W912HP-16-R-0015-0001 Amnd Var Chgs _2016.05.03

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912HP-14-D-0014 81st FIS Region P (Puerto Rico)

The purpose of this amendment is to:

1. Add Revised Attachment J 15 02 000-01 Facilities Property and Systems Inventory. See file posted separately w ith FBO announcement.

2. Add Revised “Attachment J-1502000-04 HVAC and Refrigeration System Inventory”. See file posted separately w ith FBO announcement.

3. Add Attachment “AHU AFRC Mayaguez Data”. See file posted separately w ith FBO announcement.

4. Add Attachment “Blow er Data for AFRC Mayaguez”. See file posted separately w ith FBO announcement.

5. Add Attachment “Warranty Management Plan (Inventory for Site PR098)”. See file posted separately w ith FBO announcement.

6. Add specification “3.4.14 Alternative energy systems to Section C 15 02 000 FIS”. See continued pages.

7. All other items remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-16-R-0015

X 9B. DATED (SEE ITEM 11)

20-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-May-2016

CODE

U.S. ARMY CORPS OF ENGINEERS, CHARLESTON

DISTRICT, CONTRACTING DIVISION

69-A HAGOOD AVENUE

CHARLESTON SC 29403

W912HP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HP-16-R-0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

ADD SPECIFICATION SECTION C

Revised Section C 15 02 000 FIS-Added specification 3.4.14 Alternative Energy Solutions:

3.4.14 Alternative Energy Systems

A. Summary of expectations: The Contractor shall develop and implement a program to inspect and make all necessary repairs to permanently installed alternative energy systems. This includes but is not limited to, Photovoltaic systems, solar hot water systems. Wind systems, and any other systems which provide, or off set energy use at the covered facilities (emergency generators are not to be covered by this section). This includes cleaning, inspecting, grounding or any other correcting measure which will allow the most efficient operation of the system. The contractor shall develop a program which ensure the system is operating efficiently. This can include pumps, switches, controls or any other system which is required from the proper operation. The contractor shall test inverters, and grid tie systems as OEM standards require.

(The ELINS will say Photovoltaic, however, this section shall be used to bill for all alternative energy systems) B. The performance standards:

The contractor shall ensure the systems are operating at the expected level at all times.

The contractor shall ensure the energy system is kept free of debris, and dirt during the life of the contract. The government reserves the right to inspect the energy system using all tools to ensure the proper operation of the energy system. A visual, meter, and instrument reading will be used at the main benchmark for success.

C. Measure of success and acceptable tolerance:

Superior: The energy system provides 100% of the expected output of energy, by meter reading, or temperature gauge reading for each inspection.

Acceptable: The energy system provides 80% or more of the expected output of energy, by meter reading, or temperature gauge reading for each inspection.

Marginal: The energy system provides 70% or more of the expected output of energy, by meter reading, or temperature gauge reading for each inspection.

Unacceptable The energy system provides 69% or less of the expected output of energy, by meter reading, or temperature gauge reading for each inspection.

D. Additional information: Repairs within the PM limit are accomplished prior to PM completion. Notification of repair work exceeding the PM limit is submitted to the KO within the specified time limit.

(End of Summary of Changes)