This solicitation seeks proposals to improve family housing at Camp Foster in Okinawa, Japan. The project includes whole house modernization, renovation and repair of three family housing towers totaling 204 units. It will upgrade interior and exterior utilities and communications infrastructure, remove the towers from the central plant and provide energy efficient mini-splits and electric water heaters. The project will also upgrade units, building systems, common areas, hallways and playgrounds. It incorporates demolition, asbestos and lead based paint removal and disposal. The work has an estimated value between 2.5 and 10 billion Japanese Yen. The solicitation includes specifications, drawings and project information.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 46 PAGES
W912HV-20-B-0006
Improve Family Housing (North Foster Towers)
01 11 00.00 10 SD-01 Preconstruction Submittals 1.11Initial Site Conditions Photos
1.7 GKey Personnel Qualifications
1.10.2Conformed Drawings Submittal
SD-07 Certificates Monthly Progress Photos
01 22 00.00 10 SD-01 Preconstruction Submittals
3.2 GContract Cost Breakdown
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
1.8.1 GSubmittal Register Monthly
Update 01 35 26 SD-01 Preconstruction Submittals
1.7.2.2 GStandard Lift Plan
1.7 G AAccident Prevention Plan (APP)
1.7.2.3 G ACritical Lift Plan
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B
(AM-0004)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 46 PAGES
Improve Family Housing (North Foster Towers)
01 35 26 SD-07 Certificates
1.6.1.4 G ACrane Operators/Riggers
1.8 G AActivity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
1.4 GIndoor Air Quality (IAQ)
Management Plan SD-06 Test Reports
3.9.2Verification Statement 01 45 00.15 10 SD-07 Certificates
1.8.3.5Monthly Exposure Report 01 45 35 SD-01 Preconstruction Submittals
3.1.1Project Manual 3.1.1Project Manual
3.1.1 GWritten Practices
SD-06 Test Reports 3.1.1Daily Reports 3.1.3Daily Reports 3.1.1Biweekly Reports 3.1.2Biweekly Reports
SD-07 Certificates 1.5Special Inspector
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 46 PAGES
Improve Family Housing (North Foster Towers)
01 45 35 SD-11 Closeout Submittals 3.1.1Comprehensive Final Report 3.1.3Comprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
3.3.2 GTemporary Utility Connections
Plan 01 57 19.01 SD-01 Preconstruction Submittals
1.8.1Preconstruction Survey
1.9.12.1 GSolid Waste Management Permit
1.8.2Regulatory Notifications
1.9 GEnvironmental Protection Plan
1.9.8.2 GDirt and Dust Control Plan
1.8.5 GEmployee Training Records
1.8.4 GEnvironmental Manager
Qualifications
3.14.3 GTemporary Fuel Storage Tank
Approval Request
3.14.5 GUnderground Fuel Storage Tank
Approval Request
1.9.4 GDig Permit
3.8.1 GWaste Determination
Documentation
1.8.3 GLicenses/Permits/Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 46 PAGES
Improve Family Housing (North Foster Towers)
01 57 19.01 1.9.9.1 GStormwater Pollution Prevention Plan
1.9.9.1 GStormwater Pollution Prevention
Plan
SD-06 Test Reports 3.8.1.1.2Laboratory Analysis 3.2.2Inspection Reports
3.8.2.1 GSolid Waste Management Report
3.7.2Nonhazardous Solid Waste
Diversion Report 1.9.11.2Hazardous Waste Analysis
Report SD-07 Certificates
1.8.5 GEmployee Training Records
1.9.12.1Solid Waste Management
License 1.7.1Asbestos Certification 1.7.2Lead Certification
3.11 GWritten Assessment Of Friable
Asbestos Disturbance SD-11 Closeout Submittals
3.8.1 GWaste Determination
Documentation
3.8.3.5 GDisposal Documentation for
Hazardous and Regulated Waste
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 46 PAGES
Improve Family Housing (North Foster Towers)
01 57 19.01 1.8.5 GAssembled Employee Training Records
1.9.12.1 GSolid Waste Management Permit
3.8.2.1 GSolid Waste Management Report
3.8.3.1 GHazardous Waste/Debris
Management
1.9.13.2 GFuel Storage Tank
Installation/Removal Report
1.8.2 GRegulatory Notifications
3.8.2.1Sales Documentation 1.11Environmental Records Binder 3.8.2.1Contractor Certification 3.8.2.1Contractor Certification 1.10General Use Permitted
Equipment 01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7Records 01 78 00 SD-03 Product Data
1.7.1 GWarranty Management Plan
1.7.5Warranty Tags 3.8Final Cleaning 1.5Spare Parts Data
SD-08 Manufacturer’s Instructions 1.7.1Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 46 PAGES
Improve Family Housing (North Foster Towers)
01 78 00 SD-10 Operation and Maintenance Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
1.7.1 GAs-Built Record of Equipment
and Materials
3.6 GAs-Built Record of Equipment
and Materials
3.4 GFinal Approved Shop Drawings
3.5 GConstruction Contract
Specifications
3.9 GInterim DD FORM 1354
3.9 GChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 91 00.15 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 46 PAGES
Improve Family Housing (North Foster Towers)
01 91 00.15 1.7 G DOCommissioning Firm
1.7.1 G DOLead Commissioning Specialist
1.7.2 G DOTechnical Commissioning
Specialists
1.7 G DOCommissioning Firm's Contract
SD-06 Test Reports
3.1.2.1 G DOInterim Construction Phase
Commissioning Plan
3.1.2.2 G DOFinal Construction Phase
Commissioning Plan
3.1.4.2 G DOPre-Functional Checklists
1.8Issues Log
3.2 G DOCommissioning Report
SD-07 Certificates
1.9 G DOCertificate of Readiness
SD-10 Operation and Maintenance Data
3.1.5 G ROTraining Plan
3.1.5 G ROTraining Attendance Rosters
3.1.6 G DOMaintenance and Service Life
Plans SD-11 Closeout Submittals
3.1.2.1 S DOConstruction Phase
Commissioning Plan
3.2 S DOFinal Commissioning Report
02 82 13.00 10 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 46 PAGES
Improve Family Housing (North Foster Towers)
02 82 13.00 10 1.6.2 GAsbestos Hazard Abatement Plan SD-02 Shop Drawings
1.4 GDetailed Drawings
SD-03 Product Data
3.11.3.1 GAsbestos Waste Shipment
Records
2.1 GEncapsulants
1.9.1 GRespiratory Protection Program
3.11 GCleanup and Disposal
1.6.1 GQualifications
1.11Training Program 1.8.1Licenses, Permits and
Notifications SD-06 Test Reports
3.9Exposure Assessment and Air Monitoring
1.7.2Local Exhaust System SD-07 Certificates
1.7.2Local Exhaust System
2.1 GEncapsulants
1.9Medical Surveillance
Requirements SD-11 Closeout Submittals
3.11.3.2Records 02 82 13.00 30 SD-01 Preconstruction Submittals
1.5.2.5 GMedical Examinations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 46 PAGES
Improve Family Housing (North Foster Towers)
02 82 13.00 30 3.3 GSampling Plan
3.3.2 GAsbestos Sampling Plan
SD-04 Samples
3.4.3 GAsbestos Sampling/Assessment
Record SD-06 Test Reports
3.4 GAsbestos Sampling And Analysis
Report
3.2.3 GLaboratory Analysis
3.2.1 GLaboratory Analysis Reports
SD-07 Certificates
1.5.2.11 GCertificate Of Workers
Acknowledgment
3.1 GAsbestos Hazard Abatement Plan
SD-11 Closeout Submittals
1.4.3 GHazardous Waste Manifest
1.5.2.12 GHazardous Waste Manifest
3.2.5 GHazardous Waste Manifest
02 83 19.00 30 SD-01 Preconstruction Submittals
1.4.1.1 GLead Hazard Abatement Plan
SD-06 Test Reports
1.4.1.2.1 GLaboratory Results
