14r0016_ELINS_1503050_Grounds_Maintenance_TN__2014.03.12.xlsx
XLSX spreadsheet 194 KB Posted
- Solicitation number
- W912HP-14-R-0016
About this file
Grounds Maintenance ELNIs TN
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINS Summary Grounds Maintenance Services Summary
| This sheet is filled out automatically as other sheets are completed | ||
| CLIN | Total | |
| 0009 | Base Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 0010 | Base Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 0011 | Base Period Indefinite Quantity | $0.00 |
| 0019 | Base Period Firm Fixed-Price - High Service Level (Green), OPTIONAL | -- |
| 0019AA | NSA MILLINGTON USARC #1 | $0.00 |
| 0019AB | JACKSON AFRC | $0.00 |
| 0019AC | JOHNSON CITY AFRC & AMSA #147 (G) | $0.00 |
| 0019AD | MANNING HALL USARC | $0.00 |
| 0019AE | AMSA #150 (G) | $0.00 |
| 0020 | Base Period Firm Fixed-Price - Medium Service Level (Amber), OPTIONAL | -- |
| 0020AA | NSA MILLINGTON USARC #1 | $0.00 |
| 0020AB | JACKSON AFRC | $0.00 |
| 0020AC | JOHNSON CITY AFRC & AMSA #147 (G) | $0.00 |
| 0020AD | MANNING HALL USARC | $0.00 |
| 0020AE | AMSA #150 (G) | $0.00 |
| 1009 | First Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 1010 | First Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 1011 | First Option Period Indefinite Quantity | $0.00 |
| 1019 | First Option Period Firm Fixed-Price - High Service Level (Green), OPTIONAL | -- |
| 1019AA | NSA MILLINGTON USARC #1 | $0.00 |
| 1019AB | JACKSON AFRC | $0.00 |
| 1019AC | JOHNSON CITY AFRC & AMSA #147 (G) | $0.00 |
| 1019AD | MANNING HALL USARC | $0.00 |
| 1019AE | AMSA #150 (G) | $0.00 |
| 1020 | First Option Period Firm Fixed-Price - Medium Service Level (Amber), OPTIONAL | -- |
| 1020AA | NSA MILLINGTON USARC #1 | $0.00 |
| 1020AB | JACKSON AFRC | $0.00 |
| 1020AC | JOHNSON CITY AFRC & AMSA #147 (G) | $0.00 |
| 1020AD | MANNING HALL USARC | $0.00 |
| 1020AE | AMSA #150 (G) | $0.00 |
| 2009 | Second Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 2010 | Second Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 2011 | Second Option Period Indefinite Quantity | $0.00 |
| 2019 | Second Option Period Firm Fixed-Price - High Service Level (Green), OPTIONAL | -- |
| 2019AA | NSA MILLINGTON USARC #1 | $0.00 |
| 2019AB | JACKSON AFRC | $0.00 |
| 2019AC | JOHNSON CITY AFRC & AMSA #147 (G) | $0.00 |
| 2019AD | MANNING HALL USARC | $0.00 |
| 2019AE | AMSA #150 (G) | $0.00 |
| 2020 | Second Option Period Firm Fixed-Price - Medium Service Level (Amber), OPTIONAL | -- |
| 2020AA | NSA MILLINGTON USARC #1 | $0.00 |
| 2020AB | JACKSON AFRC | $0.00 |
| 2020AC | JOHNSON CITY AFRC & AMSA #147 (G) | $0.00 |
| 2020AD | MANNING HALL USARC | $0.00 |
| 2020AE | AMSA #150 (G) | $0.00 |
| 3009 | Third Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 3010 | Third Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 3011 | Third Option Period Indefinite Quantity | $0.00 |
| 3019 | Third Option Period Firm Fixed-Price - High Service Level (Green), OPTIONAL | -- |
| 3019AA | NSA MILLINGTON USARC #1 | $0.00 |
| 3019AB | JACKSON AFRC | $0.00 |
| 3019AC | JOHNSON CITY AFRC & AMSA #147 (G) | $0.00 |
| 3019AD | MANNING HALL USARC | $0.00 |
| 3019AE | AMSA #150 (G) | $0.00 |
| 3020 | Third Option Period Firm Fixed-Price - Medium Service Level (Amber), OPTIONAL | -- |
| 3020AA | NSA MILLINGTON USARC #1 | $0.00 |
| 3020AB | JACKSON AFRC | $0.00 |
| 3020AC | JOHNSON CITY AFRC & AMSA #147 (G) | $0.00 |
| 3020AD | MANNING HALL USARC | $0.00 |
| 3020AE | AMSA #150 (G) | $0.00 |
| 4009 | Fourth Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 4010 | Fourth Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 4011 | Fourth Option Period Indefinite Quantity | $0.00 |
| 4019 | Fourth Option Period Firm Fixed-Price - High Service Level (Green), OPTIONAL | -- |
| 4019AA | NSA MILLINGTON USARC #1 | $0.00 |
| 4019AB | JACKSON AFRC | $0.00 |
| 4019AC | JOHNSON CITY AFRC & AMSA #147 (G) | $0.00 |
| 4019AD | MANNING HALL USARC | $0.00 |
| 4019AE | AMSA #150 (G) | $0.00 |
| 4020 | Fourth Option Period Firm Fixed-Price - Medium Service Level (Amber), OPTIONAL | -- |
| 4020AA | NSA MILLINGTON USARC #1 | $0.00 |
| 4020AB | JACKSON AFRC | $0.00 |
| 4020AC | JOHNSON CITY AFRC & AMSA #147 (G) | $0.00 |
| 4020AD | MANNING HALL USARC | $0.00 |
| 4020AE | AMSA #150 (G) | $0.00 |
$0.00
Note: Either CLIN 0009 or CLIN 0010 (but not both) will be awarded for fixed-price grounds maintenance services, at the discretion of the Contracting Officer. Sites under CLIN 0019 or 0020 will be awarded at the discretion of the Contracting Officer.
&F
&A &P of &N
Site Summary Sheet Grounds Maintenance Site Summary Sheet
| This sheet is filled out automatically as other sheets are completed | |||
| CLIN / SUBCLIN | Site | ELINS | Total Price |
| 0009 | Base Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 0009AA | TN001 | Total CLIN 0009AA (Items A001 Through A002) | $0.00 |
| 0009AB | TN004 | Total CLIN 0009AB (Items A003 Through A005) | $0.00 |
| 0009AC | TN010 & TN112 | Total CLIN 0009AC (Items A006 Through A008) | $0.00 |
| 0009AD | TN014 & TN116 | Total CLIN 0009AD (Items A009 Through A010) | $0.00 |
| 0009AE | TN017 | Total CLIN 0009AE (Items A011 Through A012) | $0.00 |
| 0009AF | TN105 | Total CLIN 0009AF (Items A013 Through A015) | $0.00 |
| 0009AG | TN111 | Total CLIN 0009AG (Items A016 Through A018) | $0.00 |
| 0009AH | TN122 | Total CLIN 0009AH (Items A019 Through A021) | $0.00 |
| $0.00 | |||
| 0010 | Base Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 0010AA | TN001 | Total CLIN 0010AA (Items A101 Through A102) | $0.00 |
| 0010AB | TN004 | Total CLIN 0010AB (Items A103 Through A105) | $0.00 |
| 0010AC | TN010 & TN112 | Total CLIN 0010AC (Items A106 Through A108) | $0.00 |
| 0010AD | TN014 & TN116 | Total CLIN 0010AD (Items A109 Through A110) | $0.00 |
| 0010AE | TN017 | Total CLIN 0010AE (Items A111 Through A112) | $0.00 |
| 0010AF | TN105 | Total CLIN 0010AF (Items A113 Through A115) | $0.00 |
| 0010AG | TN111 | Total CLIN 0010AG (Items A116 Through A118) | $0.00 |
| 0010AH | TN122 | Total CLIN 0010AH (Items A119 Through A121) | $0.00 |
| $0.00 | |||
| 0019 | Base Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 0019AA | TN013 | Total CLIN 0019AA (Items A001 Through A002) | $0.00 |
| 0019AB | TN019 | Total CLIN 0019AB (Items A003 Through A004) | $0.00 |
| 0019AC | TN102 & TN110 | Total CLIN 0019AC (Items A005 Through A007 | $0.00 |
| 0019AD | TN108 | Total CLIN 0019AD (Items A008 Through A009) | $0.00 |
| 0019AE | TN115 | Total CLIN 0019AE (Items A010 Through A011) | $0.00 |
| $0.00 | |||
| 0020 | Base Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 0020AA | TN013 | Total CLIN 0020AA (Items A101 Through A102) | $0.00 |
| 0020AB | TN019 | Total CLIN 0020AB (Items A103 Through A104) | $0.00 |
| 0020AC | TN102 & TN110 | Total CLIN 0020AC (Items A105 Through A107 | $0.00 |
| 0020AD | TN108 | Total CLIN 0020AD (Items A108 Through A109) | $0.00 |
| 0020AE | TN115 | Total CLIN 0020AE (Items A110 Through A111) | $0.00 |
| $0.00 | |||
| 0011 | Base Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - A701 THROUGH A740 | $0.00 |
| 1009 | First Option Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 1009AA | TN001 | Total CLIN 1009AA (Items B001 Through B002) | $0.00 |
| 1009AB | TN004 | Total CLIN 1009AB (Items B003 Through B005) | $0.00 |
| 1009AC | TN010 & TN112 | Total CLIN 1009AC (Items B006 Through B008) | $0.00 |
| 1009AD | TN014 & TN116 | Total CLIN 1009AD (Items B009 Through B010) | $0.00 |
| 1009AE | TN017 | Total CLIN 1009AE (Items B011 Through B012) | $0.00 |
| 1009AF | TN105 | Total CLIN 1009AF (Items B013 Through B015) | $0.00 |
| 1009AG | TN111 | Total CLIN 1009AG (Items B016 Through B018) | $0.00 |
| 1009AH | TN122 | Total CLIN 1009AH (Items B019 Through B021) | $0.00 |
| $0.00 | |||
| 1010 | First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 1010AA | TN001 | Total CLIN 1010AA (Items B101 Through B102) | $0.00 |
| 1010AB | TN004 | Total CLIN 1010AB (Items B103 Through B105) | $0.00 |
| 1010AC | TN010 & TN112 | Total CLIN 1010AC (Items B106 Through B108) | $0.00 |
| 1010AD | TN014 & TN116 | Total CLIN 1010AD (Items B109 Through B110) | $0.00 |
| 1010AE | TN017 | Total CLIN 1010AE (Items B111 Through B112) | $0.00 |
| 1010AF | TN105 | Total CLIN 1010AF (Items B113 Through B115) | $0.00 |
| 1010AG | TN111 | Total CLIN 1010AG (Items B116 Through B118) | $0.00 |
| 1010AH | TN122 | Total CLIN 1010AH (Items B119 Through B121) | $0.00 |
| $0.00 | |||
| 1019 | First Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 1019AA | TN013 | Total CLIN 1019AA (Items B001 Through B002) | $0.00 |
| 1019AB | TN019 | Total CLIN 1019AB (Items B003 Through B004) | $0.00 |
| 1019AC | TN102 & TN110 | Total CLIN 1019AC (Items B005 Through B007 | $0.00 |
| 1019AD | TN108 | Total CLIN 1019AD (Items B008 Through B009) | $0.00 |
| 1019AE | TN115 | Total CLIN 1019AE (Items B010 Through B011) | $0.00 |
| $0.00 | |||
| 1020 | First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 1020AA | TN013 | Total CLIN 1020AA (Items B101 Through B102) | $0.00 |
| 1020AB | TN019 | Total CLIN 1020AB (Items B103 Through B104) | $0.00 |
| 1020AC | TN102 & TN110 | Total CLIN 1020AC (Items B105 Through B107) | $0.00 |
| 1020AD | TN108 | Total CLIN 1020AD (Items B108 Through B109) | $0.00 |
| 1020AE | TN115 | Total CLIN 1020AE (Items B110 Through B111) | $0.00 |
| $0.00 | |||
| 1011 | First Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - B701 THROUGH B740 | $0.00 |
| 2009 | Second Option Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 2009AA | TN001 | Total CLIN 0009AA (Items C001 Through C002) | $0.00 |
| 2009AB | TN004 | Total CLIN 0009AB (Items C003 Through C005) | $0.00 |
| 2009AC | TN010 & TN112 | Total CLIN 0009AC (Items C006 Through C008) | $0.00 |
| 2009AD | TN014 & TN116 | Total CLIN 0009AD (Items C009 Through C010) | $0.00 |
| 2009AE | TN017 | Total CLIN 0009AE (Items C011 Through C012) | $0.00 |
| 2009AF | TN105 | Total CLIN 0009AF (Items C013 Through C015) | $0.00 |
| 2009AG | TN111 | Total CLIN 0009AG (Items C016 Through C018) | $0.00 |
| 2009AH | TN122 | Total CLIN 0009AH (Items C019 Through C021) | $0.00 |
| $0.00 | |||
| 2010 | Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 2010AA | TN001 | Total CLIN 0010AA (Items C101 Through C102) | $0.00 |
| 2010AB | TN004 | Total CLIN 0010AB (Items C103 Through C105) | $0.00 |
| 2010AC | TN010 & TN112 | Total CLIN 0010AC (Items C106 Through C108) | $0.00 |
| 2010AD | TN014 & TN116 | Total CLIN 0010AD (Items C109 Through C110) | $0.00 |
| 2010AE | TN017 | Total CLIN 0010AE (Items C111 Through C112) | $0.00 |
| 2010AF | TN105 | Total CLIN 0010AF (Items C113 Through C115) | $0.00 |
| 2010AG | TN111 | Total CLIN 0010AG (Items C116 Through C118) | $0.00 |
| 2010AH | TN122 | Total CLIN 0010AH (Items C119 Through C121) | $0.00 |
| $0.00 | |||
| 2019 | Second Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 2019AA | TN013 | Total CLIN 0019AA (Items C001 Through C002) | $0.00 |
| 2019AB | TN019 | Total CLIN 0019AB (Items C003 Through C004) | $0.00 |
| 2019AC | TN102 & TN110 | Total CLIN 0019AC (Items C005 Through C007 | $0.00 |
| 2019AD | TN108 | Total CLIN 0019AD (Items C008 Through C009) | $0.00 |
| 2019AE | TN115 | Total CLIN 0019AE (Items C010 Through C011) | $0.00 |
| $0.00 | |||
| 2020 | Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 2020AA | TN013 | Total CLIN 0020AA (Items C101 Through C102) | $0.00 |
| 2020AB | TN019 | Total CLIN 0020AB (Items C103 Through C104) | $0.00 |
| 2020AC | TN102 & TN110 | Total CLIN 0020AC (Items C105 Through C107 | $0.00 |
| 2020AD | TN108 | Total CLIN 0020AD (Items C108 Through C109) | $0.00 |
| 2020AE | TN115 | Total CLIN 0020AE (Items C110 Through C111) | $0.00 |
| $0.00 | |||
| 2011 | Second Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - A701 THROUGH A740 | $0.00 |
| 3009 | Third Option Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 3009AA | TN001 | Total CLIN 3009AA (Items D001 Through D002) | $0.00 |
| 3009AB | TN004 | Total CLIN 3009AB (Items D003 Through D005) | $0.00 |
| 3009AC | TN010 & TN112 | Total CLIN 3009AC (Items D006 Through D008) | $0.00 |
| 3009AD | TN014 & TN116 | Total CLIN 3009AD (Items D009 Through D010) | $0.00 |
| 3009AE | TN017 | Total CLIN 3009AE (Items D011 Through D012) | $0.00 |
| 3009AF | TN105 | Total CLIN 3009AF (Items D013 Through D015) | $0.00 |
| 3009AG | TN111 | Total CLIN 3009AG (Items D016 Through D018) | $0.00 |
| 3009AH | TN122 | Total CLIN 3009AH (Items D019 Through D021) | $0.00 |
| $0.00 | |||
| 3010 | Third Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 3010AA | TN001 | Total CLIN 3010AA (Items D101 Through D102) | $0.00 |
| 3010AB | TN004 | Total CLIN 3010AB (Items D103 Through D105) | $0.00 |
| 3010AC | TN010 & TN112 | Total CLIN 3010AC (Items D106 Through D108) | $0.00 |
| 3010AD | TN014 & TN116 | Total CLIN 3010AD (Items D109 Through D110) | $0.00 |
| 3010AE | TN017 | Total CLIN 3010AE (Items D111 Through D112) | $0.00 |
| 3010AF | TN105 | Total CLIN 3010AF (Items D113 Through D115) | $0.00 |
| 3010AG | TN111 | Total CLIN 3010AG (Items D116 Through D118) | $0.00 |
| 3010AH | TN122 | Total CLIN 3010AH (Items D119 Through D121) | $0.00 |
| $0.00 | |||
| 3019 | Third Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 3019AA | TN013 | Total CLIN 3019AA (Items D001 Through D002) | $0.00 |
| 3019AB | TN019 | Total CLIN 3019AB (Items D003 Through D004) | $0.00 |
| 3019AC | TN102 & TN110 | Total CLIN 3019AC (Items D005 Through D007 | $0.00 |
| 3019AD | TN108 | Total CLIN 3019AD (Items D008 Through D009) | $0.00 |
| 3019AE | TN115 | Total CLIN 3019AE (Items D010 Through D011) | $0.00 |
| $0.00 | |||
| 3020 | Third Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 3020AA | TN013 | Total CLIN 3020AA (Items D101 Through D102) | $0.00 |
| 3020AB | TN019 | Total CLIN 3020AB (Items D103 Through D104) | $0.00 |
| 3020AC | TN102 & TN110 | Total CLIN 3020AC (Items D105 Through D107 | $0.00 |
| 3020AD | TN108 | Total CLIN 3020AD (Items D108 Through D109) | $0.00 |
| 3020AE | TN115 | Total CLIN 3020AE (Items D110 Through D111) | $0.00 |
| $0.00 | |||
| 3011 | Third Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - A701 THROUGH A740 | $0.00 |
| 4009 | Fourth Option Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 4009AA | TN001 | Total CLIN 4009AA (Items E001 Through E002) | $0.00 |
| 4009AB | TN004 | Total CLIN 4009AB (Items E003 Through E005) | $0.00 |
| 4009AC | TN010 & TN112 | Total CLIN 4009AC (Items E006 Through E008) | $0.00 |
| 4009AD | TN014 & TN116 | Total CLIN 4009AD (Items E009 Through E010) | $0.00 |
| 4009AE | TN017 | Total CLIN 4009AE (Items E011 Through E012) | $0.00 |
| 4009AF | TN105 | Total CLIN 4009AF (Items E013 Through E015) | $0.00 |
| 4009AG | TN111 | Total CLIN 4009AG (Items E016 Through E018) | $0.00 |
| 4009AH | TN122 | Total CLIN 4009AH (Items E019 Through E021) | $0.00 |
| $0.00 | |||
| 4010 | Fourth Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 4010AA | TN001 | Total CLIN 4010AA (Items E101 Through E102) | $0.00 |
| 4010AB | TN004 | Total CLIN 4010AB (Items E103 Through E105) | $0.00 |
| 4010AC | TN010 & TN112 | Total CLIN 4010AC (Items E106 Through E108) | $0.00 |
| 4010AD | TN014 & TN116 | Total CLIN 4010AD (Items E109 Through E110) | $0.00 |
| 4010AE | TN017 | Total CLIN 4010AE (Items E111 Through E112) | $0.00 |
| 4010AF | TN105 | Total CLIN 4010AF (Items E113 Through E115) | $0.00 |
| 4010AG | TN111 | Total CLIN 4010AG (Items E116 Through E118) | $0.00 |
| 4010AH | TN122 | Total CLIN 4010AH (Items E119 Through E121) | $0.00 |
| $0.00 | |||
| 4019 | Fourth Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 4019AA | TN013 | Total CLIN 4019AA (Items E001 Through E002) | $0.00 |
| 4019AB | TN019 | Total CLIN 4019AB (Items E003 Through E004) | $0.00 |
| 4019AC | TN102 & TN110 | Total CLIN 4019AC (Items E005 Through E007 | $0.00 |
| 4019AD | TN108 | Total CLIN 4019AD (Items E008 Through E009) | $0.00 |
| 4019AE | TN115 | Total CLIN 4019AE (Items E010 Through E011) | $0.00 |
| $0.00 | |||
| 4020 | Fourth Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 4020AA | TN013 | Total CLIN 0020AA (Items E101 Through E102) | $0.00 |
| 4020AB | TN019 | Total CLIN 0020AB (Items E103 Through E104) | $0.00 |
| 4020AC | TN102 & TN110 | Total CLIN 0020AC (Items E105 Through E107 | $0.00 |
| 4020AD | TN108 | Total CLIN 0020AD (Items E108 Through E109) | $0.00 |
| 4020AE | TN115 | Total CLIN 0020AE (Items E110 Through E111) | $0.00 |
| $0.00 | |||
| 4011 | Fourth Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - A701 THROUGH A740 | $0.00 |
ELINS BASE PERIOD FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 - A121 |
| CLIN 0009 - Base Period - Firm Fixed-Price Work - High Service Level (Green) |
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| TN001 | CHATTANOOGA USARC | ||||
| Firm Fixed-Price Work | |||||
| A001 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A002 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AA (Items A001 Through A002) | $0.00 |
| TN004 | GREENEVILLE USARC | ||||
| Firm Fixed-Price Work | |||||
| A003 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A004 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A005 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AB (Items A003 Through A005) | $0.00 |
| TN010 | HEWGLEY USARC | ||||
| TN112 | AMSA #148 (G) | ||||
| Firm Fixed-Price Work | |||||
| A006 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A007 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A008 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AC (Items A006 Through A008) | $0.00 |
| TN014 | LYELL AFRC | ||||
| TN116 | AMSA #153 (G) | ||||
| Firm Fixed-Price Work | |||||
| A009 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A010 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AD (Items A009 Through A010) | $0.00 |
| TN017 | OAK RIDGE USARC | ||||
| Firm Fixed-Price Work | |||||
| A011 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A012 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AE (Items A011 Through A012) | $0.00 |
| TN105 | CSM PAUL B HUFF USARC | ||||
| Firm Fixed-Price Work | |||||
| A013 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A014 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A015 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AF (Items A013 Through A015) | $0.00 |
| TN111 | AMSA #142 (G) | ||||
| Firm Fixed-Price Work | |||||
| A016 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A017 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A018 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AG (Items A016 Through A018) | $0.00 |
| TN122 | CHATTANOOGA AFRC | ||||
| Firm Fixed-Price Work | |||||
| A019 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A020 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A021 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AH (Items A019 Through A021) | $0.00 |
TOTAL FFP LINE ITEMS - A001 THROUGH A021 $0.00
CLIN 0010 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber)
| TN001 | CHATTANOOGA USARC | ||||
| Firm Fixed-Price Work | |||||
| A101 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A102 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AA (Items A101 Through A102) | $0.00 |
| TN004 | GREENEVILLE USARC | ||||
| Firm Fixed-Price Work | |||||
| A103 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A104 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A105 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AB (Items A103 Through A105) | $0.00 |
| TN010 | HEWGLEY USARC | ||||
| TN112 | AMSA #148 (G) | ||||
| Firm Fixed-Price Work | |||||
| A106 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A107 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A108 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AC (Items A106 Through A108) | $0.00 |
| TN014 | LYELL AFRC | ||||
| TN116 | AMSA #153 (G) | ||||
| Firm Fixed-Price Work | |||||
| A109 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A110 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AD (Items A109 Through A110) | $0.00 |
| TN017 | OAK RIDGE USARC | ||||
| Firm Fixed-Price Work | |||||
| A111 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A112 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AE (Items A111 Through A112) | $0.00 |
| TN105 | CSM PAUL B HUFF USARC | ||||
| Firm Fixed-Price Work | |||||
| A113 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A114 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A115 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AF (Items A113 Through A115) | $0.00 |
| TN111 | AMSA #142 (G) | ||||
| Firm Fixed-Price Work | |||||
| A116 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A117 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A118 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AG (Items A116 Through A118) | $0.00 |
| TN122 | CHATTANOOGA AFRC | ||||
| Firm Fixed-Price Work | |||||
| A119 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A120 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A121 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AH (Items A119 Through A121) | $0.00 |
TOTAL FFP LINE ITEMS - A101 THROUGH A121 $0.00
&F
&P of &N
ELINS BASE PERIOD FFP (OPTNL)
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 - A111 |
| CLIN 0019 - Base Period - Firm Fixed-Price Work - High Service Level (Green), OPTIONAL |
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| TN013 | NSA MILLINGTON USARC #1 | ||||
| Firm Fixed-Price Work | |||||
| A001 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A002 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0019AA (Items A001 Through A002) | $0.00 |
| TN019 | JACKSON AFRC | ||||
| Firm Fixed-Price Work | |||||
| A003 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A004 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0019AB (Items A003 Through A004) | $0.00 |
| TN102 | JOHNSON CITY AFRC | ||||
| TN110 | AMSA #147 (G) | ||||
| Firm Fixed-Price Work | |||||
| A005 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A006 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A007 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0019AC (Items A005 Through A007 | $0.00 | ||||
| TN108 | MANNING HALL USARC | ||||
| Firm Fixed-Price Work | |||||
| A008 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A009 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0019AD (Items A008 Through A009) | $0.00 |
| TN115 | AMSA #150 (G) | ||||
| Firm Fixed-Price Work | |||||
| A010 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A011 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0019AE (Items A010 Through A011) | $0.00 |
TOTAL FFP LINE ITEMS - A001 THROUGH A011 $0.00
CLIN 0020 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber), OPTIONAL
| TN013 | NSA MILLINGTON USARC #1 | ||||
| Firm Fixed-Price Work | |||||
| A101 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A102 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0020AA (Items A101 Through A102) | $0.00 |
| TN019 | JACKSON AFRC | ||||
| Firm Fixed-Price Work | |||||
| A103 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A104 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0020AB (Items A103 Through A104) | $0.00 |
| TN102 | JOHNSON CITY AFRC | ||||
| TN110 | AMSA #147 (G) | ||||
| Firm Fixed-Price Work | |||||
| A105 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A106 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A107 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0020AC (Items A105 Through A107 | $0.00 | ||||
| TN108 | MANNING HALL USARC | ||||
| Firm Fixed-Price Work | |||||
| A108 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A109 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0020AD (Items A108 Through A109) | $0.00 |
| TN115 | AMSA #150 (G) | ||||
| Firm Fixed-Price Work | |||||
| A110 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A111 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0020AE (Items A110 Through A111) | $0.00 |
TOTAL FFP LINE ITEMS - A101 THROUGH A111 $0.00
&F
&P of &N
ELINS BASE PERIOD IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A740 |
| CLIN 0011 - Base Period - Indefinite Quantity Work |
| EST | UNIT OF | UNIT | TOTAL | |||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| A701 | Tree and Stump Removal | |
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | 1 | Each | $ - 0 | $ - 0 |
| A702 | Tree and Stump Removal | |||
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | 1 | Each | $ - 0 | $ - 0 |
| A703 | Tree and Stump Removal | |||
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | 1 | Each | $ - 0 | $ - 0 |
| A704 | Shrub and Stump Removal | |||
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | 1 | Each | $ - 0 | $ - 0 |
| A705 | Shrub and Stump Removal | |||
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | 1 | Each | $ - 0 | $ - 0 |
| A706 | Shrub and Stump Removal | |||
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | 1 | Each | $ - 0 | $ - 0 |
| A707 | Complete Tree Pruning | |||
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 1 calendar day. | 1 | Each | $ - 0 | $ - 0 |
| A708 | Complete Tree Pruning | |||
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 2 calendar days. | 15 | Each | $ - 0 | $ - 0 | |||
| A709 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | 25 | Each | $ - 0 | $ - 0 | |
| A710 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | 20 | M.S.F. | $ - 0 | $ - 0 |
| A711 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 5 | Each | $ - 0 | $ - 0 |
| A712 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 25 | Each | $ - 0 | $ - 0 |
| A713 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 5 | Each | $ - 0 | $ - 0 | |||
| A714 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 250 | Each | $ - 0 | $ - 0 | |
| A715 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | 10 | M.S.F. | $ - 0 | $ - 0 |
| A716 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | 10 | M.S.F. | $ - 0 | $ - 0 | |||
| A717 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | 100 | M.S.F. | $ - 0 | $ - 0 | |
| A718 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | |||||
| Work shall be completed within 14 calendar days. | 100 | M.S.F. | $ - 0 | $ - 0 | |||
| A719 | Aerate | Grass shall be aerated to promote health and growth. |
| Work shall be completed within 10 calendar days. | 100 | M.S.F. | $ - 0 | $ - 0 |
| A720 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | 50 | Each | $ - 0 | $ - 0 |
| A721 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | 1,000 | L.F. | $ - 0 | $ - 0 | |||
| A722 | Erosion Control | Soil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days. | 5 | M.S.F. | $ - 0 | $ - 0 | |
| A723 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | 5 | M.S.F. | $ - 0 | $ - 0 | |
| A724 | Field Mowing | Vegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days. | 50 | M.S.F. | $ - 0 | $ - 0 | |
| A725 | Control Undesired Vegetation | Remove vegetation along fence lines and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP). | |||||
| Work shall be completed within 10 calendar days. | 10 | M.S.F. | $ - 0 | $ - 0 | |||
| A726 | Debris Removal | Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris. |
| Work shall be completed within 10 calendar days. | 25 | M.S.F. | $ - 0 | $ - 0 | |||
| Special Event Grass Cutting at the following sites: | Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the raked area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site. | ||||||
| A727 | TN001 | CHATTANOOGA USARC | 3 | Each | $ - 0 | $ - 0 | |
| A728 | TN004 | GREENEVILLE USARC | 3 | Each | $ - 0 | $ - 0 | |
| A729 | TN010 & TN112 | HEWGLEY USARC & AMSA #148 (G) | 3 | Each | $ - 0 | $ - 0 | |
| A730 | TN013 | NSA MILLINGTON USARC #1 | 3 | Each | $ - 0 | $ - 0 | |
| A731 | TN014 & TN116 | LYELL AFRC & AMSA #153 (G) | 3 | Each | $ - 0 | $ - 0 | |
| A732 | TN017 | OAK RIDGE USARC | 3 | Each | $ - 0 | $ - 0 | |
| A733 | TN019 | JACKSON AFRC | 3 | Each | $ - 0 | $ - 0 | |
| A734 | TN102 & TN110 | JOHNSON CITY AFRC & AMSA #147 (G) | 3 | Each | $ - 0 | $ - 0 | |
| A735 | TN105 | CSM PAUL B HUFF USARC | 3 | Each | $ - 0 | $ - 0 | |
| A736 | TN108 | MANNING HALL USARC | 3 | Each | $ - 0 | $ - 0 | |
| A737 | TN111 | AMSA #142 (G) | 3 | Each | $ - 0 | $ - 0 | |
| A738 | TN115 | AMSA #150 (G) | 3 | Each | $ - 0 | $ - 0 | |
| A740 | TN122 | CHATTANOOGA AFRC | 3 | Each | $ - 0 | $ - 0 |
TOTAL IQ LINE ITEMS - A701 THROUGH A740 $0.00
&F
&P of &N
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELINS OPTION 1 FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 - B121 |
| CLIN 1009 - First Option Period - Firm Fixed-Price Work - High Service Level (Green) |
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| TN001 | CHATTANOOGA USARC | ||||
| Firm Fixed-Price Work | |||||
| B001 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B002 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AA (Items B001 Through B002) | $0.00 |
| TN004 | GREENEVILLE USARC | ||||
| Firm Fixed-Price Work | |||||
| B003 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B004 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B005 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AB (Items B003 Through B005) | $0.00 |
| TN010 | HEWGLEY USARC | ||||
| TN112 | AMSA #148 (G) | ||||
| Firm Fixed-Price Work | |||||
| B006 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B007 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B008 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AC (Items B006 Through B008) | $0.00 |
| TN014 | LYELL AFRC | ||||
| TN116 | AMSA #153 (G) | ||||
| Firm Fixed-Price Work | |||||
| B009 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B010 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AD (Items B009 Through B010) | $0.00 |
| TN017 | OAK RIDGE USARC | ||||
| Firm Fixed-Price Work | |||||
| B011 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B012 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AE (Items B011 Through B012) | $0.00 |
| TN105 | CSM PAUL B HUFF USARC | ||||
| Firm Fixed-Price Work | |||||
| B013 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B014 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B015 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AF (Items B013 Through B015) | $0.00 |
| TN111 | AMSA #142 (G) | ||||
| Firm Fixed-Price Work | |||||
| B016 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B017 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B018 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AG (Items B016 Through B018) | $0.00 |
| TN122 | CHATTANOOGA AFRC | ||||
| Firm Fixed-Price Work | |||||
| B019 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B020 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B021 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AH (Items B019 Through B021) | $0.00 |
TOTAL FFP LINE ITEMS - B001 THROUGH B021 $0.00
CLIN 1010 - First Option Period - Firm Fixed-Price Work - Medium Service Level (Amber)
| TN001 | CHATTANOOGA USARC | ||||
| Firm Fixed-Price Work | |||||
| B101 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B102 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AA (Items B101 Through B102) | $0.00 |
| TN004 | GREENEVILLE USARC | ||||
| Firm Fixed-Price Work | |||||
| B103 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B104 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B105 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AB (Items B103 Through B105) | $0.00 |
| TN010 | HEWGLEY USARC | ||||
| TN112 | AMSA #148 (G) | ||||
| Firm Fixed-Price Work | |||||
| B106 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B107 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B108 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AC (Items B106 Through B108) | $0.00 |
| TN014 | LYELL AFRC | ||||
| TN116 | AMSA #153 (G) | ||||
| Firm Fixed-Price Work | |||||
| B109 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B110 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AD (Items B109 Through B110) | $0.00 |
| TN017 | OAK RIDGE USARC | ||||
| Firm Fixed-Price Work | |||||
| B111 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B112 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AE (Items B111 Through B112) | $0.00 | ||||
| TN105 | CSM PAUL B HUFF USARC | ||||
| Firm Fixed-Price Work | |||||
| B113 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B114 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B115 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AF (Items B113 Through B115) | $0.00 |
| TN111 | AMSA #142 (G) | ||||
| Firm Fixed-Price Work | |||||
| B116 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B117 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B118 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AG (Items B116 Through B118) | $0.00 |
| TN122 | CHATTANOOGA AFRC | ||||
| Firm Fixed-Price Work | |||||
| B119 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B120 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B121 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AH (Items B119 Through B121) | $0.00 |
TOTAL FFP LINE ITEMS - B101 THROUGH B121 $0.00
&F
&P of &N
ELINS OPTION 1 FFP (OPTNL)
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B101 - B111 |
| CLIN 1019 - First Option - Firm Fixed-Price Work - High Service Level (Green), OPTIONAL |
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| TN013 | NSA MILLINGTON USARC #1 | ||||
| Firm Fixed-Price Work | |||||
| B001 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B002 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1019AA (Items B001 Through B002) | $0.00 |
| TN019 | JACKSON AFRC | ||||
| Firm Fixed-Price Work | |||||
| B003 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B004 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1019AB (Items B003 Through B004) | $0.00 |
| TN102 | JOHNSON CITY AFRC | ||||
| TN110 | AMSA #147 (G) | ||||
| Firm Fixed-Price Work | |||||
| B005 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B006 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B007 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1019AC (Items B005 Through B007 | $0.00 | ||||
| TN108 | MANNING HALL USARC | ||||
| Firm Fixed-Price Work | |||||
| B008 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B009 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 1019AD (Items B008 Through B009) | $0.00 |
| TN115 | AMSA #150 (G) | ||||
| Firm Fixed-Price Work | |||||
| B010 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B011 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .