2._Bidding_Schedule_REVa.pdf

PDF 207 KB Posted

Attached to
Atlantic Intracoastal Waterway Maintenance Dredging - Georgetown to Charleston
Solicitation number
W912HP-18-B-0003
Issued by

About this file

Bid Schedule

View the file

Other files

File Type Posted
B.01.02_18B0003_Abstract.pdf PDF
A.07.24_Amend_0003_W912HP-18-B-0003.pdf PDF
Attachment_4_-_SC11-Heavy_Dredging,_hydraulic-Statewide,_05_Jan_18.pdf PDF
Attachment_1_-_9603W-HP0028_REVb.pdf PDF
Attachment_2_-_1511N_W-C.xyz XYZ file
Attachment_3_-_Boring_Logs.pdf PDF
1_-_Drawing_Sheet_C-01_9603W-HP0002_REVb.pdf PDF
3_-_35_41_00.00_34_Dike_Construction_REVb.pdf PDF
A.07.24_Amendment_0002_W912HP-18-B-0003_Approved.pdf PDF
2_-_Bidding_Schedule__REVb.pdf PDF
4_-_L_Consolidated_Report_REVb.pdf PDF
1156N_W-C.xyz XYZ file
204N_W-C.xyz XYZ file
364N_W-C.xyz XYZ file
562N_W-C.zip ZIP file
5._ATTACHMENT_L_-_Consolidated_Report_REVa.pdf PDF
612S-W-C-ALL.xyz XYZ file
1190N W-C.xyz XYZ file
55N_W-C.xyz XYZ file
Combined_SH1_to_SH13.xyz XYZ file
341N_W-C.xyz XYZ file
225N_W-C.zip ZIP file
402N_W-C.xyz XYZ file
1190N_W-C.zip ZIP file
1229N_W-C.xyz XYZ file
310N_W-C.xyz XYZ file
1103N_W-C.xyz XYZ file
1._DRAWING_SHEETS_C-02,_C-07_to_C-16,_and_C-21_to_C-30_REVa.pdf PDF
4._SECTION_35_41_00.00_34_-_Dike_Construction_REVa.pdf PDF
645S-W-C-ALL.xyz XYZ file
39N_W-C.xyz XYZ file
Amendment_0001_W912HP18B0003_Dredging.pdf PDF
3._SECTION_35_20_23_-_Dredging_REVa.pdf PDF
1505N_W-C.xyz XYZ file
20180323_ICW_OWPA_SB_CT.xyz XYZ file
Specifications_FY18_AIWW_-_Georgetown_to_Charleston.pdf PDF
Solicitation_W912HP-18-B-0003_AIWW_GTowntoCharleston.pdf PDF
Drawings_FY18_AIWW_-_Georgetown_to_Charleston.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY18 Atlantic Intracoastal Waterway Maintenance Dredging W912HP-18-B-0003 (Georgetown to Charleston)

Section 00 10 00 Page 2

SECTION 00 10 00

BIDDING SCHEDULE

ITEM

NO. DESCRIPTION ESTIMATED

QUANTITY U/I

UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND DEMOBILIZATION

MAINTENANCE DREDGING SHOALS 1, 2,

3, 4, 5, 7, 8, 9, 10, 11, 12, 13

1 JA JOB $_________

0002 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 1 - BREACH INLET (12'+2')

470,000 CY $_________ $_________

0003 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 2 - DEWEES ISLAND (10'+1')

119,000 CY $_________ $_________

0004 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 3 - CAPERS ISLAND (10'+1')

33,000 CY $_________ $_________

0005 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 4 - GRAHAM CREEK (10'+1')

78,000 CY $_________ $_________

0006 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 5 - AWENDAW CREEK (11'+1')

30,000 CY $_________ $_________

0007 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 7 - JEREMY CREEK (10'+1')

99,000 CY $_________ $_________

0008 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 8 - SOUTH SANTEE RIVER

(11'+1')

14,000 CY $_________ $_________

0009 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 9 - FOUR MILE CREEKR (11'+1')

33,000 CY $_________ $_________

0010 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 10 - NORTH SANTEE RIVER

(10'+1')

16,000 CY $_________ $_________

0011 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 11 - LITTLE CROW ISLAND

(10'+1')

86,000 CY $_________ $_________

0012 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 12 MINIM CREEK (10'+1')

69,000 CY $_________ $_________

0013 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 13 - SOUTH ISLAND FERRY

(11'+1')

58,000 CY $_________ $_________

TOTAL (COMBINATION OF BASE BID

ITEMS 0001-0013)

OPTION

0014 MOBILIZATION AND DEMOBILIZATION

MAINTENANCE DREDGING SHOAL 6 -

MATTHEWS CUT

1 JA JOB $_________

Section 00 10 00 Page 3

0015 DREDGING OF UNCLASSIFIED MATERIAL

SHOAL 6 - MATTHEWS CUT (10'+1')

425,000 CY $_________ $_________

0016 MOBILIZATION AND DEMOBILIZATION

DIKE CONSTRUCTION - PLACEMENT AREAS

204N/225N W-C

1 JA JOB $_________

0017 SITE PREPARATION DIKE CONSTRUCTION

- PLACEMENT AREAS 204N/225N W-C

1 JA JOB $_________

0018 EARTHWORK - RAISE DIKES AND BERM

DIKE CONSTRUCTION - PLACEMENT AREAS

204N/225N W-C

1 JA JOB $_________

0019 REPLACE SPILLWAY WALKWAYS DIKE

CONSTRUCTION - PLACEMENT AREAS

204N/225N W-C

4 EA $_________ $_________

0020 AGRICULTURAL LIMESTONE DIKE

CONSTRUCTION - PLACEMENT AREAS

204N/225N W-C

5 TON $_________ $_________

0021 FERTILIZER DIKE CONSTRUCTION -

PLACEMENT AREAS 204N/225N W-C

10 TON $_________ $_________

0022 GRASSING DIKE CONSTRUCTION -

PLACEMENT AREAS 204N/225N W-C

19 ACRE $_________ $_________

0023 MOBILIZATION AND DEMOBILIZATION

DIKE CONSTRUCTION - PLACEMENT AREAS

341N/364N W-C

1 JA JOB $_________

0024 SITE PREPARATION DIKE CONSTRUCTION

- PLACEMENT AREAS 341N/364N W-C

1 JA JOB $_________

0025 EARTHWORK - RAISE DIKES AND BERM

DIKE CONSTRUCTION - PLACEMENT AREAS

341N/364N W-C

1 JA JOB $_________

0026 REPLACE SPILLWAY WALKWAYS DIKE

CONSTRUCTION - PLACEMENT AREAS

341N/364N W-C

4 EA $_________ $_________

0027 AGRICULTURAL LIMESTONE DIKE

CONSTRUCTION - PLACEMENT AREAS

341N/364N W-C

5 TON $_________ $_________

0028 FERTILIZER DIKE CONSTRUCTION -

PLACEMENT AREAS 341N/364N W-C

10 TON $_________ $_________

Section 00 10 00 Page 4

0029 GRASSING DIKE CONSTRUCTION -

PLACEMENT AREAS 341N/364N W-C

19 ACRE $_________ $_________

TOTAL (COMBINATION OF OPTIONAL BID

ITEMS 0014-0029)

TOTAL (COMBINATION OF ALL BID ITEMS

0001-0029)

STATEMENT

Enter prices where space is provided for ALL items. Failure to follow this instruction may render the bid non-responsive and the bid will not be considered for award.

All bidders are advised materially unbalanced bids may be rejected as non-responsive.

Quantities indicated are comprised of material within the required channel prism including the maximum optional pay slope material and the allowable overdepth as indicated on the contract drawings.

File details come from the government source that posted it.