FY15 Joint Base Charleston Maintenance Dredging Revision B
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. DRAWINGS
Delete Drawing C‐08 and replace with revised Drawing C‐08 (see attachment).
2. Section 00010, BIDDING SCHEDULE
DELETE Bidding Schedule and REPLACE with revised Bidding Schedule (see attachment).
3. Section 352023, DREDGING, Paragraph 1.4.2., Work Covered By Contract Price
DELETE “ITEMS 0002‐0006, DREDGING WORK (SHOALS 1, 2, 4, 4A, 5)” and REPLACE with “ITEMS
0002‐0005, DREDGING WORK (SHOALS 1, 2, 4, 5)”
DELETE “ITEM 0007, MOBILIZATION AND DEMOBILIZATION (TC DOCK)” and REPLACE with “ITEM
0006, MOBILIZATION AND DEMOBILIZATION (TC DOCK)”
DELETE “ITEM 0008AA, DREDGING WORK (TC DOCK ‐ DESC)” and REPLACE with “ITEM 0007AA, DREDGING WORK (TC DOCK ‐ DESC)”
DELETE “ITEM 0008AB, DREDGING WORK (TC DOCK ‐ MSDDC)” and REPLACE with “ITEM
0007AB, DREDGING WORK (TC DOCK ‐ MSDDC)”
DELETE “OPTIONAL ITEMS 0009‐0011, DREDGING WORK (SHOALS 2A, 3, 3A)” and REPLACE with
“OPTIONAL ITEMS 0008‐0011, DREDGING WORK (SHOALS 2A, 3, 3A, 4A)”
4. Attachment L
Delete Attachment L, Consolidated Report ‐ Dredging and replace with revised Attachment L, Consolidated Report ‐ Dredging (see attachment).
190+00
+0
2326726.84, 402917.65XY=
S H
O A L
1+
+0
C O
O P E R
R
IV
E R
2326522.02, 403611.84XY=
6 12
35+00
200 200 4000
SCALE IN FEET
P .I. 16
P .I. 18
+6
P.I. 147+95
W H
A R F
A L P
H A
W.E.
2.1
2326895.48, 403826.24XY=
2328072.45, 403439.94XY=
2328689.78, 403346.10XY=
G"73"
INTERFERING BUOYS
NAME LOCATION
N 403462.59 E 2328004.59 G"73"
N
E 2326000 E 2327000 E 2328000 E 2329000 E 2330000E 2325000 E 2331000
E 2326000 E 2327000 E 2328000 E 2329000 E 2330000E 2325000 E 2331000
40+00
5.0
5.4
7.2
7.8
10.8
5.0
6.2
7.0
6.4
11.2
2.8
3.2
3.6
2.2
4.2
6.6
5.9
0.3
6.1
1.5
5.7
7.1
5.8
6.2
P.I. 200+21.400
2329248.52, 404392.28XY=
V E R T I C
A L
S L
O P E
F R
O M
D
C
K
S I
D E
S L
O P E S
P T I
O N
A L
R E
Q U I R
P T
H
P L
U S
A L L
O W
A B L
V E R
D E P T
H
S T
A
T
O
E 2325350.74
N 402019.05
RANGE C FRONT
TIDE GAUGE
10’ OFFSET.
7. CONTRACTOR WILL VERTICALLY CUT AT FACE OF DOCK WITH
6. DATE OF CONDITION SURVEY: 3 MAR 2015
GUARD LIGHT LIST DATED 1 JUL 2014.
5. AIDS TO NAVIGATION IDENTIFIED ON DRAWING ARE BASED ON US COAST
CAROLINA STATE PLANE COORDINATE SYSTEM, NAD83 (NSRS2007).
4. ALL HORIZONTAL COORDINATES ARE BASED ON THE SOUTH
REFER TO MEAN LOWER LOW WATER (M.L.L.W.).
3. SOUNDINGS ARE IN FEET AND TENTHS AND
SELECTION.
HYPACK MATRIX PROGRAM WAS USED TO PERFORM THE SOUNDING
SHIFTED TO THE CELL’S CENTER. COASTAL OCEANOGRAPHIC’S
STATION LINES FROM 30’ X 30’ CELLS USING AVERAGE DEPTH
2. PLOTTED SOUNDINGS WERE EXTRACTED ALONG CHANNEL
OF ANY VOLUME USED FOR PAYMENT PURPOSES.
