AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Joint Base Charleston Dredging
The purpose of this amendment is to:
SEE ATTACHED SUMMARY OF CHANGES
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Mar-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-15-B-0002
X 9B. DATED (SEE ITEM 11)
11-Mar-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Mar-2015
CODE
U.S. ARMY CORPS OF ENGINEERS, CHARLESTON
DISTRICT, CONTRACTING DIVISION
69-A HAGOOD AVENUE
CHARLESTON SC 29403
W912HP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HP-15-B-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENNDMENT 01
FY15 Joint Base Charleston Maintenance Dredging Revision A
1. DRAWINGS
Delete Drawings C‐02 thru C‐08 and replace with revised Drawings C‐02 – C‐08 (see attachment).
2. Section 00010, DESCRIPTION OF WORK
DELETE “1,535,000 cubic yards” and REPLACE with “1,841,000 cubic yards.”
DELETE “38,000 cubic yards” and REPLACE with “31,000 cubic yards.”
3. Section 00010, BIDDING SCHEDULE
DELETE Bidding Schedule and REPLACE with revised Bidding Schedule (see attachment).
4. Section 352023, DREDGING, Paragraph 1.4.3., Estimated Quantities
Shoal Number 2
Required Dredging Prism CY PL Meas. has increased from 150,000 to 285,000
Allowable Overdepth Prism CY PL Meas. has increased from 90,000 to 135,000
Total CY PL Meas. has increased from 240,000 to 420,000
Shoal Number 2A
Required Dredging Prism CY PL Meas. has increased from 32,000 to 36,000
Allowable Overdepth Prism CY PL Meas. has decreased from 60,000 to 50,000
Total CY PL Meas. has decreased from 92,000 to 86,000
Shoal Number 3
Required Dredging Prism CY PL Meas. has increased from 40,000 to 50,000
Total CY PL Meas. has increased from 65,000 to 75,000
Shoal Number 3A
Required Dredging Prism CY PL Meas. has increased from 50,000 to 65,000
Total CY PL Meas. has increased from 95,000 to 110,000
Shoal Number 4
Required Dredging Prism CY PL Meas. has increased from 415,000 to 430,000
Allowable Overdepth Prism CY PL Meas. has increased from 100,000 to 115,000
Total CY PL Meas. has increased from 515,000 to 545,000
Shoal Number 4A
Required Dredging Prism CY PL Meas. has increased from 100,000 to 175,000
Allowable Overdepth Prism CY PL Meas. has increased from 45,000 to 75,000
Total CY PL Meas. has increased from 145,000 to 250,000
Shoal Number 5
Required Dredging Prism CY PL Meas. has increased from 125,000 to 170,000
Allowable Overdepth Prism CY PL Meas. has increased from 60,000 to 90,000
Total CY PL Meas. has increased from 185,000 to 260,000
TC Dock (MSDDC)
Required Dredging Prism CY PL Meas. has decreased from 24,000 to 17,000
Total CY PL Meas. has decreased from 35,000 to 28,000
Total
Required Dredging Prism CY PL Meas. has decreased from 1,036,000 to 1,275,000
Allowable Overdepth Prism CY PL Meas. has increased from 537,000 to 597,000
Total CY PL Meas. has increased from 1,573,000 to 1,872,000
5. Attachment L
Delete Attachment L, Consolidated Report‐Dredging and replace with revised Attachment L
(see attachment).
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 09-Apr-2015 02:00 PM to 14-Apr-2015 02:00 PM.
CLIN 0003
The pricing detail quantity has increased by 180,000.00 from 240,000.00 to 420,000.00.
CLIN 0004
The pricing detail quantity has increased by 30,000.00 from 515,000.00 to 545,000.00.
CLIN 0005
The pricing detail quantity has increased by 35,000.00 from 215,000.00 to 250,000.00.
CLIN 0006
The pricing detail quantity has increased by 42,000.00 from 218,000.00 to 260,000.00.
SUBCLIN 0008AB
The pricing detail quantity has decreased by 7,000.00 from 35,000.00 to 28,000.00.
CLIN 0009
The pricing detail quantity has decreased by 6,000.00 from 92,000.00 to 86,000.00.
CLIN 0010
The pricing detail quantity has increased by 10,000.00 from 65,000.00 to 75,000.00.
CLIN 0011
The pricing detail quantity has increased by 15,000.00 from 95,000.00 to 110,000.00.
(End of Summary of Changes)
FY15 Joint Base Charleston Maintenance Dredging Revision A
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. DRAWINGS
Delete Drawings C‐02 thru C‐08 and replace with revised Drawings C‐02 – C‐08 (see
2. Section 00010, DESCRIPTION OF WORK
DELETE “1,535,000 cubic yards” and REPLACE with “1,841,000 cubic yards.”
DELETE “38,000 cubic yards” and REPLACE with “31,000 cubic yards.”
3. Section 00010, BIDDING SCHEDULE
DELETE Bidding Schedule and REPLACE with revised Bidding Schedule (see attachment).
4. Section 352023, DREDGING, Paragraph 1.4.3., Estimated Quantities
Shoal Number 2
Required Dredging Prism CY PL Meas. has increased from 150,000 to 285,000
Allowable Overdepth Prism CY PL Meas. has increased from 90,000 to 135,000
Total CY PL Meas. has increased from 240,000 to 420,000
Shoal Number 2A
Required Dredging Prism CY PL Meas. has increased from 32,000 to 36,000
Allowable Overdepth Prism CY PL Meas. has decreased from 60,000 to 50,000
Total CY PL Meas. has decreased from 92,000 to 86,000
Shoal Number 3
Required Dredging Prism CY PL Meas. has increased from 40,000 to 50,000
Total CY PL Meas. has increased from 65,000 to 75,000
Shoal Number 3A
Required Dredging Prism CY PL Meas. has increased from 50,000 to 65,000
Total CY PL Meas. has increased from 95,000 to 110,000
Shoal Number 4
Required Dredging Prism CY PL Meas. has increased from 415,000 to 430,000
Allowable Overdepth Prism CY PL Meas. has increased from 100,000 to 115,000
Total CY PL Meas. has increased from 515,000 to 545,000
Shoal Number 4A
Required Dredging Prism CY PL Meas. has increased from 100,000 to 175,000
Allowable Overdepth Prism CY PL Meas. has increased from 45,000 to 75,000
Total CY PL Meas. has increased from 145,000 to 250,000
Shoal Number 5
Required Dredging Prism CY PL Meas. has increased from 125,000 to 170,000
Allowable Overdepth Prism CY PL Meas. has increased from 60,000 to 90,000
Total CY PL Meas. has increased from 185,000 to 260,000
TC Dock (MSDDC)
Required Dredging Prism CY PL Meas. has decreased from 24,000 to 17,000
Total CY PL Meas. has decreased from 35,000 to 28,000
Total
Required Dredging Prism CY PL Meas. has decreased from 1,036,000 to 1,275,000
Allowable Overdepth Prism CY PL Meas. has increased from 537,000 to 597,000
Total CY PL Meas. has increased from 1,573,000 to 1,872,000
5. Attachment L
Delete Attachment L, Consolidated Report‐Dredging and replace with revised Attachment L (see
.5
.6
.7
.2
.4
.3
.1
.9
.8
.0
N
O R
D
A
C E
R E
C
H
C E
R E
T U
IN
G
B
S
E 2321000 E 2322000 E 2323000
E 2321000 E 2322000 E 2323000
100 100 2000
SCALE IN FEET
P .I. 16
2320841.67, 391997.83XY=
E 2323500E 2322500E 2321500E 2320500
E 2323500E 2322500E 2321500E 2320500
.I. 17
1+
2322118.65, 393109.02XY=
2322046.00, 393192.43XY=
2320770.65, 392083.65XY= 17
E
T
I
L
K
V
R T
J
C E
R T
E
F F S E T
M
Q
I
W
C
S C
.O .E . 17
BY MATERIAL DREDGED FROM SHOAL 1.
MATERIAL FROM TC DOCK WILL NEED TO BE CAPPED IN PLACEMENT AREA
10.TO SATISFY PERMIT REQUIREMENTS RELATED TO THIS CONTRACT,
OF TC DOCK FROM STATION 1704+90 TO 1720+83.
DEPLOYMENT AND DISTRIBUTION COMMAND (MSDDC) PORTION
FROM STATION 1703+90 TO 1704+90. MILITARY SURFACE
9. DEFENSE ENERGY SUPPORT CENTER (DESC) PORTION OF TC DOCK
OPERATIONS.
TO LIMIT RISK OF DAMAGE TO DOCK STRUCTURE FROM DREDGING
8. A VERTICAL CUT AT 10’ OFFSET FROM FACE OF DOCK
STATION 1720+83.
7. DREDGING OF OPTIONAL 4:1 SIDE SLOPE MATERIAL IS ALLOWED BEYOND
6. DATE OF CONDITION SURVEY: 5 MAR 2015
GUARD LIGHT LIST DATED 1 JUL 2014.
5. AIDS TO NAVIGATION IDENTIFIED ON DRAWING ARE BASED ON US COAST
CAROLINA STATE PLANE COORDINATE SYSTEM, NAD83 (NSRS2007).
4. ALL HORIZONTAL COORDINATES ARE BASED ON THE SOUTH
REFER TO MEAN LOWER LOW WATER (M.L.L.W.).
3. SOUNDINGS ARE IN FEET AND TENTHS AND
SELECTION.
HYPACK MATRIX PROGRAM WAS USED TO PERFORM THE SOUNDING
SHIFTED TO THE CELL’S CENTER. COASTAL OCEANOGRAPHIC’S
FROM 30’ X 30’ CELLS USING AVERAGE DEPTH
2. PLOTTED SOUNDINGS WERE EXTRACTED ALONG CHANNEL STATION LINES
OF ANY VOLUME USED FOR PAYMENT PURPOSES.
PURPOSES ONLY AND SHALL NOT BE USED FOR COMPUTATION
1. THE INFORMATION DEPICTED ON THIS DRAWING IS FOR PLOTTING
NOTES:
E 2320830.42
N 392188.34
TC DOCK
TIDE GAUGE S
a
NUMBER
REFERENCE
SHEET
.S
Y
IS
IC
te e v ra w n b y k d b s ig fi le n o ie d b u b m it d in g d g s c a le lo t d a ile
IP
IO
of Engineers US Army Corps
Charleston District d b
1"
C-02
.d
J
IF
B
SHEET 2 OF 10
IE
AMENDMENT_1
40’
E 2325000 E 2326000 E 2327000 E 2328000 E 2329000E 2324000
E 2330000E 2329000E 2328000E 2327000E 2326000E 2325000
E 2323000
E 2324000
PIER "BRAVO"
200 200 4000
C-05
SHEET 5 OF 10
B d b b d b d b le n d g s c a t d a
0+0
P.I . 10
2+6 1.9
100+00
P.I. 147+94.764
IV
PIER "CHARLIE"
12 14
N T E R
C C E S
INV. OUT=5.1
INV. IN=7.2
TOP RISER=26.5
152’ - 30"HDPE
SPILLWAY STA. 118+75
TOP ELEV.=23.9
WOODEN WALK
4’ X 12’
J
2328267.80, 397726.37XY=
2328098.11, 397620.56XY=
6+0
2+0
590 ACRES
PLACEMENT AREA
YELLOW HOUSE CREEK
E 2328764.71
N 397202.59
DM 70
TIDE GAUGE
(O
5. DATE OF CONDITION SURVEY: 3 MAR 2015.
STATE PLANE COORDINATES SYSTEM, NAD83 (NSRS2007).
4. ALL HORIZONTAL COORDINATES ARE BASED ON THE SOUTH CAROLINA
LINES FROM 30’ X 30’ CELLS USING AVERAGE DEPTH
2. PLOTTED SOUNDINGS WERE EXTRACTED ALONG CHANNEL STATION
1.1
1.0
1.7
1.2
1.4
1.5
1.8
1.6
1.3
39’
41’
2326193.23, 400675.50XY=
2326363.02, 400781.17XY=
S
301 ACRES
JOINT BASE CHARLESTON
E 2325000 E 2326000 E 2327000 E 2328000 E 2329000E 2324000
E 2323000
2325434.91, 400049.01XY=
C-06
SHEET 6 OF 10
B d b b d b d b le n d g s c a t d a
PIER "CHARLIE"
INV. OUT=5.1
INV. IN=7.2
TOP RISER=26.5
152’ - 30"HDPE
SPILLWAY STA. 118+75
TOP ELEV.=23.9
WOODEN WALK
4’ X 12’
J
E 2330000
E 2325000 E 2326000 E 2327000 E 2328000 E 2329000E 2324000E 2323000 E 2330000
2325836.57, 402184.69XY=
2325444.29, 402174.59XY=
2326129.43, 400399.83XY=
2325286.82, 400834.59XY=
2325706.53, 401078.06XY=
2325402.96, 400218.55XY=
2326110.97, 399371.11XY=
2325479.98, 400295.36XY=
2325406.26, 400423.42XY=
2325414.11, 400435.53XY=
2325354.05, 400477.96XY=
E 2325350.74
N 402019.05
RANGE C FRONT
L S
2325350.88, 400494.74XY=
STRUCTURES WITH 10’ OFFSET.
6. CONTRACTOR WILL VERTICALLY CUT AT FACE OF DOCK AND MOORING
5. DATE OF CONDITION SURVEY: 3 MAR 2015.
STATE PLANE COORDINATES SYSTEM, NAD83 (NSRS2007).
4. ALL HORIZONTAL COORDINATES ARE BASED ON THE SOUTH CAROLINA
LINES FROM 30’ X 30’ CELLS USING AVERAGE DEPTH
2. PLOTTED SOUNDINGS WERE EXTRACTED ALONG CHANNEL STATION
21.3 23.6
25.6 29.1
34.9 36.8
37.1 37.4
37.9 37.4
37.8 38.4
38.9 39.6
40.6 41.9
42.9 43.6
44.1 44.0
16.1 19.4
23.4 28.2
33.5 34.7
35.3 35.1
35.4 35.7
36.3 37.3
38.2 38.9
39.9 41.2
42.6 43.4
44.0 44.4
12.2 14.8
21.2 27.7
32.1
33.7 34.0
34.2 34.5
35.0 36.0
36.5 37.5
38.6 40.0
41.5 42.7
43.8 44.4
44.6
10.8 12.0
18.5 27.2
30.9 33.0
32.9
33.3
33.8 34.3
35.7
40.1 41.9
43.5 44.6
45.2
28.7 31.1
32.5 32.6
32.8
33.2
33.6
35.5
36.5 37.6
39.9 42.6
44.7 45.4
32.5
32.3
32.0
32.4
33.2 33.9
35.9
38.3 40.5
30.0 31.8
31.6
31.9
32.7
33.4 34.4
36.0 38.5
30.9
31.5 31.4
31.4 31.5
37.5 38.8
23.6
30.6
30.2 30.2
30.6
33.4
31.3 31.2
29.2
29.0 29.8
35.8 37.2
28.9 30.4
30.1
31.6
36.1
17.0 25.8
31.2
33.6
R T
E
F S E T
P I
E R
I
37’
2326051.62, 400004.88XY=
2325790.00, 400188.18XY=
2326030.73, 399972.24XY=
2325998.68, 399994.21XY=
2326318.04, 399577.61XY=
2325991.03, 399983.18XY=
L
37’
190+00
+0
2326290.64, 401365.71XY=
2327158.17, 402418.94XY=
2327252.75, 403236.02XY=
2325788.89, 401778.92XY=
2326726.84, 402917.65XY=
2327382.22, 403022.12XY=
2327588.70, 402679.56XY=
E R
E 2325000 E 2326000 E 2327000 E 2328000 E 2329000 E 2330000 E 2331000
E 2331000E 2330000E 2329000E 2328000E 2327000E 2326000E 2325000
.I. 18
+6
P.I. 147+95
35+00
W.E.
2.1
6. DATE OF CONDITION SURVEY: 3 MAR 2015
STATION LINES FROM 30’ X 30’ CELLS USING AVERAGE DEPTH
2. PLOTTED SOUNDINGS WERE EXTRACTED ALONG CHANNEL
b d b le n d b d g s c a t d a d b
C-07
J
B
SHEET 7 OF 10
12 14
E
42’
190+00
2326726.84, 402917.65XY=
E R
2326522.02, 403611.84XY=
6 12
35+00
.I. 18
+6
P.I. 147+95
W.E.
2.1
2326895.48, 403826.24XY=
SHOAL
4A
2328072.45, 403439.94XY=
2328689.78, 403346.10XY=
G"73"
INTERFERING BUOYS
NAME LOCATION
N 403462.59 E 2328004.59 G"73"
E 2326000 E 2327000 E 2328000 E 2329000 E 2330000E 2325000 E 2331000
E 2326000 E 2327000 E 2328000 E 2329000 E 2330000E 2325000 E 2331000
40+00
5.0
5.4
7.2
7.8
10.8
5.0
6.2
7.0
6.4
11.2
2.8
3.2
3.6
2.2
4.2
6.6
5.9
0.3
6.1
5.7
7.1
5.8
6.2
P.I. 200+21.400
2329248.52, 404392.28XY=
R T
E
I
10’ OFFSET.
7. CONTRACTOR WILL VERTICALLY CUT AT FACE OF DOCK WITH
6. DATE OF CONDITION SURVEY: 3 MAR 2015
STATION LINES FROM 30’ X 30’ CELLS USING AVERAGE DEPTH
2. PLOTTED SOUNDINGS WERE EXTRACTED ALONG CHANNEL
NOTES
DREDGE PRISM, 54’ FROM CHANNEL TOE
BUOY IS CURRENTLY IN SIDE SLOPE OF
4:
SI
DE
SLOPES
OPTI
ONAL
REQUI
RED
DEPTH
PLUS
2’
ALLOWABLE
OVERDEPTH
STA.
+3
TO
5+0 b d b le n d b d g s c a t d a d b
C-08
J
L
B
SHEET 8 OF 10
1.
.537
.739
.139 .939
.137
2327588.70, 402679.56XY=
2326043.19, 402087.65XY=
2327382.22, 403022.13XY=
42’
2328572.13, 403971.15XY=
2328900.03, 404579.97XY=
2325506.28, 402530.44XY=
2327252.75, 403236.02XY=
STA. 35+02
SPILLWAY
4’ X 4’
FY15 JOINT BASE CHARLESTON W912HP-15-B-0002
MAINTENANCE DREDGING
SECTION 00010
BIDDING SCHEDULE
ITEM NO. DESCRIPTION
ESTIMATED
QUANTITY
UNIT
UNIT PRICE AMOUNT
BASE
JA
JOB
MOBILIZATION AND DEMOBILIZATION
MAINTENANCE DREDGING IN JOINT BASE
CHARLESTON CHANNEL (SHOALS
1,2,2A,3,3A,4,4A,5)
0008AA
0008AB
OPTION
DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 1
SHOAL 2
SHOAL 4
SHOAL 4A
SHOAL 5
95,000
420,000
545,000
250,000
260,000
28,000
86,000
75,000
110,000
CY
MOBILIZATION AND DEMOBILIZATION
DESC (Sta. 1703+90 to 1704+90)
MSDDC (Sta. 1704+90 to 1720+83)
(COMBINATION OF BASE ITEMS 0001-
0008)
SHOAL 2A
SHOAL 3
SHOAL 3A
(COMBINATION OF OPTION ITEMS 0009-
0011)
(COMBINATION OF ALL ITEMS 0001-
0011)
STATEMENT
Enter prices where space is provided for ALL items. Failure to follow this instruction may render the bid non-responsive and the bid will not be considered for award.
All bidders are advised materially unbalanced bids may be rejected as non-responsive.
Quantities indicated are comprised of material within the required channel prism including the maximum optional pay slope material and two foot (2’) allowable overdepth.
L-1 ATTACHMENT L
CONSOLIDATED REPORT - DREDGING
TITLE: FY15 JOINT BASE CHARLESTON MAINTENANCE DREDGING,
CHARLESTON COUNTY AND BERKELY COUNTY, SOUTH CAROLINA
IFB NO. W912HP-15-B-0002 CONTRACT NO. W912HN-15-C-00XX
DRAWING NO. 9546 (Contract), 9547 (BD), 9548 (AD)
GOVERNMENT INSPECTOR:
CONTRACTOR:
CONTRACTOR'S SUPERINTENDENT:
TYPE EQUIPMENT USED ON JOB:
DREDGE(S): (NAME, SIZE, PUMP HP, BOOSTER, ETC.)
OTHER EQUIPMENT: (DRAGLINES, DOZERS, ETC.)
SUBCONTRACTORS:
DATES:
ADVERTISEMENT: BID OPENING:
AWARD: NOTICE TO PROCEED:
REQUIRED STARTING: ACTUAL STARTING:
REQUIRED COMPLETION DATE: ACTUAL COMPLETION:
NUMBERS DAYS ON JOB (PUMPING):
NUMBERS DAYS ON JOB (TOTAL):
DREDGING QUANTITIES:
REQUIRED PRODUCTION RATE:
ACTUAL PRODUCTION RATE:
CHARACTER OF MATERIALS:
NOTE: HARD MATERIAL OR ANY CHANGE OF CONDITIONS SHOULD BE
NOTED. ANY DEBRIS ENCOUNTERED SHOULD ALSO BE LISTED
WITH EXPLANATION OF HOW IT WAS REMOVED AND WHAT EQUIP
WAS USED FOR REMOVAL.
L-2 ATTACHMENT L
CONSOLIDATED REPORT – DREDGING
ADVERTISED QUANTITIES:
REQUIRED ALLOWABLE
SHOAL DREDGING PRISM OVERDEPTH PRISM TOTAL C.Y.
NUMBER LOCATION C.Y. PL. MEAS. * C.Y. PL. MEAS. ** PL. MEAS.
1 11+91 to
30+00
2 75+69 to
106+00
2A 106+00 to
142+00
3 131+66 to
142+57
3A 140+00 to
161+26
4 152+00 to
171+36
4A 171+36 to
195+00
5 156+00 to
TC DOCK DESC
1703+90 to
1704+90
MSDDC
1704+90 to
1720+83
TOTALS
L-3 ATTACHMENT L
BEFORE DREDGING QUANTITIES:
L-4 ATTACHMENT L
AFTER DREDGING QUANTITIES:
L-5 ATTACHMENT L
EFFECTIVE AND NON-EFFECTIVE TIME:
NAME OF
DREDGE
PUMPING:
HANDLING PIPE LINES:
HANDLING SWING LINES:
CLEARING PUMP AND PIPELINES:
CLEARING CUTTER:
CHANGING LOCATION ON JOB:
PASSING VESSELS:
SHORE LINE & SHORE WORK:
MINOR REPAIR:
PREPARATION:
MISCELLANEOUS:
MOBILIZATION AND
DEMOBILIZATION:
PRIVATE WORK:
SUNDAYS AND HOLIDAYS:
MAJOR REPAIRS:
LOST TIME:
LOST TIME NOT CHARGEABLE TO COST AT WORK:
TOTAL TIME:
AVERAGES:
WIDTH OF CUT:
LIFT:
NUMBER OF LOADS PER DAY:
CUBIC YARDS PER LOAD:
CUBIC YARDS PUMPED PER HOUR - CREDIT:
CUBIC YARDS PUMPED PER HOUR - GROSS:
CUBIC YARDS PUMPED PER DAY - CREDIT:
CUBIC YARDS PUMPED PER DAY - GROSS:
PUMPING TIME - HOURS PER DAY
TIME DELAYS AND CAUSES OF SUCH DELAYS:
L-6 ATTACHMENT L
DISPOSAL AREA(S): (FOR EACH DISPOSAL AREA)
DISPOSAL AREA: Yellow House Creek
TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:
LOCATION: (WHAT DISCHARGE POINT)
REMARKS:
DISPOSAL AREA: Joint Base Charleston
TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:
LOCATION: (WHAT DISCHARGE POINT)
REMARKS:
WATER QUALITY:
NOTE: DOCUMENTATION SHOULD LIST ALL EFFORTS MADE TO INSURE
WATER QUALITY HAS BEEN MAINTAINED AND ANY PROBLEMS
THAT WERE ENCOUNTERED.
OTHER - EXPLAIN:
REMARKS, COMMENTS, AND LESSONS LEARNED:
L-7 ATTACHMENT L
COSTS/PRICES:
ORIGINAL CONTRACT AWARD AMOUNTS:
0001 MOBILIZATION AND DEMOBILIZATION JA $______ ___
JOINT BASE CHARLESTON CHANNEL
(Shoals 1,2,2A,3,3A,4,4A,5)
0002 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 1
0003 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 2
0004 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 4
0005 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 4A
0006 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 5
0007 MOBILIZATION AND DEMOBILIZATION JA $______ ___
TC Dock
0008 DREDGING OF UNCLASSIFIED MATERIAL
0008AA DESC (Sta. 1703+90 to 1704+90) JA $______ ___
0008AB MSDDC (Sta. 1704+90 to 1720+83) $/CY $______ ___
TOTAL ORIGINAL CONTRACT PRICE (COMBINATION OF BASE ITEMS 0001-0008) $______ ___
0009 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 2A
0010 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 3
0011 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
L-8 ATTACHMENT L
Shoal 3A
TOTAL ORIGINAL CONTRACT PRICE (COMBINATION OF OPTION ITEMS 0012-0013) $______ ___
TOTAL ORIGINAL CONTRACT PRICE (COMBINATION OF BID ITEMS 0001-0013) $______ ___
L-9 ATTACHMENT L
ACTUAL CONTRACT AMOUNTS:
0001 MOBILIZATION AND DEMOBILIZATION JA $______ ___
(Shoals 1,2,2A,3,3A,4,4A,5)
0002 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 1
0003 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 2
0004 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 4
0005 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 4A
0006 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 5
0007 MOBILIZATION AND DEMOBILIZATION JA $______ ___
0008 DREDGING OF UNCLASSIFIED MATERIAL
0008AA DESC (Sta. 1703+90 to 1704+90) JA $______ ___
0008AB MSDDC (Sta. 1704+90 to 1720+83) $/CY $______ ___
TOTAL ORIGINAL CONTRACT PRICE (COMBINATION OF BASE ITEMS 0001-0008) $______ ___
0009 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 2A
0010 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 3
0011 DREDGING OF UNCLASSIFIED MATERIAL $/CY $______ ___
Shoal 3A
L-10 ATTACHMENT L
TOTAL ORIGINAL CONTRACT PRICE (COMBINATION OF OPTION ITEMS 0012-0013) $______ ___
TOTAL ORIGINAL CONTRACT PRICE (COMBINATION OF BID ITEMS 0001-0013) $______ ___
L-11 ATTACHMENT L
MODIFICATIONS:
MOD 1: (BRIEF DESCRIPTION) $___________
MOD 2: (BRIEF DESCRIPTION) $___________
CLAIMS:
CLAIM 1: (BRIEF DESCRIPTION) $___________
CLAIM 2: (BRIEF DESCRIPTION) $___________
ADDITIONAL COSTS:
NOTE: INCLUDE ALL OTHER COSTS NOT LISTED ABOVE.
Summary Of Changes
FY15 JBC Amendment Drawings c-02
9546W-HP0003
9546W-HP0004
c-05 c-06 c-07 c-08
Bid Schedule
Consolidated Report
File details come from the government source that posted it. Updated .