FY17 Atlantic Intracoastal Waterway Charleston Harbor to W912HP-B-17-0005 Port Royal Maintenance Dredging
L-1 ATTACHMENT L
CONSOLIDATED REPORT - DREDGING
TITLE: FY17 ATLANTIC INTRACOASTAL WATERWAY CHARLESTON HARBOR TO PORT ROYAL
MAINTENANCE DREDGING, CHARLESTON, COLLETON, AND BEAUFORT COUNTIES, SOUTH
CAROLINA
IFB NO. W912HP-17-B-0005 CONTRACT NO. W912HP-17-C-0005
DRAWING NO. 9586 (Contract), 9587 (BD), 9588 (AD)
GOVERNMENT INSPECTOR:
CONTRACTOR:
CONTRACTOR'S SUPERINTENDENT:
TYPE EQUIPMENT USED ON JOB:
DREDGE(S): (NAME, SIZE, PUMP HP, BOOSTER, ETC.)
OTHER EQUIPMENT: (DRAGLINES, DOZERS, ETC.)
SUBCONTRACTORS:
DATES:
ADVERTISEMENT: BID OPENING:
AWARD: NOTICE TO PROCEED:
REQUIRED STARTING: ACTUAL STARTING:
REQUIRED COMPLETION DATE: ACTUAL COMPLETION:
NUMBERS DAYS ON JOB (PUMPING):
NUMBERS DAYS ON JOB (TOTAL):
DREDGING QUANTITIES:
REQUIRED PRODUCTION RATE:
ACTUAL PRODUCTION RATE:
CHARACTER OF MATERIALS:
NOTE: HARD MATERIAL OR ANY CHANGE OF CONDITIONS SHOULD BE
NOTED. ANY DEBRIS ENCOUNTERED SHOULD ALSO BE LISTED
WITH EXPLANATION OF HOW IT WAS REMOVED AND WHAT EQUIP
WAS USED FOR REMOVAL.
L-2 ATTACHMENT L
CONSOLIDATED REPORT – DREDGING
ADVERTISED QUANTITIES:
SHOAL
NO. LOCATION
REQUIRED
DREDGING PRISM
CY PL. MEAS. *
ALLOWABLE
OVERDEPTH PRISM
CY PL. MEAS. **
TOTAL CY
PL. MEAS.
BASE
Rantowles (11’+1’) 7398+00 to 7420+00
2 Dawho River 1 (11’+1’) 8284+00 to 8346+00
3 Dawho River 2 (11’+1’) 8372+00 to 8388+00
4 Watts Cut (11’+1’) 8534+00 to 8680+00
5 Fenwick Cut (11’+1’) 9055+00 to 9069+00
6 Rock Creek (11’+1’) 9281+00 to 9302+00
Ashepoo Coosaw Cutoff (11’+1’)
9313+00 to 9400+00
OPTIONS
Brickyard Creek (11’+1’) 9975+00 to 9984+00
2 Dawho River 1 (12’+2’) 8284+00 to 8388+00
Dawhoo River 2 (12’+2’)
TOTALS
L-3 ATTACHMENT L
BEFORE DREDGING QUANTITIES:
SHOAL
NO. LOCATION
REQUIRED
DREDGING PRISM
CY PL. MEAS. *
ALLOWABLE
OVERDEPTH PRISM
CY PL. MEAS. **
TOTAL CY
PL. MEAS.
L-4 ATTACHMENT L
AFTER DREDGING QUANTITIES:
SHOAL
NO. LOCATION
REQUIRED
DREDGING PRISM
CY PL. MEAS. *
ALLOWABLE
OVERDEPTH PRISM
CY PL. MEAS. **
TOTAL CY
PL. MEAS.
L-5 ATTACHMENT L
EFFECTIVE AND NON-EFFECTIVE TIME:
NAME OF
DREDGE
PUMPING:
HANDLING PIPE LINES:
HANDLING SWING LINES:
CLEARING PUMP AND PIPELINES:
CLEARING CUTTER:
CHANGING LOCATION ON JOB:
PASSING VESSELS:
SHORE LINE & SHORE WORK:
MINOR REPAIR:
PREPARATION:
MISCELLANEOUS:
MOBILIZATION AND
DEMOBILIZATION:
PRIVATE WORK:
SUNDAYS AND HOLIDAYS:
MAJOR REPAIRS:
LOST TIME:
LOST TIME NOT CHARGEABLE TO COST AT WORK:
TOTAL TIME:
AVERAGES:
WIDTH OF CUT:
LIFT:
NUMBER OF LOADS PER DAY:
CUBIC YARDS PER LOAD:
CUBIC YARDS PUMPED PER HOUR - CREDIT:
CUBIC YARDS PUMPED PER HOUR - GROSS:
CUBIC YARDS PUMPED PER DAY - CREDIT:
CUBIC YARDS PUMPED PER DAY - GROSS:
PUMPING TIME - HOURS PER DAY
TIME DELAYS AND CAUSES OF SUCH DELAYS:
L-6 ATTACHMENT L
DISPOSAL AREA(S): (FOR EACH DISPOSAL AREA)
DISPOSAL AREA:
TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:
LOCATION: (WHAT DISCHARGE POINT)
REMARKS:
DISPOSAL AREA:
TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:
LOCATION: (WHAT DISCHARGE POINT)
REMARKS:
WATER QUALITY:
NOTE: DOCUMENTATION SHOULD LIST ALL EFFORTS MADE TO INSURE
WATER QUALITY HAS BEEN MAINTAINED AND ANY PROBLEMS
THAT WERE ENCOUNTERED.
OTHER - EXPLAIN:
REMARKS, COMMENTS, AND LESSONS LEARNED:
L-7 ATTACHMENT L
COSTS/PRICES:
ORIGINAL CONTRACT AWARD AMOUNTS:
ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY U/I
UNIT PRICE AMOUNT
BASE
0001 MOBILIZATION AND
DEMOBILIZATION
MAINTENANCE DREDGING BASE
SHOALS 1-7
1 JA JOB $_________
0002 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 1 - RANTOWLES
32,000 CY $_________ $_________
0003 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 2 - DAWHOO RIVER 1
154,000 CY $_________ $_________
0004 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 3 - DAWHOO RIVER 2
28,000 CY $_________ $_________
0005 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 4 - WATTS CUT
282,000 CY $_________ $_________
0006 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 5 - FENWICK CUT
14,000 CY $_________ $_________
0007 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 6 - ROCK CREEK
44,000 CY $_________ $_________
0008 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 7 - ASHEPOO COOSAW
CUTOFF
250,000 CY $_________ $_________
TOTAL (COMBINATION OF BASE BID
ITEMS 0001-0008)
OPTION
0009 MOBILIZATION AND
DEMOBILIZATION
MAINTENANCE DREDGING OPTIONAL
SHOAL 8 - BRICKYARD CREEK
1 JA JOB $_________
0010 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 8- BRICKYARD CREEK
35,000 CY $_________ $_________
0011 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 2 - DAWHOO RIVER 1 TO
12'+2'
68,000 CY $_________ $_________
0012 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL - 3 DAWHOO RIVER 2 TO
12'+2'
16,000 CY $_________ $_________
L-8 ATTACHMENT L
TOTAL (COMBINATION OF OPTIONAL
BID ITEMS 0009-0012)
TOTAL (COMBINATION OF ALL BID
ITEMS 0001-0012)
L-9 ATTACHMENT L
ACTUAL CONTRACT AMOUNTS:
ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY U/I
UNIT PRICE AMOUNT
BASE
0001 MOBILIZATION AND
DEMOBILIZATION
MAINTENANCE DREDGING BASE
SHOALS 1-7
1 JA JOB $_________
0002 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 1 - RANTOWLES
32,000 CY $_________ $_________
0003 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 2 - DAWHOO RIVER 1
154,000 CY $_________ $_________
0004 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 3 - DAWHOO RIVER 2
28,000 CY $_________ $_________
0005 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 4 - WATTS CUT
282,000 CY $_________ $_________
0006 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 5 - FENWICK CUT
14,000 CY $_________ $_________
0007 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 6 - ROCK CREEK
44,000 CY $_________ $_________
0008 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 7 - ASHEPOO COOSAW
CUTOFF
250,000 CY $_________ $_________
TOTAL (COMBINATION OF BASE BID
ITEMS 0001-0008)
OPTION
0009 MOBILIZATION AND
DEMOBILIZATION
MAINTENANCE DREDGING OPTIONAL
SHOAL 8 - BRICKYARD CREEK
1 JA JOB $_________
0010 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 8- BRICKYARD CREEK
35,000 CY $_________ $_________
0011 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL 2 - DAWHOO RIVER 1 TO
12'+2'
68,000 CY $_________ $_________
0012 DREDGING OF UNCLASSIFIED
MATERIAL
SHOAL - 3 DAWHOO RIVER 2 TO
12'+2'
16,000 CY $_________ $_________
L-10 ATTACHMENT L
TOTAL (COMBINATION OF OPTIONAL
BID ITEMS 0009-0012)
TOTAL (COMBINATION OF ALL BID
ITEMS 0001-0012)
MODIFICATIONS:
MOD 1: (BRIEF DESCRIPTION) $___________
MOD 2: (BRIEF DESCRIPTION) $___________
CLAIMS:
CLAIM 1: (BRIEF DESCRIPTION) $___________
CLAIM 2: (BRIEF DESCRIPTION) $___________
ADDITIONAL COSTS:
NOTE: INCLUDE ALL OTHER COSTS NOT LISTED ABOVE.