PURPOSES ONLY AND SHALL NOT BE USED FOR COMPUTATION
1. THE INFORMATION DEPICTED ON THIS DRAWING IS FOR PLOTTING
NOTES:
NOTES
DREDGE PRISM, 54’ FROM CHANNEL TOE
BUOY IS CURRENTLY IN SIDE SLOPE OF
4:
SI
DE
SLOPES
OPTI
ONAL
REQUI
RED
DEPTH
PLUS
2’
ALLOWABLE
OVERDEPTH
STA.
+3
TO
5+0
AMENDMENT_2
a
S O
U N
D
IN
G S C
O N
T O
U R
N O
T
U
D A T
R
B M
S a
.1
.0
.7
.4
.1
.9
.8
.8
.8
.1
.2
.1
.9
.5
.6
.0
.7
.9
.0
.1
.7
.4
.3
.0
.4
.2
.9
.6
.4
.1
.9
.8
.8
.1
.1
.3
.2
.8
.0
.1
.7
.9
.0
.9
.7
.4
.1
.5
.7
.8
.9
.4
.0
.7
.6
.3
.1
.1
.5
.4
.2
.8
.7
.4
.1
.2
.6
.6
.8
.5
.1
.3
.0
.3
.1
.4
.1
.8
.7
.7
.9
.5
.6
.2
.9
.7
.7
.6
.7
.8
.5
.0
.0
.4
.0
.5
.9
.3
.6
.1
.5
.0
.8
.5
.3
.1
.0
.7
.5
.3
.2
.0
.2
.2
.4
.0
.5
.0
.9
.5
.2
.4
.0
.8
.9
.2
.7
.3
.8
.7
.7
.2
.0
.7
.6
.7
.6
.6
.7
.4
.2
.9
.1
.8
.7
.2
.5
.6
.2
.9
.5
.7
.1
.8
.4
.2
.9
.7
.2
.1
.0
.8
.1
.8
.6
.5
.3
.2
.4
.1
.8
.3
.4
.4
.0
.4
.6
.9
.6
.0
.6
.4
.0
.7
.5
.3
.3
.9
.1
.2
.1
.1
.3
.1
.9
.7
.8
.1
.8
.4
.8
.3
.8
.1
.8
.4
.0
.6
.3
.8
.1
.9
.0
.7
.6
.3
.4
.7
.4
.4
.2
.6
.8
.6
.2
.7
.3
.8
.3
.7
.1
.8
.5
.2
.7
.4
.1
.2
.2
.5
.4
.3
.7
.6
.8
.0
.8
.3
.5
.6
.5
.4
.2
.0
.4
.0
.4
.0
.7
.3
.3
.2
.5
.4
.4
.5
.2
.3
.4
.2
.4
.0
.8
.3
.9
.4
.6
.8
.9
.1
.2
.0
.2
.7
.3
.8
.2
.4
.1
.9
.1
.5
.0
.6
.8
.4
.7
.3
.2
1.
.6
.2
.7
.1
.2
.5
.1
.6
.2
.6
.1
.8
.5
.8
.6
.2
.0
.8
.5
.2
.9
.6
.6
.1
.1
.7
.1
.3
.6
.5
.8
.4
.0
.5
.0
.7
.3
.9
.4
.3
.1
.8
.4
.1
.8
.7
.5
.7
.5
.9
.3
.3
.3
.1
.9
.7
.1
.6
.2
.0
.6
.4
.1
.7
.6
.3
.0
.8
.5
.2
.1
.6
.2
.6
.5
.4
.3
.2
.9
.5
.3
.9
.6
.4
.2
.2
.7
.7
.2
.0
.8
.5
.2
.0
.5
.0
.6
.3
.7
.5
.7
.6
.5
.5
.4
.0
.9
.7
.4
.1
.9
.8
.5
.3
.1
.8
.7
.4
.1
.9
.7
.8
.8
.9
.7
.8
.9
.9
.9
.0
.8
.7
.6
.5
.5
.3
.3
.3
.9
.8
.6
.3
.2
.0
.9
.6
.4
.2
.537 .9
.8
.739 .4
.139 .939 .6
.3
.137
.2 .8
.9
.9
.9
.4
.6
.6
.9
.8
.3
.6
.1
.8
.1
.7
.2
.4 a
2327588.70, 402679.56XY=
NUMBER
REFERENCE
SHEET
C H
A R
L E S T
O N S
O U
T H
C
R O
L
IN
A
C O
R
F
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
R
IS
T R
IC
T
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w in g o d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
1"
C-08
W H
P .d g n
J R J
J
J
IN
T E
N A
N
E D
G
IN
G
F Y
J O
IN
T
B
A
A R
E L S T
O N
J A
N
B M
S
S H
O A L S
A
(O
P T
IO
N
IF
B
W
H P B
R
H J C
SHEET 8 OF 10
C H
A R
L E S T
B
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
A B
R A
N D
S
C U
L L Y
B M
S b
S H
O A L
V
IS
T
IO
N A L
B
ID
IT
E M
R b
SHOAL
4A
(OPTI
ON)
2326043.19, 402087.65XY=
2327382.22, 403022.13XY=
42’
40’
2328572.13, 403971.15XY=
2328900.03, 404579.97XY=
2325506.28, 402530.44XY=
2327252.75, 403236.02XY=
590 ACRES
PLACEMENT AREA
YELLOW HOUSE CREEK
39’
STA. 35+02
SPILLWAY
4’ X 4’
41’
41’
FY15 JOINT BASE CHARLESTON W912HP-15-B-0002
MAINTENANCE DREDGING
SECTION 00010
BIDDING SCHEDULE
ITEM NO. DESCRIPTION ESTIMATED
QUANTITY UNIT UNIT PRICE AMOUNT
BASE
JA
JOB
MOBILIZATION AND DEMOBILIZATION
MAINTENANCE DREDGING IN JOINT BASE
CHARLESTON CHANNEL (SHOALS
1,2,2A,3,3A,4,4A,5)
0007AA
0007AB
OPTION
DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 1
DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 2
DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 4
DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 5
95,000
420,000
545,000
260,000
28,000
86,000
75,000
110,000
250,000
CY
MOBILIZATION AND DEMOBILIZATION
TC DOCK
DREDGING OF UNCLASSIFIED MATERIAL
TC DOCK
DESC (Sta. 1703+90 to 1704+90)
MSDDC (Sta. 1704+90 to 1720+83)
(COMBINATION OF BASE ITEMS 0001-
0007)
DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 2A
DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 3
DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 3A
DREDGING OF UNCLASSIFIED MATERIAL
SHOAL 4A
(COMBINATION OF OPTION ITEMS 0008-
0011)
(COMBINATION OF ALL ITEMS 0001-
0011)
STATEMENT
Enter prices where space is provided for ALL items. Failure to follow this instruction may render the bid non-responsive and the bid will not be considered for award.
All bidders are advised materially unbalanced bids may be rejected as non-responsive.
Quantities indicated are comprised of material within the required channel prism including the maximum optional pay slope material and two foot (2’) allowable overdepth.
L-1 ATTACHMENT L
CONSOLIDATED REPORT - DREDGING
TITLE: FY15 JOINT BASE CHARLESTON MAINTENANCE DREDGING,
CHARLESTON COUNTY AND BERKELY COUNTY, SOUTH CAROLINA
IFB NO. W912HP-15-B-0002 CONTRACT NO. W912HN-15-C-00XX
DRAWING NO. 9546 (Contract), 9547 (BD), 9548 (AD)
GOVERNMENT INSPECTOR:
CONTRACTOR:
CONTRACTOR'S SUPERINTENDENT:
TYPE EQUIPMENT USED ON JOB:
DREDGE(S): (NAME, SIZE, PUMP HP, BOOSTER, ETC.)
OTHER EQUIPMENT: (DRAGLINES, DOZERS, ETC.)
SUBCONTRACTORS:
DATES:
ADVERTISEMENT: BID OPENING:
AWARD: NOTICE TO PROCEED:
REQUIRED STARTING: ACTUAL STARTING:
REQUIRED COMPLETION DATE: ACTUAL COMPLETION:
NUMBERS DAYS ON JOB (PUMPING):
NUMBERS DAYS ON JOB (TOTAL):
DREDGING QUANTITIES:
REQUIRED PRODUCTION RATE:
ACTUAL PRODUCTION RATE:
CHARACTER OF MATERIALS:
NOTE: HARD MATERIAL OR ANY CHANGE OF CONDITIONS SHOULD BE
NOTED. ANY DEBRIS ENCOUNTERED SHOULD ALSO BE LISTED
WITH EXPLANATION OF HOW IT WAS REMOVED AND WHAT EQUIP
WAS USED FOR REMOVAL.
L-2 ATTACHMENT L
CONSOLIDATED REPORT – DREDGING
ADVERTISED QUANTITIES:
REQUIRED ALLOWABLE
SHOAL DREDGING PRISM OVERDEPTH PRISM TOTAL C.Y.
NUMBER LOCATION C.Y. PL. MEAS. * C.Y. PL. MEAS. ** PL. MEAS.
1 11+91 to 30+00
2 75+69 to 106+00
2A 106+00 to 142+00
3 131+66 to 142+57
3A 140+00 to 161+26
4 152+00 to 171+36
4A 171+36 to 195+00
5 156+00 to 171+36
TC DOCK DESC
1703+90 to 1704+90
MSDDC
1704+90 to 1720+83
TOTALS
L-3 ATTACHMENT L
BEFORE DREDGING QUANTITIES:
REQUIRED ALLOWABLE
SHOAL DREDGING PRISM OVERDEPTH PRISM TOTAL C.Y.
NUMBER LOCATION C.Y. PL. MEAS. * C.Y. PL. MEAS. ** PL. MEAS.
1 11+91 to 30+00
2 75+69 to 106+00
2A 106+00 to 142+00
3 131+66 to 142+57
3A 140+00 to 161+26
4 152+00 to 171+36
4A 171+36 to 195+00
5 156+00 to 171+36
TC DOCK DESC
1703+90 to 1704+90
MSDDC
1704+90 to
L-4 ATTACHMENT L
AFTER DREDGING QUANTITIES:
REQUIRED ALLOWABLE
SHOAL DREDGING PRISM OVERDEPTH PRISM TOTAL C.Y.
NUMBER LOCATION C.Y. PL. MEAS. * C.Y. PL. MEAS. ** PL. MEAS.
1 11+91 to 30+00
2 75+69 to 106+00
2A 106+00 to 142+00
3 131+66 to 142+57
3A 140+00 to 161+26
4 152+00 to 171+36
4A 171+36 to 195+00
5 156+00 to 171+36
TC DOCK DESC
1703+90 to 1704+90
MSDDC
1704+90 to
L-5 ATTACHMENT L
EFFECTIVE AND NON-EFFECTIVE TIME:
NAME OF
DREDGE
PUMPING:
HANDLING PIPE LINES:
HANDLING SWING LINES:
CLEARING PUMP AND PIPELINES:
CLEARING CUTTER:
CHANGING LOCATION ON JOB:
PASSING VESSELS:
SHORE LINE & SHORE WORK:
MINOR REPAIR:
PREPARATION:
MISCELLANEOUS:
MOBILIZATION AND
DEMOBILIZATION:
PRIVATE WORK:
SUNDAYS AND HOLIDAYS:
MAJOR REPAIRS:
LOST TIME:
LOST TIME NOT CHARGEABLE TO COST AT WORK:
TOTAL TIME:
AVERAGES:
WIDTH OF CUT:
LIFT:
NUMBER OF LOADS PER DAY:
CUBIC YARDS PER LOAD:
CUBIC YARDS PUMPED PER HOUR - CREDIT:
CUBIC YARDS PUMPED PER HOUR - GROSS:
CUBIC YARDS PUMPED PER DAY - CREDIT:
CUBIC YARDS PUMPED PER DAY - GROSS:
PUMPING TIME - HOURS PER DAY
TIME DELAYS AND CAUSES OF SUCH DELAYS:
L-6 ATTACHMENT L
DISPOSAL AREA(S): (FOR EACH DISPOSAL AREA)
DISPOSAL AREA: Yellow House Creek
TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:
LOCATION: (WHAT DISCHARGE POINT)
REMARKS:
DISPOSAL AREA: Joint Base Charleston
TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:
LOCATION: (WHAT DISCHARGE POINT)
REMARKS:
WATER QUALITY:
NOTE: DOCUMENTATION SHOULD LIST ALL EFFORTS MADE TO INSURE
WATER QUALITY HAS BEEN MAINTAINED AND ANY PROBLEMS
THAT WERE ENCOUNTERED.
OTHER - EXPLAIN:
REMARKS, COMMENTS, AND LESSONS LEARNED:
| Summary Of Changes |
| 9546W-HP0008 |
| Bid Schedule |
| L consol rpt |
File details come from the government source that posted it. Updated .