A.07.24_Amendment_0002_W912HP-18-B-0003_Approved.pdf

PDF 138 KB Posted

Attached to
Atlantic Intracoastal Waterway Maintenance Dredging - Georgetown to Charleston
Solicitation number
W912HP-18-B-0003
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
B.01.02_18B0003_Abstract.pdf PDF
A.07.24_Amend_0003_W912HP-18-B-0003.pdf PDF
Attachment_4_-_SC11-Heavy_Dredging,_hydraulic-Statewide,_05_Jan_18.pdf PDF
Attachment_1_-_9603W-HP0028_REVb.pdf PDF
Attachment_2_-_1511N_W-C.xyz XYZ file
Attachment_3_-_Boring_Logs.pdf PDF
1_-_Drawing_Sheet_C-01_9603W-HP0002_REVb.pdf PDF
3_-_35_41_00.00_34_Dike_Construction_REVb.pdf PDF
2_-_Bidding_Schedule__REVb.pdf PDF
4_-_L_Consolidated_Report_REVb.pdf PDF
1156N_W-C.xyz XYZ file
204N_W-C.xyz XYZ file
364N_W-C.xyz XYZ file
562N_W-C.zip ZIP file
5._ATTACHMENT_L_-_Consolidated_Report_REVa.pdf PDF
612S-W-C-ALL.xyz XYZ file
1190N W-C.xyz XYZ file
55N_W-C.xyz XYZ file
Combined_SH1_to_SH13.xyz XYZ file
341N_W-C.xyz XYZ file
225N_W-C.zip ZIP file
402N_W-C.xyz XYZ file
2._Bidding_Schedule_REVa.pdf PDF
1190N_W-C.zip ZIP file
1229N_W-C.xyz XYZ file
310N_W-C.xyz XYZ file
1103N_W-C.xyz XYZ file
1._DRAWING_SHEETS_C-02,_C-07_to_C-16,_and_C-21_to_C-30_REVa.pdf PDF
4._SECTION_35_41_00.00_34_-_Dike_Construction_REVa.pdf PDF
645S-W-C-ALL.xyz XYZ file
39N_W-C.xyz XYZ file
Amendment_0001_W912HP18B0003_Dredging.pdf PDF
3._SECTION_35_20_23_-_Dredging_REVa.pdf PDF
1505N_W-C.xyz XYZ file
20180323_ICW_OWPA_SB_CT.xyz XYZ file
Specifications_FY18_AIWW_-_Georgetown_to_Charleston.pdf PDF
Solicitation_W912HP-18-B-0003_AIWW_GTowntoCharleston.pdf PDF
Drawings_FY18_AIWW_-_Georgetown_to_Charleston.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update the solicitation and extend the due date for receipt of offers. See Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP18B0003

X 9B. DATED (SEE ITEM 11)

25-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Aug-2018

CODE

US ARMY CORPS OF ENGINEERS, CHARLESTON

69-A HAGOOD AVENUE

CHARLESTON SC 29403

W912HP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HP18B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

FY18 Atlantic Intracoastal Waterway Maintenance Dredging (Georgetown to Charleston) Amendment 0002

1. CHANGE BID OPENING DATE

CHANGE bid opening date to 06 SEPT 2018 at 1400 HRS

2. CONTRACT DRAWINGS, SHEETS C-02, AND SHEETS C-31 THROUGH C-39

DELETE Contract Drawing Sheets C-02 and REPLACE with Contract Drawing Sheet C-02 bearing the notation REV b (see attachment).

DELETE Contract Drawing Sheets C-31 through C-39.

Bid Schedule_REVa optional CLIN items 0016, 0017, 0018, 0019, 0020, and 0021 relating to earthwork associated with dike raising at Placement Area 204N/225N have been removed from the contract.

3. SECTION 00 10 00 BIDDING SCHEDULE

DELETE BIDDING SCHEDULE_REVa, and REPLACE with BIDDIDNG SCHEDULE bearing the notation REV b (see attachment).

Bid Schedule_REVa optional CLIN items 0016, 0017, 0018, 0019, 0020, and 0021 relating to earthwork associated with dike raising at Placement Area 204N/225N have been removed from the contract.

OPTION CLIN item 0015 advertised quantity changed from 425,000 cy to 450,000 cy

4. SECTION 35 41 00.00 34 DIKE CONSTRUCTION

DELETE the entire SECTION_REVa and REPLACE with SECTION 35 41 00.00 34 bearing the notation REV B (see attachment).

Paragraphs “MEASUREMENT AND PAYMENTS” and “ORDER OF WORK” were updated.

5. ATTACHMENTS, Section “L CONSOLIDATED REPORT” DELETE “L CONSOLIDATED REPORT_REVa” and REPLACE with “L CONSOLIDATED REPORT” bearing the notation REV b (see attachment).

BID SCHEDULE_REVa was replaced by BID SCHEDULE_REVb.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 28-Aug-2018 02:00 PM to 06-Sep-2018 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it.