W912HP-18-B-0002-0001_Amendment_01.pdf

PDF 215 KB Posted

Attached to
FY18 Myrtle Beach Storm Damage Reduction Project Federal contract opportunity
Solicitation number
W912HP-18-B-0002
Issued by
Department of the Army Corps of Engineers Engineering District Charleston

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to FY18 Myrtle Beach Storm Damage Reduction Project, newest first.
File Type Posted
B.01.02_18B0002_Abstract_of_Offers_3-30-2018.pdf PDF
20170920_MBR3_LI_CS_XS.xyz XYZ file
20170921_MBR3_LI_CS_XS.xyz XYZ file
20170410_CaneSouth_BorrowArea_SB_CS.xyz XYZ file
20170922_MBR2_LI_CS_XS.xyz XYZ file
W912HP-17-C-0004_Myrtle_Beach_AD_Survey_Surfside_Borrow_Area_XYZ_NAVD88.xyz XYZ file
20170921_MBR2_LI_CS_XS.xyz XYZ file
20170922_MBR1_LI_CS_XS.xyz XYZ file
171031_SB_R1_BA_AD_Survey_NAVD88.txt TXT text file
W912HP-18-B-0002-_Solicitation.pdf PDF
Volume_3_to_Myrtle_Beach_Specifications_(Geotech_Reach_1-3).pdf PDF
MBR123Drawings15Feb2018.pdf PDF
Volume_1_to_Myrtle_Beach_Specifications_(Main_Sections)FinalRev.pdf PDF
Volume_2_to_Myrtle_Beach_Specifications_(Geotech_Reach_2).pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add the bid opening date to the Solicitation. The Bid Opening Date w ill be 29 March 2018, 2:00 P.M.

Eastern, 69A Hagood Avenue, Charleston, SC, 29403.

Also, Section 01 55 00.00, 3.3.4: is being replaced.

All other terms and conditions of the original solicitation remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP18B0002

X 9B. DATED (SEE ITEM 11)

28-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Mar-2018

CODE

U.S. ARMY CORPS OF ENGINEERS, CHARLESTON

DISTRICT, CONTRACTING DIVISION

69-A HAGOOD AVENUE

CHARLESTON SC 29403

W912HP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HP18B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time 29-Mar-2018 02:00 PM has been added.

The following have been added by full text:

AMENDMENT 1

Summary of Changes – W912HP-18-B-0002- AMENDMENT 01 1.) Bid opening is 29 March 18 @ 1400. 69A Hagood Ave. Charleston SC 29403

2.)

a. Replace Section 01 55 00.00, 3.3.4: Pre-construction surveys shall be made of the beach profile prior to placement of fill. Such surveys shall be taken between 7 and

14 days prior to commencement of work in an acceptance section so that field notes and computations can be furnished to the Contracting Officer's

Representative in advance of placement of beach fill. Cross sections shall be taken at every 200-foot station and breaks in terrain. Cross sectioning shall be in advance of the beach work and at right angles to the longitudinal alignment of the construction baseline. All cross sections shall extend from at least 15' landward of the top of existing bank or point where new fill ties into the existing ground

(whichever is more landward) to at least 1,500 feet seaward of the project construction baseline. Elevations and ocean soundings shall be taken generally at maximum intervals of 25 feet and at all breaks in the natural grade. Where unusual site or terrain conditions exist, additional stations, ranges, and elevations shall be taken for greater definition.

b. With Section 01 55 00.00, 3.3.4: Pre-construction surveys shall be made of the beach profile prior to placement of fill. Such surveys shall be taken between 7 and 21 days, excluding periods of major weather and no increased cost to the

Government, prior to commencement of work in an acceptance section so that field notes and computations can be furnished to the Contracting Officer's

Representative in advance of placement of beach fill. Cross sections shall be taken at every 200-foot station and breaks in terrain. Cross sectioning shall be in advance of the beach work and at right angles to the longitudinal alignment of the construction baseline. All cross sections shall extend from at least 15' landward of the top of existing bank or point where new fill ties into the existing ground

(whichever is more landward) to at least 1,500 feet seaward of the project construction baseline. Elevations and ocean soundings shall be taken generally at maximum intervals of 25 feet and at all breaks in the natural grade. Where unusual site or terrain conditions exist, additional stations, ranges, and elevations shall be taken for greater definition.

W912HP18B0002

(End of Summary of Changes)