1.4.1.2.1 GToxicity Analysis
SD-11 Closeout Submittals
1.4.1.3 GHazardous Waste Manifest
02 83 19.13 10 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 46 PAGES
Improve Family Housing (North Foster Towers)
02 83 19.13 10 2.1Materials and Equipment 2.1.1Expendable Supplies
1.5.1 GQualifications
1.5.3 GOccupant Protection Plan
SD-06 Test Reports 3.1.3Pressure Differential Log 1.5.4Licenses, Permits and
Notifications
1.3.2 GSampling and Analysis
3.5 GAbatement Report
02 84 16 SD-07 Certificates
1.8.1 GQualifications of IH/PQP
1.8.1 GTraining Certification
1.8.2 GPCB and Lamp Removal and
Disposal Work Plan
1.8.3 GPCB and Lamp Disposal Plan
3.5.1 GJapan Specially Controlled
Hazardous Waste Disposal Permit
3.5.2 GJapan Industrial Waste Collection
And Transport Permit SD-11 Closeout Submittals
3.5.5 GTransporter certification
3.2.4Certification of Decontamination 3.5.6.2Disposal Request Form 3.5.3Copy E of the Japan Hazardous
Waste Manifest
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 46 PAGES
Improve Family Housing (North Foster Towers)
02 84 16 3.3.1Signed Ballast Turn-in (at Bldg 3625) Sheet
02 84 33 SD-07 Certificates 1.7.1Training certification 1.7.2Qualifications of CIH 1.7.3PCB removal work plan 1.7.4PCB disposal plan 1.7.5Notification 3.5.4Certification of Decontamination
03 01 00 SD-01 Preconstruction Submittals 1.5.3Qualifications 1.5.5Work Plan 1.6.1Work Plan 1.5.2Quality Control Plan
SD-03 Product Data 2.5Conventional Concrete 2.6Polymers 2.7Miscellaneous Materials And
Equipment SD-05 Design Data
3.1.3Formwork And Shoring 1.5.1Repair Procedures 2.8Mixture Proportioning
SD-06 Test Reports 2.8Mixture Proportioning 3.1.5Quality Control
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 46 PAGES
Improve Family Housing (North Foster Towers)
03 01 00 3.2.3Quality Control 3.3.3Quality Control 3.4.3Quality Control 1.6.2Tolerence Report 2.4Reinforcement And
Reinforcement Supports 2.5Conventional Concrete 2.6Polymers 2.7Miscellaneous Materials And
Equipment SD-07 Certificates
1.5.3Qualifications 2.4Reinforcement And
Reinforcement Supports 2.5Conventional Concrete 2.6Polymers
SD-08 Manufacturer’s Instructions 2.2Equipment For Concrete
Preparation 2.5Conventional Concrete 2.6Polymers 2.7Miscellaneous Materials And
Equipment 03 30 53 SD-02 Shop Drawings
1.4Installation Drawings SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 46 PAGES
Improve Family Housing (North Foster Towers)
03 30 53 2.2.3.1Accelerating Admixture 2.2.3.2Water-Reducing or Retarding
Admixture 2.2.11Curing Materials 2.2.6Expansion Joint Filler Strips, Premolded 2.2.7Joint Sealants - Field Molded
Sealants 3.2Conveying and Placing Concrete 2.2.8Formwork 2.3Mix Design Data 2.3Ready-Mix Concrete 2.4.2Curing Compound 2.2.5Mechanical Reinforcing Bar
Connectors SD-06 Test Reports
2.2.2Aggregates 2.1.3Concrete Mixture Proportions 3.3.3.2Measurement of Floor Tolerances 3.9.3Compressive Strength Testing 3.9.3Slump 2.2.4Water
SD-07 Certificates 2.2.1Cementitious Materials 2.2.1.2Pozzolan 2.2.2Aggregates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 46 PAGES
Improve Family Housing (North Foster Towers)
03 30 53 2.3Delivery Tickets SD-08 Manufacturer’s Instructions
2.4.2Curing Compound 05 50 13 SD-02 Shop Drawings
2.4Lightning Rod Masts 2.1Certificates of Compliance 2.2Certified Mill 2.1Recycled Content
06 20 00 SD-02 Shop Drawings
1.3 GDetail Drawings Indicating All
Wood Assemblies SD-03 Product Data
2.1 GWood Products
2.2 GCountertops
1.4 GTreated Wood Products
2.5 GHardware and Accessories
SD-04 Samples
1.5 GSamples
SD-07 Certificates
1.7.1.1 GCertificates of Grade
1.7.1.2 GIndoor Air Quality
06 61 16 SD-02 Shop Drawings
1.4.2 GDetail Drawings
3.1 GInstallation
SD-04 Samples
2.1 GMaterial
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 46 PAGES
Improve Family Housing (North Foster Towers)
06 61 16 2.3.4 GCounter and Vanity Tops SD-10 Operation and Maintenance Data
3.2Clean-up 07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.2 GBlock or Board Insulation
1.4 GProtection Board or Coatings
2.3 GAccessories
SD-07 Certificates
2.2 GBlock or Board Insulation
1.7 GSpecial Warranties
1.7 GSpecial Warranties
2.2.5 SIndoor Air Quality For Block Or
Board Insulation SD-08 Manufacturer’s Instructions
2.2Block or Board Insulation 2.3.1Adhesive
07 21 16 SD-03 Product Data 2.2Blanket Insulation
SD-08 Manufacturer’s Instructions 3.3.1Insulation
07 56 00 SD-11 Closeout Submittals 3.5.2Instructions To Government
Personnel 07 84 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 46 PAGES
Improve Family Housing (North Foster Towers)
07 84 00 2.1 GFirestopping System SD-03 Product Data
2.2 GFirestopping Materials
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.7 GFrames
2.7 GFrames
2.5Accessories 2.9Weatherstripping
SD-04 Samples
2.11.4 GFactory-applied enamel finish
08 11 16 SD-02 Shop Drawings
1.5.1 GDoor and Frame Assembly
SD-03 Product Data
1.2.6 GWindow Performance
SD-04 Samples
1.5.2 GFinish Samples
SD-05 Design Data
1.2.1 GCalculations
1.5.4 GDesign Analysis
SD-06 Test Reports
1.2.3 GAir Infiltration
1.2.4 GWater Penetration
1.2.2Windborne-Debris-Impact
Performance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 46 PAGES
Improve Family Housing (North Foster Towers)
08 11 16 SD-10 Operation and Maintenance Data
1.5.3 GAdjustments, Cleaning, and
Maintenance
08 14 00 SD-02 Shop Drawings
2.2 GDoors
SD-03 Product Data
2.2 GDoors
2.3 GAccessories
1.4 GWarranty
08 51 13 SD-02 Shop Drawings
2.8 GWindows
2.3 GEntrance Doors
1.9Fabrication Drawings
SD-03 Product Data 2.9.4Adhesives
SD-05 Design Data
1.10 GWindow Performance
3.1 GInstallation
2.8 GCalculations
1.4.4 GDesign Analysis
SD-06 Test Reports 2.2.2.2Windborne-Debris-Impact
Performance SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 46 PAGES
Improve Family Housing (North Foster Towers)
08 51 13 2.8 GWindows 08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.6 GKeying System
SD-10 Operation and Maintenance Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting 08 81 00 SD-02 Shop Drawings
3.3.1 GInstallation
SD-03 Product Data
1.5 GWindow Performance
SD-05 Design Data
1.3.2 GCalculations
1.7 GDesign Analysis
SD-06 Test Reports 1.3.3Windborne-Debris-Impact
Resistive Performance SD-08 Manufacturer’s Instructions
2.6Setting and Sealing Materials 3.2Glass Setting
08 91 00 SD-02 Shop Drawings 1.4Wall louvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 46 PAGES
Improve Family Housing (North Foster Towers)
08 91 00 1.5Wall louvers SD-04 Samples
1.4Wall louvers 1.5Wall louvers
09 22 00 SD-02 Shop Drawings 2.2Metal support systems
09 29 00 SD-07 Certificates
2.3 GAsbestos Free Materials
SD-10 Operation and Maintenance Data
2.3Manufacturer Maintenance Instructions
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-04 Samples
2.2 GTile
SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions
SD-10 Operation and Maintenance Data
3.2 GInstallation
09 65 00 SD-02 Shop Drawings
2.7 GResilient Flooring and
Accessories
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 46 PAGES
