FY18 Atlantic Intracoastal Maintenance Dredging W912HP-18-B-0003 (Georgetown to Charleston)
L-1 ATTACHMENT L
CONSOLIDATED REPORT - DREDGING
TITLE: FY18 ATLANTIC INTRACOASTAL WATERWAY MAINTENANCE DREDGING (GEORGETOWN TO
CHARLESTON), CHARLESTON AND GEORGETOWN COUNTIES, SOUTH CAROLINA
IFB NO. W912HP-18-B-0003 CONTRACT NO. W912HP-18-C-XXXX
DRAWING NO. 9603 (Contract), 9604 (BD), 9605 (AD)
GOVERNMENT INSPECTOR:
CONTRACTOR:
CONTRACTOR'S SUPERINTENDENT:
TYPE EQUIPMENT USED ON JOB:
DREDGE(S): (NAME, SIZE, PUMP HP, BOOSTER, ETC.)
OTHER EQUIPMENT: (DRAGLINES, DOZERS, ETC.)
SUBCONTRACTORS:
DATES:
ADVERTISEMENT: BID OPENING:
AWARD: NOTICE TO PROCEED:
REQUIRED STARTING: ACTUAL STARTING:
REQUIRED COMPLETION DATE: ACTUAL COMPLETION:
NUMBERS DAYS ON JOB (PUMPING):
NUMBERS DAYS ON JOB (TOTAL):
DREDGING QUANTITIES:
REQUIRED PRODUCTION RATE:
ACTUAL PRODUCTION RATE:
CHARACTER OF MATERIALS:
NOTE: HARD MATERIAL OR ANY CHANGE OF CONDITIONS SHOULD BE
NOTED. ANY DEBRIS ENCOUNTERED SHOULD ALSO BE LISTED
WITH EXPLANATION OF HOW IT WAS REMOVED AND WHAT EQUIP
WAS USED FOR REMOVAL.
L-2 ATTACHMENT L
CONSOLIDATED REPORT – DREDGING
ADVERTISED QUANTITIES:
SHOAL
NO. LOCATION
REQUIRED
DREDGING
PRISM CY PL.
MEAS. *
ALLOWABLE
OVERDEPTH
PRISM CY PL.
MEAS. **
TOTAL CY
PL. MEAS.
BASE
Breach Inlet (12'+2')
6341+00 to 6163+00
2 Dewees Island (10'+1)
5957+00 to 5898+00
Capers Island (10'+1)
5758+00 to 5732+00
Graham Creek (10'+1)
5244+00 to 5179+00
Awendaw Creek (11'+1')
5019+00 to 5001+00
Jeremy Creek (10'+1')
00+45 to 42+79.55
South Santee River (11'+1')
4216+00 to 4195+00
Four Mile Creek (11'+1')
4107+00 to 4084+00
North Santee River (10'+1)
4066+70 to 4053+00
Little Crow Island (10'+1)
4050+00 to 3998+18
Minim Creek (10'+1)
3997+18 to 3957+00
South Island Ferry (11'+1')
3743+00 to 3697+50
OPTIONS
Matthews Cut (10'+1')
4926+00 to 4723+18
TOTAL
L-3 ATTACHMENT L
BEFORE DREDGING QUANTITIES:
SHOAL
NO. LOCATION
REQUIRED
DREDGING
PRISM CY PL.
MEAS. *
ALLOWABLE
OVERDEPTH
PRISM CY PL.
MEAS. **
TOTAL CY
L-4 ATTACHMENT L
AFTER DREDGING QUANTITIES:
SHOAL
NO. LOCATION
REQUIRED
DREDGING
PRISM CY PL.
MEAS. *
ALLOWABLE
OVERDEPTH
PRISM CY PL.
MEAS. **
TOTAL CY
L-5 ATTACHMENT L
EFFECTIVE AND NON-EFFECTIVE TIME:
NAME OF
DREDGE
PUMPING:
HANDLING PIPE LINES:
HANDLING SWING LINES:
CLEARING PUMP AND PIPELINES:
CLEARING CUTTER:
CHANGING LOCATION ON JOB:
PASSING VESSELS:
SHORE LINE & SHORE WORK:
MINOR REPAIR:
PREPARATION:
MISCELLANEOUS:
MOBILIZATION AND
DEMOBILIZATION:
PRIVATE WORK:
SUNDAYS AND HOLIDAYS:
MAJOR REPAIRS:
LOST TIME:
LOST TIME NOT CHARGEABLE TO COST AT WORK:
TOTAL TIME:
AVERAGES:
WIDTH OF CUT:
LIFT:
NUMBER OF LOADS PER DAY:
CUBIC YARDS PER LOAD:
CUBIC YARDS PUMPED PER HOUR - CREDIT:
CUBIC YARDS PUMPED PER HOUR - GROSS:
CUBIC YARDS PUMPED PER DAY - CREDIT:
CUBIC YARDS PUMPED PER DAY - GROSS:
PUMPING TIME - HOURS PER DAY
TIME DELAYS AND CAUSES OF SUCH DELAYS:
L-6 ATTACHMENT L
DISPOSAL AREA(S): (FOR EACH DISPOSAL AREA)
DISPOSAL AREA: _________________________
TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:
LOCATION: (WHAT DISCHARGE POINT)
REMARKS:
DISPOSAL AREA: _________________________
TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:
LOCATION: (WHAT DISCHARGE POINT)
REMARKS:
WATER QUALITY:
NOTE: DOCUMENTATION SHOULD LIST ALL EFFORTS MADE TO INSURE
WATER QUALITY HAS BEEN MAINTAINED AND ANY PROBLEMS
THAT WERE ENCOUNTERED.
OTHER - EXPLAIN:
REMARKS, COMMENTS, AND LESSONS LEARNED:
L-7 ATTACHMENT L
COSTS/PRICES:
ORIGINAL CONTRACT AWARD AMOUNTS:
ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY U/I
UNIT PRICE AMOUNT
BASE
0001 MOBILIZATION AND DEMOBILIZATION
MAINTENANCE DREDGING SHOALS 1, 2,
3, 4, 5, 7, 8, 9, 10, 11, 12, 13
JA JOB $_________
0002 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 1 - BREACH INLET (12'+2')
CY $_________ $_________
0003 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 2 - DEWEES ISLAND (10'+1')
0004 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 3 - CAPERS ISLAND (10'+1')
0005 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 4 - GRAHAM CREEK (10'+1')
0006 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 5 - AWENDAW CREEK (11'+1')
0007 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 7 - JEREMY CREEK (10'+1')
0008 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 8 - SOUTH SANTEE RIVER
(11'+1')
0009 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 9 - FOUR MILE CREEKR (11'+1')
0010 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 10 - NORTH SANTEE RIVER
(10'+1')
0011 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 11 - LITTLE CROW ISLAND
0012 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 12 MINIM CREEK (10'+1')
0013 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 13 - SOUTH ISLAND FERRY
L-8 ATTACHMENT L
TOTAL (COMBINATION OF BASE BID
ITEMS 0001-0013)
OPTION
0014 MOBILIZATION AND DEMOBILIZATION
MAINTENANCE DREDGING SHOAL 6 -
MATTHEWS CUT
0015 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 6 - MATTHEWS CUT (10'+1')
0016 MOBILIZATION AND DEMOBILIZATION
DIKE CONSTRUCTION - PLACEMENT AREAS
341N/364N W-C
0017 SITE PREPARATION DIKE CONSTRUCTION
- PLACEMENT AREAS 341N/364N W-C
0018 EARTHWORK - RAISE DIKES AND BERM
0019 REPLACE SPILLWAY WALKWAYS DIKE
CONSTRUCTION - PLACEMENT AREAS
EA $_________ $_________
0020 AGRICULTURAL LIMESTONE DIKE
TON $_________ $_________
0021 FERTILIZER DIKE CONSTRUCTION -
PLACEMENT AREAS 341N/364N W-C
0022 GRASSING DIKE CONSTRUCTION -
ACRE $_________ $_________
TOTAL (COMBINATION OF OPTIONAL BID
ITEMS 0014-0022)
TOTAL (COMBINATION OF ALL BID ITEMS
0001-0022)
L-9 ATTACHMENT L
ACTUAL CONTRACT AMOUNTS:
ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY U/I
UNIT PRICE AMOUNT
BASE
0001 MOBILIZATION AND DEMOBILIZATION
MAINTENANCE DREDGING SHOALS 1, 2,
3, 4, 5, 7, 8, 9, 10, 11, 12, 13
0002 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 1 - BREACH INLET (12'+2')
0003 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 2 - DEWEES ISLAND (10'+1')
0004 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 3 - CAPERS ISLAND (10'+1')
0005 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 4 - GRAHAM CREEK (10'+1')
0006 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 5 - AWENDAW CREEK (11'+1')
0007 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 7 - JEREMY CREEK (10'+1')
0008 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 8 - SOUTH SANTEE RIVER
0009 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 9 - FOUR MILE CREEKR (11'+1')
0010 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 10 - NORTH SANTEE RIVER
0011 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 11 - LITTLE CROW ISLAND
0012 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 12 MINIM CREEK (10'+1')
0013 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 13 - SOUTH ISLAND FERRY
L-10 ATTACHMENT L
TOTAL (COMBINATION OF BASE BID
ITEMS 0001-0013)
OPTION
0014 MOBILIZATION AND DEMOBILIZATION
MAINTENANCE DREDGING SHOAL 6 -
MATTHEWS CUT
0015 DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 6 - MATTHEWS CUT (10'+1')
0016 MOBILIZATION AND DEMOBILIZATION
0017 SITE PREPARATION DIKE CONSTRUCTION
- PLACEMENT AREAS 341N/364N W-C
0018 EARTHWORK - RAISE DIKES AND BERM
0019 REPLACE SPILLWAY WALKWAYS DIKE
EA $_________ $_________
0020 AGRICULTURAL LIMESTONE DIKE
0021 FERTILIZER DIKE CONSTRUCTION -
0022 GRASSING DIKE CONSTRUCTION -
ACRE $_________ $_________
TOTAL (COMBINATION OF OPTIONAL BID
ITEMS 0014-0022)
TOTAL (COMBINATION OF ALL BID ITEMS
0001-0022)
L-11 ATTACHMENT L
MODIFICATIONS:
MOD 1: (BRIEF DESCRIPTION) $___________
MOD 2: (BRIEF DESCRIPTION) $___________
CLAIMS:
CLAIM 1: (BRIEF DESCRIPTION) $___________
CLAIM 2: (BRIEF DESCRIPTION) $___________
ADDITIONAL COSTS:
NOTE: INCLUDE ALL OTHER COSTS NOT LISTED ABOVE.