This Request for Proposals solicits proposals for program support services for the Strategic Environmental Research and Development Program and the Environmental Security Technology Certification Program. Key details include:
-
The solicitation seeks proposals for an Indefinite Delivery Indefinite Quantity contract with a base year and four one-year options to provide program management, technical, administrative, and financial support services.
-
Proposals are due by 4:30PM Eastern Daylight Time on June 23, 2022. Award will be made based on best value using a tradeoff process.
-
The work includes program planning, technical and financial oversight, document and proposal review, project tracking, outreach, and meeting support. It involves support for environmental research, energy technology, and operational energy programs.
-
Pricing will be firm fixed-price for task orders under the IDIQ. Reimbursable travel costs and other direct costs will be negotiated separately in task orders.
-
The place of performance is primarily the contractor's facility with occasional travel. The period of performance spans one base year and up to four option years.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A X B X C
D
EX
X G F 54 - 61
62 - 69 X H 70 - 76
David.A.Kaplan@usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 76
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912HQ 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
DAVID A KAPLAN 703-428-8487
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 12
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
13 - 41 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
43 - 44
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 45 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 46 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
47 - 52
PART II - CONTRACT CLAUSES
USACE HUMPHREYS ENGR CTR SPT ACTIVITY
ATTN: CEHEC-CT,
7701 TELEGRAPH ROAD
ALEXANDRIA VA 22315-3860
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912HQ22R0008 23 MAY 2022
4:30 PM 23 JUNE 2022
W912HQ22R0008
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Project Program Support Services - Base Year
FFP
Contractor shall provide all labor, supervision, and management necessary to complete the required services for the Base Year of the Period of Performance (POP) in accordance with the attached Performance Work Statement (PWS) entitled "SERDP, ESTCP, OECIF, & OEPF Support".
FOB: Destination
PSC CD: R408
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0002 1 Project Other Direct Costs - Base Year
FFP
Routine supplies and reproduction costs should be covered in overhead expenses.
Excessive supplies (materials used in multiple sets such as management reports, etc), special equipment requirements, or multiple reproduction costs (more than three copies) will be negotiated with each task order.
FOB: Destination
PSC CD: R408
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0003 1 Project Travel - Base Year
FFP
Travel will be negotiated at the task order level. The Government will reimburse travel at cost (including applicable overhead and/or G&A costs), without any fee.
FOB: Destination
PSC CD: R408
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
1001 1 Project OPTION Program Support Services - Option Year 1
FFP
Contractor shall provide all labor, supervision, and management necessary to complete the required services for Option Year 1 of the POP in accordance with the attached PWS entitled "SERDP, ESTCP, OECIF, & OEPF Support".
FOB: Destination
PSC CD: R408
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
1002 1 Project OPTION Other Direct Costs - Option Year 1
FFP
Routine supplies and reproduction costs should be covered in overhead expenses.
Excessive supplies (materials used in multiple sets such as management reports, etc), special equipment requirements, or multiple reproduction costs (more than three copies) will be negotiated with each task order.
FOB: Destination
PSC CD: R408
UNIT UNIT PRICE MAX AMOUNT
1003 1 Project OPTION Travel Costs - Option Year 1
FFP
Travel will be negotiated at the task order level. The Government will reimburse travel at cost (including applicable overhead and/or G&A costs), without any fee.
UNIT UNIT PRICE MAX AMOUNT
2001 1 Project OPTION Program Support Services - Option Year 2
FFP
Contractor shall provide all labor, supervision, and management necessary to complete the required services for Option Year 2 of the POP in accordance with the attached PWS entitled "SERDP, ESTCP, OECIF, & OEPF Support".
UNIT UNIT PRICE MAX AMOUNT
2002 1 Project OPTION Other Direct Costs - Option Year 2
FFP
Routine supplies and reproduction costs should be covered in overhead expenses.
Excessive supplies (materials used in multiple sets such as management reports, etc), special equipment requirements, or multiple reproduction costs (more than three copies) will be negotiated with each task order.
UNIT UNIT PRICE MAX AMOUNT
2003 1 Project OPTION Travel Costs - Option Year 2
FFP
Travel will be negotiated at the task order level. The Government will reimburse travel at cost (including applicable overhead and/or G&A costs), without any fee.
UNIT UNIT PRICE MAX AMOUNT
3001 1 Project OPTION Program Support Services - Option Year 3
FFP
Contractor shall provide all labor, supervision, and management necessary to complete the required services for Option Year 3 of the POP in accordance with the attached PWS entitled "SERDP, ESTCP, OECIF, & OEPF Support".
UNIT UNIT PRICE MAX AMOUNT
3002 1 Project OPTION Other Direct Costs - Option Year 3
FFP
Routine supplies and reproduction costs should be covered in overhead expenses.
Excessive supplies (materials used in multiple sets such as management reports, etc), special equipment requirements, or multiple reproduction costs (more than three copies) will be negotiated with each task order.
UNIT UNIT PRICE MAX AMOUNT
3003 1 Project OPTION Travel Costs - Option Year 3
FFP
Travel will be negotiated at the task order level. The Government will reimburse travel at cost (including applicable overhead and/or G&A costs), without any fee.
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
4001 1 Project OPTION Program Support Services: Opt. to Extend
FFP
Contractor shall provide all labor, supervision, and management necessary to complete the required services for the Option to Extend under FAR 52.217-8 of the POP in accordance with the attached PWS entitled "SERDP, ESTCP, OECIF, & OEPF Support".
FOB: Destination
PSC CD: R408
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
4002 1 Project OPTION Other Direct Costs - Option to Extend
FFP
Routine supplies and reproduction costs should be covered in overhead expenses.
Excessive supplies (materials used in multiple sets such as management reports, etc), special equipment requirements, or multiple reproduction costs (more than three copies) will be negotiated with each task order.
FOB: Destination
PSC CD: R408
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
4003 1 Project OPTION Travel Costs - Option to Extend
FFP
Travel will be negotiated at the task order level. The Government will reimburse travel at cost (including applicable overhead and/or G&A costs), without any fee.
FOB: Destination
PSC CD: R408
MAX
NET AMT
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$10,000.00 $47,414,607.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$2,500.00 $47,414,607.00
CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE
The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
0001 $2,500.00 $10,284,750.00 0002 $220,000.00 0003 $154,400.00 1001 $2,500.00 $10,479,959.00 1002 $158,000.00 1003 $150,000.00 2001 $2,500.00 $10,479,959.00 2002 $158,000.00 2003 $150,000.00 3001 $2,500.00 $10,479,959.00 3002 $158,000.00 3003 $150,000.00 4001 $2,500.00 $5,239,979.00 4002 $79,000.00 4003 $75,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
0001 $2,500.00 $10,284,750.00
0002 $ $220,000.00
0003 $ $154,400.00
1001 $2,500.00 $10,479,959.00
1002 $ $158,000.00
1003 $ $150,000.00
2001 $2,500.00 $10,479,959.00
2002 $ $158,000.00
2003 $ $150,000.00
3001 $2,500.00 $10,479,959.00
3002 $ $158,000.00
3003 $ $150,000.00
4001 $2,500.00 $5,239,979.00
4002 $ $79,000.00
4003 $ $75,000.00
PRICE SCHEDULE - LABOR
This award incorporates the Offeror’s Technical Proposal dated (to be completed at time of award) at the binding labor rates shown in the schedule below.
Binding Labor Rates Unit Price Schedule. The Contractor shall provide services at the following fixed, fully loaded rates:
Labor Category Base Opt. Yr. 1 Opt. Yr. 2 Opt. Yr. 3 Opt. to Extend
Project Manager (PM) Deputy Project Manager
(DPM)
IT Specialist (ITS) Technical Reviewer (TR) Program Assistant 1
(PA1)
Program Assistant 2
(PA2)
Technical Specialist (TS) Financial Speacialist (FS) Administrative/Clerical (A/C)
Contractor shall use the labor rates in this schedule to price all task orders and task order modifications issued throughout the life of the contract. The labor rates in this schedule are the ceiling rates. The contractor may use labor rates that are lower than the ceiling rates. Contractor shall not exceed the negotiated ceiling rates.
The resulting IDIQ contract includes a base ordering period of one year, three (3) one-year option periods, and a six-month option to extend services in accordance with FAR 52.217-8. There is no guarantee that the option periods will be exercised on the awarded contract. The minimum guaranteed order shall be $10,000.00 for the base year. The
Contracting Officer is under no obligation to issue any task orders against this contract in excess of the minimum guarantee amount. The maximum capacity of this contract is $47,414,607.00. The Government reserves the right to move unused capacity between CLINs and performance periods as necessary. The only authorized ordering office is the US Army Corps of Engineers (USACE) – Humphreys Engineer Center Support Activity (HECSA).
