W912HP-15-B-0002_JBC_Maintenance_Dredging_Amendment_02_040115.pdf

PDF 95 KB Posted

Attached to
FY15 Joint Base Charleston Maintenance Dredging, Charleston County, South Carolina
Solicitation number
W912HP-15-B-0002
Issued by

About this file

W912HP-15-B-0002 JBC Maintenance Dredging Am 02

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912HP-15-B-0002 JBC MAINTENANCE DREDGING

The purpose of this amendment is to incorporate the follow ing changes:

1. Schedule Pre-Bid Teleconference - April 7, 2015 @12:00 Noon. Call in information w ill be provided via FBO.

2. Change Bid Opening Date to - April 16, 2015 @ 2:00 PM EST

3. See attached SUMMARY OF CHANGES.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Apr-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-15-B-0002

X 9B. DATED (SEE ITEM 11)

11-Mar-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Apr-2015

CODE

U.S. ARMY CORPS OF ENGINEERS, CHARLESTON

DISTRICT, CONTRACTING DIVISION

69-A HAGOOD AVENUE

CHARLESTON SC 29403

W912HP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HP-15-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 02

FY15 Joint Base Charleston Maintenance Dredging

Revision B

SUMMARY OF CHANGES

1. DRAWINGS

Delete Drawing C‐08 and replace with revised Drawing C‐08 (see attachment).

2. Section 00010, BIDDING SCHEDULE

DELETE Bidding Schedule and REPLACE with revised Bidding Schedule (see attachment).

3. Section 352023, DREDGING, Paragraph 1.4.2., Work Covered By Contract Price

DELETE “ITEMS 0002‐0006, DREDGING WORK (SHOALS 1, 2, 4, 4A, 5)” and REPLACE with “ITEMS

0002‐0005, DREDGING WORK (SHOALS 1, 2, 4, 5)”

DELETE “ITEM 0007, MOBILIZATION AND DEMOBILIZATION (TC DOCK)” and REPLACE with

“ITEM

0006, MOBILIZATION AND DEMOBILIZATION (TC DOCK)”

DELETE “ITEM 0008AA, DREDGING WORK (TC DOCK ‐ DESC)” and REPLACE with “ITEM

0007AA, DREDGING WORK (TC DOCK ‐ DESC)”

DELETE “ITEM 0008AB, DREDGING WORK (TC DOCK ‐ MSDDC)” and REPLACE with “ITEM

0007AB, DREDGING WORK (TC DOCK ‐ MSDDC)”

DELETE “OPTIONAL ITEMS 0009‐0011, DREDGING WORK (SHOALS 2A, 3, 3A)” and REPLACE with

“OPTIONAL ITEMS 0008‐0011, DREDGING WORK (SHOALS 2A, 3, 3A, 4A)”

4. Attachment L

Delete Attachment L, Consolidated Report ‐ Dredging and replace with revised Attachment L, Consolidated Report ‐ Dredging (see attachment).

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 14-Apr-2015 02:00 PM to 16-Apr-2015 02:00 PM.

The number of offeror copies required has decreased by 90 from 90 to 0.

CLIN 0005

The CLIN extended description has changed from Shoal 4A to Shoal 5.

The pricing detail quantity has increased by 10,000.00 from 250,000.00 to 260,000.00.

CLIN 0006

The CLIN description has changed from DREDGING OF UNCLASSIFIED MATERIAL to Mobilization and Demobilization TC Dock.

The CLIN extended description Shoal 5 has been deleted.

The pricing detail quantity has decreased by 259,999.00 from 260,000.00 to 1.00.

The unit of issue has changed from Cubic Yard to Job.

CLIN 0007

The CLIN type priced has been deleted.

The CLIN description has changed from Mobilization and Demobilization TC Dock to DREDGING OF

UNCLASSIFIED MATERIAL TC.

The CLIN extended description Dock has been added.

The pricing detail quantity 1.00 has been deleted.

CLIN 0008

This CLIN has been renumbered to CLIN 0009.

The CLIN type priced has been added.

The CLIN description has changed from DREDGING OF UNCLASSIFIED MATERIAL TC to

DREDGING OF UNCLASSIFIED MATERIAL.

The CLIN extended description has changed from Dock to Shoal 3. The Government may exercise this option within 120 days after award of contract..

The pricing detail quantity 75,000.00 has been added.

The unit of issue Cubic Yard has been added.

The option status has changed from No Status to Option.

SUBCLIN 0008AA

This SUBCLIN has been renumbered to SUBCLIN 0007AA.

SUBCLIN 0008AB

This SUBCLIN has been renumbered to SUBCLIN 0007AB.

CLIN 0009

This CLIN has been renumbered to CLIN 0008.

CLIN 0010

The CLIN extended description has changed from Shoal 3. The Government may exercise this option within 120 days after award of contract. to Shoal 3A. The Government may exercise this option within 120 days after award of contract..

The pricing detail quantity has increased by 35,000.00 from 75,000.00 to 110,000.00.

CLIN 0011

The CLIN extended description has changed from Shoal 3A. The Government may exercise this option within 120 days after award of contract. to Shoal 4A. The Government may exercise this option within 120 days after award of contract..

The pricing detail quantity has increased by 140,000.00 from 110,000.00 to 250,000.00.

TABLE OF CONTENTS

The below Table of Contents has been added

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 2 01-APR-2015

(End of Summary of Changes)