4_-_L_Consolidated_Report_REVb.pdf

PDF 82 KB Posted

Attached to
Atlantic Intracoastal Waterway Maintenance Dredging - Georgetown to Charleston
Solicitation number
W912HP-18-B-0003
Issued by

About this file

Attachment 4

View the file

Other files

File Type Posted
B.01.02_18B0003_Abstract.pdf PDF
A.07.24_Amend_0003_W912HP-18-B-0003.pdf PDF
Attachment_4_-_SC11-Heavy_Dredging,_hydraulic-Statewide,_05_Jan_18.pdf PDF
Attachment_1_-_9603W-HP0028_REVb.pdf PDF
Attachment_2_-_1511N_W-C.xyz XYZ file
Attachment_3_-_Boring_Logs.pdf PDF
1_-_Drawing_Sheet_C-01_9603W-HP0002_REVb.pdf PDF
3_-_35_41_00.00_34_Dike_Construction_REVb.pdf PDF
A.07.24_Amendment_0002_W912HP-18-B-0003_Approved.pdf PDF
2_-_Bidding_Schedule__REVb.pdf PDF
1156N_W-C.xyz XYZ file
204N_W-C.xyz XYZ file
364N_W-C.xyz XYZ file
562N_W-C.zip ZIP file
5._ATTACHMENT_L_-_Consolidated_Report_REVa.pdf PDF
612S-W-C-ALL.xyz XYZ file
1190N W-C.xyz XYZ file
55N_W-C.xyz XYZ file
Combined_SH1_to_SH13.xyz XYZ file
341N_W-C.xyz XYZ file
225N_W-C.zip ZIP file
402N_W-C.xyz XYZ file
2._Bidding_Schedule_REVa.pdf PDF
1190N_W-C.zip ZIP file
1229N_W-C.xyz XYZ file
310N_W-C.xyz XYZ file
1103N_W-C.xyz XYZ file
1._DRAWING_SHEETS_C-02,_C-07_to_C-16,_and_C-21_to_C-30_REVa.pdf PDF
4._SECTION_35_41_00.00_34_-_Dike_Construction_REVa.pdf PDF
645S-W-C-ALL.xyz XYZ file
39N_W-C.xyz XYZ file
Amendment_0001_W912HP18B0003_Dredging.pdf PDF
3._SECTION_35_20_23_-_Dredging_REVa.pdf PDF
1505N_W-C.xyz XYZ file
20180323_ICW_OWPA_SB_CT.xyz XYZ file
Specifications_FY18_AIWW_-_Georgetown_to_Charleston.pdf PDF
Solicitation_W912HP-18-B-0003_AIWW_GTowntoCharleston.pdf PDF
Drawings_FY18_AIWW_-_Georgetown_to_Charleston.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY18 Atlantic Intracoastal Maintenance Dredging W912HP-18-B-0003 (Georgetown to Charleston)

L-1 ATTACHMENT L

CONSOLIDATED REPORT - DREDGING

TITLE: FY18 ATLANTIC INTRACOASTAL WATERWAY MAINTENANCE DREDGING (GEORGETOWN TO

CHARLESTON), CHARLESTON AND GEORGETOWN COUNTIES, SOUTH CAROLINA

IFB NO. W912HP-18-B-0003 CONTRACT NO. W912HP-18-C-XXXX

DRAWING NO. 9603 (Contract), 9604 (BD), 9605 (AD)

GOVERNMENT INSPECTOR:

CONTRACTOR:

CONTRACTOR'S SUPERINTENDENT:

TYPE EQUIPMENT USED ON JOB:

DREDGE(S): (NAME, SIZE, PUMP HP, BOOSTER, ETC.)

OTHER EQUIPMENT: (DRAGLINES, DOZERS, ETC.)

SUBCONTRACTORS:

DATES:

ADVERTISEMENT: BID OPENING:

AWARD: NOTICE TO PROCEED:

REQUIRED STARTING: ACTUAL STARTING:

REQUIRED COMPLETION DATE: ACTUAL COMPLETION:

NUMBERS DAYS ON JOB (PUMPING):

NUMBERS DAYS ON JOB (TOTAL):

DREDGING QUANTITIES:

REQUIRED PRODUCTION RATE:

ACTUAL PRODUCTION RATE:

CHARACTER OF MATERIALS:

NOTE: HARD MATERIAL OR ANY CHANGE OF CONDITIONS SHOULD BE

NOTED. ANY DEBRIS ENCOUNTERED SHOULD ALSO BE LISTED

WITH EXPLANATION OF HOW IT WAS REMOVED AND WHAT EQUIP

WAS USED FOR REMOVAL.