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
Performance Work Statement (PWS)
SERDP, ESTCP, OECIF, & OEPF Support
1. OBJECTIVE
The Strategic Environmental Research and Development Program (SERDP), the Environmental Security Technology Certification Program (ESTCP), the Operational Energy Capability Improvement Fund (OECIF), and the Operational Energy Prototyping Fund (OEPF) require program support to execute their missions of developing and demonstrating technologies that meet the Department of Defense (DoD) environmental and energy requirements. SERDP, ESTCP, OECIF and OEPF are separate programs that are managed through a joint program office. Support is needed at the program level and in each of the technical areas in which these programs invest.
2. BACKGROUND
SERDP is a multi-agency research and development program that was established by Congress in 1991. As described in Title 10, U.S.C. Sections 2901-2904, the major focus of SERDP is to “address environmental matters of concern to the Department of Defense and the Department of Energy through support for basic and applied research and development of technologies that can enhance the capabilities of the departments to meet their environmental obligations.” SERDP supports environmental research and development activities in government, industry, and academic laboratories in the areas of Environmental Restoration, Munitions Response, Weapons Systems and Platforms, and Resource Conservation and Resiliency.
ESTCP is a DoD demonstration and validation program for environmental and energy technologies. The DoD established ESTCP in fiscal year 1995. ESTCP demonstrates and validates innovative technologies that target DoD’s most urgent environmental needs and are projected to pay back the investment through cost savings, increased efficiency, and improved environmental outcomes. The program provides funding to government, industry, and academic institutions to conduct demonstrations in the areas of Environmental Restoration, Munitions Response, Weapons Systems and Platforms, Resource Conservation and Resiliency, and Installation Energy and Water.
It is anticipated that a program area on Climate Resilience will be added in late 2022.
OECIF is a DoD program whose mission is to guide operational energy innovation via targeted science and technology investments. As defense-wide funding, it incentivizes science and technology to promote long term change in DoD capabilities, so they are better aligned with the Operational Energy Strategy. OECI fosters innovation to improve operational energy performance and has two key mission aspects: (1) to develop, demonstrate and transition into use operational energy technologies and practices that will improve DoD military capabilities and/or reduce costs and (2) to establish within the military Services sustainable, institutional capability to continue to research, develop, and adopt operational energy innovations. OECI funds serve as “seed money” to start or consolidate promising operational energy programs to be sustained by the Services;
accordingly, OECI generally emphasizes supporting or establishing programs, with the Services or Combatant Commands.
OEPF is a DoD program to identify and demonstrate the most promising, innovative, and cost-effective technologies and methods that address joint high-priority operational energy requirements. OEP funding efforts will identify and mitigate energy-related risks and increase warfighting capabilities and resilience. OEP will invest in prototype and demonstrations (BA 6.4) that enter around Technology Readiness Level (TRL) 6 and complete at TRL 8/9. OEP serves as the program by which operational energy technology advances, especially those made under the OECIF, can transition to military service acquisition programs. Transition plans for each prototype will be established to ensure that components have time to plan, program, and budget for technology transition to programs of record.
Details about the SERDP and ESTCP program structure, current projects, examples of solicitation documents, project requirements, and examples of program outreach can be found on the joint SERDP and ESTCP web site, www.serdp-estcp.org. Details about OECIF and OEPF can be found at www.oecif.org.
3. TYPE OF SUPPORT
The required services are expected to break out as roughly:
1. Technical Review of Proposals and Documents: 35%
2. Direct Support to Program Areas: 30%
3. Administrative and Financial: 15%
4. Meeting Planning, Logistics and Support: 10%
5. Outreach: 10%
All personnel shall be qualified by education and experience appropriate to perform their assigned tasks. The following key personnel are essential to management and oversight, and shall meet the minimum specific qualifications outlined.
Project Manager: The project manager shall have a minimum of 7 years’ experience in project management, including 3 years’ experience managing a team of the size and diversity of skills needed to perform the work described. The project manager shall have experience with government management of research and development, as well as familiarity with the structure and management of the DoD. The project manager must have sufficient technical training so as to be capable of managing and assuring the technical quality of the support provided, including technical reviews.
Information Technology Specialist: Three essential elements of the work described below are the online project management system, the online proposal management and evaluation system, and the SERDP and ESTCP joint web site. To manage these elements, the contractor must demonstrate that the individual in the role of providing oversight for the information technology enterprise has expertise in state-of-the-art hardware and software, including experience in web site management, database management, on-line reporting and management systems, acceptance and management of electronic proposals, and the appropriate security protections.
4. GENERAL REQUIREMENTS
This section describes the general requirements for this effort. The following sub-sections provide details of various considerations on this effort.
4.1 Non-Personal Services
The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.
4.2 Business Relations
The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.
4.3 Contract Administration and Management
The following subsections specify requirements for contract, management, and personnel administration.
4.3.1 Contract Management: The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement.
4.3.2 Contract Administration: The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders.
4.3.3 Personnel Administration: The contractor shall provide the following management and support as required. The contractor shall provide for employees during designated Government non-work days or other periods where Government offices are closed due to weather or security conditions. The contractor shall maintain the currency of their employees by providing initial and refresher training as required to meet the PWS requirements. The contractor shall make necessary travel arrangements for employees. The contractor shall provide necessary infrastructure to support contract tasks. The contractor shall provide administrative support to employees in a timely fashion (time keeping, leave processing, pay, emergency needs, etc.).
4.4 Subcontract Management
The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest considerations. Cross teaming may or may not be permitted.
4.5 Contractor Personnel, Disciplines, and Specialties
The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources. The contractor shall ensure the labor categories as defined in the Labor Categories document (see Appendix A), labor rates, and man-hours utilized in the performance of each task order issued hereunder will be the minimum necessary to accomplish the task.
4.6 Location of Work
Accomplishment of the results contained in this PWS requires work primarily at the contractor’s and subcontractor’s location, with occasional domestic travel to be determined at the task order level. The administrative tasks described in Section 5.1.10 will be performed on-site at the SERDP and ESTCP Office. The Program Area Support tasks described in Section 5.2 will require approximately bi-weekly visits to the SERDP and ESTCP Office.
4.7 Travel / Temporary Duty (TDY)
Travel to government facilities or other locations may be required and will be specified in the individual task order PWS. All travel requirements (including plans, agenda, itinerary, or dates) shall be pre-approved by the government (subject to local policy procedures), and is on a strictly cost reimbursable basis. Costs for travel shall be billed in accordance with the regulatory implementation of Public Law 99-234 and FAR 31.205-46 Travel Costs.
5. SERDP & ESTCP PERFORMANCE REQUIREMENTS
The contractor shall provide comprehensive technical, programmatic, and administrative support services for the Program Office in the Washington, D.C. area. The contractor shall provide services to the Executive Director and his staff to meet all program planning, technical and financial oversight, and management needs to the two programs. This includes support for the Program Office located in Alexandria, VA.
5.1 Program Level Support
5.1.1 Web-Based Reporting System: The contractor shall support and maintain a web-based project tracking system for approximately 350 active SERDP and ESTCP projects. The incumbent contractor currently maintains the SERDP and ESTCP Management System (SEMS), which is used to track technical and financial status of projects, contract actions, document status, financial planning, and distribution. The contractor shall adhere to security plans for SEMS according to industry best practices.
5.1.2 Solicitation: The contractor shall administratively manage one annual solicitation each for
SERDP and ESTCP, an Open Broad Agency Announcement (BAA) each for SERDP and ESTCP, as well as additional special solicitations as needed. Tasks include (a) assisting with updating and preparing proposal submittal instructions and announcements; (b) administratively supporting the integration of technical input to the annual Statements of Need (SONs) and topic areas; and (c) disseminating outreach materials describing the solicitations, including but not limited to the SERDP and ESTCP joint web site, ListServe, and support of a webinar. The contractor shall support special studies and workshops as needed for solicitation development.
5.1.3 Proposal Management and Selection: The contractor shall provide technical and programmatic support to execute the SERDP and ESTCP solicitations. Both programs request a brief pre-proposal that is the basis for requesting or not requesting a full proposal.
Tasks include maintaining an electronic proposal submittal and tracking system;
administrative assistance with drafting selection plans and procedures, and associated documentation; administrative assistance with technical evaluations of proposals; and drafting and disseminating notification to proposers.
5.1.4 Information Requests and Programming Actions: The contractor will assist the director in responding to requests from the Office of the Secretary of Defense, the Congress, the General Accountability Office, and other similar requests. The contractor shall assist in drafting and maintaining budget exhibits (R-2/R-3/R-4).
5.1.5 Financial: The contractor shall provide assistance to the director and financial officer. Tasks include assisting with the preparation of funding documents; tracking execution of ~200 projects; and tracking the status of approximately 200 invoices per month.
5.1.6 SERDP Scientific Advisory Board (SAB) and Technical Review Board (TRB): The contractor shall provide technical and program support to the director in managing the SAB and the TRB. The SAB is a Federal Advisory Committee governed by the Federal Advisory Committee Act (FACA) that meets four times per year. Tasks include development and distribution of agendas and read-ahead materials for SAB meetings; meeting site selection and logistics; on-site support; recording, and tracking action items from meetings; recording official minutes; maintaining correspondence and schedule for membership appointments;
assistance with preparing the annual FACA report; and meeting all other FACA requirements.
The TRB is comprised of the SERDP director, deputy director, program managers, and select federal employees. The TRB meets up 4 or 5 times per year, only if the SAB is not meeting within that year. Tasks include development and distribution of agendas and read-ahead materials for TRB meetings; meeting site selection and logistics; on-site support; recording, and tracking action items from meetings; and recording official minutes.
5.1.7 SERDP Annual Report: The contractor shall assist with drafting the SERDP Annual
Report, as required by Statute. Tasks include assembling all current year and planned future year investments and activities and drafting a summary of SAB activities for the year of the report.
5.1.8 Document Management: The contractor will track the status of all documents associated with SERDP and ESTCP projects, including receipt, review, revision, submission for clearance, and posting to the joint web site and the Defense Technical Information Center (DTIC). Document status shall be tracked electronically in a web-accessible format that is easily accessed by federal program staff. The contractor shall prepare DoD forms to clear documents for public release and interact with the reviewing office in DoD.
5.1.9 Special Studies and Analyses: The contractor shall provide technical and administrative support to meet the needs of SERDP and ESTCP in response to information requests, program development, technology transfer, and collaboration.
5.1.10 Administrative Support: The contractor shall provide the administrative support needed to execute the requirements set forth in this PWS. Tasks will include assistance with correspondence, preparation and tracking of packages for the Office of the Secretary of Defense (OSD), assistance with travel planning, preparation and transmittal of contracting packages, maintenance of office files, interaction with DoD security and building management, interaction with DoD IT staff, and maintenance of an annual master program schedule.
5.2 Program Area Direct Support
The contractor shall provide direct support to each Program Area under SERDP and ESTCP. The direct support will involve assisting the Program Manager throughout the life cycle of investments, including solicitation planning, proposal review and selection, tracking project execution, and ending with technology transfer. Each Program Area requires a designated support staff possessing excellent executive management skills in order to assist with the management of a multitude of deliverables, meetings, and information requests. Specific support activities that are required are described in the following sections.
5.2.1 Manage Project Selection Process: An annual solicitation is released each year under both
SERDP and ESTCP. Historically, approximately 800-1000 pre-proposals and 250 full proposals are received for the combined solicitations. Within each Program Area, the contractor shall administratively manage the project selection process, to include the following:
Assist the Program Manager with the development of the Program Area’s solicitation topic.
Coordinate the technical review of submitted proposals, as described in Section 5.1.3, including assisting with the selection and notification of peer reviewers, and interfacing with Technical Review Committees.
Assist with the development of response letters to Principal Investigators (PIs).
Assist with the organization of selection meetings, including developing agendas, interfacing with PIs, collecting presentations in advance, and conducting the meeting.
5.2.2 Project Technical and Financial Tracking: The PI for each project is required to submit specific technical and financial information to the SERDP and ESTCP Office. Technical and financial information is summarized in a number of different reports and includes the following:
Monthly financial reports (MFRs) (required of all projects) Quarterly progress reports (QPRs) (required of all projects) Demonstration Plan (required for all ESTCP projects) Interim Report (at least one required for all core SERDP projects) Final Report (required for all projects) Miscellaneous project-specific reports
Historically, excluding the MFRs and QPRs, a total of approximately 700 documents are received in a year. The contractor shall track technical and financial information through every step of the review process as described in Section 5.1.8, including the following:
Review the database for delinquent reports and contact lead investigators regarding delinquent reports as necessary.
Enter tracking information into a database for all documents excluding MFRs and QPRs.
Coordinate the technical review of documents as needed.
Incorporate technical reviewer comments into response letters to the PI for Program
Office review as needed.
5.2.3 Manage Technical Progress Meetings: All SERDP and ESTCP PIs are required to attend an in-person meeting on an annual basis to provide an overview of project results to the Program Office. The contractor shall manage these technical progress meetings, to include the following:
Track projects to ensure they attend progress meetings on the appropriate schedule.
Assist the Program Manager in the development and distribution of meeting agendas.
Interface with PIs and the Technical Review Committee to communicate logistical details.
Collect final presentations from PIs.
Assist with the development of response letters to PIs after the meeting.
Assist with conducting the meeting.
5.2.4 Represent Program Office at Technical Conferences: The Program Office attends approximately 10 national conferences per year and displays a booth at these meetings to highlight the Programs and encourage future participation in the solicitation process. The contractor shall attend these conferences, maintain and display the booth, and answer questions from conference attendees about SERDP and ESTCP.
5.2.5 Other Duties: The contractor shall provide additional direct support to the program areas in responding to data requests, maintaining orderly and up to date project information in SEMS and tracking deviances, planning and attending program area-related meetings, tracking project contracting actions and funding distributions, and attending and documenting other project-related calls and meetings including kick off calls and final project summary briefings.
5.3 Technical Review
The contractor shall provide technical review of documents and proposals as required by SERDP and ESTCP. Effective technical review will require personnel with expertise in a wide variety of technical topics including environmental engineering, ecology, materials science, chemistry, energetic materials, electromagnetics, underwater acoustics, contaminated groundwater and sediments, munitions constituents, energy efficiency technologies, cybersecurity, renewable energy, and microgrids. As the SERDP and ESTCP portfolios evolve, additional expertise beyond this list may be required.
The technical reviewers shall have advanced degrees (generally a Ph.D. or a MS with 5+ years of experience) in their specified technical areas. Reviewers shall have sufficient familiarity with the environmental requirements of the DoD to make recommendations as to the technical merit of proposed and ongoing work, and its value to the DoD.
Specific support activities required are described in the following sections.
5.3.1 Demonstration Plans and Reports: Each SERDP and ESTCP project is required to submit a number of technical reports over the life of the project. These include:
Demonstration Plans (required for all ESTCP projects), Interim Reports (at least one required for all core SERDP projects), Final Reports (required for all projects), and Miscellaneous project-specific reports.
Historically, a total of 700 of these documents are received in a year. The contractor shall engage subject matter experts for an independent, critical review of each submitted document. The normal turn-around time expected for these reviews is three weeks, although the vagaries of field site availability or weather windows may require a shorter turn-around in a limited number of cases.
5.3.2 Pre-proposals and Proposals: Both SERDP and ESTCP release an annual solicitation for proposals. Historically, approximately 800-1000 pre-proposals and 250 full proposals are received in response to these solicitations.
For each pre-proposal, the contractor shall provide a review to evaluate relevance and feasibility, and will offer technical advice to support SERDP and ESTCP in deciding whether to request a full proposal.
For each full proposal requested, the contractor shall arrange for peer review by three to five outside experts identified by the contractor and approved by the Director.
For each proposal recommended by the peer reviewers, the contractor shall summarize the review comments and provide technical advice to the Program Manager to support a decision on whether to fund the proposal.
The technical experts who review the proposals may be required to support the Program Manager at a Technical Committee selection meeting and subsequent In- Progress Reviews.
5.3.3 New Technical Challenges and Modifications to Existing Program Areas: As the environmental challenges confronting the DoD evolve, SERDP and ESTCP evolve to meet these challenges. This may take the form of modifications to the emphasis of existing Program Areas or the establishment of new Program Areas. Often these changes are accomplished by convening a workshop of technical experts to assist SERDP and ESTCP in defining requirements and drafting a research strategy in response to these requirements. As needed, the contractor shall identify technical experts in any new area identified by the director of SERDP and ESTCP, vet these experts, and make them available to support workshops and planning sessions. Subsequent to any modifications to SERDP and ESTCP, these technical experts, or others similarly qualified, shall be available for proposal and document review as described above.
5.4 Meeting Planning, Support, and Logistics
5.4.1 Proposal and Project Reviews: The contractor shall provide support for program meetings as listed below. Tasks will include assistance with developing and distributing agendas and read-ahead materials, receipt and organization of presentations, identifying and procuring space, on-site meeting support, note taking, and summarizing and documenting action items.
The contractor shall be capable of supporting on-line meetings and webinars for up to 1500 people. For meetings where required (In Progress Reviews [IPRs], SAB, and Selection Meetings at a minimum), the contractor shall provide computer access for up to 20 attendees to provide real-time comments through web-based meeting software.
In-Progress Reviews: IPR meetings are held three times per year. Every core project that SERDP and ESTCP fund is required to provide an IPR presentation at least once per year. Typically, there are a total of 40-45 days of IPR meetings per year.
SAB: The SERDP SAB is required by statute to meet 4 times per year. Meetings are typically 1-2 days. Three meetings per year are held in the Washington, D.C. area.
One meeting is often held at a DoD installation and includes a tour of DoD activities relevant to SERDP.
TRB: The SERDP TRB meets 4 -5 times per year only when SAB meetings cannot be convened. Meetings are typically 1-2 days. These meetings are held in the Washington, D.C. area.
SERDP Selection Meetings: Each of the four SERDP Program Areas holds a one-to two-day meeting to select proposals for funding annually.
ESTCP Selection Meetings: Each of the five current ESTCP Program Areas holds one meeting annually to review pre-proposals. These meetings are 0.5-2 days’ duration. The five areas also each hold one meeting to review full proposals. These meetings involve in-person presentations by proposers and are typically 2-4 days’ duration.
5.4.2 Workshops and Special Technical Meetings: The contractor shall provide technical, program, and administrative support for occasional meetings hosted by SERDP and ESTCP.
Such meetings may include project reviews, technology transfer meetings, workshops, and other focused technical meetings. These meetings may vary in size from 10 to 200 participants. Tasks will include developing agendas, organizing speakers, organizing and disseminating read-ahead material, planning and acquiring space, making arrangements for hotel room blocks, providing on-site support, taking meeting notes, and drafting summary reports.
5.5 Outreach
5.5.1 Web Site: The contractor shall maintain and host the SERDP and ESTCP joint web site, keep content current, draft news stories and blogs, update and draft content for web pages, and produce pages for new start and complete projects. The contractor shall update the web site as needed, to include transfer to a new operating platform and an update of the content structure. The SERDP and ESTCP web site can be accessed at www.serdp-estcp.org.
5.5.2 Webinar Series: The contractor shall provide support for a series of regular bi-weekly webinars with a capacity of up to 2000 attendees. The contractor shall be responsible for maintaining a schedule in consultation with SERDP and ESTCP staff, contacting presenters, coordinating presentations, providing all needed technical support, and recording and editing webinars for archiving on the SERDP and ESTCP web site.
5.5.3 ListServe: The contractor shall maintain the SERDP and ESTCP ListServe, which currently has approximately 15,000 subscribers, and periodically disseminate information at the direction of SERDP and ESTCP.
5.5.4 Social Media: The contractor will maintain SERDP and ESTCP social media presence on
Twitter, Linked-In, Facebook, and Google+, as well as other emerging social media as appropriate. The contractor shall regularly post notices, including but not limited to new start projects, recently completed reports, awards to investigators, and significant events in the DoD related to energy and environment.
5.5.5 Newsletters: The contractor will assemble and disseminate the SERDP and ESTCP
Headlines newsletter three times per year as well as Program Area specific newsletters up to once per month per Program Area. Most content is derived from materials already produced for the web site. Additional content will be required in the areas of program updates, news, and announcements.
5.5.6 Conference Support: The contractor shall represent and promote SERDP and ESTCP technical conferences relevant to the programs. Tasks include maintenance and support of an exhibit booth, preparing technical presentations, and supporting training sessions on technology implementation.
5.6.7 Technology Transfer Products: The contractor shall prepare as needed draft and final briefing slides, web pages, and written summaries of technologies, project status, demonstration results, and program accomplishments suitable for a variety of audiences, including DoD decision makers, end users, and regulators.
5.6.8 Symposium: The contractor shall provide technical and administrative support for a joint SERDP and ESTCP Symposium to be held in the Washington, D.C. area in a major conference center. The contractor shall cover all requirements to plan, publicize and execute a national technical conference that has recently attracted 1000 to 1200 attendees. It is expected that future symposia will be similar in format to prior symposia, including a plenary session, multiple concurrent technical sessions, poster sessions, and short courses.
Information regarding prior symposia is on the SERDP and ESTCP web site at https://www.serdp-estcp.org/News-and-Events/Conferences-Workshops.
6. OECIF AND OEPF PERFORMANCE REQUIREMENTS
The contractor shall provide comprehensive technical, programmatic, administrative, and financial support services for the Operational Energy – Innovation Directorate including support to OECIF and the OEPF Program Offices in the Washington, D.C. area. The contractor shall provide services to the Program Manager and their staff to meet all program planning, technical and financial oversight and management needs to the two programs. This includes support for the Program Office located in Alexandria, VA.
6.1 Program Level Support
6.1.1 Web-Based Reporting System: The contractor shall host and maintain a web-based project tracking system for approximately 250 active and in-active OECIF and OEPF projects through the Operational Energy Management System (OMS), which is used to track the technical and financial status of projects, financial, technical, and program/project management actions, document status, financial planning and distribution. The contractor shall adhere to security plans for OEMS according to industry best practices.
6.1.2 Solicitation: The contractor shall manage tasks associated with annual OECIF and OEPF Energy Technologies solicitations. Tasks include (a) assisting with updating and preparing proposal submittal instructions and announcements; (b) administratively supporting the integration of technical input to the topic areas; and (c) disseminating outreach materials describing the solicitations, including but not limited to the OECIF and OEPF joint web site, ListServe, and support of four webinars. The contractor shall support special studies and workshops as needed for solicitation development and proposal team building.
6.1.3 Proposal Management and Selection: The contractor shall provide technical and programmatic support to proposal management and selection of proposals under the OECIF and OEPF solicitations. Both programs request a brief pre-proposal that is the basis for requesting or not requesting a full proposal. Tasks include maintaining an electronic proposal submittal and tracking system; administrative assistance with drafting selection plans, procedures, and associated documentation; administrative assistance with drafting selection plans and procedures, and associated documentation; administrative assistance with technical evaluations of proposals; assisting with hosting and support of the Proposal
Evaluation Board (PEB) for at least 2 week-long review and selection meeting, and drafting and disseminating notification to proposers and senior leadership.
6.1.4 Information Requests and Programming Actions: The contractor will assist the director in responding to requests from the Office of the Secretary of Defense, the Congress, the General Accountability Office, and other similar requests. The contract shall assist in drafting and maintaining budget exhibits (R-2/R-3/R-4).
6.1.5 Financial: The contractor shall provide assistance to the director and their team. Tasks include assisting with the preparation of funding documents; tracking execution of ~50 active projects and ~100 in-active projects; and tracking the status of approximately 400 invoices per month.
6.1.6 Document Management: The contractor will track the status of all documents associated with OECIF and OEPF projects, including receipt, review, revision, submission for clearance, and posting to the joint web site, the National Archives and Record Administration (NARA), and DTIC. Document status shall be tracked electronically in a web-accessible format that is easily accessed by federal program staff. The contractor shall prepare DoD forms to clear documents for public release and interact with the reviewing office in DoD. OECIF and OEPF projects publish regularly, the contractor should anticipate 5-10 publication clearance requests monthly.
6.1.7 Program Wide Support: The contractor shall provide program wide support needed to execute the requirements set forth in this PWS. Tasks will include assistance with correspondence, preparation and tracking of packages for OSD, assistance with travel planning, preparation and transmittal of contracting packages, maintenance of office files, interaction with DoD security and building management, interaction with DoD IT staff, and maintenance of an annual master program schedule.
6.2 Program Area Direct Support
The contractor shall provide direct support to each portfolio area under OECIF and OEPF. The direct support will involve assisting the Program Manager and Portfolio Leads throughout the life cycle of investments, including solicitation planning, proposal review and selection, tracking project execution, and ending with technology transfer. There are four portfolio areas (Powering the Force, Electrifying the Battlespace, Commanding Energy, and Nuclear) that each require a designated support staff possessing excellent executive management skills in order to assist with the management of a multitude of deliverables, meetings, and information requests. Specific support activities that are required are described in the following sections.
6.2.1 Manage Project Selection Process: An annual solicitation is released each year.
Historically, approximately 300 proposals are received, and half are invited to submit full proposals. Within each Portfolio Area, the contractor shall administratively manage the project selection process, to include the following:
Assist the Program Manager with the development of the Program Area’s solicitation topic(s).
Preparing for the technical review of submitted proposals, including interfacing with
Proposal Evaluation Board and Proposal Submission Teams.
Assisting with the development of response letters to PIs.
Assisting with the organization and facilitation of selection meetings, including developing agendas, interfacing with PIs, collecting presentations in advance, and conducting the meeting.
6.2.2 Project Technical and Financial Tracking: The PI for each project is required to submit specific technical and financial information to the OECIF and OEPF Program Office.
Technical and financial information is summarized in a number of different reports and includes the following:
Monthly financial reports (MFRs) (required of all projects) Quarterly progress reports (QPRs) (required of all projects) Demonstration Plan (required for all projects) Annual Technology Exchange briefing (at least one required for all projects) Final Report (required for all projects) Miscellaneous project-specific reports
Historically, excluding the MFRs and QPRs, OECIF and OEPF receive a total of approximately 150 documents in a three-month period, including all revisions.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .