrooms, flooring, fixtures and finishes, and an improved overall floor plan. Building systems, common areas, and hallways will also be upgraded, along with installation of a radon mitigation system and improvements to playgrounds and recreation areas. Demolition and asbestos/lead-based paint removal and disposal are included. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Japan. The contract value is estimated to be between 2.5 and 10 billion Japanese Yen.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BL

DG

ME

DI

CA

L

DE

NT

AL

CL

IN

IC

Y=

Y=

Y=

Y=

Y=

Y=

Y=

Y=

Y=

Y=

X=3 3050 X=33050

X=33100 X=33100

X=33150 X=33150

X=33200

X=33250 X=33250

X=33300 X=33300

X=33350

Y=

S O U

TH

D A K

OT

A

S AI

PAN

ROA

D

44 0

4 37

44 4A

440A

UT

UT

UT

UT

UT

UT

SUBSTATION

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

SUBSTATION

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UTUT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

H

H

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

SUBSTATION

UT

UT

UT

UT

UT

UT

UT

UT

5629 5

T-

72 56

875670

T-5858

59005971

T-5829

58035805

T-5799

T-5798

CONC

CONC

CONC

STORAGE

SPACE

5805 5803

T348D

RANGE

PISTOL

XER.

STA.

KUWAE

CONC

CONC

TRA ILER

CONC

CONC

CONC

TRA ILER

CONC

TR

A

IL

E R

CONC

CONC

FOUNDATION

TRA ILER

TRA ILER

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

FOUNDATION

FOUNDATION

CONC

5878 5879

5836 T-5834

T-5862

T-5807

TH265

T-5861

5851A

OPEN

STORAGE

5645 5686

S-5956

T-129

T

5604A

G5 H

T-121

T-118

T-117

5625 5619

6D

T-124

5632A

DIRT

370R

377376

T-113

5 704

0 769

628C

17 3A

A

92108

(PASS &ID)

TH222

TH228

TH

TH

TH226

SU

B

STATION

H

68368

7 62

4 762

744746

24 1

1327 1322

13234

8 1

11411 55 1

1710 17

01808

TH178

29 23

TH72C1R3

C 1R

3TH

TH

70A

CR

TH

64F3

TH

64ACR3

C1R3

TH

TH

A

C1 R3

TH

63AC1R3

F3

TH

TH

63A

F3

F3

TH

B

SH36

TH

17F4

F4

TH

TH

18F4

TH

20F4

TH21

F4

F4

TH

F4

TH

F4

TH

TH22A

F4

TH

6 2

1 2

7 2

208B

1000444

LEGION

AMERICAN

LEGION

CLUB

6A

546B547

A

496D

TH130B

A

TH219

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

5689A

5689B

POOL

ATHLETIC

FIELD

BASEBALL

FIELD

COURT

TENNIS

COURT

COURT

TENNIS

COURTS

OPEN

STORAGE

STACK

OPEN

STORAGE

SEA

GATE

STORAGE

LO

AD

IN

G

DO

C K

LOADING

DOCK

373A

PLAY

AREA

GROUND

PLAY-

PLAY

AREA

QUARRY

QUARRY

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

W.L.

4.03

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

RAMP

STEPS

STEPS

STEPS

STEPS

OKL

AHO

MA

STR

EET

N O

H W Y

N

AT

IO

N A L

N O

H W Y

N

AT

IO

N A L

DIV

ISIO

N

6TH

RO

AD

MARINE

DIVISION

M

ARINE

ROAD

TH

M

AR

IN

E

RO

AD

DI

VI

SI

ON

N O

H W Y

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING PAVED

PARKING

PAVED

PARKING

P A

VE

D

P

AR

K

IN

G

PAVED

PARKING

P

AV

E D

P

AR

K

IN

G

STILLW

ILL

PAVED

PARKING

OPEN

STORAGE

PAVED

PARKING

PAVED

PARKING

DIRT

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

P

AV

ED

P

AR

KI

N G

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

STORAGE

AREA

P

AV

E D

P A R K

IN

G

P

AV

E D

P

AR

K

IN

G

P

AV

E D

P A R K

IN

G

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

P

AV

E D

P

AR

K

IN

G

PAVED

PARKING

PAVED

PARKING PAVED

PARKING

CORAL

C O R A L

CORAL

DIRT

GATE

DRIV

E

TH

N

AT

IO

N

AL

OKL

AHO

MA

STR

EET

GATE

P

RE

F

R

OA

D

NO

NEBRASKASTREET

IWO

STREET

JIMA

STREET

M

AR

IN

E

S T

TH

D

IV

ST

RE

ET

DIV

G

AT

E

A

M E X

IC

O

S

TR

EE

T

PREF ROAD NO.

G

ATE2C

G

ATE

A.C.

PATTON

RO

AD

NEW

YO

RK

STR

EET

PRE

F R

OAD

OKLAHOMA

WAY

N

EW

YO

R K

S

TR

EET

NE

W

YO

RK

ST

RE

ETOKLAHOMA

STREET

HA

WA

II

LO

OP

WEST VIRGINIA

LOOP

A

LA

S K A

S

TR

EE

T

OR

EG

ON

ST

RE

ET

G

EO

RG

IA

STREET

ARM

Y

RO

AD

M

AIN

E

STR

EET

SAIPAN

ROAD

O K

IN

AW

A

E X P R E S S W

AY

NEBRASKA

STREET

GUADALCANAL

ROAD

ST

ILL

W

ILL

DR

IV

E

TARAWA

ROAD

VLT

VLT

VLT

VLT

VLT

PILE PILE

VLT

VLT

VLT

VLT

VLT

VLT

PILE

PILE

VLT

PILE

PILE

PILE

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

PILE

VLT

VLT

PILE

PILE

PILE

PILE

PILE

VLT

VLTPILE

VLT

VLT

VLT

VLT

VLT

VLT

VLT

PILE

PILE

PILE

PILE

PILE

PILE

PILE

PILE

PILE

PILE

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

PILE

VLT

VLT

VLT

POOL

ATHLETIC

FIELD

SOCCER/

SOFTBALLFIELDS

TENNIS

BASKETBALL

POOL

TENNIS

TENNIS

TENNIS

GREEN

TEE

GREEN

GREEN

S.T.

S.T.

BLEACHERS

TENNIS

VOLLYBALL

COURT

FLAGPOLE

FLAGPOLE

FLAGPOLE

PAVED

FLAGPOLE

MBX

FLAGPOLE

LOAD ING

DOCK

PLAY

AREA

REC

AREA

REC

AREA

REC

AREA

PLAY

AREA

PLAY

AREA

PLAY

AREA

PLAYGROUND

PLAY

AREA

PLAY

AREA

PLAY

AREA

P.G.

P.G.

3A P.G

P.

G.

P.G.

P.G.

600A

P.G.

632A

P.G

P.G . 7

11A

U/C

U/C

U/C

SIDEWALK

U/C

SIDEWALK

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

U/C

0A

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

ANTENNA

ANTENNA

ANTENNA

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

RAMP

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STA IRS

STEPS

STEPS

STEPS

STEPS

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

ARKANSASSTREET

FLO

R

IDA

C T.

C

OLU

M B U S

C T.

SU

PERIO

R

C T.

ERIE

STREE

T

MA

RY

LA

ND

ST

RE

ET

PE

NN

SYL

VAN

IA

CT

K

EN

TU

C K Y

S

TR

EE

T

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

PAVED

PARKING

VIR

GIN

IA

STR

EET

ALA

BAM

A

STR

EET

PR

EF

DR

IVE

GATE

2C

OHIO

GATE

A

2B

G

AT

E

MARINE

1ST

TH

D

IV

ST

RE

ET

TH

A

RM

Y

RO

AD

IWO

JIMA

MINNESOTASTREET

D

IVISIO

N

STREET

GAT

E

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

PILE

PILE

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT

VLT VLT

VLT

PIPE

VLT

VLT

VLT

VLT

VLT

21C

B

442B

499A

3 OKINAWA

10091

1400 1408

TRAILER

52347

7 2

A

TH

F6

TH

F4

TH

F4

TH

23492

62248

TH231

21762172

0A

CONC

CONC

CONC

CONC

RUINS

CONC

O

EPC

1277 1

TH

TH176

TH232

TH227A

TH

TH

103B

13A

TH186

109C

109B

109A

13A

13B

13C

DFAB

51B

TH151

225B

225B

TS217

336A

355TS

370G

TS464

TH129G

TS

129K

TS

129D1

361TS

362TS

359G

359F

346E346C

1018ATS16C

S O U

TH

D

AK

O

TA

LO

O P

5910B

ST

EP

S

TS

5908C

493491

ST

EP

S

OEPC

TOWER

14-SW

499B

499C

1261A

TH

24A

11-SH

370TS

371TS

371A

371R

371E

TS320

375A

363B

363TS

S

TILLW

ELL

D

RIVE

READY-TO-ADVERTISE (RTA)

FY

M C

O N

P R

O

JE

C T

EV

KP

IM

PR

O

VE

F

AM

IL

Y H

O U

SI

N

G (N

O R

TH

F

O

ST

ER

T

O W

ER

C

AM

P

FO

ST

ER

, O

KI

N

AW

A, J

AP

AN

SHEET ID

D

ES

IG

N

ED

B

Y:

US Army Corps of Engineers®

1 2 3 4 5 6 7 8 9 10

G

F

E

D

C

B

A

H O

N O

LU

LU

, H

AW

AI

I 9

FO

R

T

ST

R

EE

T M

AL

L

SU

IT

E

IN

SY

N

ER

G

Y

EN

G

IN

EE

R

IN

G

, I N

C O

PR

PO

R

AT

ED

SI

ZE

FI

LE

N

AM

E:IS

SU

E

D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

D R

AW

IN

G C

O D

E:

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N D

IS

TR

IC

T

AP

O

A P

3-

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

IF

S

H

EE

T

IS

L

ES

T H

AN

S

IZ

E

SP

EC

IF

IE

D

IN

TI

TL

EB

LO

C K, A

SS

U M

E R

ED

U

C

ED

A1 (8

X

Sheet No of

Y.

H

W

AN

G

Y.

H

W

AN

G

A.

O

SH

IR

O

J.

YU

EN

US Army Corps of Engineers ®

KENDALL ELLINGWOOD III, AIA

ARCHITECTURAL

THIS WORK WAS PREPARED BY ME

OR UNDER MY SUPERVISION

JUN CAPULONG, P.E.

CIVIL

THIS WORK WAS PREPARED BY ME

OR UNDER MY SUPERVISION

BENNETT FUNG, P.E.

STRUCTURAL

THIS WORK WAS PREPARED BY ME

OR UNDER MY SUPERVISION

ROSS TAKAI, P.E.

ELECTRICAL

THIS WORK WAS PREPARED BY ME

OR UNDER MY SUPERVISION

JOEL YUEN, P.E.

MECHANICAL

THIS WORK WAS PREPARED BY ME

OR UNDER MY SUPERVISION

BARRY JIM ON, P.E.

FIRE PROTECTION

THIS WORK WAS PREPARED BY ME

OR UNDER MY SUPERVISION IMPROVE FAMILY HOUSING (NORTH FOSTER TOWER)

CAMP FOSTER, OKINAWA, JAPAN

BUILDING LIST:

- BUILDINGS #376, #377 & #378 (BID OPTION 6) (TOWERS)

- BUILDINGS #376A, #377A & #378A (MECHANICAL YARDS)

- BUILDING #375 (FIRE PUMP)

- BUILDING #379 (BOILER) (BID OPTION 6)

- NEW GENERATOR BUILDING

CONTRACT NO:

ISSUE DATE: MAY, 2020

SOLICITATION NO: W912HV20B0006

USACE SIGNATURE BLOCK AREA

SMALL PROJECT INDEX AREA / AE STAMP

AE LOGO AREA

PROJECT RENDERING AREA / SMALL PROJECT LOCATION MAP

6-

EV

KP

.d w g

M

AY

, 2

W

2H V2

0B

C :\U se rs

\s go sh i\D oc um en ts

\1

-1

- F O

ST

ER

TO

W

ER

S.

C

EN

TR

AL

_v

_ s go sh i@ de si gn pa rtn er s i nc .c om . rv t

GI001

C O

VE

R

S H

EE

T , L O

C A T

IO

N

A N

D V

IC

IN

IT

Y

M A P

S

G I0

VICINITY MAP

PROJECT SITE

(NOT TO SCALE)

PLAN

NORTH

LOCATION MAP

E A S T C H I N A S E A

P A C I F I C O C E A N

HOKKAIDO

HONSHU

KYUSHU

IWO JIMA

SHIKOKU

(NOT TO SCALE)

KADENA AIR BASE

PLAN

NORTH

PRIME A-E: INSYNERGY ENGINEERING, INCORPORATED

828 FORT STREET MALL #500

HONOLULU, HI, 96813

ARCHITECTURAL: DESIGN PARTNERS INCORPORATED

1580 MAKALOA ST. SUITE 1100

HONOLULU, HI, 96814

CIVIL: DESIGN PARTNERS INCORPORATED

1580 MAKALOA ST. SUITE 1100

HONOLULU, HI, 96814

STRUCTURAL: SSFM INTERNATIONAL

501 SUMNER STREET, SUITE 620

HONOLULU, HI, 96817

FIRE PROTECTION: INSYNERGY ENGINEERING, INCORPORATED

828 FORT STREET MALL #500

HONOLULU, HI, 96813

MECHANICAL: INSYNERGY ENGINEERING, INCORPORATED

828 FORT STREET MALL #500

HONOLULU, HI, 96813

ELECTRICAL: INSYNERGY ENGINEERING, INCORPORATED

828 FORT STREET MALL #500

HONOLULU, HI, 96813

READY-TO-ADVERTISE (RTA)

U

I U.S.A

.HAWAI

LICENSED

PROFESSIONAL

ENGINEER

NO. 6293-S

FY.TTENNEB GN

PROFESSIONAL

WA

E K

H

A

N D A

LL

I

A

ARCHITECT

No. 9075

I I , U . S

II

O

LICENSED

EL L INGW

O D

PROFESSIONAL ENG

IN

EE

R

ER

NE

STO

A . CAPULONG

JR

( CIVIL )

EXP. 04-30-19

NO. 649

G U A M

C

ER

T I F I CATE

LICENSED

PROFESSIONAL

ENGINEER

No. 10940-E

ROSS N. TAKAI

HAWA I I, U. S. A

No. FP 001359

RE

G

IS

TE

RE

D P

ROFESSIONAL

ENG

INEER

B A

RR

Y

G .S . J IM

O N

F I R

E P R O T E

C T

I O

NF

I R

E P R O T E

C T

I O

NF

I R

E P R O T E

C T

I O

NF

I R

E P R O T E

C T

I O N

S T A T E

OF CA L I

FO

RN

I A

ENGINEER

PROFESSIONAL

LICENSED

A.S.U,IIA

WA

H

No. 5805-M

JO

EL P. YUEN

386 1

MATCHLINE

BUILDING SECTION/ ELEVATION

DETAIL SECTION

DETAIL ENLARGEMENT

NUMBER INDICATES

BUILDING SECTION

SHEET NUMBER WHERE

SECTION IS DRAWN

NUMBER INDICATES DETAIL

X-X X

X-X

GRAPHIC SYMBOLS:

XX

PLAN

NORTH

NORTH ARROW

TRUE NORTH

X/X-XXX

LOCATION OF ADJACENT

DRAWING

MATCH LINE

SCALE: 1 : 100

2000 4000

GRAPHIC SCALE

DRAWING TITLE

ROOM NAME

150 SF

ROOM NAME

ROOM NAME

ROOM NUMBER

AREA (WHERE OCCURS)

+3

ROOM TAG

REFLECTED CEILING TAG

ROOM NAME

ROOM NUMBER

CEILING HEIGHT

X-X X

NUMBER INDICATES

BUILDING SECTION

SHEET NUMBER WHERE

SECTION IS DRAWN

SHEET NUMBER WHERE

DETAIL IS DRAWN

PLAN NORTH

DRAWING SCALE SHEET

NUMBER

D /1

DOOR TAG WINDOW TAG

XXX

PARTITION TYPE TAG

RFI XXX

REVISION TAG

NAME

ELEVATION

BUILDING LEVEL

FURNITURE TAG

XX

XX

BUILDING GRID

KEYNOTE

DIMENSION DIM

D

IM

D

IM

EN

SI

O N

C

LR

D

IM

EN

SI

O N

CLR

DIMENSION

STANDARD DIMENSIONING

DIMENSIONS TAKEN FROM FACE OF

FRAMING MEMBER (I.E. CMU,

STRUCTURAL STEEL, WOOD, ETC.) TO

FACE OF FRAMING MEMBER.

DIMENSION TAKEN FROM FACE OF

FRAMING TO FACE OF FRAMING, UNLESS

NOTED OTHERWISE. WHERE DRAWINGS

INDICATE THE FACE OF FINISH IS THE

SAME AS FACE OF FRAMING (I.E. CMU,

CONCRETE, EXPOSED STRUCTURAL

STEEL, EXPOSED WOOD, ETC.),

DIMENSION SHALL BE TAKEN FROM FACE

OF FRAMING

DRAWING TITLE

3AW

A1 1:200 A101

VIEW TITLE

DRAWING NUMBER DRAWING TITLE

DRAWING SCALE SHEET NUMBER

MATERIAL LEGEND:

SAND/ MORTAR

CONCRETE - CAST IN

PLACE OR PRECAST

PLYWOOD

EARTH

COMPACTED FILL

BATT INSULATION

GYPSUM BOARD

METAL

GLASS

PROFESSIONAL

WA

E K

H

A

N D A L

L

I

A

ARCHITECT

No. 9075

I I , U . S

II

O

LICENSED

E L L ING W

O D

READY-TO-ADVERTISE (RTA)

FY

M C

O N

P R

O

JE

C T

EV

KP

IM

PR

O

VE

F

AM

IL

Y H

O U

SI

N

G (N

O R

TH

F

O

ST

ER

T

O W

ER

C

AM

P

FO

ST

ER

, O

KI

N

AW

A, J

AP

AN

SHEET ID

D

ES

IG

N

ED

B

Y:

US Army Corps of Engineers®

1 2 3 4 5 6 7 8 9 10

G

F

E

D

C

B

A

H O

N O

LU

LU

, H

AW

AI

I 9

M

AK

AL

O

A

ST

R

EE

T, S

U

IT

E

D

ES

IG

N P

AR

TN

ER

S

IN

C

O R

PO

R

AT

ED

SI

ZE

FI

LE

N

AM

E:IS

SU

E

D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

D R

AW

IN

G C

O D

E:

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N D

IS

TR

IC

T

AP

O

A P

3-

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

IF

S

H

EE

T

IS

L

ES

T H

AN

S

IZ

E

SP

EC

IF

IE

D

IN

TI

TL

EB

LO

C K, A

SS

U M

E R

ED

U

C

ED

A1 (8

X

Sheet No of 386

A.