Improve Family Housing (North Foster Towers)
09 65 00 2.7 GResilient Flooring and Accessories
SD-10 Operation and Maintenance Data
2.7 GResilient Flooring and
Accessories
09 90 00 SD-02 Shop Drawings 3.11Piping identification 3.11stencil
10 14 00.20 SD-02 Shop Drawings 1.3.2Detail Drawings
SD-04 Samples 1.3.1Interior Signage
10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
SD-04 Samples
2.1.2 GFinishes
2.2Accessory Items
11 31 13 SD-03 Product Data
2.2.2 GRange Hood
SD-08 Manufacturer’s Instructions 2.2Kitchen Equipment 2.2.2Range Hood
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 46 PAGES
Improve Family Housing (North Foster Towers)
11 31 13 2.2Kitchen Equipment SD-11 Closeout Submittals
3.3Manufacturer's Warranty 3.4Contractor's Warranty for
Installation 12 21 00 SD-02 Shop Drawings
3.3Installation SD-08 Manufacturer’s Instructions
2.2 GWindow Blinds
SD-10 Operation and Maintenance Data
2.2 GWindow Blinds
12 32 00 SD-02 Shop Drawings
2.3 GFabrication
3.1.1 GInstallation Drawings
SD-03 Product Data
2.5 GMedium Density Fiberboard
(MDF)
2.5 GHardwood
2.5 GHardwood Plywood
2.5 GSoftwoods
2.4.1 GCountertops
SD-08 Manufacturer’s Instructions Part 3Manufacturer's Instructions
13 48 00 SD-02 Shop Drawings 3.1Bracing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 46 PAGES
Improve Family Housing (North Foster Towers)
13 48 00 3.4Resilient Vibration Isolation Devices
2.1Equipment Requirements SD-03 Product Data
3.1Bracing 2.1Equipment Requirements 3.3Anchor Bolts 2.1.2Vibration Isolators
SD-05 Design Data 1.2.3Design Calculations
SD-06 Test Reports 3.3Anchor Bolts
21 12 00 SD-02 Shop Drawings
1.3.4 GStandpipe system
SD-03 Product Data
2.1.1 GPipe and fittings
2.1.1 GMechanical couplings
2.1.2 GPipe hangers and supports
2.1.3 GValves
2.1.9 GFire department connections
2.1.10 GWaterflow detector
2.1.11 GValve tamper switch
SD-06 Test Reports
3.6.1 GPreliminary tests
3.6.2 GAcceptance tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 46 PAGES
Improve Family Housing (North Foster Towers)
21 12 00 1.5.1 GQualifications of installer SD-11 Closeout Submittals
1.5.3 GSystem as-built drawings
21 13 13.00 10 SD-02 Shop Drawings
1.4.4 GShop Drawings
3.9As-Built Drawings
SD-03 Product Data 1.4.2Fire Protection Related
Submittals
2.3 GMaterials and Equipment
1.6Spare Parts
3.8 GPreliminary Tests
3.9 GFinal Acceptance Test
3.10 GOnsite Training
1.4.2 GFire Protection Specialist
1.4.3 GSprinkler System Installer
SD-05 Design Data
1.4.4 GSway Bracing
1.2.1.3 GHydraulic Calculations
SD-06 Test Reports 3.8Preliminary Test Report 3.9Final Acceptance Test Report
SD-07 Certificates 3.3Inspection by Fire Protection
Specialist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 46 PAGES
Improve Family Housing (North Foster Towers)
21 13 13.00 10 SD-10 Operation and Maintenance Data
3.10 GOperating and Maintenance
Manuals
21 30 00 SD-01 Preconstruction Submittals 1.3Fire Pump Installation Related
Submittals
1.7.2 GFire Protection Specialist
SD-02 Shop Drawings
3.3.1 GInstallation Drawings
3.11.2 GAs-Built Drawings
3.3.2 GPiping Layout
3.3.2 GPump Room
SD-03 Product Data
2.1 GCatalog Data
1.6Spare Parts 3.8.2Preliminary Tests
3.8 GField Tests
1.7.7 GManufacturer's Representative
3.11.1 GField Training
3.8.3Army Final Acceptance Test
SD-06 Test Reports 3.8.2Preliminary Tests 3.8.3Army Final Acceptance Test
SD-07 Certificates 1.7.2Fire Protection Specialist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 46 PAGES
Improve Family Housing (North Foster Towers)
