W912HV20B0001-0002 Revised Specs_Drawing Sebille Manor.pdf
PDF 185 KB Posted
- Solicitation number
- W912HV20B0001
About this file
This document is an amendment to a solicitation providing revised specifications and drawings for a federal contract opportunity to improve family housing at Sebille Manor on Kadena Air Base in Okinawa, Japan. The Army Corps of Engineers Engineering District Japan issued Solicitation Number W912HV20B0001 to upgrade buildings, mechanical and electrical systems. Revised specifications and over 100 drawings replaced prior versions. Bids were due on the original date with no extension. Work includes renovating buildings, installing new HVAC, electrical and plumbing systems.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY18 PAIP LXEZ184546, IMPROVE FAMILY HOUSING SEBILLE MANOR, KADENA AIR BASE, OKINAWA JAPAN.
The purpose of this Solicitation Amendment is to provide revised specifications and draw ings in response to contractor inquires. See Continuation Page for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Feb-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HV20B0001
X 9B. DATED (SEE ITEM 11)
27-Nov-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Feb-2020
CODE
CONTRACTING DIVISION
USACE-JAPAN DISTRICT
RM. 116, BLDG. 364
CAMP FOSTER
CHATAN-CHO, NAKAGAMI-GUN OKINAWA
JAPAN
W912HV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HV20B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
14. DESCRIPTION OF AMENDMENT (continued)
A. CHANGES TO SPECIFICATIONS – The amendment mark “(AM-0002)” is shown on each page of the amended specification section(s).
(1) Revised Section(s) and Revised Section Attachment(s) to Project Specifications. Attached hereto are the following revised section(s) and revised section attachment(s) to the specifications. Revised section(s) replace like numbered section(s) in the subject solicitation specifications, though some existing section attachment(s) pertaining to these sections remain in effect, as identified below. Revised section attachment(s) replace like-numbered section attachment(s) in the subject solicitation specifications.
Changes are indicated by a red line in the left margin of revised areas. All portions of the revised section(s) and revised section attachment(s) shall apply whether or not changes have been indicated.
Revised Section(s):
Section 01 45 00 Section 01 57 19.01 (existing Attachment 01 57 19-A remains in effect and is not attached to this Amendment) Section 07 05 23 Section 13 48 00 Section 21 21 00 Section 23 81 00.00 20 Section 26 20 00 Section 26 51 56.02 23 Section 33 30 00 Section 33 71 02
Revised Attachment(s): (None)
(2) Added Section(s). The following section(s) are attached hereto and added to the specifications:
Added Section(s): (None)
(3) Deleted Section(s). The following section(s) are deleted entirely from the specifications:
Deleted Section(s):
Section 01 57 19.00 30 Section 26 28 01.00 20
B. CHANGES TO DRAWINGS – The amendment mark “(AM-0002)” is shown on each sheet of the amended drawing sheet(s).
(1) Revised Sheet(s) to Drawings. Attached hereto are the following revised sheets to the drawings. Revised sheets will replace like-numbered sheets in the subject solicitation drawings. Changes are indicated in revision clouds. All portions of the revised sheet(s) shall apply whether or not changes have been indicated.
Revised Sheet(s) to Drawing:
Volume 1 G-001
Volume 1 G-007 Volume 1 CS101 Volume 1 LS102 Volume 1 ES101 Volume 1 ES106 Volume 1 ES107 Volume 2 (CT-3) G-011 Volume 2 (CT-3) SD110 Volume 2 (CT-3) S-510 Volume 2 (CT-3) A-110 Volume 2 (CT-3) A-120 Volume 2 (CT-3) A-170 Volume 2 (CT-3) A-300 Volume 2 (CT-3) A-500 Volume 2 (CT-3) A-510 Volume 2 (CT-3) A-540 Volume 2 (CT-3) A-550 Volume 2 (CT-3) A-600 Volume 2 (CT-3) A-610 Volume 2 (CT-3) A-620 Volume 2 (CT-3) IN600 Volume 2 (CT-3) P-502 Volume 2 (CT-3) M-500 Volume 2 (CT-3) E-001 Volume 2 (CT-3) ED110 Volume 2 (CT-3) ED120 Volume 2 (CT-3) ED130 Volume 2 (CT-3) ED140 Volume 2 (CT-3) E-100 Volume 2 (CT-3) E-110 Volume 2 (CT-3) E-120 Volume 2 (CT-3) E-130 Volume 2 (CT-3) E-140 Volume 2 (CT-3) E-301 Volume 2 (CT-3) E-501 Volume 2 (CT-3) E-601 Volume 2 (CT-3) E-701 Volume 2 (CT-3) E-702 Volume 2 (CT-3) TD110 Volume 2 (CT-3) TD120 Volume 2 (CT-3) T-100 Volume 2 (CT-3) T-110 Volume 2 (CT-3) T-120 Volume 3 (DT-4) G-021 Volume 3 (DT-4) S-151 Volume 3 (DT-4) S-510 Volume 3 (DT-4) A-111 Volume 3 (DT-4) A-150 Volume 3 (DT-4) A-170 Volume 3 (DT-4) A-300 Volume 3 (DT-4) A-500 Volume 3 (DT-4) A-510 Volume 3 (DT-4) A-540 Volume 3 (DT-4) A-550 Volume 3 (DT-4) A-600
Volume 3 (DT-4) A-610 Volume 3 (DT-4) A-620 Volume 3 (DT-4) IN600 Volume 3 (DT-4) P-501 Volume 3 (DT-4) M-500 Volume 3 (DT-4) E-001 Volume 3 (DT-4) ED100 Volume 3 (DT-4) ED111 Volume 3 (DT-4) ED112 Volume 3 (DT-4) ED113 Volume 3 (DT-4) ED114 Volume 3 (DT-4) E-100 Volume 3 (DT-4) E-111 Volume 3 (DT-4) E-112 Volume 3 (DT-4) E-131 Volume 3 (DT-4) E-132 Volume 3 (DT-4) E-150 Volume 3 (DT-4) E-301 Volume 3 (DT-4) E-501 Volume 3 (DT-4) E-601 Volume 3 (DT-4) E-701 Volume 3 (DT-4) E-702 Volume 3 (DT-4) TD100 Volume 3 (DT-4) TD111 Volume 3 (DT-4) TD112 Volume 3 (DT-4) T-111 Volume 3 (DT-4) T-112 Volume 3 (DT-4) T-150
(2) Added Sheet(s) to Drawings. Attached hereto are the following added sheets to the drawings:
Added Sheet(s) to Drawings:
Volume 2 (CT-3) E-502 Volume 3 (DT-4) E-502
(3) Deleted Sheet(s). The following sheet(s) are deleted entirely from the drawings:
Deleted Sheet(s) to Drawings:
Volume 1 CG201 Volume 1 CG202 Volume 1 CG203 Volume 1 CG204
C. All questions and Government responses regarding this solicitation are to be viewed through the web-based program, “Bidder Inquiry Module,” located at https://www.projnet.org/projnet. Answers provided to the respective questions through ProjNet do not amend the solicitation (specifications, drawings, etc.), unless revision to the specification(s) or drawing(s) is specifically noted and incorporated into the solicitation via an amendment.
D. The bid due date and time is unchanged.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .