FY16 C-130J Flight Simulator Facility 16AF0003 Yokota AB, Japan

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.3 WORK COVERED BY CONTRACT DOCUMENTS

1.3.1 Project Description

1.3.2 Location

1.4 PROJECT ENVIRONMENTAL GOALS

1.4.1 Independent Verification

1.4.1.1 US Green Building Council (USGBC) - LEED(tm) Rating System

1.4.1.2 EPA Energy Performance Rating

1.5 EXISTING WORK

1.6 LOCATION OF UNDERGROUND UTILITIES

1.7 Notification Prior to Excavation

1.8 SALVAGE MATERIAL AND EQUIPMENT

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

W912HV-16-B-0007 SECTION 01 11 00 Page 1 (Am-0003)

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E2114 (2008) Standard Terminology for Sustainability Relative to the Performance of Buildings

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)

HEADQUARTERS, US FORCES JAPAN, DEPARTMENT OF DEFENSE (DOD)

JEGS (2016) Japan Environmental Governing Standards

1.2 DEFINITIONS

Definitions pertaining to sustainable development are as defined in ASTM E2114 and JEGS, Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION and as specified.

a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.

b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.

c. "Operational performance" is the functional behavior of the building as a whole or of the building components.

d. "Sustainability" is the balance of environmental, economic, and societal considerations.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

1.3.1 Project Description

Civil:

W912HV-16-B-0007 SECTION 01 11 00 Page 2 (Am-0003)

1. Project site work and development includes providing site improvements for grading, stormwater drainage system as indicated on drawings.

2. Demolition in this project shall include demolition of existing asphalt concrete pavement, existing concrete curbs, demolition and rerouting of existing utilities and associated appurtenances that are no longer required and shall not be abandoned in place.

3. Pavement in this project shall include asphalt concrete pavement parking lot and vehicle access road, concrete sidewalk and concrete pad. Vehicle access road and concrete pad must be able to withstand double drop trailer vehicle load and flight simulator equipment.

4. Stormwater drainage system shall include new drainage pipe, drainage manhole, surface inlet, gutter inlets and connection points. Existing drainage system in the project site area are sufficient for runoff generated from this project. Water supply system shall include water service line for domestic water, water meter, fire department connection and fire hydrant. Sewer system shall include gravity sewer pipes and connection points.

Structural/Architectural and Mechanical:

1. Provide two storey building for the new Flight Simulator Training Facility.

2. Provide new fire pump house for the new Flight Simulator Training Facility.

3. Provide new Chiller enclosure for the new Flight Simulator Training Facility.

4. Option item includes provision of aluminum windows with sun shades for the new facility and floor finish upgrade to carpet floor tiles and polished flooring in lieu of vinyl floor tiles as indicated on drawings.

Mechanical:

1. Provide a complete HVAC systems and plumbing systems ready for use to the simulator building and pump house.

2. The HVAC systems shall include but not limited to water chiller/heat pump unitsf plant and water distribution system, variable air volume air handling units and air distribution systems, dedicated outdoor air unit and air distribution system, direct expansion multi split system, computer room air conditioning system, exhaust ventilation systems, electric panel heaters, direct digital control systems, and other related appurtenances.

3. The plumbing systems shall include but not limited to hot and cold water distribution systems, sanitary drainage systems, vent piping systems, storage type electric water heater, recirculation pumps, expansion tank, plumbing fixtures, water fountains, and other related appurtenances.

W912HV-16-B-0007 SECTION 01 11 00 Page 3 (Am-0003)

4. Option Item to provide back-up direct expansion computer room air conditioning systems (CRAC-1B, ACCU-1B) for the computer room complete with refrigerant and condensate drain piping, power and control wiring, programmable thermostat controllers and other related accessories.

Electrical and Communication:

1. The facility shall be provided with lighting system, power to the flight simulator equipment and other mechanical equipment, receptacles, etc.

2. The project shall include a transformer station, lightning protection and communication systems such as telephone and data outlets, public address system, CATV and intrusion and detection alarm system (IDS).

Fire Protection:

1. Provide fire protection system.

2. Provide fire alarm and mass notification system.

3. Provide fire pump system to be located at the new fire pump room.

1.3.2 Location

The project site is located at the Southwest side of Yokota Air Base, Fussa, Tokyo. Surrounding facilities are existing Building 911 at North side, existing Building 907 at East side, existing Building 920 at West side and existing Building 950 at Southwest side. Adjacent roadways are McGuire Avenue at South side and Hamilton Street at West side. The exact location will be shown by the Contracting Officer.

1.4 PROJECT ENVIRONMENTAL GOALS

Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability. Specifically:

a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.

b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.

c. Use environmentally preferable products and decrease toxicity level of materials used.

d. Use renewable energy and material resources.

e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.

Consider the durability, maintainability, and flexibility of building systems.

W912HV-16-B-0007 SECTION 01 11 00 Page 4 (Am-0003)

f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.

g. Reduce construction waste through reuse, recycling, and supplier take-back.

1.4.1 Independent Verification

1.4.1.1 US Green Building Council (USGBC) - LEED(tm) Rating System

This project shall be registered with USGBC / GBCI under the LEED for New Construction, 2009 (LEED NC, 2009) and shall attempt for LEED Certification Level Silver Certified and encourage pursuit of LEED Certification Level Silver .

1.4.1.2 EPA Energy Performance Rating

Provide work consistent with drawings in order to meet Energy Star in accordance with design.

1.5 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.6 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation by contacting the Contracting Officer 15 calendar days in advance. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated to be specified or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.7 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

1.8 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged shall remain the property of the Government.

The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area.

W912HV-16-B-0007 SECTION 01 11 00 Page 5 (Am-0003) j2ee9wwh Line

Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

W912HV-16-B-0007 SECTION 01 11 00 Page 6 (Am-0003)

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00.70 33

GENERAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 STATEMENT OF WORK

1.2 KEY PERSONNEL QUALIFICATIONS

1.2.1 Program Manager

1.2.2 Project Manager

1.2.3 Project Superintendent (Supervisor)

1.2.4 English Speaking Representative (Interpreter)

1.2.5 Contractor Quality Control System Manager (CQCSM)

1.2.6 Site Safety and Health Officer (SSHO)

1.3 DEFINITIONS

1.4 SUBSTITUTION

1.5 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (MAY 2013)

1.6 PERMITS AND RESPONSIBILITIES

1.7 SPECIAL CONTRACT REQUIREMENTS

1.7.1 Availability of Work Site and Working Hours

1.7.2 Request for Contractor's Employee Passes and Vehicle Passes

1.7.3 Meetings

1.8 AS-BUILT DRAWINGS

1.9 DISPOSAL OF MATERIAL

1.10 OPEN FLAME AND WELDING

1.11 CONSTRUCTION SCHEDULE

1.12 CONTRACTOR FURNISHED MATERIAL AND WORKMANSHIP

1.13 CLEAN UP

PART 2 PRODUCTS

PART 3 EXECUTION

W912HV-16-B-0007 SECTION 01 11 00.70 33 Page 1 (Am-0003)

SECTION 01 11 00.70 33

GENERAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 STATEMENT OF WORK

The work covered by these specifications and drawings, consists of furnishing labor, equipment, supplies, and materials, specified to perform all operations for the work. Work shall be accomplished in accordance with these specifications and drawings, subject to the terms and conditions of the contract. Drawings, included hereinafter, form a part of the contract documents.

1.2 KEY PERSONNEL QUALIFICATIONS

The Contractor's Project Key personnel shall not be assigned duties to any other Contracts (excluding the project manager) without approval from the Contracting Officer. The Superintendent, Project Engineer, and CQC Manager shall all be separate persons. Within five (5) working days after receipt of the Notice to Proceed, the Contractor shall submit in writing to the Contracting Officer an organizational chart, the qualifications and background history of the proposed Key Personnel for approval. The Contracting Officer shall have the explicit right to determine acceptability (or rejection) of the proposed individuals. In addition, the Contractor shall be responsible to replace said individuals upon notification by the Government should performance become inadequate during the Contract period. Key Personnel shall attend the Preconstruction conference.

1.2.1 Program Manager

The Program Manager is responsible for the overall management of the Contract. The Program Manager shall have a minimum of five (5) years experience in the administration of construction Contracts on construction projects similar in size and scope to this Contract, and shall have a thorough knowledge of the duties of key management personnel assigned to this Contract.

1.2.2 Project Manager

The Project Manager shall have a minimum of five (5) years experience as a Project Manager on construction projects similar in size and scope to this Contract. The Project Manager shall maintain oversight of Contract proposals prepared by the Contractor staff and be authorized to negotiate Contract terms and sign Contract documents on behalf of the Contractor.

The project manager does not need to be present on the site daily, but shall attend weekly progress meetings and be available on site within 24 hours upon request. The Project Manager shall have one of the licensing qualifications as shown in Attachment 01 11 00.70 33-A 01 11 00.00 10-B .

1.2.3 Project Superintendent (Supervisor)

The Project Superintendent shall be on the work site when on-site work is being performed and shall be available to the Contracting Officer or his

W912HV-16-B-0007 SECTION 01 11 00.70 33 Page 2 (Am-0003) representatives upon request. The Project Superintendent shall have overall responsibility for all operations at the job site and be authorized to make decisions, negotiate Contract terms and sign Contract documents on behalf of the Contractor. The Project Superintendent shall have a minimum of five (5) years experience as a superintendent on construction projects similar in size and scope to this Contract. The Project Superintendent shall have one of the licensing qualifications as shown in Attachment 01 11 00.70 33-A 01 11 00.00 10-B .

1.2.4 English Speaking Representative (Interpreter)

At all times during the Contract period the Contractor shall have an employee capable of fluent bilingual speech in the Japanese and English languages at the job site. The bilingual interpreter shall have the capability to receive and issue concise and technical explanation and instructions between the Government representative(s) and Contractor supervisory personnel concerning all aspects of Contract administration and construction. Within fifteen (15) days after notice of Contract award, the Contractor shall submit in writing to the Contracting Officer's Representative the qualifications and background history of the proposed interpreter for approval. The Contracting Officer's Representative shall have the explicit right to determine acceptability or rejection of the proposed individual. In addition, the Contractor shall be responsible to replace said individual upon notification by the Government should performance become inadequate during the Contract period. The interpreter shall attend the preconstruction conference.

1.2.5 Contractor Quality Control System Manager (CQCSM)

See Section 01 45 00.00 10 QUALITY CONTROL.

1.2.6 Site Safety and Health Officer (SSHO)

See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS.

1.3 DEFINITIONS

The term "United States" will appear before the word "Government" whenever the latter word appears in this contract, except where the word "Government" refers to a different-named Government.

1.4 SUBSTITUTION

Any material systems specified by JIS equal to United States Standards and these specifications may be used in lieu of the systems specified.

Documentary evidence thereof shall be furnished to the Contracting Officer for approval.

1.5 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (MAY 2013)

a. This paragraph specifies the procedure for determination of time extensions for unusually severe weather in accordance with the Contract clause entitled "DEFAULT (FIXED-PRICE CONSTRUCTION)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

(1) The weather experienced at the project site during the Contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location

W912HV-16-B-0007 SECTION 01 11 00.70 33 Page 3 (Am-0003) during any given month.

(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

b. The listing below defines the monthly anticipated adverse weather days for the Contract period and is based upon 20th Weather Squadron (MAC), U.S. Air Force; Iwakuni U.S. Marine Corps Air Station, Weather Service; Sasebo Naval Pacific Meteorology and Oceanography Detachment;

JASDF (Japan Air Self Defense Force), or similar data for the geographic location of the project. (More specific information may be obtained as specified under Special Contract Requirements Clause entitled "Physical Data.")

MONTHLY ANTICIPATED ADVERSE WEATHER DELAYS

WORK DAYS BASED ON (5) DAY WORK WEEK

Misawa-area Kanto Plain Iwakuni Okinawa Sasebo

JAN 8 1 2 5 7

FEB 9 3 4 7 6

MAR 6 6 7 8 7

APR 3 6 6 6 7

MAY 4 4 6 6 6

JUN 5 9 8 6 12

JUL 6 6 6 6 9

AUG 6 6 5 9 9

SEP 6 7 6 7 9

OCT 4 5 4 4 8

NOV 6 4 4 4 5

DEC 7 1 3 5 5

The above schedule of anticipated adverse weather days shall constitute the base line for monthly (or portion thereof) weather time evaluations.

c. Upon acknowledgment of the Notice-to-Proceed (NTP) and continuing throughout the Contract, the Contractor shall record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.

d. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph (b), above, the contracting Officer shall convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the Contract clause entitled "DEFAULT

(FIXED PRICE CONSTRUCTION)".

e. For all work under this Contract, adverse weather is defined as:

(1) Rainfall - Number of occurrences of precipitation greater than or equal to 0.10 inches (2.54mm).

W912HV-16-B-0007 SECTION 01 11 00.70 33 Page 4 (Am-0003)

(2) Snowfall - Number of occurrences of precipitation greater than or equal to 1.00 inches (25.4mm). (Not applicable to Okinawa Area)

(3) Cold Temperature - Number of occurrences when daily maximum temperature does not exceed the monthly mean low temperature or 32 degrees Fahrenheit (0 degrees Celsius), whichever is lower. (Not applicable to Okinawa Area)

(4) Concurrence between snowfall and cold temperature is 80 percent, i.e. 80 percent of the time snow falls, the temperature is "cold".

(5) Wind - Number of occurrences when the wind is gusting 30 knots (56 kilometers/hour) or greater.

f. The Contractor's schedule must reflect the above anticipated adverse weather delays on all weather-dependent activities.

1.6 PERMITS AND RESPONSIBILITIES

a. The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable laws, codes, and regulations in connection with prosecution of work. The Contractor shall be similarly responsible for all damages to persons or property that occurs as a result of his negligence. These damages shall be repaired or replaces by the Contractor at no cost to the Government. The Contractor shall take proper safety and health precautions to protect all work and workers.

b. The Contractor shall submit a planned schedule of road closures to the Contracting Officer for proper coordination with the proper base personnel, and shall notify the Contracting Office in writing not less than thirty (30) calendar days for all road closures, in advance of the intended closure. No road closure will be permitted until the Contractor receives written approval for the Contracting Officer.

Full road closures will NOT be permitted.

1.7 SPECIAL CONTRACT REQUIREMENTS

1.7.1 Availability of Work Site and Working Hours

Normal working hours are Monday through Friday, 0800 hours through 1700 hours. Work on Saturdays, Federal Holidays and other than normal working hours may be arranged if coordinated 21 calendar days in advance and if approved.

1.7.2 Request for Contractor's Employee Passes and Vehicle Passes

a. No employee or representative of the Contractor will be admitted to the site of work unless he furnishes authorized admittance to the site of work by the Resident Office. Prior to the start of on-site work the Contractor shall submit applications for base passes to the contracting officer for key employees (project manager, interpreter, project superintendent for long term passes. Contractor through these key people and the Contracting Officer will be responsible for securing passes for all other workers, including subcontractor's employees and vehicles requiring access to the base.

b. Upon completion of this contract, the Contractor shall return all

W912HV-16-B-0007 SECTION 01 11 00.70 33 Page 5 (Am-0003) employee and vehicle passes to the base, and obtain a certification of receipt. Final Payment will be withheld until the Contractor has returned all such passes.

1.7.3 Meetings

A weekly progress meeting shall be conducted, with the day, time, and location to be determined at the Preconstruction Conference. The Contractor's Project Engineer, Superintendent, Interpreter, and Quality Control Manager shall attend. Representatives from the Government may include, but are not limited to, JED Yokota RO and PM. The Contractor shall be prepared to discuss work completed during the previous week, work currently in progress, and work forecasted for the following week, as well as the status of any construction issues and open action items.

1.8 AS-BUILT DRAWINGS

See Section 01 78 00 CLOSEOUT SUBMITTALS.

1.9 DISPOSAL OF MATERIAL

Except as specified elsewhere in the contract, all residue and scrap generated by the Contractor during the performance of this contract shall be disposed of outside the confines of the Base unless otherwise directed by the Contracting Officer.

1.10 OPEN FLAME AND WELDING

The Contractor shall submit a request for open flame work permits to the Base Fire Department for approval. The Contractor shall describe the work to be performed to the Fire Department representative at the work site.

The Base Fire Department and Representative of the Contracting Officer shall be notified during hours of 0800 through 0900, Monday through Friday, prior to commencement of open flame work. Open flame work will not begin without approval of the Contracting Officer's Representative (open flame and welding permit) or until the Fire Department arrives at work site if required.

1.11 CONSTRUCTION SCHEDULE

The Contractor shall submit within fifteen (15) calendar days after receipt of Notice to Proceed a construction schedule in accordance with contract clause entitled SCHEDULES FOR CONSTRUCTION CONTRACTS and Section

01 32 01.00 10 PROJECT SCHEDULE.

1.12 CONTRACTOR FURNISHED MATERIAL AND WORKMANSHIP

The Contractor shall furnish all materials necessary for performance of the work of this contract unless otherwise specified. Materials procured shall be new and shall meet any specifications and standards listed in these specifications. If no specification for a material needed to perform this contract are stated, the material shall be new, of acceptable industrial grade and quality, equal to or better than the manufacturer's original equipment for equipment being repaired or replaced, and will be compatible with existing materials and systems. All materials provided under this contract shall be free of asbestos, lead in paint and PCB. The Contracting Officer reserves the right to request submittal of any material being provided under this contract. The Contracting Office shall make the fine determination of the acceptability of any material used on

W912HV-16-B-0007 SECTION 01 11 00.70 33 Page 6 (Am-0003) this contract.

1.13 CLEAN UP

The Contractor shall at all times keep the work area, including storage areas used by him, tidy and free from accumulation of waste material or rubbish, and prior to completion of the work, remove any rubbish from the premises. All tools, equipment and materials not the property of the Government shall be removed from the premises and properly disposed of off Government property. Upon completion of the work, the Contractor shall notify the Government representative for final inspection and acceptance.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

W912HV-16-B-0007 SECTION 01 11 00.70 33 Page 7 (Am-0003)

01 11 00.70 33-A - 1

ATTACHMENT 01 11 00.70 33-A

JAPANESE PROFESSIONAL REGISTRATION EQUIVALENCIES

Architecture 1st Class Kenchikushi 建築 一級建築士

OR

1st Class Kenchiku Sekou Kanrigishi 一級建築施工管理技士

Structural Engineer 1st Class Kanchikushi 構造 一級建築士

OR

1st Class Kenchiku Sekou Kanrigishi 一級建築施工管理技士

Civil Engineer 1st Class Doboku Sekou Kanrigishi 土木 一級土木施工管理技士

Mechanical Engineer 1st Class Kankouji Sekou Kanrigishi 機械 一級管工事施工管理技士

Electrical Engineer 1st Class Denkikouji Sekou Kanrigishi 電気 一級電気工事施工管理技士

Communication Engineer AI・DD Sougoushu

通信 AI・DD総合種

Fire Protection Engineer Shoubou Setsubishi Koushu (Type 1 ~ 5) 消防 消防設備士 甲種(第1~5類)

FY16 C-130J Flight Simulator Facility Yokota AB, Japan

16AF0003

W912HV-16-B-0007 (Am-0003)

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 35 14

MECHANICAL GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

1.2 PUBLICATIONS

1.3 GENERAL

1.4 MATERIALS AND EQUIPMENT

1.5 APPLICATION

1.6 POSTED OPERATING INSTRUCTIONS

1.7 INSTRUCTIONS TO GOVERNMENT PERSONNEL

1.8 DELIVERY AND STORAGE

1.9 STANDARD PRODUCTS/SERVICES AVAILABILITY

1.10 SAFETY REQUIREMENTS

1.11 ELECTRICAL REQUIREMENTS

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 FACTORY PAINTING AND PLATING

3.2 FUNCTIONAL TEST

3.3 OPERATIONAL TEST

3.4 OPERATING AND MAINTENANCE INSTRUCTIONS

3.5 JOB SITE CLEANING

3.6 DEFECTIVE WORK

W912HV-16-B-0007 SECTION 01 35 14 Page 1 (Am-0003)

SECTION 01 35 14

MECHANICAL GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

This guide specification covers the mechanical general requirements for all sections of "Mechanical." This guide specification can be applied to other divisions of the project specifications.

1.2 PUBLICATIONS

a. The following specifications and standards listed below form a part of this specification.

1. Air-Conditioning and Refrigeration Institute (ARI)

2. American National Standards Institute (ANSI)

3. American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Inc. (ASHRAE) Standards

4. American Society of Sanitary Engineering (ASSE)

5. Associated Air Balance Council (ASSE)

6. Construction Code of Pressure Vessels (Japanese Labor Ministry)

7. Federal Specifications (FS)

8. Japanese Industrial Standards (JIS)

9. Japanese Refrigerating and Air Conditioning Association (JRA)

10. Japan Pipe Fittings Association (MP) Standards

11. Japan Steel Water Pipe Association (WSP) Standards

12. Japan Water Works Association (JWWA) Standards

13. Japan Industrial Safety and Health Association (JISHA)

14. National Environmental Balancing Bureau (NEBB)

15. National Association of Corrosion Engineers (NACE)

16. National Fire Protection Association (NFPA)

17. National Sanitation Foundation (NSF)

18. National Standard Plumbing Code

19. Sheet Metal and Air Conditioning Contractors National Association

(SMACNA)

W912HV-16-B-0007 SECTION 01 35 14 Page 2 (Am-0003)

20. Standard of Society of Heating, Air Conditioning and Sanitary Engineers of Japan (HASS)

21. Underwriters Laboratories, Inc. (UL)

22. International Organization for Standardization (ISO)

23. Unified Facilities Criteria (UFC)

b. Where Japanese Specifications or Standards are not listed after U.S.

Standards in the technical specification sections, equivalent Japanese Specifications or Standards may be applied or used.

c. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the base designation only.

d. ASTM (American Society for Testing and Materials)/ASTM B 117.

e. CFR (Code of Federal Regulations)/29 CFR 1910, Occupational Safety and Health Standards.

1.3 GENERAL

a. The drawings indicate the general arrangement. The Contractor shall carefully examine the drawings and shall be responsible for the proper fitting of materials as indicated, without substantial alteration.

b. Verification of Dimensions and Condition: The Contractor shall be responsible for the proper dimensional relationship of his work to the building structure and to that of other trades involved. The Contractor shall visit the premises to familiarize himself with all details of the work and to verify all existing dimensions and condition in the field. The Contractor shall inform the Contracting Officer of any discrepancies found before performing any work.

c. Coordination: The Contractor shall be responsible for coordinating the work of all trades working in the area. Coordinate work with work of other trades so that all components will be installed in the proper time, avoiding conflicts between other trades and improper space for servicing. Components improperly installed shall be removed and relocated or reinstall correctly as directed by the Contracting Officer's designated representative at no additional cost to the Government.

d. Drawings: Drawings show the general arrangement of all components.

The Contractor shall carefully study the structural and finish conditions affecting all his work and shall arrange such work accordingly as may be required to meet such conditions.

e. Protection of Materials and Equipment: Equipment shall be tightly covered and protected against dirt, water, and chemical or mechanical injury. At the completion of the work, materials and equipment shall be thoroughly cleaned, adjusted and operated.

f. Brand Names and Manufacturers: Reference to specific brand name and models of equipment is for the purpose of establishing minimum quality standards, identification and guidance and is not intended to limit

W912HV-16-B-0007 SECTION 01 35 14 Page 3 (Am-0003) selection to other manufacturers that are equal or exceed the specified items in terms of physical properties, including finish, durability, appearance, performance, and other factors. Other products may be submitted for evaluation and approval/disapproval by the Contracting Officer.

g. The Contractor shall have all new materials and equipment required to complete the mechanical work approved for each phase and at the project site prior to beginning any demolition work.

h. Prior to installation, changes in piping, ductwork or equipment location up to 1524 mm shall be made by the Contractor without additional compensation as directed by the Contracting Officer to allow for field conditions.

i. The Contractor shall provide all necessary fittings and components to provide a complete and usable system. Route all piping and ductwork to minimize the numbers of bends and elbows.

j. The Contractor shall route all new ductwork and piping and build all duct transitions and offsets to avoid all obstructions such as structural members, electrical conduit, and piping at no additional cost to the Government.

k. All pipes shall be square with the building and all risers and drop plumb. Grades, offsets, and swings shall be done in the most economical manner. All necessary building equipment and maintenance clearances shall be maintained.

l. The Contractor shall provide temporary heating if the outside air temperature falls bellow 60 degrees F and temporary cooling if the outside air temperature rises above 85 degrees F between demolition and installation of new HVAC systems at no additional cost to the Government.

m. Contractor shall provide a minimum of 6 hours of on the job site training (OJT) for all new equipment, systems, and controls installed.

1.4 MATERIALS AND EQUIPMENT

Materials and equipment shall conform to the respective publications and other requirements specified below. Other materials and equipment shall be as specified elsewhere herein and as shown on the drawings. Capacities of all equipment and material shall be not less than indicated on the drawings. Material and equipment shall be the products of a manufacturer regularly engaged in the manufacturer of the products. Where two or more units of the same class of equipment are required, these units shall be products of a single manufacturer; however, the component parts of the system need not be the products of the same manufacturer. Materials and equipment used for this project shall not contain any asbestos. Japanese made materials and equipment are preferred for this project to ease future repair and maintenance work. Materials and equipment used for this project shall be compatible with existing materials and equipment where interface occurs.

a. Plumbing: Plumbing material used shall be "lead free". "Lead free" when used with respect to pipes and pipe fittings refers to pipes pipe fittings containing not more than 8.0 percent lead. When used with respect to solders and flux it refers to solders and flux containing

W912HV-16-B-0007 SECTION 01 35 14 Page 4 (Am-0003) not more than 0.2 percent lead.

b. Manufacture Warranty: Items of equipment shall essentially duplicate equipment that has been in satisfactory use at least 2 years. A three (3)-year warranty shall be provided for equipment, single package air conditioners, fan coil units, pumps, chillers and air handling units.

A five (5)-year warranty shall be provided for bathtub and apron re-finishment materials and construction. Each warranty shall be provided by equipment manufacture or regular distributor. If the equipment manufacturer cannot provide the 3-year manufacturer warranty, the contractor shall provide an official documentation from the manufacturer the maximum warranty they will provide for their equipment. Contractor's warranty of the remaining years will be acceptable. Any equipment warranty by the Contractor shall not be acknowledged.

c. Manufacturer Equipment: HVAC equipment shall be recommended, registered and authorized by Japanese Public Architecture Construction Association.

d. Painting: All equipment shall be factory painted by manufacturer.

Outdoor installed equipment shall be painted in color #207(U19-80F) of the Japan Paint Industrial Association (JPIA). Stainless steel outdoor equipment and accessories shall not be painted. Exposed interior installed equipment (include ceiling diffuser, register, grille, damper, access door, panel, metal casing and cabinet, etc.)

shall be painted adjacent wall and/or ceiling color, if required color is not indicated. Concealed area, attic space or mechanical room installed equipment may be painted manufacturer standard color.

Non-metal parts may not be painted. Field painting for the equipment shall not be approved. If required color is not manufacturer standard color, equipment shall be painted in original method (in principle, baking finish for metal surface).

1.5 APPLICATION

a. Apply this guide specification to other divisions of the project specifications as required; delete the Division which are not appropriate, and change punctuation if necessary. Be sure that the appropriate section which has mechanical equipment has the following paragraph:

b. "1.3 GENERAL: Section 01 35 14 MECHANICAL GENERAL REQUIREMENTS applies to this section, with the additions and modifications specified herein."

c. This section applies to all sections of "Mechanical" of this specification, including modifications and additions specified in each individual section.

d. The Contractor shall be prepared and provided Qualification of Mechanical General (Drawing and Construction Control) in each Construction projects for approved submittals.

1.6 POSTED OPERATING INSTRUCTIONS

Furnish approved operating instructions for each principal item of equipment as specified in each individual section for the use of the operation and maintenance personnel. The operating instructions shall

W912HV-16-B-0007 SECTION 01 35 14 Page 5 (Am-0003) j2ee9wwh Line include wiring diagrams, control diagrams, and control sequence for each principal item of equipment. Operating instructions shall be printed or engraved, and shall be framed under glass or in approved laminated plastic and posted where directed. Operating instructions shall be attached to or posted adjacent to each principal item of equipment and include directions for start up, proper adjustment, operating, lubrication, shutdown, safety precautions, procedure in the event of equipment failure, and other areas as recommended by the manufacturer of each item of equipment. Operating instructions exposed to the weather shall be made of weatherproof materials or shall be suitably enclosed to be weather protected.

Operating instructions shall not fade when exposed to sunlight and shall be secured to prevent easy removal or peeling.

1.7 INSTRUCTIONS TO GOVERNMENT PERSONNEL

When specified in other sections, the Contractor shall furnish the services of competent instructors who will give full instruction to the designated personnel in the adjustment, operation, and maintenance, including pertinent safety requirements, of the equipment or system specified. Each instructor shall be thoroughly familiar with all parts of the installation and shall be trained in operating theory as well as practical operation and maintenance work. Instruction shall be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation.

Instruction with the each equipment and other system on the job training shall be held a minimum 2 times as necessary operating and maintenance shops and number of man-days (7 hours) of instruction furnished shall be as specified in other section. When more than 4 man-days of instruction are specified approximately half of the time shall be used for classroom instructions. All other time shall be used for instruction with the equipment or system. When significant changes or modifications in the equipment or system are made under the term of the contract, additional instruction shall be provided to acquaint the operating personnel with the changes or modifications.

1.8 DELIVERY AND STORAGE

Equipment and materials shall be handled, stored, and protected to prevent damage before and during installation in accordance with the manufacturer's recommendations, and as approved by the Contracting Officer. Damaged or defective items shall be replaced.

1.9 STANDARD PRODUCTS/SERVICES AVAILABILITY

a. Materials and Equipment: Materials and equipment shall be standard products of a manufacturer engaged in the manufacture of such products, which are of a similar material, design and workmanship.

The standard products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use shall include applications of equipment and materials under similar circumstances and of similar size.

b. Experience Required: The 2-year experience must be satisfactorily completed by a product which has been sold or is offered for sale on the commercial market through advertisements, manufacturer's catalogs, or brochures.

c. Alternate Service Record: Products having less than 2-year field service record will be acceptable if a certified record of

W912HV-16-B-0007 SECTION 01 35 14 Page 6 (Am-0003) satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.

d. Service Support: The equipment items shall be supported by service organizations. The Contractor shall submit a certified list of qualified permanent service organizations for support of the equipment which includes their addressees and qualifications. These service organizations shall be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

e. Manufacturer's Nameplate: Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.

1.10 SAFETY REQUIREMENTS

a. Equipment Safety

1. The designer should show on the drawings the details and locations of catwalks, ladders, and guard rails.

2. Belts, pulleys, chairs, gears, couplings, projecting setscrews, keys, rotating parts, and other power transmission apparatus, located so that any person can come in close proximity, shall be fully enclosed or properly guarded in accordance with 29 CFR 19100, Part 219, "Mechanical Power - Transmission Apparatus."

Points of operation, ingoing nip points, and machinery producing flying chips and sparks shall be guarded in accordance with the applicable portions of 29 CFR 19100 Subpart O, "Machinery and Machine Guarding." Provide positive means of locking out equipment so that it cannot be accidentally started during maintenance procedures. High-temperature equipment and piping so located as to endanger personnel or create a fire hazard shall be properly guarded or covered with insulation of a type specified.

Catwalks, maintenance platforms, and guardrails shall be provided where required for safe operation and maintenance of equipment.

Provide ladders or stairways to reach catwalks and maintenance platforms. Ensure that access openings leading to equipment are large enough to carry through routine maintenance items such as filters and tools.

b. Warning Sign: Provide a permanent placard or other sign at the entrance hall to all confined spaces contained in the equipment. The sign shall warn personnel not to enter the space until the atmosphere inside has been tested and all systems have been deenergized.

1.11 ELECTRICAL REQUIREMENTS

Electrical components of mechanical equipment and systems such as motors, starters, and controls shall be provided under this Division and shall be as specified herein and as necessary for complete and operable systems.

Extended voltage range motors will not be permitted. Interconnecting wiring for components of packaged equipment shall be provided as an integral part of the equipment. All interconnecting power wiring and conduit for field erected equipment and all control wiring and conduit shall be as specified in the Electrical sections. Motor control equipment

W912HV-16-B-0007 SECTION 01 35 14 Page 7 (Am-0003) forming part of motor control centers or switchgear assemblies and all necessary conduit and wiring connecting such assemblies, centers, or other power sources to mechanical equipment shall conform to the Electrical sections.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 FACTORY PAINTING AND PLATING

a. Factory applied painting plating of equipment shall be as specified herein, and provided under each individual section.

b. Factory Painting and Plating System: Manufacturer's standard factory painting and plating systems may be provided subject to certification that the factory painting and plating system applied will withstand 125 hours in a salt-spray fog test, except that equipment located outdoors shall withstand 500 hours. Salt spray fog test shall be done in accordance with ASTM B 117, JRA 9002, JIS K 5400 and JIS Z 2371.

Immediately after completion of the test, the paint shall show no signs of blistering, wrinkling or cracking; and no loss of adhesion;

and the specimen shall show no signs of rust creepage beyond 3.175 mm on either side of the scratch mark. The film thickness of the factory painting system applied on the equipment shall not be less than the film thickness used on the test specimen. If manufacturer's standard factory painting and plating system are being proposed for use in lieu of the shop painting and plating systems, certifications that the manufacturer's standard factory painting system conforms to the heat resistance requirement shall be submitted in addition to other certifications.

c. Field Painting: Field painting is not permitted.

3.2 FUNCTIONAL TEST

a. General: The Contractor shall submit his proposed testing program at least one week prior to the scheduled test to assure agreement as to personnel and instrumentation required and scope of testing program.

Testing, adjusting and balancing of HVAC (Heating, Ventilating and Air Conditioning) systems shall be in accordance with the applicable provisions of AABC-02, NEBB-01 or SMACNA-07. All tests shall be conducted in the presence of the Contracting Officer or his authorized representative (Construction Inspector) who shall be given 2 days notice before any test is to be conducted. The Contractor shall be provide his notice in writing two days before testing. Water and electricity required for the tests will be furnished by the government. Any material, equipment, instruments, and personnel required for the tests shall be provided by the Contractor. Test instruments proposed to be used shall be brought to the jobsite at least 3 days prior to the scheduled tests to allow for inspection and approval.

b. Tests for Pressurized Piping: Except as otherwise specified below, piping shall be tested hydrostatically and proved tight at a pressure not less than l-l/2 times the maximum operating pressure of the system for a period of time sufficient to inspect every joint in the system

W912HV-16-B-0007 SECTION 01 35 14 Page 8 (Am-0003) and in no case less than 2 hours. No loss of pressure will be permitted. Leaks detected shall be repaired by tightening, rewelding joints, or replacing pipe or fittings. Calking of joints will not be permitted. Concealed and insulated piping shall be tested in place before covering or concealing. Tests shall be conducted in the presence of the Contracting Officer or his representative who shall be given a notice of 2 days before any test is to be conducted. Any material, equipment, or instruments required for tests shall be provided by the Contractor.

1. Water Piping: The piping system shall be tested hydrostatically, before insulation is applied where possible, and shall be proved tight under test pressure 7.5 Kg/cm2 (107 psig).

2. Refrigerant Piping: The system shall be tested for tightness after installation and before insulation is applied. Controls and other equipment that may be damaged by the test pressure employed shall be temporarily removed or made inoperative before the tests are made and the openings shall be plugged or capped. Threaded, soldered, or brazed joints that leak shall be corrected by having the joints remade. Welded joints that leak shall be repaired by cutting out the faulty weld affected section and rewelding the joint or renewing the section of pipe.

(a) Test Pressures: Refrigerant system test pressures for tightness shall not be less than recommended by the manufacturer or approved by the Contracting Officer or Contracts Inspector.

(b) Charging the System for Test: The low and high pressure sides of the system shall be charged with a dry, inert gas, such as nitrogen (N2) or anhydrous carbon dioxide (CO2) using a small amount of the refrigerant gas to act as a tracer. A pressure limiting or reducing valve with pressure gage shall be used on the high pressure gas tank to limit the pressure in the system to the specified test pressure for the respective refrigerant.

(c) Leakage Test: With the system charged to the desired pressure, the gas supply shall be tightly shut off and system held for 30 minutes, during which time there shall be no loss of pressure. If a pressure drop, not attributable to temperature changes, occurs during this period the entire system shall be checked with a halide torch or an electronic leak detector. When leaks are found they shall be repaired and another 30 minute period at the test pressure shall be made. Testing and repair shall continue until there is no loss of pressure. The loss of refrigerant during the first season of operation shall be guaranteed not to exceed l0 percent of the system, and all refrigerant required shall be furnished if the loss is the result of defective equipment or installation.

(d) Evacuation, Dehydration, and Charging: After the system is found to be without leaks, evacuate the system using a reliable gage and a vacuum pump capable of pulling a vacuum of at least 1 mm Hg absolute. Evacuate the system in strict accordance with the triple evacuation and blotter method or in strict accordance with equipment manufacturer's printed instructions. System leak testing, evacuation, dehydration, and charging with refrigerant shall comply with the requirements contained in High Pressure Gas Control Law, HASS 010 or manufacturer's standards.

W912HV-16-B-0007 SECTION 01 35 14 Page 9 (Am-0003)

c. Tests for Nonpressurized Piping: Waste and other nonpressurized piping to be tested by the Contractor shall be as follows:

1. Drainage and Vent Piping: Water test shall be applied to the drainage and venting system either in its entirety or in sections. If the entire system is tested, all openings in the pipes shall be tightly closed except the highest opening, and the system shall be filled with water to the point of overflow. If the system is tested in sections, each opening except the highest opening of the section under test shall be tightly plugged, and each section shall be filled with water and tested with at least a 3,050 mm (10-foot) head of water.