21 30 00 1.7.3Qualifications of Welders 1.7.4Qualifications of Installer 1.7.5Preliminary Test Certification 1.7.6Final Test Certification
SD-10 Operation and Maintenance Data
3.11.1 GOperating and Maintenance
Instructions
2.14Flow Meter 22 00 00 SD-02 Shop Drawings
3.9.1Plumbing System SD-03 Product Data
2.7 GWater Heaters
2.8 GPumps
SD-06 Test Reports 3.9Tests, Flushing and Disinfection
SD-07 Certificates 1.3Materials and Equipment 2.1.1Bolts
SD-10 Operation and Maintenance Data
3.9.1 GPlumbing System
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data
2.10.3Fire Dampers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 46 PAGES
Improve Family Housing (North Foster Towers)
23 00 00 2.11.1.2In-Line Centrifugal Fans 2.11.1.4Centrifugal Type Power Roof
Ventilators
2.12 GAir Handling Units
1.2.1.2 GDiagrams
2.14.4Control Panels
SD-06 Test Reports
3.10 GDamper Acceptance Test
SD-10 Operation and Maintenance Data
3.14.1Operation and Maintenance Manuals
2.10.3Fire Dampers 2.11.1.2In-Line Centrifugal Fans 2.11.1.3Centrifugal Type Power Wall
Ventilators 2.11.1.4Centrifugal Type Power Roof
Ventilators 2.11.1.5Ceiling Exhaust Fans 2.12Air Handling Units
23 05 48.19 SD-02 Shop Drawings 3.1Coupling and Bracing 3.3Flexible Couplings or Joints 2.2Equipment Restraint 1.2.4Contractor Designed Bracing
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 46 PAGES
Improve Family Housing (North Foster Towers)
23 05 48.19 3.1Coupling and Bracing 3.3Flexible Couplings Or Joints 2.2Equipment Restraint 1.2.4Contractor Designed Bracing 3.9Anchor Bolts 2.2.2Vibration Isolators
SD-05 Design Data 1.2.4Design Calculations
23 05 93 SD-01 Preconstruction Submittals
1.3.2 GRecords of Existing Conditions
1.3.2 GRecords of Existing Conditions
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.2 GTAB Design Review Report
1.6.2.1 GTAB Design Review Report
1.5.7.1 GTAB Firm
1.2 GTAB Team Assistants
1.2 GTAB Team Engineer
1.5.7.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
1.3.2 GTAB Schematic Drawings and
Report Forms SD-03 Product Data
1.3 GEquipment and Performance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 46 PAGES
Improve Family Housing (North Foster Towers)
23 05 93 1.5.1.3 GTAB Related HVAC Submittals
1.5.7.4 GTAB Related HVAC Submittals
1.5.5 GTAB Procedures
1.5.5 GCalibration
1.3.2 GSystems Readiness Check
1.5.8 GTAB Execution
1.5.8.3 GTAB Verification
SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
1.5.3.3 GPrerequisite HVAC Work
Checkout List
1.5.3.3 GPrerequisite HVAC Work
Checkout List
1.6.2 GPrerequisite HVAC Work
Checkout List
1.6.2 GPrerequisite HVAC Work
Checkout List
3.7 GProportional Balancing
1.5.3.2 GTAB Design Review Report
1.6.2.1 GTAB Design Review Report
1.5.9.2 GTAB Report
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 46 PAGES
Improve Family Housing (North Foster Towers)
23 05 93 1.5.3.2 GDALT and TAB Submittal and Work Schedule
1.6.2 GDALT and TAB Submittal and
Work Schedule
1.5.3.3 GTAB Pre-Field Engineering
Report
1.6.2.3 GTAB Pre-Field Engineering
Report
1.5.4 GInstrument Calibration
Certificates
3.7 GDALT and TAB Procedures
Summary
3.7 GCompleted Pre-Final DALT Work
Checklist
3.3.2 GAdvance Notice of Pre-Final
DALT Field Work
3.7 GProportional Balancing
1.5.7.1 GTAB Firm
1.3.2 GDesign Review Report
1.6.2.2 GPre-field DALT Preliminary
Notification
1.6.2 GAdvanced Notice for TAB Field
Work
1.5.3.3 GPrerequisite HVAC Work Check
Out List
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 46 PAGES
Improve Family Housing (North Foster Towers)