FO

R M

AN

A.

FO

R M

AN

D .M

O

AT

S

JR

K.

EL

LI

N

G W

O O

D

II

I

SIGNED

6-

EV

KP

g

W

2H V2

0B

M

AY

, 2

C :\U se rs

\s go sh i\D oc um en ts

\1

-1

- F O

ST

ER

TO

W

ER

S.

C

EN

TR

AL

_v

_ s go sh i@ de si gn pa rtn er s i nc .c om . rv t

GI002

G

EN

ER

AL

N O

TE

S, S

YM

BO

LS

, L

EG

EN

D

S, A

N D

M A S

TE

R

K

EY

N O

T E L

EG

E N

D

G I0

GENERAL NOTES

1 CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND DIMENSIONS AT THE JOB SITE AND IMMEDIATELY NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES BEFORE COMMENCING WITH WORK. COMMENCEMENT OF WORK SIGNIFIES ACCEPTANCE OF EXISTING CONDITIONS.

2 THE CONTRACTOR IS TO FOLLOW DIRECTIONS OF ONLY THE CONTRACTING OFFICER OR THEIR AUTHORIZED REPRESENTATIVE. CONTRACTOR SHALL PROVIDE COPIES OF APPROVED PERMITS TO THE CONTRACTING OFFICER PRIOR TO BEGINNING ANY EXCAVATION WORK.

3 ALL WORK SHALL STRICTLY CONFORM TO ALL APPLICABLE LOCAL AND FEDERAL CODES, STANDARDS, AND REGULATIONS.

EXPOSED CONCRETE FOUNDATIONS (BETWEEN SIDING AND FINISH GRADE) SHALL BE CEMENT WASHED AND PAINTED.

4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY LOSS OR DAMAGE OF EXISTING PROPERTY AND CONDITIONS TO REMAIN, RESULTING FROM CONSTRUCTION ACTIVITIES, AND SHALL MAKE GOOD ANY LOSS, DAMAGE, OR INJURY WITHOUT COST TO THE GOVERNMENT.

5 CONSTRUCTION ACTIVITIES SHALL NOT DISRUPT EXISTING ONGOING OPERATIONS IN THE VICINITY.

6 CONFINE ALL OPERATIONS TO AREAS SPECIFICALLY AUTHORIZED BY THE GOVERNMENT. KEEP WORK AREAS AND ADJACENT TO THE WORK AREA FREE FROM

ACCUMULATION OF TRASH AND DEBRIS.

7 CONTRACTOR TO FIELD VERIFY ALL EQUIPMENT AND MATERIAL SIZES AND PROVIDE ADEQUATE CLEARANCE AS REQUIRED, BEFORE PROCEEDING WITH THE WORK.

8 FOR ANY APPROVED SUBSTITUTIONS, CONTRACTOR IS RESPONSIBLE TO PROVIDE A COMPLETE AND WORKING COMPONENT AND MUST BEAR ALL NEW INCIDENTAL

COSTS IMPACTED BY THE APPROVED SUBSTITUTION REQUEST.

9 CONTRACTOR SHALL VERIFY ALL APPLIANCE REQUIREMENTS AND STUB-OUT LOCATIONS.

10 UPON COMPLETION, REMOVE FOREIGN MATERIALS FROM ALL EXPOSED SURFACES AND CLEAN THOROUGHLY.

11 FOLLOW SPEC SECTION 01 74 19 - "CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT" FOR PROPER DISPOSAL OF CONSTRUCTION AND DEMOLITION DEBRIS.

CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL CONSTRUCTION MATERIAL, UNLESS NOTED OTHERWISE.

12 ANY EXISTING EXTERIOR DOORS AND/OR WINDOWS TO REMAIN SHALL BE PROTECTED DURING THE DEMOLITION AND CONSTRUCTION PHASES OF THE PROJECT. ANY

DAMAGE TO THE STRUCTURAL INTEGRITY OF THE WINDOW FRAMES, GLAZING AND ACCESSORIES SHALL BE REPLACED AT NO ADDITIONAL COST TO THE GOVERNMENT.

13 WHERE DEMOLITION AND CUTTING WORK HAS OCCURRED OR WHERE EXISTING SURFACES, MATERIALS OR OTHER ITEMS HAVE BEEN DAMAGED OR DISTURBED AS A

RESULT OF THIS CONTRACT, THE SAID SURFACES AND AREAS SHALL BE CAREFULLY CLOSED UP, PATCHED AND FINISHED, AND OR RESTORED AS REQUIRED TO BE

CONTIGUOUS TO EXISTING SURROUNDING SURFACES.

14 THE GENERAL CONTRACTOR, AT THE COMPLETION OF THIS WORK, SHALL LEAVE ALL WORK AREAS AND FINISHED SPACES IN A CLEAN AND ACCEPTABLE CONDITION.

FINAL CLEAN-UP INCLUDES, BUT NOT LIMITED TO: ALL INTERIOR SURFACES, LIGHT FIXTURES, PLUMBING FIXTURES, APPLIANCES, INTERIOR OF WINDOWS, SILLS ETC.

15 ALL JOINTS AND PENETRATIONS (MEMBRANE AND THROUGH PENETRATIONS) IN FIRE OR SMOKE RESISTIVE ASSEMBLIES SHALL BE PROPERLY FIRE STOPPED W/ FACTORY MUTUAL (FM) OR UNDERWRITERS LABORATORY (UL) APPROVED MATERIALS, MEANS AND METHODS.

17 CAULK ALL INSIDE CORNERS WHERE COUNTERTOPS / BACKSPLASHES MEET CABINET AND / OR GYPSUM BOARD 18 SEE SPECIFICATION SECTION 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES FOR CONTRACT LINE ITEM NUMBERS (CLIN) AND LIST OF BID OPTIONS

19 ALL NEW GYPSUM BOARD AT BATHROOMS AND LAUNDRY ROOMS SHALL BE WATER RESISTANT

MASTER ARCHITECTURAL KEYNOTE LEGEND - REMOVAL WORK

KEY

VALUE DESCRIPTION

AD01 REMOVE (E) MET STUD WALL

AD02 REMOVE (E) CONCRETE WALL

AD03 REMOVE (E) FLOORING AND BASE

AD04 REMOVE (E) SOFFIT

AD05 REMOVE (E) CEILING

AD06 REMOVE (E) WALL TILE

AD07 REMOVE (E) DOOR AND FRAME

AD08 REMOVE (E) LOUVER

AD09 REMOVE (E) WINDOW

AD10 REMOVE (E) BASE CABINETS

AD11 REMOVE (E) WALL CABINETS

AD12 REMOVE (E) COUNTERTOP AND BACKSPLASH

AD13 REMOVE (E) APPLIANCE NIC (GOV'T TO REMOVE)

AD14 REMOVE (E) LIGHT FIXTURE

AD15 REMOVE (E) MECHANICAL EQUIPMENT

AD16 REMOVE (E) PLUMBING FIXTURES

AD17 REMOVE (E) TOILET PARTITION AND DOOR

AD18 REMOVE (E) TOILET ACCESSORIES (MIRRORS, TPH, TB ETC.)

AD19 REMOVE (E) SHELVING

AD20 REMOVE (E) SHELVES / RODS

AD21 REMOVE (E) WINDOW GUARD. STORE FOR REINSTALLATION

AD22 REMOVE ALL (E) WALL BASES

AD27 REMOVE (E) RANGE HOOD

MASTER ARCHITECTURAL KEYNOTE LEGEND - NEW WORK

KEY

VALUE DESCRIPTION

AN01 (N) MET STUD AND GYPSUM BOARD WALL (ALL NEW GYPSUM BOARD AT BATHROOMS

AND LAUNDRY ROOMS SHALL BE WATER RESISTANT)

AN03 (N) LVT FLOORING AND BASE (SEE ROOM FINISH SCHEDULE A-603 AND FINISH

MATERIAL SCHEDULE A-603)

AN04 (N) GYPSUM BOARD SOFFIT (SEE DETAIL B5/A-541)

AN05 (N) GYPSUM BOARD CEILING (ALL NEW GYPSUM BOARD AT BATHROOMS AND LAUNDRY

ROOMS SHALL BE WATER RESISTANT)

AN06 (N) WALL TILE (SEE ROOM FINISH SCHEDULE A-603 AND FINISH MATERIAL SCHEDULE

A-604)

AN07 (N) DOOR AND FRAME (SEE DOOR SCHEDULE A-601)

AN08 (N) LOUVER (SEE LOUVER SCHEDULE A-602)

AN09 (N) WINDOW (SEE WINDOW SCHEDULE A-602)

AN10 (N) BASE CABINETS (SEE INTERIOR ELEVATIONS A-400 SERIES AND CABINET DETAILS

A-521)

AN11 (N) WALL CABINETS (SEE INTERIOR ELEVATIONS A-400 SERIES AND CABINET DETAILS

A-521)

AN12 (N) COUNTERTOP & 100MM BACKSPLASH W/O. FULL HEIGHT BACKSPLASH BEHIND

RANGE. (SEE INTERIOR ELEVATIONS A-400 SERIES AND CABINET DETAILS A-521)

AN13 (N) (GF/CI) APPLIANCE (RANGE, D/W, REFRIGERATOR, WASHER, DRYER)

AN14 (N) LIGHT FIXTURE, SEE ELECTRICAL

AN16 (N) PLUMBING FIXTURE, SEE PLUMBING

AN18 (N) TOILET ACCESSORIES (MG, MMC, TTD, SCR, TB, GB , ETC. SEE INTERIOR

ELEVATIONS A-40X)

AN20 (N) SHELF AND ROD (SEE INTERIOR DETAIL D8/A-521)

AN21 REINSTALL EXISTING WINDOW GUARDS

AN22 (N) CMU WALL (2-HR)

AN23 REINSTALL EXISTING SHOWER PARTITION

AN24 (N) RANGE HOOD, (CF/CI)

AN25 (N) CEILING FAN, SEE ELECTRICAL

AN28 (N) VERTICAL BLINDS

AN29 (N) HARD TILE FLOORING AND BASE (SEE ROOM FINISH SCHEDULE A-603 AND FINISH

MATERIAL SCHEDULE A-603)

AN31 (N) 600X600 ACCESS PANEL (SEE DETAIL F5/A-541). COORDINATE LOCATION WITH

UTILITY ITEMS REQUIRING ACCESS WITHIN THE CEILING.

AN33 (N) SOLID SURFACE TUB/SHOWER SURROUND (SEE ROOM FINISH SCHEDULE A-603 AND

FINISH MATERIAL SCHEDULE A-604)

AN34 (N) CERAMIC TILE BACKSPLASH, BID OPTION 3 (SEE ROOM FINISH SCHEDULE A-603 AND

FINISH MATERIAL SCHEDULE A-604)

AN35 (N) 300X300 ACCESS PANEL (SEE DETAIL F5/A-541). COORDINATE LOCATION WITH

UTILITY ITEMS REQUIRING ACCESS WITHIN THE CEILING.

AN36 (N) 450X450 ACCESS PANEL (SEE DETAIL F5/A-541). COORDINATE LOCATION WITH

UTILITY ITEMS REQUIRING ACCESS WITHIN THE CEILING.

PROFESSIONAL

WA

E K

H

A

N D A L

L

I

A

ARCHITECT

No. 9075

I I , U . S

II

O

LICENSED

E L L ING W

O D

READY-TO-ADVERTISE (RTA)

FY

M C

O N

P R

O

JE

C T

EV

KP

IM

PR

O

VE

F

AM

IL

Y H

O U

SI

N

G (N

O R

TH

F

O

ST

ER

T

O W

ER

C

AM

P

FO

ST

ER

, O

KI

N

AW

A, J

AP

AN

SHEET ID

D

ES

IG

N

ED

B

Y:

US Army Corps of Engineers®

1 2 3 4 5 6 7 8 9 10

G

F

E

D

C

B

A

H O

N O

LU

LU

, H

AW

AI

I 9

M

AK

AL

O

A

ST

R

EE

T, S

U

IT

E

D

ES

IG

N P

AR

TN

ER

S

IN

C

O R

PO

R

AT

ED

SI

ZE

FI

LE

N

AM

E:IS

SU

E

D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

D R

AW

IN

G C

O D

E:

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N D

IS

TR

IC

T

AP

O

A P

3-

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

IF

S

H

EE

T

IS

L

ES

T H

AN

S

IZ

E

SP

EC

IF

IE

D

IN

TI

TL

EB

LO

C K, A

SS

U M

E R

ED

U

C

ED

A1 (8

X

Sheet No of 386

A.

FO

R M

AN

A.

FO

R M

AN

D .M

O

AT

S

JR

K.

EL

LI

N

G W

O O

D

II

I

SIGNED

6-

EV

KP

g

W

2H V2

0B

M

AY

, 2

C :\U se rs

\s go sh i\D oc um en ts

\1

-1

- F O

ST

ER

TO

W

ER

S.

C

EN

TR

AL

_v

_ s go sh i@ de si gn pa rtn er s i nc .c om . rv t

GI003

AB

BR

EV

IA

TI

O

N S

G I0

TMPD

GL

TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ___

TOC TABLE OF CONTENT

TOL TOLERANCE

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TRTD TREATED

TYP TYPICAL

UC UNDERCUT

UCD UNDERCUT DOOR

UL UNDERWRITERS

LABORATORIES

UN UNLESS NOTED

UNO UNLESS NOTED

OTHERWISE

UPS UNINTERRUPTIBLE POWER

SUPPLY

UR URINAL

UTIL UTILITY

VAN VANITY

VAR VARIES

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL

TILE

VIC VICINITY

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLITILE ORGANIC

COMPOUND

VOL VOLUME

VRFY VERIFY

VS VENT STACK

VTR VENT THROUGH ROOF

W WEST

W CAB WALL CABINETS

W/ WITH

W/O WITHOUT

WARR WARRANTY

WB WOOD BASE

WBL WOOD BLOCKING

WC WATER CLOSET

WC WL

HNG

WATER CLOSET WALL

HUNG

WCL WL

MTD

WATER COOLER, WALL

MOUNTED

WCLR WATER COOLER

WCO WALL CLEANOUT

WD WOOD

WDF WOOD DOOR AND FRAME

WDMA WINDOW AND DOOR

MANUFACTURERS

ASSOCIATION

WDSP WASTE DISPOSER

WDW WINDOW

WFR WOOD FRAME

WGL WIRED GLASS

WH WATER HEATER

WHSE WAREHOUSE

WM WATER METER

WO WHERE OCCURS

WP WEATHERPROOF

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WSL WEATHER SEAL

WU WINDOW UNIT

WW WASTE WATER

WWR WELDED WIRE

REINFORCEMENT

X BY

XPS EXTRUDED POLYSTYRENE

BOARD

YD YARD

° DEGREES

³ SQUARED

Ø DIAMETER

SALV SALVAGE

SAT SUSPENDED ACOUSTICAL

TILE

SATC SUSPENDED ACOUSTICAL

TILE CEILING

SB SPLASH BLOCK

SBSTR SUBSTRATE

SC SOLID CORE

SCD SEAT COVER DISPENSER

SCHED SCHEDULE

SCP SCUPPER

SCR SHOWER CURTAIN ROD

SCRN SCREEN

SCWD SOLID CORE WOOD DOOR

SD SOAP DISPENSER

SDG SIDING

SDI STEEL DOOR INSTITUTE

SECT SECTION

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SGD SLIDING GLASS DOOR

SGL SINGLE

SH SINGLE HUNG

SHFT SHAFT (ELEVATOR)

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT

MTL

FLASH

SHEET METAL FLASHING

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJI STEEL JOIST INSTITUTE

SK SKETCH

SLD

WDW

HORIZONTAL SLIDING

WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SND SANITARY NAPKIN

DISPENSER

SNDU SANITARY NAPKIN

DISPOSAL UNIT

SNSR SENSOR

SPCL SPECIAL

SPEC SPECIFICATION

SPKLR SPRINKLER

SPLY SUPPLY

SQ SQUARE

SS STANDING SEAM (ROOF)

SSP SOLID SURFACE POLYMER

SST STAINLESS STEEL

ST STAIRS

STAG STAGGERED

STC SOUND TRANSMISSION

CLASS

STD STANDARD

STL JST STEEL JOIST

STOR STORAGE

STRUCT STRUCTURAL

SUB SUBSTITUTE

SUPPL SUPPLEMENT

SURF SURFACE

SURR SURROUND

SURV SURVEY

SUSP SUSPEND

SUSP

CLG

SUSPENDED CEILING

SV SHEET VINYL

SVCE SERVICE

SWDR SWING DOOR

SYM SYMBOL

SYS SYSTEM

T TREAD

T&G TOUNGE AND GROOVE

T/S TUB/SHOWER

TB TOWEL BAR

TC TERRA COTTA

TCA TILE COUNCIL OF AMERICA

TD TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPORARY

TFF TOP OF FINISH FLOR

THK THIKNESS

THRES

H

THRESHOLD

THRU THROUGH

TMPD TEMPERED

PH PENTHOUSE

PK LOT PARKING LOT

PKG PACKAGE

PL PROPERTY LINE

PLB PLUMB

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNL PANEL

POLY POLYETHYLENE (PLASTIC)

PORC PORCELAIN

PORT PORTABLE

PP PUSH/PULL

PR PAIR

PRCST PRECAST

PREF PREFERENCE

PREFAB PREFABRICATE

PREFIN PREFINISH

PREFM

D

PREFORMED

PRELIM PRELIMINARY

PREP PREPARATION

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PS PIPE SPACE

PS

CONC

PRESTRESSED CONCRETE

PT PAINT

PT

CONC

POST-TENSIONED

CONCRETE

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER

AND RECEPTACLE

PTN PARTITION

PTR PAPER TOWEL

RECEPTACLE

PV PHOTOVOLTAIC

PVC POLYVINYL CHLORIDE

(PLASTIC)

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QM QUALITY MANAGEMENT

QT QUARRY TILE

QTY QUANTITY

QUAL QUALITY

R RADIUS

RB RESILIENT BASE

RB HK ROBE HOOK

RBR RUBBER

RC REINFORCED CONCRETE

RCP REFLECTED CEILING PLAN

RCPTN RECEPTION

RD ROOF DRAIN

RDG

INS

RIDGID INSULATION, SOLID

REBAR REINFORCING STEEL BARS

REC RECESSED

REC

ROOM

RECREATION ROOM

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFRIGERATOR

REINF REINFORCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

REST RESTROOM

REV REVISION

RF RESILIENT FLOORING

RFG ROOFING

RFI REQUEST FOR

INFORMATION

RFP REQUEST FOR PROPOSAL

RH ROBE HOOK

RL ROOF LEADER

RM ROOM

RO ROUGH OPENING

RR RESTROOM

RST REINFORCING STEEL

RT RIGHT

RTF RUBBER TILE FLOORING

RTG RATING

RVL REVEAL

S SOUTH

LAT LATTICE

LAU LAUNDRY

LAV LAVATORY

LBS POUNDS

LC LAUNDRY CHUTE

LDG LANDING

LDR LEADER

LKR LOCKER

LNDSCP LANDSCAPE

LR LIVING ROOM

LVD LOUVERED

LVDR LOUVERED DOOR

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

MACH

RM

MACHINE ROOM

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MBH MOP/BROOM HOLDER

MD METAL DECK

ME MATCH EXISTING

MECH MECHANICAL

MEMB MEMBRANE

MEZZ MEZZANINE

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR

REC

MANUFACTURER'S

RECOMMENDATION

MIN MINIMUM

MIRR MIRROR

MJ MECHANICAL JOINT

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILWORK

MOD

BIT

MODIFIED BITUMEN

MOPR MOP RACK

MR MOISTURE RESISTANT

MRT MARBLE THRESHOLD

MS MOP SINK

MT METAL TRESHOLD

MTD MOUNTED

MTG MOUNTING

MTL METAL

MTLF METAL FLASHING

MTLR METAL ROOF

MULL MULLION

N NORTH

NA NOT APPLICABLE

NE NOT EXCEEDING

NEC NATIONAL ELECTRIC CODE

NFRC NATIONAL FENESTRATION

RATING COUNCIL

NIC NOT IN CONTRACT

NO NUMBER

NRC NOISE REDUCTION

COEFFICIENT

NRP NONREMOVEABLE PIN

NS NO SCALE

NTP NOTICE TO PROCEED

O/ OVER

OA OVERALL

OF OUTSIDE FACE

OFF OFFICE

OFS OUTSIDE FACE OF STUDS

OH OVERHANG

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OUTSIDE RADIUS

OSHA OCCUPATIONAL SAFETY

AND HEALTH

ADMINISTRATION

OVFL OVERFLOW

PA PUBLIC ADDRESS

PAR PARAPET

PART PARTIAL

PAT PATTERN

PB PAINTED BASE

PCC PRECAST CONCRETE

PCT PERCENT

PED PEDISTAL

PEJ PREMOLDED EXPANSION

JOINT

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

FN FENCE

FOS FACE OF STUD

FP FIRE PROTECTION

FR FIRE RATING

FRA FIRE RATED ASSEMBLY

FRMG FRAMING

FRP FIBERGLASS REINFORCED

PLASTIC

FRZ FREEZER

FSP FIRE STANDPIPE

FT FOOT, FEET

FTG FOOTING

FURG FURRING

FURN FURNITURE

G DISP GARBAGE DISPOSAL

GA GYPSUM ASSOCIATION

GALV GALVANIZED

GB GRAB BAR

GDR GUARDRAIL

GF/CI GOVERNMENT FURNISHED

CONTRACTOR INSTALLED

GFRP GLASS-FIBER-REINFORCED

PLASTIC

GL GLASS

GL BLK GLASS BLOCK

GLU

LAM

GLUE LAMINATED WOOD

GOVT GOVERNMENT

GR GROSS

GR FL GROUND FLOOR

GRAN GRANITE

GSB GYPSUM SHEATHING

BOARD

GSM GALVANIZED SHEET METAL

GUT GUTTER

GYM GYMNASIUM

GYP GYPSUM

GYP BD GYPSUM BOARD

H HIGH

H PLAM HIGH PRESSURE PLASTIC

LAMINATE

HAZ HAZARD

HAZ

MAT

HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD

DOOR

HD HAND DRYER

HDPE HIGH DENSITY

POLYETHYLENE

HDR HEADER

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND

FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HS HAND SINK

HSE HOUSE

HSKPG HOUSEKEEPING

HT HEIGHT

HVAC HEATING, VENTILATING,

AND AIR CONDITIONING

HW HOT WATER

IBC INTERNATIONAL BUILDING

CODE

ID INSIDE DIAMETER, INSIDE

DIMENSION

IF INSIDE FACE

IGU INSULATED GLAZING UNIT

IIC IMPACT ISOLATION CLASS

INCL INCLUDED

INSTL INSTALL

INSUL INSULATION

INSUL

PNL

INSULATED METAL PANEL

INT INTERIOR

IS INSECT SCREEN

ISO INTERNATIONAL

STANDARDS

ORGANIZATION

JAN JANITOR

JS JANITOR'S SINK

KB KNEE BRACE

KIT KITCHEN

KPL KICKPLATE

L ANGLE

L CL LINEN CLOSET

LAB LABORATORY

LAM LAMINATE

DEL DELETE

DEMO DEMOLITION, DEMOLISH

DEPT DEPARTMENT

DES DESIGNATE, DESIGNATION

DESCR DESCRIBE, DESCRIPTION

DET DETAIL

DF DRINKING FOUNTAIN

DH DOUBLE HUNG

DHI DOOR HARDWARE

INSTITUTE

DHW DOUBLE HUNG WINDOW

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIP DUCTILE IRON PIPE

DISP DISPENSER

DIST DISTANCE

DMPF DAMPPROOFING

DOC DOCUMENT

DPTN DEMOUNTABLE PARTITION

DR DOOR

DR CL DOOR CLOSER

DR FR DOOR FRAME

DRH DOOR HOLDER

DRLV DOOR LOUVER

DRST DOOR STOP

DRSW DOOR SWITCH

DS DOWNSPOUT

DSGN DESIGN

DSPL DISPOSAL

DUPL DUPLICATE

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRAWER

DWV DRAIN, WASTE AND VENT

E EAST

EA EACH

EE EACH END

EF EACH FACE

EFS EXTERIOR FINISH SYSTEM

EGB EXTERIOR GYPSUM BOARD

EHD ELECTRIC HAND DRYER

ELAST ELASTOMERIC

ELEV ELEVATOR

EM EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EOS EDGE OF SLAB

EPA ENVIRONMENTAL

PROTECTION AGENCY

EPS EXPANDED POLYSTYRENE

BOARD (INSULATION)

EQ EQUAL

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESH EXHAUST

ESMT EASEMENT

ETC ET CETERA

EWH ELECTRIC WATER HEATER

EWS EYE WASH STATION

EXP EXPAND

EXST EXISTING

EXST

GR

EXISTING GRADE

EXT EXTERIOR

FAS FASCIA

FC FILE CABINET

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND

EQUIPMENT

FG FINISH/FINISHED GRADE

FGL FIBERGLASS

FHA FEDERAL HOUSING

ADMINISTRATION

FHC FIRE HOSE CABINET

FHP FULL HEIGHT PARTITION

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLASH FLASHING

FLR FLOOR

FM FACTORY MUTUAL

BKG BACKING

BLDG BUILDING

BLKT BLANKET

BLT BUILT

BLW BELOW

BM BEAM

BMS BALANCED MAGNETIC

SWITCH

BN BULLNOSE

BOT BOTTOM

BP BUILDING PAPER

BR BEDROOM

BS BOTH SIDES

BSMT BASEMENT

BT BATHTUB

BTWN BETWEEN

C TO C CENTER TO CENTER

C&P CARPET AND PAD

CAB CABINET

CATV COMMUNITY ANTENNA

TELEVISION

CB CORNER BEAD

CCD CONTRACT CHANGE

DIRECTIVE

CCTV CLOSED CIRCUIT

TELEVISION

CD CONSTRUCTION

DOCUMENTS

CEM CEMENT

CER CERAMIC

CERT CERFTIFY

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR

FURNISHED/CONTRACTOR

INSTALLED

CFE CONTRACTOR FURNISHED

EQUIPMENT

CFMF COLD-FORMED METAL

FRAMING

CG CORNER GUARD

CH COAT HOOK

CH BD CHALKBOARD

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONSTRUCTION JOINT

CL CENTER LINE

CLG CEILING

CLO CLOSET

CLR CLEAR

CLRM CLASSROOM

CM CONSTRUCTION

MANAGEMENT

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CASED OPENING

COL COLUMN

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMPL COMPLETE

CONC CONCRETE

COND CONDITION

CONF CONFERENCE

CONST

R

CONSTRUCTION

CONT CONTINUE, CONTINUOUS

COORD COORDINATE

COR CHANGE ORDER REQUEST

CPT CARPET

CR CLOSET ROD

CRT YD COURTYARD

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION

SPECIFICATIONS

INSTITUTE

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTI CERAMIC TILE INSTITUTE

OF AMERICA

CTR COUNTER

CW CASEMENT WINDOW

D DEEP, DEPTH

d PENNY (NAIL SIZE)

D-B DESIGN-BUILD

DBL DOUBLE

DEF DEFINITION

DEG DEGREE

# POUND OR NUMBER

% PERCENT

& AND

(E) EXISTING

(N) NEW

@ AT

A/C AIR CONDITION

A/E ARCHITECT / ENGINEER

AB ANCHOR BOLT

ACC ACCESSIBLE

ACI AMERICAN CONCRETE

INSTITUTE

ACOUS ACOUSTICAL

ACS DR ACCESS DOOR

ACS

FLR

ACCESS FLOOR

ACS

PNL

ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH

DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDM ADDENDUM

ADJ ADJACENT

ADMIN ADMINISTRATION

ADS AUTOMATIC DOOR SEAL

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AFS ABOVE FINISH SLAB

AHJ AUTHORITY HAVING

JURISDICTION

AHR ANCHOR

AIA AMERICAN INSTITUTE OF

ARCHITECTS

AISC AMERICAN INSTITUTE OF

STEEL CONSTRUCTION

ALLOW ALLOWANCE

ALT ALTERNATE

ALTRN ALTERATION

ALUM ALUMINUM

AMT AMOUNT

ANG ANGLE

ANOD ANODIZE

ANSI AMERICAN NATIONAL

STANDARDS INSTITUTE

APC ACOUSTICAL PANEL

CEILING

APPD APPROVED

APPRO

X

APPROXIMATE

APPX APPENDIX

ARCH ARCHITECT,

ACRCHITECTURAL

ARF ARCHITECTURAL FINISH

ASHRA

E

AMERICAN SOCIETY OF

HEATING, REFRIGERATING,

AND AIR CONDITIONING

ENGINEERS

ASI ARCHITECT'S

SUPPLEMENTAL

INSTRUCTION

ASME AMERICAN SOCIETY OF

MECHANICAL ENGINEERS

ASR AUTOMATIC SPRINKLER

RISER

ASSN ASSOCIATION

ASSY ASSEMBLY

ASTM AMERICAN SOCIETY FOR

TESTING AND MATERIALS

ASWG AMERICAN STEEL WIRE

GAUGE

ATC ACOUSTICAL TILE CEILING

ATCH ATTACH, ATTACHMENT

ATS AUTOMATIC TRANSFER

SWITCH

ATTN ATTENTION

AWI AMERICAN

WOODWORKING INSTITUTE

AWT ACOUSTICAL WALL

TREATMENT

BAT BATTEN

BB BASEBOARD

BC BOTTOM CORD

BD BOARD

BDRY BOUNDARY

BHMA BUILDER'S HARDWARE

MANUFACTURER'S

ASSOCIATION

BI FLD

DR

BI FOLDING DOORS

BKBD BACKBOARD

E K

H

A

N D A L

L

I

A

ARCHITECT

No. 9075

I I , U . S

II

O

LICENSED

E L L ING W

O D

READY-TO-ADVERTISE (RTA)

FY

M C

O N

P R

O

JE

C T

EV

KP

IM

PR

O

VE

F

AM

IL

Y H

O U

SI

N

G (N

O R

TH

F

O

ST

ER

T

O W

ER

C

AM

P

FO

ST

ER

, O

KI

N

AW

A, J

AP

AN

SHEET ID

D

ES

IG

N

ED

B

Y:

US Army Corps of Engineers®

1 2 3 4 5 6 7 8 9 10

G

F

E

D

C

B

A

H O

N O

LU

LU

, H

AW

AI

I 9

M

AK

AL

O

A

ST

R

EE

T, S

U

IT

E

D

ES

IG

N P

AR

TN

ER

S

IN

C

O R

PO

R

AT

ED

SI

ZE

FI

LE

N

AM

E:IS

SU

E

D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

D R

AW

IN

G C

O D

E:

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N D

IS

TR

IC

T

AP

O

A P

3-

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

IF

S

H

EE

T

IS

L

ES

T H

AN

S

IZ

E

SP

EC

IF

IE

D

IN

TI

TL

EB

LO

C K, A

SS

U M

E R

ED

U

C

ED

A1 (8

X

Sheet No of 386

A.

FO

R M

AN

A.

FO

R M

AN

D .M

O

AT

S

JR

K.

EL

LI

N

G W

O O

D

II

I

SIGNED

6-

EV

KP

g

W

2H V2

0B

M

AY

, 2

C :\U se rs

\s go sh i\D oc um en ts

\1

-1

- F O

ST

ER

TO

W

ER

S.

C

EN

TR

AL

_v

_ s go sh i@ de si gn pa rtn er s i nc .c om . rv t

GI004

IN

D

EX

T

O D

R A W

IN

G

S

G I0

69 A-101 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - FLOOR 1 70 A-102 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - TYPICAL FLOOR (2 - 9) 71 A-103 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - FLOOR 1 ZONE A 72 A-104 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - FLOOR 1 ZONE B 73 A-105 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - TYPICAL FLOOR (2 - 9) ZONE A 74 A-106 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - TYPICAL FLOOR (2 - 9) ZONE B 75 A-107 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - LOBBY AND PENTHOUSE 76 A-108 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - ENLARGED - TYPICAL UNIT (TYPE A) 77 A-109 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - ENLARGED - TYPICAL UNIT (TYPE B) 78 A-111 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW REFLECTED CEILING PLAN - OVERALL - FLOOR 1 79 A-112 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW REFLECTED CEILING PLAN - OVERALL - TYPICAL FLOOR (2 - 9) 80 A-113 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW REFLECTED CEILING PLAN - PARTIAL - FLOOR 1 ZONE A 81 A-114 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW REFLECTED CEILING PLAN - PARTIAL - FLOOR 1 ZONE B 82 A-115 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW REFLECTED CEILING PLAN - PARTIAL - TYPICAL FLOOR (2 - 9) ZONE A 83 A-116 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW REFLECTED CEILING PLAN - PARTIAL - TYPICAL FLOOR (2 - 9) ZONE B 84 A-117 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW REFLECTED CEILING PLAN - PARTIAL - LOBBY 85 A-118 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW REFLECTED CEILING PLAN - ENLARGED - TYPICAL UNIT (TYPE A) 86 A-119 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW REFLECTED CEILING PLAN - ENLARGED - TYPICAL UNIT (TYPE B)

87 A-121 BLDG 376A & 377A (BLDG 378A BID OPTION 6) - MECH YARDS

88 A-131 BLDG 375 - FIRE PUMP - FLOOR PLAN

89 A-151 GENERATOR BLDG - FLOOR PLAN & REFLECTED CEILING PLAN

90 A-152 GENERATOR BLDG - ROOF PLAN

91 A-201 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - EXTERIOR ELEVATIONS

92 A-251 GENERATOR BLDG - EXTERIOR ELEVATIONS

93 A-301 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - BUILDING SECTIONS

94 A-302 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - BUILDING SECTIONS

95 A-351 GENERATOR BLDG - BUILDING SECTIONS & WALL SECTIONS

96 A-401 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - TYPICAL UNIT A - ENLARGED DETAIL PLANS AND INTERIOR ELEVATIONS 97 A-402 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - TYPICAL UNIT A - ENLARGED DETAIL PLANS AND INTERIOR ELEVATIONS 98 A-403 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - TYPICAL UNIT A - ENLARGED DETAIL PLANS AND INTERIOR ELEVATIONS 99 A-404 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - TYPICAL UNIT B - ENLARGED DETAIL PLANS AND INTERIOR ELEVATIONS 100 A-405 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - TYPICAL UNIT B - ENLARGED DETAIL PLANS AND INTERIOR ELEVATIONS 101 A-406 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - TYPICAL UNIT B - ENLARGED DETAIL PLANS AND INTERIOR ELEVATIONS 102 A-407 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - MP RESTROOMS AND KITCHENETTE (BID OPTION 4) - ENLGD DETAIL PLANS AND INT

ELEV

103 A-501 DOOR DETAILS

104 A-511 WINDOW DETAILS

105 A-521 CABINET DETAILS

106 A-541 INTERIOR DETAILS

107 A-551 GENERATOR BLDG - EXTERIOR DETAILS

108 A-601 DOOR SCHEDULE, TYPES AND NOTES

109 A-602 WINDOW AND LOUVER SCHEDULE, TYPES AND NOTES

110 A-603 ROOM AND MATERIAL FINISH SCHEDULES

111 A-604 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DOOR AND WINDOW KEY PLAN

112 A-611 WALL PARTITION DIAGRAMS

113 A-612 MOUNTING HEIGHTS

INDEX - LIFE SAFETY

GI101 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - LIFE SAFETY PLAN - FLOOR 1

GI102 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - LIFE SAFETY PLAN - TYPICAL FLOOR (2-9)

GI103 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - LIFE SAFETY PLAN - ROOF

GI151 LIFE SAFETY PLAN - GENERATOR BUILDING

INDEX - CIVIL

16 C-001 GENERAL, GRADING AND PAVING, GENERAL TRAFFIC, PUBLIC HEALTH AND SAFETY & CULTURAL ASSETS SURVEY NOTES

17 C-002 WATER NOTES & SEWER NOTES ANDCIVIL UTILTIES NOTES

18 CD101 SITE DEMOLITION PLAN (BID OPTION 2) LEGEND AND NOTES

19 CD102 SITE DEMOLITION PLAN -2 (BID OPTION 2) LEGEND AND NOTES

20 CS101 SITE LAYOUT PLAN -1 (BID OPTION 2) LEGEND AND NOTES

21 CS102 SITE LAYOUT PLAN - 2 (BID OPTION 2) LEGEND AND NOTES

22 CS121 SITE STRIPING AND MARKING PLAN -1 (BID OPTION 2) NEW PARKING STALL COUNTS AND NOTES

23 CS122 SITE STRIPING AND MARKING PLAN - 2 (BID OPTION 2) AND NOTES

24 CU101 SITE UTILITY PLAN LEGEND AND NOTES

25 C-501 WATER LINE DETAILS - 1

26 C-502 WATER LINE DETAILS - 2

27 C-503 PAVEMENT, CURB AND SIDEWALK DETAILS

28 C-504 SIGNAGE AND STRIPING DETAILS

29 C-505 ADA RAMP AND PAVEMENT MARKING DETAILS

30 C-506 PARKING STALL LAYOUT DETAILS

31 C-507 CURB RAMP DETAILS

32 C-508 TEMPORARY EROSION CONTROL NOTES AND BEST MANAGEMENT PRACTICES (BMPS) SILT FENCE DETAIL, DRAIN INLET

SEDIMENT BARRIER,SAND BAG DETAIL, TEMPORARY CONSTRUCTION FENCE DETAIL

33 C-509 SANITARY SEWER DETAILS

34 C-510 MECHANICAL YARD ENCLOSURE AT BUILDING 376 & 378 (OPTION 6),NEW GENERATOR BUILDING

35 C-511 CHAIN-LINK ENCLOSURE FENCE & GATE DETAILS

INDEX - GENERAL

1 GI001 COVER SHEET, LOCATION AND VICINITY MAPS

2 GI002 GENERAL NOTES, SYMBOLS, LEGENDS, AND MASTER KEYNOTE LEGEND

3 GI003 ABBREVIATIONS

4 GI004 INDEX TO DRAWINGS

5 GI005 INDEX TO DRAWINGS

6 GI006 INDEX TO DRAWINGS

7 GI007 PHASING PLAN - PHASE 1

8 GI008 PHASING PLAN - PHASE 2

9 GI009 PHASING PLAN - PHASE 3

10 GI010 ANTITERRORISM SITE PLAN

11 GI011 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - WIND AND WINDBORNE DEBRIS REQUIREMENTS

INDEX - STRUCTURAL

36 S-001 STRUCTURAL NOTES

37 SD100 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - CRAWL SPACE 38 SD101 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - FLOOR 1 39 SD102 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - TYPICAL FLOOR (2-9) 40 SD103 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - ROOF 41 SD104 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION & NEW FLOOR PLAN - PENTHOUSE FLOOR AND ROOF

42 SD121 BLDG 377A & 378A - DECONSTRUCTION AND NEW - MECHANICAL YARDS

43 S-100 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - CRAWL SPACE 44 S-101 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - FLOOR 1 45 S-102 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - TYPICAL FLOOR (2-9) 46 S-103 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - ROOF

47 S-121 BLDG 377A CHAIN LINK ROOF FRAMING PLAN AND DETAILS

48 S-131 BLDG 375 - NEW FLOOR PLAN - FIRE PUMP

49 S-151 NEW GENERATOR BUILDING FOUNDATION PLAN

50 S-152 NEW GENERATOR BUILDING FRAMING ELEVATIONS

51 S-301 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - BUILDING SECTIONS

52 S-302 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - BUILDING SECTIONS

53 S-501 CONCRETE REPAIR DETAILS

54 S-502 CONCRETE DETAILS

55 S-503 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DETAILS

56 S-504 NEW GENERATOR BUILDING SECTION

57 S-601 CONCRETE REPAIR SCHEDULE AND DEMO/CONCRETE DETAILS

INDEX - ARCHITECTURAL

58 AD101 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - FLOOR 1 59 AD102 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - TYPICAL FLOOR (2 - 9) 60 AD103 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - FLOOR 1 ZONE A 61 AD104 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - FLOOR 1 ZONE B 62 AD105 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - TYPICAL FLOOR (2 - 9) ZONE A 63 AD106 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - TYPICAL FLOOR (2 - 9) ZONE B

64. AD107 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - LOBBY AND PENTHOUSE 65 AD108 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - ENLARGED - TYPICAL UNIT (TYPE A) 66 AD109 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - ENLARGED - TYPICAL UNIT (TYPE B) 67 AD118 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION REFLECTED CEILING PLAN - ENLARGED - TYPICAL UNIT (TYPE A) 68 AD119 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION REFLECTED CEILING PLAN - ENLARGED - TYPICAL UNIT (TYPE B)

E K

H

A

N D A L

L

I

A

ARCHITECT

No. 9075

I I , U . S

II

O

LICENSED

E L L ING W

O D

READY-TO-ADVERTISE (RTA)

FY

M C

O N

P R

O

JE

C T

EV

KP

IM

PR

O

VE

F

AM

IL

Y H

O U

SI

N

G (N

O R

TH

F

O

ST

ER

T

O W

ER

C

AM

P

FO

ST

ER

, O

KI

N

AW

A, J

AP

AN

SHEET ID

D

ES

IG

N

ED

B

Y:

US Army Corps of Engineers®

1 2 3 4 5 6 7 8 9 10

G

F

E

D

C

B

A

H O

N O

LU

LU

, H

AW

AI

I 9

M

AK

AL

O

A

ST

R

EE

T, S

U

IT

E

D

ES

IG

N P

AR

TN

ER

S

IN

C

O R

PO

R

AT

ED

SI

ZE

FI

LE

N

AM

E:IS

SU

E

D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

D R

AW

IN

G C

O D

E:

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N D

IS

TR

IC

T

AP

O

A P

3-

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

IF

S

H

EE

T

IS

L

ES

T H

AN

S

IZ

E

SP

EC

IF

IE

D

IN

TI

TL

EB

LO

C K, A

SS

U M

E R

ED

U

C

ED

A1 (8

X

Sheet No of 386

A.

FO

R M

AN

A.

FO

R M

AN

D .M

O

AT

S

JR

K.

EL

LI

N

G W

O O

D

II

I

SIGNED

6-

EV

KP

g

W

2H V2

0B

M

AY

, 2

C :\U se rs

\s go sh i\D oc um en ts

\1

-1

- F O

ST

ER

TO

W

ER

S.

C

EN

TR

AL

_v

_ s go sh i@ de si gn pa rtn er s i nc .c om . rv t

GI005

IN

D

EX

T

O D

R A W

IN

G

S

G I0

INDEX - MECHANICAL

M-001 MECHANICAL NOTES AND LEGENDS

MS101 DECONSTRUCTION SITE PLAN

MS102 NEW SITE PLAN

MD101 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - FLOOR 1 MD102 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - TYPICAL FLOOR (2-9) MD103 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - ROOF MD111 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - FLOOR 1 ZONE A MD112 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - FLOOR 1 ZONE B MD113 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - TYPICAL FLOOR (2-9) ZONE A MD114 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - TYPICAL FLOOR (2-9) ZONE B MD115 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - ROOF ZONE A MD116 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - ROOF ZONE B

MD121 BLDG 376A - DECONSTRUCTION FLOOR PLAN - OVERALL - MECHANICAL YARD

MD122 BLDG 377A - DECONSTRUCTION FLOOR PLAN - OVERALL - MECHANICAL YARD

MD123 BLDG 378A (BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - MECHANICAL YARD

MD131 BLDG 375 - DECONSTRUCTION FLOOR PLAN - OVERALL - FIRE PUMP ROOM

MD141 BLDG 379 (BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - BOILER ROOM M-100 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - UNDERSLAB M-101 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - FLOOR 1 M-102 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - TYPICAL FLOOR (2 - 9)

M-103 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - ROOF

M-111 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - FLOOR 1 ZONE A M-112 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - FLOOR 1 ZONE B M-113 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - TYPICAL FLOOR (2 - 9) ZONE A M-114 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - TYPICAL FLOOR (2 - 9) ZONE B M-115 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - ROOF ZONE A M-116 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - ROOF ZONE B

M-121 BLDG 376A - NEW FLOOR PLAN - OVERALL - MECHANICAL YARD

M-122 BLDG 377A - NEW FLOOR PLAN - OVERALL - MECHANICAL YARD

M-123 BLDG 378A (BID OPTION 6) - NEW FLOOR PLAN - OVERALL - MECHANICAL YARD

M-131 BLDG 375 - NEW FLOOR PLAN - OVERALL - FIRE PUMP ROOM

M-151 GENERATOR BUILDING - NEW FLOOR PLAN - OVERALL

M-301 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - SECTIONS - MECHANICAL ROOM

M-401 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - ENLARGED - MECHANICAL ROOM M-402 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - ENLARGED - MECHANICAL ROOM M-403 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - ENLARGED - TYPICAL UNIT A M-404 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - ENLARGED - TYPICAL UNIT B M-405 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - ENLARGED - TYPICAL PLUMBING SHAFT M-406 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - ENLARGED - TYPICAL PLUMBING SHAFT M-407 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - ENLARGED - TYPICAL PLUMBING SHAFT M-408 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - ENLARGED - TYPICAL PLUMBING SHAFT

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-505 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-611 MECHANICAL DIAGRAMS

M-612 MECHANICAL DIAGRAMS

M-613 MECHANICAL DIAGRAMS

M-902 MECHANICAL ISOMETRICS

M-901 MECHANICAL ISOMETRICS

M-903 MECHANICAL ISOMETRICS

M-904 MECHANICAL ISOMETRICS

INDEX - PLUMBING

P-001 PLUMBING NOTES

PS101 DECONSTRUCTION SITE PLAN

PS102 NEW SITE PLAN

PD101 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - FLOOR 1 PD102 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - TYPICAL FLOOR (2- 9) PD103 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - OVERALL - ROOF PD111 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - FLOOR 1 ZONE A PD112 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - FLOOR 1 ZONE B PD113 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - FLOOR 2 ZONE A PD114 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - FLOOR 2 ZONE B PD115 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - TYPICAL FLOOR (3- 9) ZONE A PD116 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - TYPICAL FLOOR (3- 9) ZONE B PD117 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - ROOF ZONE A PD118 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - PARTIAL - ROOF ZONE B P-101 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - FLOOR 1 P-102 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - TYPICAL FLOOR (2- 9)

P-103 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - OVERALL - ROOF

P-104 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - CRAWL SPACE ZONE A - SANITARY, VENT &

DRAIN

P-105 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - CRAWL SPACE ZONE B - SANITARY, VENT &

DRAIN

P-106 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - FLOOR 1 ZONE A - SANITARY, VENT & DRAIN P-107 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - FLOOR 1 ZONE B - SANITARY, VENT & DRAIN P-108 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - FLOOR 2 ZONE A - SANITARY, VENT & DRAIN P-109 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - FLOOR 2 ZONE B - SANITARY, VENT & DRAIN P-110 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - TYPICAL FLOOR (3- 9) ZONE A - SANITARY, VENT

& DRAIN

P-111 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - TYPICAL FLOOR (3- 9) ZONE B- SANITARY, VENT &

DRAIN

P-112 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - ROOF ZONE A P-113 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - ROOF ZONE B P-114 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - FLOOR 1 ZONE A - DOMESTIC WATER P-115 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - FLOOR 1 ZONE B - DOMESTIC WATER P-116 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - FLOOR 2 ZONE A - DOMESTIC WATER P-117 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - FLOOR 2 ZONE B - DOMESTIC WATER P-118 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - TYPICAL FLOOR (3- 9) ZONE A - DOMESTIC

WATER

P-119 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - PARTIAL - TYPICAL FLOOR (3- 9) ZONE B - DOMESTIC

WATER

P-131 BLDG 375 - NEW FLOOR PLAN - OVERALL - FIRE PUMP ROOM

P-301 BLDG 376 & 377 (BLDG 378 BID OPTION 6) -SECTIONS - PARTIAL - MECHANICAL ROOM P-401 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - FLOOR PLAN - ENLARGED - MECHANICAL ROOM P-402 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - ENLARGED - TYPICAL UNIT (TYPE A) P-403 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - ENLARGED - TYPICAL UNIT (TYPE B) P-404 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - ENLARGED - TYPICAL UNIT (TYPE A) P-405 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - ENLARGED - TYPICAL UNIT (TYPE B)

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-602 PLUMBING SEQUENCE

P-611 PLUMBING DIAGRAMS

P-612 PLUMBING DIAGRAMS

P-901 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - TYPICAL SANITARY RISERS

INDEX - FIRE PROTECTION

F-001 FIRE PROTECTION NOTES

FS101 FIRE PROTECTION DECONSTRUCTIION SITE PLAN

FS102 FIRE PROTECTION NEW SITE PLAN

FA101 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - FIRE ALARM - OVERALL - FLOOR 1 FA102 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - FIRE ALARM - OVERALL - TYPICAL FLOOR

PLAN (2-9)

FA103 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - FIRE ALARM - OVERALL - ROOF FA111 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE ALARM - OVERALL - FLOOR 1 FA112 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE ALARM - OVERALL - TYPICAL FLOOR (2-9) FA113 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE ALARM - PARTIAL - FLOOR 1 ZONE A FA114 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE ALARM - PARTIAL - FLOOR 1 ZONE B FA115 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE ALARM - PARTIAL - TYPICAL FLOOR (2-9) ZONE A FA116 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE ALARM - PARTIAL - TYPICAL FLOOR (2-9) ZONE B FA117 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE ALARM - PENTHOUSE 1 AND 2 FA118 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE ALARM - ENLARGED STAIR PLANS FA131 BLDG 375 - NEW FLOOR PLAN - FIRE ALARM - OVERALL - FIRE PUMP ROOM AND GENERATOR BUILDING

FA-501 FIRE ALARM MATRICES

FA-601 FIRE ALARM RISER DIAGRAMS

FX101 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - FIRE PROTECTION - OVERALL - FLOOR 1 FX102 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - FIRE PROTECTION - OVERALL - TYPICAL

FLOOR PLAN (2-9)

FX103 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - FIRE PROTECTION - OVERALL - ROOF FX111 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE PROTECTION - OVERALL - FLOOR 1 FX112 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE PROTECTION - OVERALL - TYPICAL FLOOR (2-9) FX113 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE PROTECTION - OVERALL - ROOF FX114 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE PROTECTION - PARTIAL - FLOOR 1 ZONE A FX115 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE PROTECTION - PARTIAL - FLOOR 1 ZONE B FX116 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE PROTECTION - PARTIAL - TYPICAL FLOOR (2-9) ZONE A FX117 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE PROTECTION - PARTIAL - TYPCIAL FLOOR (2-9) ZONE B FX118 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE PROTECTION - PENTHOUSE 1 AND 2 FX119 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - NEW FLOOR PLAN - FIRE PROTECTION - ENLARGED STAIR PLANS

FX131 BLDG 375 - DECONSTRUCTION FLOOR PLAN - FIRE PUMP

FX132 BLDG 375 - NEW FLOOR PLAN - FIRE SPRINKLER - FIRE PUMP

FX501 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - FIRE PROTECTION DETAILS

FX601 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - STANDPIPE ISOMETRIC

INDEX - PLUMBING CONTINUED

P-903 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - PLUMBING ISOMETRIC - MULITPURPOSE ROOM P-904 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - PLUMBING ISOMETRIC - OVERALL DOMESTIC WATER RISER DISTRIBUTION P-905 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - PLUMBING ISOMETRIC - TYPICAL UNITS - DOMESTIC WATER P-906 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - PLUMBING ISOMETRIC - CONDENSATE DRAIN

E K

H

A

N D A L

L

I

A

ARCHITECT

No. 9075

I I , U . S

II

O

LICENSED

E L L ING W

O D

READY-TO-ADVERTISE (RTA)

FY

M C

O N

P R

O

JE

C T

EV

KP

IM

PR

O

VE

F

AM

IL

Y H

O U

SI

N

G (N

O R

TH

F

O

ST

ER

T

O W

ER

C

AM

P

FO

ST

ER

, O

KI

N

AW

A, J

AP

AN

SHEET ID

D

ES

IG

N

ED

B

Y:

US Army Corps of Engineers®

1 2 3 4 5 6 7 8 9 10

G

F

E

D

C

B

A

H O

N O

LU

LU

, H

AW

AI

I 9

M

AK

AL

O

A

ST

R

EE

T, S

U

IT

E

D

ES

IG

N P

AR

TN

ER

S

IN

C

O R

PO

R

AT

ED

SI

ZE

FI

LE

N

AM

E:IS

SU

E

D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

D R

AW

IN

G C

O D

E:

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N D

IS

TR

IC

T

AP

O

A P

3-

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

IF

S

H

EE

T

IS

L

ES

T H

AN

S

IZ

E

SP

EC

IF

IE

D

IN

TI

TL

EB

LO

C K, A

SS

U M

E R

ED

U

C

ED

A1 (8

X

Sheet No of 386

A.

FO

R M

AN

A.

FO

R M

AN

D .M

O

AT

S

JR

K.

EL

LI

N

G W

O O

D

II

I

SIGNED

6-

EV

KP

g

W

2H V2

0B

M

AY

, 2

C :\U se rs

\s go sh i\D oc um en ts

\1

-1

- F O

ST

ER

TO

W

ER

S.

C

EN

TR

AL

_v

_ s go sh i@ de si gn pa rtn er s i nc .c om . rv t

GI006

IN

D

EX

T

O D

R A W

IN

G

S

G I0

INDEX - TELECOMMUNICATIONS

333 T-001 TELECOMM NOTES AND LEGENDS

334 TS101 DECONSTRUCTION SITE PLAN

335 TS102 NEW TELECOMMUNICATION SITE PLAN

336 TS103 BLDG 378 (BID OPTION 6) - NEW TELECOMMUNICATION SITE PLAN

337 TD101 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - TELECOMMUNICATION - OVERALL - FLOOR 1 338 TD102 BLDG 376 & 377 (BLDG 378 BID OPTION 6) - DECONSTRUCTION FLOOR PLAN - TELECOMMUNICATION - OVERALL - FLOOR 2 339 TD103 BLDG 376 & 377 (BLDG 378 BID…