L-2 ATTACHMENT L

CONSOLIDATED REPORT – DREDGING

ADVERTISED QUANTITIES:

SHOAL

NO. LOCATION

REQUIRED

DREDGING

PRISM CY PL.

MEAS. *

ALLOWABLE

OVERDEPTH

PRISM CY PL.

MEAS. **

TOTAL CY

PL. MEAS.

BASE

Breach Inlet (12'+2')

6341+00 to 6163+00

2 Dewees Island (10'+1)

5957+00 to 5898+00

Capers Island (10'+1)

5758+00 to 5732+00

Graham Creek (10'+1)

5244+00 to 5179+00

Awendaw Creek (11'+1')

5019+00 to 5001+00

Jeremy Creek (10'+1')

00+45 to 42+79.55

South Santee River (11'+1')

4216+00 to 4195+00

Four Mile Creek (11'+1')

4107+00 to 4084+00

North Santee River (10'+1)

4066+70 to 4053+00

Little Crow Island (10'+1)

4050+00 to 3998+18

Minim Creek (10'+1)

3997+18 to 3957+00

South Island Ferry (11'+1')

3743+00 to 3697+50

OPTIONS

Matthews Cut (10'+1')

4926+00 to 4723+18

TOTAL

L-3 ATTACHMENT L

BEFORE DREDGING QUANTITIES:

SHOAL

NO. LOCATION

REQUIRED

DREDGING

PRISM CY PL.

MEAS. *

ALLOWABLE

OVERDEPTH

PRISM CY PL.

MEAS. **

TOTAL CY

L-4 ATTACHMENT L

AFTER DREDGING QUANTITIES:

SHOAL

NO. LOCATION

REQUIRED

DREDGING

PRISM CY PL.

MEAS. *

ALLOWABLE

OVERDEPTH

PRISM CY PL.

MEAS. **

TOTAL CY

L-5 ATTACHMENT L

EFFECTIVE AND NON-EFFECTIVE TIME:

NAME OF

DREDGE

PUMPING:

HANDLING PIPE LINES:

HANDLING SWING LINES:

CLEARING PUMP AND PIPELINES:

CLEARING CUTTER:

CHANGING LOCATION ON JOB:

PASSING VESSELS:

SHORE LINE & SHORE WORK:

MINOR REPAIR:

PREPARATION:

MISCELLANEOUS:

MOBILIZATION AND

DEMOBILIZATION:

PRIVATE WORK:

SUNDAYS AND HOLIDAYS:

MAJOR REPAIRS:

LOST TIME:

LOST TIME NOT CHARGEABLE TO COST AT WORK:

TOTAL TIME:

AVERAGES:

WIDTH OF CUT:

LIFT:

NUMBER OF LOADS PER DAY:

CUBIC YARDS PER LOAD:

CUBIC YARDS PUMPED PER HOUR - CREDIT:

CUBIC YARDS PUMPED PER HOUR - GROSS:

CUBIC YARDS PUMPED PER DAY - CREDIT:

CUBIC YARDS PUMPED PER DAY - GROSS:

PUMPING TIME - HOURS PER DAY

TIME DELAYS AND CAUSES OF SUCH DELAYS:

L-6 ATTACHMENT L

DISPOSAL AREA(S): (FOR EACH DISPOSAL AREA)

DISPOSAL AREA: _________________________

TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:

LOCATION: (WHAT DISCHARGE POINT)

REMARKS:

DISPOSAL AREA: _________________________

TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:

LOCATION: (WHAT DISCHARGE POINT)

REMARKS:

WATER QUALITY:

NOTE: DOCUMENTATION SHOULD LIST ALL EFFORTS MADE TO INSURE

WATER QUALITY HAS BEEN MAINTAINED AND ANY PROBLEMS

THAT WERE ENCOUNTERED.

OTHER - EXPLAIN:

REMARKS, COMMENTS, AND LESSONS LEARNED:

L-7 ATTACHMENT L

COSTS/PRICES:

ORIGINAL CONTRACT AWARD AMOUNTS:

ITEM

NO. DESCRIPTION ESTIMATED

QUANTITY U/I

UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND DEMOBILIZATION

MAINTENANCE DREDGING SHOALS 1, 2,

3, 4, 5, 7, 8, 9, 10, 11, 12, 13

JA JOB $_________

0002 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 1 - BREACH INLET (12'+2')

CY $_________ $_________

0003 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 2 - DEWEES ISLAND (10'+1')

0004 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 3 - CAPERS ISLAND (10'+1')

0005 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 4 - GRAHAM CREEK (10'+1')

0006 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 5 - AWENDAW CREEK (11'+1')

0007 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 7 - JEREMY CREEK (10'+1')

0008 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 8 - SOUTH SANTEE RIVER

(11'+1')

0009 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 9 - FOUR MILE CREEKR (11'+1')

0010 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 10 - NORTH SANTEE RIVER

(10'+1')

0011 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 11 - LITTLE CROW ISLAND

0012 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 12 MINIM CREEK (10'+1')

0013 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 13 - SOUTH ISLAND FERRY

L-8 ATTACHMENT L

TOTAL (COMBINATION OF BASE BID

ITEMS 0001-0013)

OPTION

0014 MOBILIZATION AND DEMOBILIZATION

MAINTENANCE DREDGING SHOAL 6 -

MATTHEWS CUT

0015 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 6 - MATTHEWS CUT (10'+1')

0016 MOBILIZATION AND DEMOBILIZATION

DIKE CONSTRUCTION - PLACEMENT AREAS

341N/364N W-C

0017 SITE PREPARATION DIKE CONSTRUCTION

- PLACEMENT AREAS 341N/364N W-C

0018 EARTHWORK - RAISE DIKES AND BERM

0019 REPLACE SPILLWAY WALKWAYS DIKE

CONSTRUCTION - PLACEMENT AREAS

EA $_________ $_________

0020 AGRICULTURAL LIMESTONE DIKE

TON $_________ $_________

0021 FERTILIZER DIKE CONSTRUCTION -

PLACEMENT AREAS 341N/364N W-C

0022 GRASSING DIKE CONSTRUCTION -

ACRE $_________ $_________

TOTAL (COMBINATION OF OPTIONAL BID

ITEMS 0014-0022)

TOTAL (COMBINATION OF ALL BID ITEMS

0001-0022)

L-9 ATTACHMENT L

ACTUAL CONTRACT AMOUNTS:

ITEM

NO. DESCRIPTION ESTIMATED

QUANTITY U/I

UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND DEMOBILIZATION

MAINTENANCE DREDGING SHOALS 1, 2,

3, 4, 5, 7, 8, 9, 10, 11, 12, 13

0002 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 1 - BREACH INLET (12'+2')

0003 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 2 - DEWEES ISLAND (10'+1')

0004 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 3 - CAPERS ISLAND (10'+1')

0005 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 4 - GRAHAM CREEK (10'+1')

0006 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 5 - AWENDAW CREEK (11'+1')

0007 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 7 - JEREMY CREEK (10'+1')

0008 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 8 - SOUTH SANTEE RIVER

0009 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 9 - FOUR MILE CREEKR (11'+1')

0010 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 10 - NORTH SANTEE RIVER

0011 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 11 - LITTLE CROW ISLAND

0012 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 12 MINIM CREEK (10'+1')

0013 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 13 - SOUTH ISLAND FERRY

L-10 ATTACHMENT L

TOTAL (COMBINATION OF BASE BID

ITEMS 0001-0013)

OPTION

0014 MOBILIZATION AND DEMOBILIZATION

MAINTENANCE DREDGING SHOAL 6 -

MATTHEWS CUT

0015 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 6 - MATTHEWS CUT (10'+1')

0016 MOBILIZATION AND DEMOBILIZATION

0017 SITE PREPARATION DIKE CONSTRUCTION

- PLACEMENT AREAS 341N/364N W-C

0018 EARTHWORK - RAISE DIKES AND BERM

0019 REPLACE SPILLWAY WALKWAYS DIKE

EA $_________ $_________

0020 AGRICULTURAL LIMESTONE DIKE

0021 FERTILIZER DIKE CONSTRUCTION -

0022 GRASSING DIKE CONSTRUCTION -

ACRE $_________ $_________

TOTAL (COMBINATION OF OPTIONAL BID

ITEMS 0014-0022)

TOTAL (COMBINATION OF ALL BID ITEMS

0001-0022)

L-11 ATTACHMENT L

MODIFICATIONS:

MOD 1: (BRIEF DESCRIPTION) $___________

MOD 2: (BRIEF DESCRIPTION) $___________

CLAIMS:

CLAIM 1: (BRIEF DESCRIPTION) $___________

CLAIM 2: (BRIEF DESCRIPTION) $___________

ADDITIONAL COSTS:

NOTE: INCLUDE ALL OTHER COSTS NOT LISTED ABOVE.

File details come from the government source that posted it.