Am-0003_Revised_Drawings.pdf
PDF 36 MB Posted
- Solicitation number
- W912HV-16-B-0007
About this file
Am-0003 Revised Drawings
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
YOKOTA AIR BASE, JAPAN
ZNRE143000
FY16 C-130J FLIGHT SIMULATOR FACILITY
Z N
R E
G
G-001
G E
N E
R A
L
N
O T
E S
A
B B
R E
V I A
T I O
N S
V
I C
I N
I T
Y
L O
C A
T I O
N
M
A P
S
A
N D
S
E C
T I O
N D
E T
A I L
C
R O
S S
R E
F E
R E
N C
I N
G
C
O N
V E
N T
I O
N S
M
G
I M
A S
S
H I R
O M
A
K
A
M A
C I O
NAME: TAKASHI GUSHIKEN
REGISTRATION NO. : 106017 DATE : JUL 08 '16
I CERTIFY THAT THE DRAWINGS AND SPECIFICATIONS UNDER MY
RESPONSIBILITY ARE TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE.
LOCATION MAP
GENERAL NOTES
1. CONTRACTORS SHALL PROVIDE ENGINEERING DESIGN FOR ALL UTILITIES, FOR THIS
PROJECT COMPLETE AND READY FOR USE.
2. CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PREVENT AND THE
TRANSPORT OF THE SEDIMENTS ONTO PAVED SURFACES AND INTO DRAINAGE
FACILITIES AND COMPLY WITH ALL REQUIREMENTS OF YAB ORDINANCE.
3. THE CONTRACTOR SHALL CONFIRM LOCATIONS OF ALL EXISTING UTILITIES THAT
MAY BE AFFECTED BY NEW CONSTRUCTION AT NO COST TO THE GOVERNMENT.
4. INCIDENTAL DAMAGE TO EXISTING STRUCTURES AND UTILITIES SHALL BE REPAIRED
OR REPLACED BY THE CONTRACTOR AT NO COST TO THE GOVERNMENT.
5. RECONNECTION OF ALL UTILITIES INVOLVED SHALL BE CARRIED OUT WITH LEAST
POSSIBLE UTILITY SERVICE INTERRUPTION.
6. CONTRACTOR SHALL CLEAR ROADWAY WITHIN THE CONSTRUCTION AREA AFTER
COMPLETION OF EACH WORK DAY INCLUDING FINAL CLEAN-UP.
7. ALL GROUND SURFACE DISTURBED DURING CONSTRUCTION SHALL BE RESTORED
TO MATCH EXISTING CONDITION WITHOUT ADDITIONAL COST TO THE GOVERNMENT.
8. ANY EXCAVATION AND/OR PENETRATION REQUIRES THE USE OF GROUND/WALL
PENETRATING RADAR OR X-RAY PRIOR TO DRILLING IN ORDER TO PREVENT ANY
DAMAGE TO THE REINFORCING AND/OR ANY OTHER OBJECTS.
HOKKAIDO
MISAWA AB
HONSHU
NAF ATSUGI
YOKOSUKA NB
IKEGO
IWO JIMA
SHIKOKU
SASEBO NB
OKINAWA
KYUSHU
MCAS IWAKUNI
CAMP FUJI
CAMP ZAMA
SAGAMIHARA HOUSING AREA
SAGAMI GENERAL DEPOT
NORTH
PROJECT AREA
YOKOTA AB
MAP OF JAPAN
NOT TO SCALE
A R
C H
I T
E C
T
E
N G
I N
E E
R
T O
K Y
O
J A
P A
N
P A
E
D
E S
I G
N
F A
C I L
I T
Y
M
A N
A G
E M
E N
T
Z N
R E
F Y
C
J
F
L I G
H T
M
U L A
T O
R
F
A C
I L I T
Y
Y O
K O
A
B
S
E
J A
P A
N
M
O
K A
N O
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
O
P L O
T
S
C A
L E
S U
B M
I T
T E
D
B
Y
F I
M
E
S I Z
E
DESIGN STAGE
D R
A W
I N
G
C
O D
E
SHEET OF 187
S U
B M
I T
T A
L
D
A T
E
P L O
T
D
A T
E
I S
O
A
Japan District
W H
V D
T
O
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
J A
P A
N
C O
R P
S
O
F
E
N G
I N
E E
R S
A P
O
A
P
A F
ENGINEERING AND CONSTRUCTION DIVISION
US ARMY ENGINEER DISTRICT, JAPAN
APO AP 96338-5010
VICINITY MAP
YOKOTA AIR BASE
PROJECT LOCATION
PROJECT AREA
T W
Y
C
1105-A
1143 1147
TRUE BEARING N 9-41-47.5 W
T W
Y
D
M c G
U I R
E
A
V E
DAVIS ST
W I L K
I N
S
S
T
CRABB AVE
CRABB AVE
LANE
M c G
U I R
E
A
V E
B
O
U
L
E
V
A
R
D
W
A
L
K
V
E
M c
G
U
I R
I
S
P
E
R
S
A
L
T A
X
IW
A Y
T A
X I W
Y
S
P E
R S
A L
T A
X I W
S
P E
R S
A L
T
A
X
I W
S
P
E
R
S
T A
X I W
S
P E
R S
A L
EAST PARALLEL
T
W
W
Y
B
T W
Y
C
(1836)
T W
Y
D
T
2085564
1019 1018
4 4
EAST GATE
GATE #17
GATE #18
SOUTH GATE
S
T
R
E
E
T
GODFREY AVE
L
I
N
D
S
E
Y
M
A
T
H
M A
T H
I E
S
S
T
D E
S E
V E
R S
K
ANDREWS DR
A
R
N
O
S
E
L
F
R
I
D
G
E
C
H
E
N
N
A
U
L
T
H E
G E
N B
E R
G E
R
G R
I S
S O
M
B E
N N
E T
L A
H M
R I C
K E
N B
A C
K E
R
S
T
S P
A A
Z
T W
I N
I N
G
S
T
ARNOLD DR
B A
K E
R
S
T
V A
N D
E N
B E
G
H A
U G
H T
A
IR
L
IF
T
A
V
E
F R
I E
N D
S H
P
V
D
LUKE AVE
ALABAMA AVE
T U
N N
F O
U L O
A
I
R
L
I
F
E
H
U
G
H
E
S
D
R
G
E
O
R
G
E
D
R
B O
GOETTLER ST
CASTLE ST
E A
K E
R
S
T
MITCHELL RD
C A
R S
W E
L L
S
T
HAMILTON ST
HOWARD ST
C H
E L I
A
V E
COCHRAN
EAR
H
AR
T A
VE
K
U
T
E
R
F
E
M
O
Y
E
R
C
R
A
W
D
E
T
H
L
E
S
F
S
E
N
J
A
M
E
P
U
C
K
E
T
B
R
O
E
M
O
R
G
M
E
Y
A
V
E
S
A
R
N
O
S
K
I
P
E
A
S
E
D
R
P
E
A
T
R
U
E
M
P
W
A
L
M
S
L
S
E
B
I
L
S
M
I
S
H
O
M
M
E
T
Z
G
E
R
S
T
M
I
C
H
A
V
O
S
L
W
I L
B
A
N
K
VANCE ST
S
I
J
S
I
J
Y O
U N
G
D
R
DAVIS ST
4 1
448450
SUMP
B
O
B
Z
I
E
C
I
R
C
L
E
L
O
R
I N
G
C
O
U
R
T
WALKER BOULEVARD
WALKER BOULEVARD
T W
Y
A c
WEST GATE
GATE #13
T O
K Y
O
A Q
U E
D U
C T
K
N
I
G
E
KEARBY
J
O
N
E
INSTRUMENT RUNWAY 11,000' X 200'
GATE #12
1108-B
1108-A
1105-B
NE
TWY
TWY
NW
1111-B
1111-A
FUSSA GATE
GATE #2
SUPPLY GATE
GATE #5
ABBREVIATIONS
SECTION/DETAIL CROSS REFERENCING CONVENTIONS
A-301
A-501
DETAIL
SECTION
A-201
ELEVATION
A
B
C
D
SECTION IDENTIFICATION NUMBER
NUMBER OF SHEET ON WHICH
SECTION IS DRAWN
DETAIL IDENTIFICATION NUMBER
NUMBER OF SHEET ON WHICH
DETAIL OF THE CONDITION IS
DRAWN
DIRECTION
ELEVATION IDENTIFICATION
NUMBER
NUMBER OF SHEET ON WHICH
ELEVATION IS DRAWN
DIRECTION
DRAWING SCALE
DRAWING TITLE NUMBER
SCALE
DRAWING TITLE
A1
A1
A1
A1
% PERCENT
& AND
/ DIVIDE BY
@ AT
° DEGREES
1ST FIRST
2ND SECOND
A/C AIR CONDITION
AAV AUTOMATIC AIR VENT
AC ALTERNATING CURRENT
AC ASPHALTIC CONCRETE
ACST ACOUSTICAL
AF AMPERE FRAME
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIC AMPERE INTERRUPTING
CAPACITY
AMP AMPERE
ANSI AMERICAN NATIONAL
STANDARD INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AT AMPERE TRIP
AUT AUTOMATIC
AVE AVENUE
AW ALUMINUM WINDOW
AWG AMERICAN WIRE GAGE
BD BOARD
BLDG BUILDING
CAE
CAT CATEGORY
CATV COMMUNITY ANTENNA
TELEVISION
CBT COMPUTER BASED TRAINING
CCTV CLOSED CIRCUIT TELEVISION
CFL COMPACT FLUORESCENT LAMP
CH CEILING HEIGHT
CI CAST IRON
CKT CIRCUIT
CLG CEILING
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUATION
CP CONCRETE PIPE
CPVC CHLORINATED POLYVINYL
CHLORIDE
CT CERAMIC TILE
CW COLD WATER PIPING
dB DECIBELS
DB DRY BULB
DC DIRECT CURRENT
DDC DIRECT DIGITAL CONTROL
DET DETAIL
DIA, Ø DIAMETER
DIP DUCTILE IRON PIPE
DMH DRAINAGE MANHOLE
DWG DRAWING
EA EACH
EHH ELECTRICAL HANDHOLE
EIA ELECTRONIC INDUSTRIES
ASSOCIATION
ELCB EARTH LEAKAGE CIRCUIT
BREAKER
ELEC ELECTRICAL
ELEV ELEVATOR
EMH ELECTRICAL MANHOLE
EMM ELECTRO-MECHANICAL MOTION
SYSTEM
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EXIST EXISTING
F/O FIBER OPTIC
FA FIRE ALARM
FAVB FLUID APPLIED VAPOR BARRIER
FACP FIRE ALARM CONTROL PANEL
FCC FIBER CLOTH COVERED
INSULATION
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FEP PERFLUORO
ETHYLENE-PROPYLEN
FHY FIRE HYDRANT
FIN FINISH
FL FLOOR LINE
FLR FLOOR
FT FEET
G GROUND
GAL GALLON
GALV GALVANIZED
GF/CI GOVERNMENT FURNISH AND
CONTRACTOR INSTALLED
GF/GI GOVERNMENT FURNISH AND
GOVERNMENT INSTALLED
GFCI GROUND FAULT CIRCUIT
INTERRUPTER
GFM GOVERNMENT FURNISHED
MATERIAL
GI GUTTER INLET
GL GROUND LEVEL
GOVT GOVERNMENT
GPH GALLON PER HOUR
GPM GALLON PER MINUTE
GSP GALVANIZED STEEL PIPE
GTB GROUND TERMINAL BAR
GWB GYPSUM WALL BOARD
GYP GYPSUM
GYP BD GYPSUM BOARD
H HIGH
HB HOSE BIBB
HOR HORIZONTAL
HVAC HEATING VENTILATING AND AIR
CONDITIONING
HW HOT WATER
Hz HERTZ
ID INDIRECT DRAIN
IDS INTRUSION DETECTION SYSTEM
INV INVERTER
INVX
JAN JANITOR
JIS JAPANESE INDUSTRIAL
STANDARES
k KILO kA KILOAMPERE kAIC KILOAMPERE INTERRUPTING
CAPACITY
kPa KILOPASCAL kV KILOVOLT kVA KILOVOLT AMPERES kW KILOWATT
L LENGTH
L LITER
L/h LITER PER HOUR
L/s LITER PER SECOND
LED LIGHT EMITTING DIODE
LFLI LOCKHEED MARTIN/CAE
INSTALLED EQUIPMENT
LSD LIGHT STEEL DOOR
m METER m/s METER PER SECOND m² SQUARE METER
MAINT MAINTENANCE
MAX MAXIMUM
MCB MAIN CIRCUIT BREAKER
MCCB MOLDED CASE CIRCUIT
BREAKER
MD MOTOR DAMPER
MECH MECHANICAL
MH MANHOLE
MH MOUNTING HEIGHT
MHL METAL HALIDE LAMP
MIN MINIMUM
MLO MAIN LUGS ONLY
mm MILLIMETER
MM MULTI MODE
m㎡ SQUARE MILLIMETER
MNS MASS NOTIFICATION SYSTEM
Mpa MEGA PASCAL
N/mm² NEWTON PER SQUARE
MILLIMETER
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NO NUMBER
NTB NEUTRAL TERMINAL BAR
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
P POLE
Pa PASCAL
PA PUBLIC ADDRESS
PDI PLUMBING AND DRAINAGE
INSTITUTE
PE POLYETHYLENE
PH PHASE
POC POINT OF CONNECTION
PR PAIR
PRESS PRESSURE
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE (PLASTIC)
QTY QUANTITY
R RADIUS
RA RETURN AIR
RC REINFORCED CONCRETE
RCP REINFORCED CONCRETE PIPE
REINF REINFORCEMENT
RL ROOF LEVEL
RM ROOM
S SLOPE
SA SUPPLY AIR
SAD SUPPLY AIR DIFFUSER
SAR SUPPLY AIR REGISTER
SCHED SCHEDULE
SD STEEL DOOR
SHT SHEET
SM SINGLE MODE
SQ SQUARE
SST STAINLESS STEEL
STL STEEL
SW SWITCH
TDH TOTAL DYNAMIC HEAD
TEL TELEPHONE
TEMP TEMPERATURE
TGB TERMINATION GROUNDING BAR
THH TELEPHONE HANDHOLE
THK THICKNESS
TIA TELECOMMUNICATION
INDUSTRIES ASSOCIATION
TMGB TERMINATION MAIN
GROUNDING BAR
TMH TELEPHONE MANHOLE
TV TELEVISION
TYP TYPICAL
UFC UNIFORM FIRE CODE
V VOLT
VA VOLT AMPERE
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VERT VERTICAL
VTRAT VISUAL THREAT RECOGNITION
& AVOIDANCE TRAINER
W WATT
W WIDE
W/ WITH
WB WET BULB
WHA WATER HAMMER ARRESTOR
WP WEATHERPROOF
WR WATER RESISTANT
WWF WELDED WIRE FABRIC
XFMR TRANSFORMER
DATE: JUL 08 '16
一級建築士
(1ST CLASS ARCHITECT)
LC# 106017
TAKASHI GUSHIKEN
EXPIRATION DATE : NONE
SIGNED
A D
D I T
I O
N A
L
A
B B
R E
V I A
T I
FY16 C-130J Flight Simulator Facility Yokota AB, Japan
16AF0003
W912HV-16-B-0007 (Am-0003)
UTM ZONE: 54 NORTH
DATUM: WGS84
UNITS: METERS
ELLIPSOID: WGS84
APPROX. GAQ. DEC. 0^ 17' W
(2015)
GRAPHIC SCALES
2000M1000M400M
1 : 7000 SCALE IN METRIC SYSTEM
0 500M
CONTRACTOR ACCESS, HAUL ROUTE AND STAGING NOTES:
1. THE PROPOSED CONTRACTOR STAGING AREAS ARE AS SHOWN ON THE DRAWING SHEET G-102 EROSION CONTROL PLAN.
2. GATE 5 SHALL BE THE ACCESS POINT FOR ALL YOKOTA AIR BASE CONSTRUCTION TRAFFIC, ACCESS VIA OTHER YOKOTA
AIR BASE GATES IS PROHIBITED, UNLESS OTHERWISE APPROVED BY THE CONTRACTING OFFICE.
3. THE CONTRACTOR EMPLOYEES WILL ONLY PARK IN AREAS DESIGNATED BY THE CONTRACTING OFFICE.
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE EMPLOYEE TRANSPORTATION BETWEEN THE WORK AND STAGING
AREAS IF NECESSARY.
5. ALL CONSTRUCTION TRAFFIC SHALL TRAVEL ON THE ROUTES INDICATED ON THIS DRAWING OR AS APPROVED BY THE
CONTRACTING OFFICER.
6. BASE EMERGENCY VEHICLE MUST HAVE UNRESTRICTED USE OF THE EXISTING ADJACENT ON-SITE HAUL ROUTES AT ALL
TIMES; OPERATE ON THESE ROADS WITHOUT DELAYS TO THE EMERGENCY RESPONSE TIME.
7. CONTRACTORS AREA RESPONSIBLE FOR SECURING THEIR EQUIPMENT, MATERIALS, AND VEHICLES.
8. STAGING AREA; THE GOVERNMENT SHALL PROVIDE ANY REQUIRED UTILITIES TO THE CONTRACTOR AT NO ADDITIONAL
COST.
9. ALL BARICADE LIGHTING SHALL BE VERIFIED BY THE CONTRACTOR FOR PROPER OPERATION AT THE END OF EACH DAY
BEFORE CONTRACTOR CEASES OPERATION.
10. ALL COSTS ASSOCIATED WITH PREPARING THE STORAGE AND STAGING AREA SITE SHALL BE BORNE BY THE
CONTRACTOR, THIS INCLUDES BUT IN NOT LIMITED TO CLEARING AND GRADING OF THE SITE, CONSTRUCTION OF ALL
TEMPORARY UTILITIES, ACCESS ROADS, ALL SECURITY FENCING, RESTORATION OF THE SITE AT PROJECT COMPLETION.
11. THE CONTRACTOR SHALL REMOVE EXIST AS PAVEMENTS, RESTORE GRASSED GRADING SLOPE AS PER SITE GRADING
PLAN FOR HAUL SITE STAGING AREA.
12. THE CONTRACTOR IS PERMITTED TO USE THE YOKOTA PARKING LOT GARAGE LOCATED ON THE NORTHWEST SIDE OF THE
CONSTRUCTION AREA ALONG CARSWELL STREET.
A R
C H
I T
E C
T
E
N G
I N
E E
R
T O
K Y
O
J A
P A
N
P A
E
D
E S
I G
N
F A
C I L
I T
Y
M
A N
A G
E M
E N
T
Z N
R E
F Y
J
F
L I G
M
U L
A T
C
I L
I T
Y
Y O
K O
S
E
J A
J A
P A
N
M
O
K A
N O
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
SHEET
DESIGN STAGE
D R
A W
I N
G
C
O D
E
SHEETSHEETSHEET OF 187
S U
B M
I T
T A
L
D
A T
E
P L
T
E
I S
O
A
Japan District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
A
R E
A
O
F F
I C
E
A P
O
A
P
C I V
I L
J O
N A
T H
S
T R
E L
L A
J
L
A S
T R
E L
L A
T
H
A Y
A S
H I
W
H V
D
A F
A R
C H
I T
E C
T
E
N G
I N
E E
R
T O
K Y
O
J A
P A
N
P A
E
D
E S
I G
N
F A
C I L
I T
Y
M
A N
A G
E M
E N
T
Z N
R E
F Y
J
F
L I G
M
U L
A T
C
I L
I T
Y
Y O
K O
S
E
J A
J A
P A
N
M
O
K A
N O
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
SHEET
DESIGN STAGE
D R
A W
I N
G
C
O D
E
SHEETSHEETSHEET OF 187
S U
B M
I T
T A
L
D
A T
E
P L
T
E
I S
O
A
Japan District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
A
R E
A
O
F F
I C
E
A P
O
A
P
C I V
I L
J O
N A
T H
S
T R
E L
L A
J
L
A S
T R
E L
L A
T
H
A Y
A S
H I
W
H V
D
A F
PROJECT SITE
CONSTRUCTION VEHICLE
ACCESS ROUTE
BASE CONTROL POINT
BENCH MARK (YK19)
BASE CONTROL POINT
BENCH MARK (PERBASE)
BASE CONTROL POINT
BENCH MARK (YK17)
N
A
T
I O
N
O
T
Y
T O
T A
C H
IK
A
W A
C
IT
Y
MAIN GATE ACCESS ENTRY
(GATE #5)
YOKOTA AIR BASE
CONSTRUCTION SITE
(SEE ENLARGED PLAN)
BENCH MARKS
UTM COORDINATES
X Y
350004.51 3955969.308YK17
350302.14 3955734.169YK19
350527.684 3955082.882
BASE CONTROL POINT
BENCH MARK (YK17)
BASE CONTROL POINT
BENCH MARK (YK19)
BASE CONTROL POINT
BENCH MARK (YK23)
BASE CONTROL POINT
BENCH MARK (YK24)
350409.895 3955300.488
YK23
YK24
WGS84 UTM 54N SYSTEM
SURVEY NOTES:
1. SURVEY IS REFERENCED TO THE WGS84 UTM ZONE 54 COORDINATE SYSTEM, COORDINATES ARE AS SHOWN IN TABLE BELOW.
2. SURVEY CONDUCTED BY:
UNIVERSAL ENGINEERING CO., LTD. REGISTERED SURVEYOR: MR. TOMOYA ONO
3. DATE OF SURVEY: SEPTEMBER 2014
4. SURVEY UNITS ARE METERS. ELEVATION CONTOUR INTERVAL IS 0.10M.
5. CONTROL POINTS ARE ESTABLISHED BY THE BASE CONTROL POINTS ABOUND THE PROJECT SITE AS INDICATED AT THE TABLE BELOW.
O V
E R
A L
L
H
A U
L
R
O U
A
N
A
T
E S
G-101
SCALE 1:7000
OVERALL HAUL ROUTE PLAN
A4
Z N
R E
G
R E
V I S
F
E R
E N
A
W I N
G
N
O
R E
V I S
T
E
A D
D E
D
N
O T
E
FY16 C-130J Flight Simulator Facility Yokota AB, Japan x
419.15
419.13
419.14
419.14
419.01
419.16
419.16
419.19
419.01
419.08
419.03
419.07 419.03
419.00
419.00
418.91
418.94
418.97
418.91
418.97
418.66
418.81
418.84
418.81
418.86
418.79
418.76
418.72
418.79
418.86
418.73
418.57
418.62
418.64
418.66
418.63
418.66
418.53
418.59
418.58
418.79418.51
418.47
418.69
418.75
419.00
419.10
418.90
418.80
418.70
418.60
418.50
S S
S
S x
S
S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S
S x
SMH
SMH
SMH
SMH
TMH
TMH
TMH
H A
M I L T
MCGUIRE AVE
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
A B A N D O N
Ø
C I P
Ø
P
Ø
C P
Ø
C I P
Ø150 CIP
S S x
S S x
S S x
S S x
S S x
DMH
DMH
DMH
DMH
DMH
DMH
DMH
419.18
419.83
Y
BM
EL=418.70
SF SF SF SF SF SF SF
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
SFSF
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S
F
S
F
SF SF SF SF SF SF
S F
S F
SF SF SF SF SF SF SF SF SF SF SF SF SF SF
S F
S F
W W
A R
C H
I T
E C
T
E
N G
I N
E E
R
T O
K Y
O
J A
P A
N
P A
E
D
E S
I G
N
F A
C I L
I T
Y
M
A N
A G
E M
E N
T
Z N
R E
F Y
J
F
L I G
M
U L
A T
C
I L
I T
Y
Y O
K O
S
E
J A
J A
P A
N
M
O
K A
N O
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
SHEET
DESIGN STAGE
D R
A W
I N
G
C
O D
E
SHEETSHEETSHEET OF 187
S U
B M
I T
T A
L
D
A T
E
P L
T
E
I S
O
A
Japan District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
A
R E
A
O
F F
I C
E
A P
O
A
P
C I V
I L
J O
N A
T H
S
T R
E L
L A
J
L
A S
T R
E L
L A
T
H
A Y
A S
H I
W
H V
D
A F
A R
C H
I T
E C
T
E
N G
I N
E E
R
T O
K Y
O
J A
P A
N
P A
E
D
E S
I G
N
F A
C I L
I T
Y
M
A N
A G
E M
E N
T
Z N
R E
F Y
J
F
L I G
M
U L
A T
C
I L
I T
Y
Y O
K O
S
E
J A
J A
P A
N
M
O
K A
N O
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
SHEET
DESIGN STAGE
D R
A W
I N
G
C
O D
E
SHEETSHEETSHEET OF 187
S U
B M
I T
T A
L
D
A T
E
P L
T
E
I S
O
A
Japan District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
A
R E
A
O
F F
I C
E
A P
O
A
P
C I V
I L
J O
N A
T H
S
T R
E L
L A
J
L
A S
T R
E L
L A
T
H
A Y
A S
H I
W
H V
D
A F
A R
C H
I T
E C
T
E
N G
I N
E E
R
T O
K Y
O
J A
P A
N
P A
E
D
E S
I G
N
F A
C I L
I T
Y
M
A N
A G
E M
E N
T
Z N
R E
F Y
J
F
L I G
M
U L
A T
C
I L
I T
Y
Y O
K O
S
E
J A
J A
P A
N
M
O
K A
N O
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
SHEET
DESIGN STAGE
D R
A W
I N
G
C
O D
E
SHEETSHEETSHEET OF 187
S U
B M
I T
T A
L
D
A T
E
P L
T
E
I S
O
A
Japan District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
A
R E
A
O
F F
I C
E
A P
O
A
P
C I V
I L
J O
N A
T H
S
T R
E L
L A
J
L
A S
T R
E L
L A
T
H
A Y
A S
H I
W
H V
D
A F
GRAPHIC SCALE
E R
O S
I O
N
C
O N
T R
A
N
C
O N
T R
A C
T O
R
PROVIDE A TEMPORARY CONSTRUCTION
STEEL PANEL AROUND THE PROJECT AREA
WITHIN THE CONSTRUCTION LIMIT
G-102
SCALE 1:200
EROSION SEDIMENT CONTROL PLAN
A3
105310 20m
1 : 200
Z N
R E
G
CONTRACTOR'S
OFFICE
TEMPORARY SEDIMENT BASIN WITH
TWO Ø150mm DISCHARGE PIPE
OPEN DITCH WITH TEMPORARY
CONSTRUCTION SHEET COVER
TEMPORARY CONSTRUCTION GATE
FOLDING PANEL TYPE WITH HEIGHT
CLEARANCE BAR ON TOP
EROSION & SEDIMENTATION CONTROL NOTES:
1. THE CONTRACTOR SHALL PREPARE A PROJECT-SPECIFIC EROSION AND
SEDIMENTATION CONTROL (ESC) PLAN, WHICH CONFORMS TO THE CONTRACT
SPECIFICATIONS AS WELL AS LOCAL ESC STANDARDS AND CODES. THE PLAN
SHALL BE INCLUDED IN THE ENVIRONMENTAL PROTECTION PLAN, AND
APPROVED BY THE CONTRACTING OFFICER BEFORE CONSTRUCTION
COMMENCES.
2. THE ESC PLAN SHALL INCLUDE A MINIMUM OF ONE OF THE FOLLOWING
DOCUMENTATION REQUIREMENTS:
A. WRITTEN EVIDENCE THAT SCHEDULED PERIODIC INSPECTION OF THE
ESC MEASURES WAS PERFORMED THROUGHOUT THE CONSTRUCTION
PROCESS AND THAT THE PLAN WAS CARRIED OUT APPROPRIATELY.
B. DATE-STAMPED PHOTOS WHICH SHOW THE IMPLEMENTED ESC
MEASURES AND DESCRIPTION OF ANY CORRECTIVE ACTIONS TAKEN.
C. NARRATIVE DESCRIBING THE ESC PLAN IMPLEMENTATION.
3. THE CONTRACTOR SHALL INSTALL TEMPORARY OPEN DITCH WITH SHEET
COVER PROTECTION TO ALLOW THE STORMWATER TO FLOW OUT THE
CONSTRUCTION SITE AREA. PROVIDE TEMPORARY CONSTRUCTION STEEL
PANEL FENCE, ENTRY GATE, VEHICLE TIRE WASH DOWN AREA, MATERIAL
STORAGE AREA, OPERATOR'S OFFICE AND OTHER NECESSARY
ENVIRONMENTAL PROTECTION METHODS ON THE SITE AREA.
4. MEASURES TO CONTROL EROSION AND OTHER POLLUTANTS SHALL BE IN
PLACE BEFORE EARTHWORK OPERATIONS BEGIN.
5. EXPOSED TRENCHED AREAS SHALL BE PROTECTED FROM RUNOFF AND WIND
EROSION WITH STEEL PLATE COVERS UNTIL REPAVING CAN BE
ACCOMPLISHED.
6. DRAIN INLET PROTECTION SHALL BE MONITORED PERIODICALLY AND/OR
AFTER SIGNIFICANT RAINFALL EVENTS 12.5 MILLIMETERS OR GREATER FOR
STRUCTURAL INTEGRITY AND SEDIMENT BUILD-UP. DAMAGED OR IMPROPERLY
FUNCTIONING FILTERS SHALL BE REPLACED (PAID FOR BY THE CONTRACTOR)
AND SEDIMENT ACCUMULATION SHALL BE REMOVED. AFTER EARTHWORK
OPERATIONS, EXISTING CATCH BASINS AND DRAIN MANHOLES SURROUNDING
THE PROJECT SITE SHALL BE INSPECTED AND ACCUMULATED SEDIMENT
SHALL BE REMOVED. FLUSHING INTO THE CATCH BASINS AND DRAIN
MANHOLES IS PROHIBITED.
7. THE FINAL LIFT OF EACH DAY'S WORK SHALL BE COMPACTED TO PREVENT
EROSION OF FILL MATERIAL.
8. CONTRACTOR SHALL ENSURE ROADWAYS WILL BE PROTECTED FROM MUD,
DIRT, AND DEBRIS.
9. ALL TEMPORARY BEST MANAGEMENT PRACTICES (BMPs) SHALL NOT BE
REMOVED UNTIL PERMANENT STABILIZATION IS ESTABLISHED.
10. WASH WATER FROM WASHDOWN OF CONSTRUCTION EQUIPMENT, VEHICLES
AND CONCRETE TRUCK DRUMS SHALL BE DISCHARGED INTO THE SEDIMENT
BASIN BEFORE DISCHARGING TO THE EXISTING DRAINAGE SYSTEM ALONG THE
ROAD.
11. THE CONTRACTOR SHALL ENSURE THAT ALL TIRES OF CONSTRUCTION
VEHICLES ARE SUFFICIENTLY CLEANED OFF SO THAT DIRT OR DEBRIS IS NOT
TRACKED OFF THE CONSTRUCTION SITE. WASHING OFF TIRES WITH WATER
WILL NOT BE ACCEPTABLE UNLESS THE RUNOFF IS CONTAINED AND DOES NOT
ENTER THE STORM DRAIN SYSTEM.
12. AT THE CONCLUSION OF ALL PROJECT WORK, ALL TEMPORARY BEST
MANAGEMENT PRACTICES SHALL BE REMOVED AND THE AREA SHALL BE
RESTORED TO ITS ORIGINAL CONDITION, OR BETTER, UPON ACCEPTANCE OF
THE PROJECT BY THE CONTRACTING OFFICER.
13. EXPOSED, DISTURBED, OR GRADED AREAS SHALL RECEIVE TEMPORARY
STABILIZATION WITHIN 14 CALENDAR DAYS. THE CONTRACTOR SHALL KEEP A
DAILY GRADING LOG AND MAP IDENTIFYING DATES OF AREAS WHEN GRADING
ACTIVITIES ARE OCCURRING. THE DAILY LOG AND MAP SHALL BE USED TO
IDENTIFY AREAS THAT SHALL BE TEMPORARILY STABILIZED.
14. FOR SLOPES STEEPER THAN 3:1 (HORIZONTAL:VERTICAL), EROSION CONTROL
MATTING SHALL BE INSTALLED.
15. THE CONTRACTOR IS RESPONSIBLE TO MANAGE OFFSITE STORMWATER TO
MEET LOCAL AND FEDERAL REGULATIONS AND SPECIFICATION
REQUIREMENTS.
16. KEEP SPILL KITS, DRIP PANS, AND OTHER POLLUTION PREVENTION AND
REMEDIATION SUPPLIES AT THE PROJECT SITE.
CONSTRUCTION VEHICLE
WASH DOWN AREA
CONSTRUCTION MATERIAL
STAGING AREA
G-102
A3.2
G-102
A3.1
OPEN DITCH WITH TEMPORARY
CONSTRUCTION SHEET COVER
TEMPORARY CONSTRUCTION STEEL
FENCE PANEL ENCLOSURE AROUND
THE PROJECT SITE, H = 2.5 ~ 3.0m
CONSTRUCTION
SITE AREA
TEMPORARY CONSTRUCTION STEEL
PANEL ENCLOSURE AROUND THE
PROJECT SITE H = 2.5 ~ 3.0m
PANEL SUPPORT (TYP)
OPEN DITCH WITH COVER
SHEETS ON SURFACE H=0.6M
3.0%
H
V
CONSTRUCTION SITE AREA
TEMPORARY CONSTRUCTION STEEL
PANEL ENCLOSURE AROUND THE
PROJECT SITE H = 2.5 ~ 3.0m
TEMPORARY SEDIMENT BASIN
H
V
3.0%
CLEAR THE CLOGGED DRAIN OF
EXISTING DRAINAGE FOR CONTINOUS
FLOW OF STORMWATER
DISCHARGE TO EXISTING
INLET (VP Ø150mmX2)
NOTE:
THE LAYOUT PLAN/MATERIALS USED
FOR EROSION CONTROL PLAN CAN BE
MODIFIED AS PER CONTRACTOR'S ACTUAL
CONSTRUCTION SCHEDULE.
EXISTING PARKING AREA
EXISTING INLET
COVER SURFACE INLET TO
PREVENT DIRTY TO FLOW IN
CONSTRUCTION LIMIT
SECTION
A3.1
TEMPORARY SEDIMENT BASIN WITH
TWO Ø150mm DISCHARGE PIPE
SECTION
A3.2
O P
E R
A T
I O
N
A
A
G I N
G
A
R E
A
E X
T E
N D
N
S T
R U
C T
I O
N
F
E N
C E
R E
V I S
M
P O
R A
C
L O
S U
I G
TEMPORARY SEWER
CONNECTION POINT
TEMPORARY WATER
CONNECTION POINT
A D
D E
D
T
E M
P O
R A
W
E R
W
A T
N
N E
C T
I O
N
P
T
TOP SOIL STOCKPILE AREA
WITH PVC SHEETING COVER
FY16 C-130J Flight Simulator Facility Yokota AB, Japan
FDC
FHY179
S T
S T
S T
S T
S T
ST
S T
ST
ST
S T
ST
W x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
S D x
S D x
S D x
SD
x
S D x
S D x
S D x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x SD x SD x
S
D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
SD
x
S
D x
S
D x
S D x
S D x
S D x
S
D x
S
D x
S
D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
SD
x
SD
x
SD
x
S
D x
SD
x
S
D x
S D x
S D x
S
D x
SD
x
SD
x
SD
x
SD
x
S D x
SD
x
SD
x
S
D x
S
D x
S
D x
419.15
419.13
419.14
419.14
419.00
419.00
418.97
418.86
418.73
418.57
418.66
418.72
418.79418.51
418.47
418.69
BLDG 920
BLDG 907
S S
S
S x
S
S x
S
S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S
S x
SMH
SMH
SMH
SMH
SMH
TMH
TMH
TMH
TMH
H A
M I L
T O
N
S
T
MCGUIRE AVE
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
A B A N D O N
Ø
C I P
Ø
P
Ø
C P
Ø
R C P
Ø
P
Ø
P
Ø3
RC
P
Ø2
RC
P
Ø2 R
CP
Ø2
RC
P
Ø
S P
Ø150 CP
Ø
Ø
R C P
O
H
E
P
O H
E
P
OH.EP
OH.ESOH.ES
OH.EP
O
H
E
P
O
H
E
S
O H
E
P
O H
E
S
O H
E
P
O H
E
S
O H
E
P
O H
E
S
S L
S L
S L
E S
O
H
E
P
OH.ES
OH.EP
O H
E
P
O H
E
S
C
C
C
C
C
C
C
C
C C
E
P
Ø900 RCP
Ø2200 RCP
Ø
C I P
Ø
C I P
Ø150 CIP
Ø
S P
Ø300 CP
Ø450 RCP
S S x
S S x
S S x
S S x
S S x
S S x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
Ø
R C P
Ø300 RCP
SD
x
SD
x
SD
x
DMH
DMH
DMH
DMH
DMH
DMH
DMH
EXIST GI
TOP 418.57
OUT 417.77
419.18
419.83
EXIST GI
TOP 418.37
OUT 417.77
Y
Y
Y
BM
EL=418.40
BM
EL=418.70
EXIST GI
TOP 419.14
OUT 417.99
EXIST GI
TOP 419.14
OUT 418.04
EXIST GI
TOP 419.15
OUT 418.15
EXIST GI
TOP 419.13
OUT 418.33
EXIST GI
TOP 419.18
OUT 418.53
EXIST GI
TOP 418.47
OUT 418.37
EXIST GI
TOP 418.32
OUT 417.42
S D
S D
SD SD SD
S
D
SS
SS
SCO
F
F
SD
S
D
S
D
S
D
S D
EXIST SMH
TOP 418.66
I.I.E 416.12
NEW I.I.E 416.53
O.I.E 416.08
EXIST GI
TOP 418.76
NEW I.I.E 417.905
O.I.E 417.90
SI#4
TOP 418.965
I.I.E 417.440
I.I.E 418.215
I.I.E 418.215
O.I.E 417.435
SI#5
TOP 418.715
I.I.E 417.355
I.I.E 418.015
I.I.E 417.965
I.I.E 417.965
O.I.E 417.350
SI#6
TOP 418.360
I.I.E 417.610
O.I.E 417.460
GI#5
TOP 419.380
O.I.E 417.505
GI#4
TOP 419.390
O.I.E 418.440
GI#6
TOP 418.83
O.I.E 417.93
SI#1
TOP 418.600
I.I.E 417.700
I.I.E 417.850
O.I.E 417.695
GI#3
TOP 419.120
I.I.E 417.500
O.I.E 417.495
GI#1
TOP 419.057
I.I.E 417.292
O.I.E 417.287
SI#8
TOP 418.665
I.I.E 417.280
I.I.E 417.915
I.I.E 417.280
O.I.E 417.275
F
F F
F F
F F
F F
W W
W W
W W
SD SDSD SD SD SD
S
D
S
D
EXIST DMH
TOP 418.55
NEW I.I.E 417.220
BOT 416.01±
EXIST DMH
TOP 418.90
NEW I.I.E 417.200
BOT 416.45±
S D
S
D
S D
SI#3
TOP 419.100
I.I.E 418.042
I.I.E 417.570
I.I.E 418.200
O.I.E 417.565
GI#2
TOP 419.195
I.I.E 417.425
O.I.E 417.420
SI#7
TOP 418.580
I.I.E 417.830
I.I.E 417.385
O.I.E 417.380
SD
S
D
Ø
U
Ø150 PVC
L=8.75m,S=0.50%
Ø
C
L m
S
Ø
C
L m
S
Ø150 PVC
L=8.75m,S=0.50%
Ø
P V C
L m
S
Ø
C
L m
Ø 100 V
U P
IP
E
S =4.00%
S D
S D
S
D
SD SD
HCS
HCR
GV
S
D
S
D
S
S
S
S
SD
SD
S D
S D
S
D
S D
SD
S D
S D
GI#7
TOP 418.977
O.I.E 418.077
GI#8
TOP 418.872
O.I.E 417.972
GI#9
TOP 418.790
O.I.E 417.735
Ø
P V C
L m
S
SI#2
TOP 418.850
I.I.E 417.936
I.I.E 417.640
I.I.E 418.100
O.I.E 417.635
PIV
SCO
Ø150 PVC
L=7.50m,S=0.50%
E S
ES
E S
E
P
E S
EP
E P
E S
ES
ES
EP
E
S
ES
C
THH
THH
C
C
Ø
C
L m
S
EMH
EMH
EMH
EMH
SCO
EXIST SMH
TOP 418.82
NEW I.I.E 416.70
O.I.E 416.25
FHY180
NEW C-130J FLIGHT
SIMULATOR FACILITY
FFL = 419.70
S
D
S
D
Ø
C
L m
S
GRAPHIC SCALE
U T
I L
I T
I E
S
P
L A
N
POINT OF CONNECTION
FOR NEW WATER LINE
EXIST STEAM VAULT
CONSTRUCTION LIMIT
A R
C H
I T
E C
T
E
N G
I N
E E
R
T O
K Y
O
J A
P A
N
P A
E
D
E S
I G
N
F A
C I L
I T
Y
M
A N
A G
E M
E N
T
Z N
R E
F Y
J
F
L I G
M
U L
A T
C
I L
I T
Y
Y O
K O
S
E
J A
J A
P A
N
M
O
K A
N O
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
SHEET
DESIGN STAGE
D R
A W
I N
G
C
O D
E
SHEETSHEETSHEET OF 187
S U
B M
I T
T A
L
D
A T
E
P L
T
E
I S
O
A
Japan District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
A
R E
A
O
F F
I C
E
A P
O
A
P
C I V
I L
J O
N A
T H
S
T R
E L
L A
J
L
A S
T R
E L
L A
T
H
A Y
A S
H I
W
H V
D
A F
CU101
SCALE 1:200
UTILITIES PLAN
A3
BLDG
SCOPE OF WORK:
LEGEND:
DRAINAGE LINE
WATER LINE
SEWER LINE
ELEVATION SPOT
FHY-XX
FIRE HYDRANT
SD
x
W x
SS
x
PRIMARY ELECTRICAL LINE
OH.EP
SECONDARY ELECTRICAL LINE
SERVICE ELECTRICAL LINE
E
COMMUNICATION LINE
C
COMMUNICATION HANDHOLE
THH
DRAINAGE MANHOLE
DMH
SEWER MANHOLE
SMH
STEAM LINE
ST
ELECTRICAL POLE
TRANSFORMER
BUILDING STRUCTURE
BLDG
418.84
AC PAVEMENT
x
17. PROVIDE NEW SEWER LINE.
18. PROVIDE NEW SURFACE CLEANOUT.
19. PROVIDE NEW DRAINAGE LINE.
20. PROVIDE NEW GUTTER INLET.
21. PROVIDE NEW SURFACE INLET.
OH.ES
EXIST
SD
W
NEW
CONCRETE SIDEWALK
SODDING
CONCRETE CURB
GUTTER INLET
GI
SURFACE INLET
SI
GI
SI
DMH
CONCRETE CURB AND GUTTER
NEW SURFACE CLEANOUT
SEE SEWER LINE - 1
POINT OF CONNECTION
FOR NEW SEWER LINE
SEE DRAINAGE LINE-2A
NEW SURFACE INLET
POINT OF CONNECTION
FOR NEW DRAINAGE LINE
POINT OF CONNECTION
FOR NEW DRAINAGE LINE
NEW SURFACE INLET
NEW GUTTER INLET
NEW SURFACE INLET
NEW DRAINAGE LINE-3
105310 20m
1 : 200
Z N
R E
C U
CONSTRUCTION LIMIT
SLOPE
SS
SEE DRAINAGE LINE PROFILE - 1
NEW Ø150 DCIP FIRE WATER LINE
C-505
A1
C-505
C4
THH
EXIST DRAINAGE LINE
TO BE CONNECTED TO
THE NEW GUTTER INLET
NEW Ø150 DCIP WATER LINE
EXIST CONTROL PANEL
SEE DRAINAGE LINE-2B
FIREWATER LINE
F
NEW DRAINAGE LINE -1A
C-302
C1
NEW DRAINAGE LINE-1B
C-302
C3
C-302
A1
C-302
A3
C-303
C1
NEW DRAINAGE LINE-4
C-303
C2
NEW DRAINAGE LINE-5
C-303
C4
NEW DRAINAGE LINE-6
C-303
C5
CONNECT TO EXIST SEWER MANHOLE
C-508
C2
EP
ES
C
SEE SEWER LINE - 2
NEW SURFACE CLEANOUT
C-508
A5
N
C-508
C4
R E
V I S
T
A
F
E R
E N
FY16 C-130J Flight Simulator Facility Yokota AB, Japan
420.00
418.00
416.00
414.00
422.00
ELEVATION
(METERS)
GROUND
ELEVATION
INVERT ELEV.
(PIPE BOTTOM)
DISTANCE
STATION
N
N
N
N
420.00
418.00
416.00
414.00
422.00
ELEVATION
(METERS)
GROUND
ELEVATION
INVERT ELEV.
(PIPE BOTTOM)
DISTANCE
STATION
N
N
N
N
420.00
418.00
416.00
414.00
422.00
ELEVATION
(METERS)
GROUND
ELEVATION
INVERT ELEV.
(PIPE BOTTOM)
DISTANCE
STATION
E
X
I
H
N
N
N
420.00
418.00
416.00
414.00
422.00
ELEVATION
(METERS)
GROUND
ELEVATION
INVERT ELEV.
(PIPE BOTTOM)
DISTANCE
STATION
N
N
E
X
I
H
N
C-302
D R
A I N
A G
E
P
R O
F I L
SCALE: HOR=1:300, VERT=1:100
DRAINAGE LINE - 1A
C1
A R
C H
I T
E C
T
E
N G
I N
E E
R
T O
K Y
O
J A
P A
N
P A
E
D
E S
I G
N
F A
C I L
I T
Y
M
A N
A G
E M
E N
T
Z N
R E
F Y
J
F
L I G
M
U L
A T
C
I L
I T
Y
Y O
K O
S
E
J A
J A
P A
N
M
O
K A
N O
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
SHEET
DESIGN STAGE
D R
A W
I N
G
C
O D
E
SHEETSHEETSHEET OF 187
S U
B M
I T
T A
L
D
A T
E
P L
T
E
I S
O
A
Japan District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
A
R E
A
O
F F
I C
E
A P
O
A
P
C I V
I L
J O
N A
T H
S
T R
E L
L A
J
L
A S
T R
E L
L A
T
H
A Y
A S
H I
W
H V
D
A F
L=10.30m,S=0.54%
Ø300 PVC Ø300 PVC
L=12.72m, S=0.51%
Ø300 PVC
L=12.29m, S=0.53%
Ø300 PVC
L=15.30m, S=0.52%
Ø300 PVC
L=13.30m, S=0.51%
Ø300 PVC
SCALE: HOR=1:300, VERT=1:100
DRAINAGE LINE - 2A
A1
NEW GRADE
NEW GRADE
NEW Ø150 DCIP
FIRE WATER LINE
NEW Ø100 VU SEWER LINE
A R
C H
I T
E C
T
E
N G
I N
E E
R
T O
K Y
O
J A
P A
N
P A
E
D
E S
I G
N
F A
C I L
I T
Y
M
A N
A G
E M
E N
T
Z N
R E
F Y
J
F
L I G
M
U L
A T
C
I L
I T
Y
Y O
K O
S
E
J A
J A
P A
N
M
O
K A
N O
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
SHEET
DESIGN STAGE
D R
A W
I N
G
C
O D
E
SHEETSHEETSHEET OF 187
S U
B M
I T
T A
L
D
A T
E
P L
T
E
I S
O
A
Japan District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
A
R E
A
O
F F
I C
E
A P
O
A
P
C I V
I L
J O
N A
T H
S
T R
E L
L A
J
L
A S
T R
E L
L A
T
H
A Y
A S
H I
W
H V
D
A F
Z N
R E
C
L=12.13m, S=0.54%
EXIST STEAM LINES
SCALE: HOR=1:300, VERT=1:100
DRAINAGE LINE - 1B
C3
L=13.75m,S=0.51%
Ø300 PVC Ø300 PVC
L=25.10m, S=0.51%
Ø300 PVC
NEW CONC CURB
L=15.52m, S=0.56%
NEW CONC SIDEWALK
NEW CONC SIDEWALK
SCALE: HOR=1:300, VERT=1:100
DRAINAGE LINE - 2B
A3
L=14.40m, S=0.52%
Ø300 PVC
L=20.57m, S=0.51%
Ø300 PVC
L=9.90m, S=0.56%
Ø300 PVC
NEW WATER LINE
NEW CONC SIDEWALK
NEW FIREWATER LINE
NEW AC PAVEMENT
NEW CONC BLOCK
GRAPHIC SCALE
10m510
1 : 100
201050 30m
1 : 300
PE 28mm CONDUIT
4WAY-TYPE VP100 DUCT
FEP 30mm CONDUIT
A R
C H
I T
E C
T
E
N G
I N
E E
R
T O
K Y
O
J A
P A
N
P A
E
D
E S
I G
N
F A
C I L
I T
Y
M
A N
A G
E M
E N
T
Z N
R E
F Y
J
F
L I G
M
U L
A T
C
I L
I T
Y
Y O
K O
S
E
J A
J A
P A
N
M
O
K A
N O
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
SHEET
DESIGN STAGE
D R
A W
I N
G
C
O D
E
SHEETSHEETSHEET OF 187
S U
B M
I T
T A
L
D
A T
E
P L
T
E
I S
O
A
Japan District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
A
R E
A
O
F F
I C
E
A P
O
A
P
C I V
I L
J O
N A
T H
S
T R
E L
L A
J
L
A S
T R
E L
L A
T
H
A Y
A S
H I
W
H V
D
A F
R E
V I S
V E
E
V A
T I O
N
1 1
FY16 C-130J Flight Simulator Facility Yokota AB, Japan
PRECAST CONC
CURB
APPLY EPOXY
ADHESIVE PRIOR TO
CONC APPLICATION
C-505
D R
A I N
A G
E
M
I S
C E
L L
A N
E O
U
T
A I L
S
NOT TO SCALE
SURFACE INLET DETAIL
A1
GRATING W/ FRAME
(T-25)
GRATING W/ FRAME
(T-25)
NEW PIPE
C-505
C4.1
REINFORCE CONCRETE
(24N/mm
D10 @200 BOTH WAYS
LEVELING CONCRETE
(18N/mm
GRAVEL BASE
(CRUSHER-RUN,RC-40)
SLOPE
SECTION
C4.1
NOT TO SCALE
GUTTER INLET DETAIL
C4
PLAN
NO. H
GI#4 950
165 400 150
165 400 150
H
100 715 100
M
I N
A R
C H
I T
E C
T
E
N G
I N
E E
R
T O
K Y
O
J A
P A
N
P A
E
D
E S
I G
N
F A
C I L
I T
Y
M
A N
A G
E M
E N
T
Z N
R E
F Y
J
F
L I G
M
U L
A T
C
I L
I T
Y
Y O
K O
S
E
J A
J A
P A
N
M
O
K A
N O
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
SHEET
DESIGN STAGE
D R
A W
I N
G
C
O D
E
SHEETSHEETSHEET OF 187
S U
B M
I T
T A
L
D
A T
E
P L
T
E
I S
O
A
Japan District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
A
R E
A
O
F F
I C
E
A P
O
A
P
C I V
I L
J O
N A
T H
S
T R
E L
L A
J
L
A S
T R
E L
L A
T
H
A Y
A S
H I
W
H V
D
A F
NOT TO SCALE
LADDER RUNG DETAIL
B4
Ø19 SUS 304 WITH
POLYPROPYLENE COAT
(YELLOW COLOR,
NON-SLIP TYPE)
NOT TO SCALE
DRAINAGE LINE TRENCHING DETAIL
C2
NOTE: DO NOT TAMP BACKFILL USING SHOVEL OF BACKHOE.
INITIAL SAW CUT
REMOVE & REPLACE
ASPHALT, 50mm MIN OR TO
MATCH EXIST THICKNESS
APPLY TACK COAT
C-505
A1.1
GRATING W/ FRAME (T-6)
NON-SLIP TYPE
BOLT LOCK TYPE
REINFORCE CONCRETE
(24N/mm
D10 @200 BOTH WAYS
LEVELING CONCRETE
(18N/mm
GRAVEL BASE
(CRUSHER-RUN,RC-40)
SECTION
A1.1
NOTE: STEEL GRATING SPACE @12.5mm O.C
PLAN
AC PAVEMENT AREA
P I P
E
O D
NEW PIPE
SAND THOROUGHLY TAMPED
BACKFILL IN 150mm
LAYERS THOROUGHLY TAMPED
BASE COURSE
COMPACTED TO AT LEAST
95% OF MAXIMUM DENSITY)
EXIST SUBBASE COURSE
EXIST AC PAVEMENT
2ND SAW CUT AND
APPLY TACK COAT
SUBBASE COURSE
COMPACTED TO AT LEAST
90% OF MAXIMUM DENSITY)
EXIST BASE COURSE
NO. H
SI#1 905
900SI#6
SI#7
1,200
150 600 150
150 600 150
H
100 900 100
GRATING W/ FRAME
(T-25)
NEW PIPE
C-505
C4.2
SECTION
C4.2
PLAN
210 400 150
GRATING W/ FRAME
(T-25)
SLOPE
REINFORCE CONCRETE
(24N/mm
D10 @200 BOTH WAYS
LEVELING CONCRETE
(18N/mm
GRAVEL BASE
(CRUSHER-RUN,RC-40)
210 400 150
H
M
I N
100 760 100
300 300
NO. H
EXIST INLET EXTERIOR WALL
CONCRETE PLUG
(18N/mm
EXIST PIPE
TO BE REMOVED AND DISPOSE
NOT TO SCALE
CONCRETE PLUG DETAIL
B5
SAND THOROUGHLY TAMPED
BACKFILL IN 150mm
LAYERS THOROUGHLY TAMPED
BASE COURSE
COMPACTED TO AT LEAST
95% OF MAXIMUM DENSITY)
CONC SIDEWALK AREA
P I P
E
O D
NEW PIPE
H
V A
R I E
S
S
O
F I L
E
SODDING AREA
CONCRETE SIDEWALK
1m H<3m
H<1m
DEPTH (H) SLOPE (N)
0.3
STRAIGHT
SAND THOROUGHLY TAMPED
BACKFILL IN 150mm
LAYERS THOROUGHLY TAMPED
NEW SODDING
P I P
E
O D
H
V A
R I E
S
S
O
F I L
E
PROVIDE NEW 100mm THK
TOP SOIL
NEW PIPE
H
V A
R I E
S
S
O
F I L
E
Z N
R E
C
GRATING W/ FRAME (T-6)
995x1000x65
BOLT LOCK TYPE
REINFORCE CONCRETE
(24N/mm
D13 @200 BOTH WAYS
LEVELING CONCRETE
(18N/mm
GRAVEL BASE
(CRUSHER-RUN,RC-40)
SECTION
A1.2
NOTE: STEEL GRATING SPACE @13.0mm O.C
200 900 200
H
100 1300 100
LADDER RUNG @300O.C
C-505
A1.2
200 900 200
PLAN
NO. H
SI#2
1,215
1,735
SI#3
SI#4
1,530
SI#5
1,365
SI#8
1,390
GI#6 900
50mm ANCHOR FLANGE
50mm ANCHOR FLANGE
DETECTABLE
WARNING TAPE
DETECTABLE
WARNING TAPE
DETECTABLE
WARNING TAPE
GRATING W/ FRAME
(T-25)
GRATING W/ FRAME
(T-25)
NEW PIPE
C-505
C4.3
REINFORCE CONCRETE
(24N/mm
D13 @200 BOTH WAYS
LEVELING CONCRETE
(18N/mm
GRAVEL BASE
(CRUSHER-RUN,RC-40)
SLOPE
SECTION
C4.3
PLAN
NO. H
1,875
GI#5
200 700 200
200 700 200
H
100 1100 100
M
I N
GI#2
1,775
GI#3
1,625
GI#1
1,770
A D
D I T
I O
N A
L
G
U T
T E
R
I N
L E
T
D
E T
A I L
LADDER RUNG @300O.C
FY16 C-130J Flight Simulator Facility Yokota AB, Japan
| ZNRE143000C-302 |
| ZNRE143000C-505 |
| ZNRE143000CU101 |
| ZNRE143000G-101 |
| 07 MECHANICAL.pdf |
| ZNRE143000M-002 |
| ZNRE143000M-103 |
| ZNRE143000M-601 |
| ZNRE143000M-602 |
| 08 ELECTRICAL.pdf |
| ZNRE143000E-001 |
| ZNRE143000E-401 |
| ZNRE143000E-402 |
| ZNRE143000E-602 |
| ZNRE143000E-603 |
| 09 TELECOMMUNICATIONS.pdf |
| ZNRE143000T-104 |
| ZNRE143000T-601 |
File details come from the government source that posted it. Updated .