Questions and Answers- 24 Sep 26.pdf
PDF 133 KB Posted
- Solicitation number
- W912HQ26S0077
About this file
This is a Questions and Answers document addressing clarifications on controls and equipment for a federal contract opportunity involving HVAC systems management and maintenance.
The document contains eight questions and answers organized by equipment category: Controls/Liebert IRC, Liebert CRV/IRC Equipment, Multistack Chiller, and related systems. Key technical details include: the centralized management system is specified as a BAS system using Niagara Tridium V4.13.3.48; the Liebert IRC controllers are existing and require programming/configuration under the contract scope; a controls point list and Sequence of Operations are not available (N/A); all 12 existing Liebert CRV units are currently operational despite some error codes noted in the SOW; and equipment schedule details including serial/instance numbers and nameplate information for the 12 CRV units and 2 IRC controllers are referenced in an attachment. The document also addresses a failed CRV top fan component, for which serial and model information were provided during a site walkthrough, and requests equipment nameplate information and photographs for an existing Multistack chiller, with detailed specifications referenced in a supporting attachment. The answers indicate that redundancy and failover testing protocols are controlled through the Liebert IRC system, though the specific network control method (BAS/BMS versus Liebert internal unit-to-unit network) is referenced but not explicitly confirmed in the provided responses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Multistack Model.jpeg | JPEG file | |
| equipment schedule serial_instance .jpeg | JPEG file | |
| Questions and Answers- 22 Sep 26.pdf | ||
| CSS_Full Start-Up Commissioning of Data Center Cooling (002).pdf | ||
| CSS_Full Start-Up Commissioning of Data Center Cooling.pdf | ||
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controls / Liebert IRC
1. What system is being referenced as the “centralized management system” in the
SOW?
BAS system Niagara Tridium V4.13.3.48
2. Are the Liebert IRC controllers existing and currently programmed, or is programming/configuration required under this scope?
Yes
3. If available, please provide the applicable controls point list and Sequence of Operations.
N/A
Liebert CRV / IRC Equipment
4. Please provide the equipment schedule, serial/instance numbers, or available nameplate information for the 12 existing Liebert CRV units and 2 IRC controllers.
See Attachment
5. Please confirm whether the existing CRV units are currently operational.
All are operational with some error code as per SOW.
6. For redundancy/failover testing, please confirm whether the CRV units are controlled through the facility BAS/BMS or through the Liebert internal unit-to-unit (U2U) network.
Liebert IRC
7. For the failed CRV top fan identified in the SOW, please provide the applicable CRV serial/instance number or equipment nameplate information, if available.
Serial and model were provided during site walk.
Multistack Chiller
8. Please provide the model number, serial number, and/or available equipment nameplate information for the existing Multistack chiller identified in the SOW. If available, a photograph of the equipment nameplate would also be helpful.
See attachment.