23 05 93 1.6.2 GPrerequisite HVAC Work Check Out List
23 07 00 SD-02 Shop Drawings 3.2.2.4MICA Plates 2.4Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
SD-03 Product Data
2.4 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data 2.3Refrigerant Piping System 2.5Pre-engineered piping
SD-06 Test Reports 3.5Refrigerant Piping Tests
SD-10 Operation and Maintenance Data
1.5Maintenance 3.4Operation and Maintenance
Manuals 3.4Demonstrations
23 82 02.00 10 SD-02 Shop Drawings 1.4Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 46 PAGES
Improve Family Housing (North Foster Towers)
23 82 02.00 10 SD-03 Product Data
2.1 GMaterials and Equipment
SD-06 Test Reports
3.6 GSystem Performance Tests
SD-10 Operation and Maintenance Data
3.4 GOperation and Maintenance
Manuals
26 05 48.00 10 SD-02 Shop Drawings 3.2Lighting Fixtures in Buildings 1.3Equipment Requirements
SD-03 Product Data 3.2Lighting Fixtures in Buildings 1.3Equipment Requirements 1.2.4Contractor Designed Bracing
26 08 00 SD-06 Test Reports 3.1Acceptance tests and inspections
SD-07 Certificates 1.4.1Qualifications 1.4.3Acceptance test and inspections procedure 26 12 19.10 SD-02 Shop Drawings
1.5.1Pad-mounted Transformer Drawings
SD-03 Product Data
2.2 GPad-mounted Transformers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 46 PAGES
Improve Family Housing (North Foster Towers)
26 12 19.10 SD-06 Test Reports 3.7.1Acceptance Checks and Tests
SD-07 Certificates 2.2.2.1Transformer Efficiencies
26 20 00 SD-02 Shop Drawings
2.13 GPanelboards
2.16 GTransformers
2.3 GBusway
2.4Cable trays
2.27 GWireways
3.1.10.1 GMarking strips
SD-03 Product Data
2.12 GReceptacles
2.13.3 GCircuit breakers
2.14.2 GCircuit breakers
2.11 GSwitches
2.16 GTransformers
2.15 GEnclosed circuit breakers
2.18 GManual motor starters
2.14 GResidential load centers
2.28 GMetering
2.29Surge protective devices
SD-06 Test Reports 3.5.2600-volt wiring test 3.5.5Grounding system test 3.5.3Transformer tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 46 PAGES
Improve Family Housing (North Foster Towers)
26 20 00 3.5.4Ground-fault receptacle test 26 24 13 SD-02 Shop Drawings
1.5.2 GSwitchboard Drawings
SD-03 Product Data
2.2 GSwitchboard
SD-06 Test Reports
2.5.3Switchboard Production Tests 3.5.1Acceptance Checks and Tests
SD-11 Closeout Submittals
3.5 GRequired Settings
2.7Service Entrance Available Fault
Current Label 26 29 23 SD-02 Shop Drawings
1.5.1 GSchematic diagrams
1.5.2 GInterconnecting diagrams
1.5.3 GInstallation drawings
SD-03 Product Data
2.1 GVariable frequency drives
2.3Wires and cables 1.5.4Equipment schedule
SD-06 Test Reports 3.2.1VFD Test 3.2.2Performance Verification Tests 3.2.3Endurance Test
26 32 15.00 10 SD-02 Shop Drawings
1.3.7 GDetailed Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 46 PAGES
Improve Family Housing (North Foster Towers)
26 32 15.00 10 3.10Acceptance SD-03 Product Data
2.1.7Harmonic Requirements 2.1.1Engine-Generator Parameter
Schedule 2.9.2Heat Exchanger
2.16 GGenerator
2.5Manufacturer's Catalog 3.7Onsite Training 2.1.6Vibration-Isolation 3.9Posted Data and Instructions 1.3.6Field Engineer
SD-05 Design Data 2.16Performance Criteria 2.10Sound Limitations 2.6.4Day Tank 3.6.1.2Power Factor 2.20.5Time-Delay on Alarms 2.14.3.2Battery Charger
SD-06 Test Reports
3.6 GOnsite Inspection and Tests
26 36 00.00 10 SD-02 Shop Drawings 1.3.1Detail Drawings 2.1Equipment 3.1Installation
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 46 PAGES
Improve Family Housing (North Foster Towers)
26 36 00.00 10 2.1Equipment SD-06 Test Reports
2.6Testing 26 51 00 SD-02 Shop Drawings
1.5.2 GOccupancy/Vacancy Sensor
Coverage Layout
SD-03 Product Data 2.2Luminaires
2.4 GLight Sources
2.3 GDrivers
1.6.1 GLED Luminaire Warranty
2.5.4 GLocal Area Controllers
2.5.3.2 GVacancy Sensors
2.5.2 GDimming Controllers (Dimmers)
2.6.1 GExit Signs
2.6.2 GEmergency Lighting Unit (EBU)
2.6.3 GLED Emergency Drivers
2.5.3.1 GOccupancy Sensors
SD-06 Test Reports 1.5.8Occupancy/Vacancy Sensor
Verification Tests 27 05 14.00 10 SD-02 Shop Drawings
1.2 GCable TV Premises Distribution
System
3.1 GInstallation
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 33 00-B
(AM-0004)
j2ee9gsg Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 46 PAGES
Improve Family Housing (North Foster Towers)
27 05 14.00 10 1.4Qualifications SD-06 Test Reports
3.4Testing 27 10 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications drawings
1.6.1.2 GTelecommunications Space
Drawings SD-03 Product Data
2.3 GTelecommunications cabling
2.4.5 GPatch panels
2.5 GTelecommunications
outlet/connector assemblies
2.4.2 GEquipment support frame
2.4.3 GConnector blocks
SD-06 Test Reports 3.5.1Telecommunications cabling testing 28 31 64.00 10 SD-02 Shop Drawings
1.3.2Detail Drawings SD-03 Product Data
2.5Storage Batteries 2.1.2Low Battery Voltage 1.6Special Tools and Spare Parts
1.4 GTechnical Data and Computer
Software 3.6Training
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 46 PAGES
Improve Family Housing (North Foster Towers)
28 31 64.00 10 3.7Testing SD-06 Test Reports
3.7Testing SD-07 Certificates
1.3.1Qualifications SD-10 Operation and Maintenance Data
3.6 GOperating and Maintenance
Instructions
28 31 76 SD-02 Shop Drawings
3.2.1 GWiring Diagrams
1.2.1 GSystem Layout
2.3 GSystem Operation
SD-03 Product Data
1.6 GTechnical Data And Computer
Software
3.2.2 GTerminal Cabinets
2.9 GTransmitters
2.7 GSmoke Sensors
2.5 GAddressable Interface Devices
2.9.1 GRadio Transmitter and Interface
Panels SD-06 Test Reports
3.6Field Quality Control
3.6.1 GTesting Procedures
2.7.2 GSmoke Sensor Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 46 PAGES
Improve Family Housing (North Foster Towers)
28 31 76 SD-07 Certificates 1.7.1.4Installer 3.6.2.2Formal Inspection and Tests 3.6.2.3Final Testing
SD-09 Manufacturer’s Field Reports
2.3 GSystem Operation
1.7.2.2Fire Alarm/Mass Notification
System SD-10 Operation and Maintenance Data
3.9 GOperation and Maintenance
(O&M) Instructions
3.7 GInstruction of Government
Employees
SD-11 Closeout Submittals 3.6.2.4As-Built Drawings
31 00 00 SD-01 Preconstruction Submittals
3.5 GShoring
1.4.2 GDewatering Work Plan
SD-03 Product Data
3.9 GUtilization of Excavated Materials
3.4Opening of any Excavation or
Borrow Pit SD-06 Test Reports
3.16Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 46 PAGES
Improve Family Housing (North Foster Towers)
31 00 00 2.1Borrow Site Testing SD-07 Certificates
3.16Testing 31 21 13 SD-02 Shop Drawings
1.6.1.1Radon mitigation systems 2.1Radon mitigation systems
SD-03 Product Data 2.1.2Radon mitigation systems components 2.2Radon mitigation systems enclosures SD-07 Certificates
1.9.1.1Contractor qualifications 1.9.1.2Contractor experience 1.8Worker protection plan
SD-08 Manufacturer’s Instructions 2.1.2Radon mitigation systems components 2.2Radon mitigation systems enclosure components SD-10 Operation and Maintenance Data
1.6.1.1Radon Mitigation Systems 2.1Radon Mitigation Systems
SD-11 Closeout Submittals 1.7Radon Detector Location Log
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .