ELINS_1503050_Grounds_Maintenance_Edit_4_4_13.xlsx
XLSX spreadsheet 146 KB Posted
- Solicitation number
- W912HP-13-R-0012
About this file
ELINS Grounds Maintenance
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN Summary Grounds Maintenance Services Summary
| This sheet is filled out automatically as other sheets are completed | ||
| CLIN | Total | |
| 5008 | Base Period Firm Fixed-Price | $ - 0 |
| 5009 | Base Period Firm Fixed-Price | $ - 0 |
| 5010 | Base Period Indefinite Quantity | $ - 0 |
| 6008 | First Option Period Firm Fixed-Price | $ - 0 |
| 6009 | First Option Period Firm Fixed-Price | $ - 0 |
| 6010 | First Option Period Indefinite Quantity | $ - 0 |
| 7008 | Second Option Period Firm Fixed-Price | $ - 0 |
| 7009 | Second Option Period Firm Fixed-Price | $ - 0 |
| 7010 | Second Option Period Indefinite Quantity | $ - 0 |
| 8008 | Third Option Period Firm Fixed-Price | $ - 0 |
| 8009 | Third Option Period Firm Fixed-Price | $ - 0 |
| 8010 | Third Option Period Indefinite Quantity | $ - 0 |
| 9008 | Fourth Option Period Firm Fixed-Price | $ - 0 |
| 9009 | Fourth Option Period Firm Fixed-Price | $ - 0 |
| 9010 | Fourth Option Period Indefinite Quantity | $ - 0 |
| $ - 0 | |
| Note: Either CLIN 5008 or CLIN 5009 (but not both) will be awarded for fixed-price grounds maintenance services, at the discretion of the Contracting Officer. |
&F
Attachment J-0200000-07 &A &P of &N
ELIN BASE PERIOD FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 - A040 | |||||
| CLIN 5008 - Base - Firm Fixed-Price Work - Service Levels A and B | |||||
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| RQ550 | CPT E. Rubio Jr. Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A001 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A002 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A003 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5008AA (Items A001 Through A003) | $ - 0 |
| RQ627 | CPL Juan G. Rosario Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A004 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A005 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5008AB (Items A004 Through A005) | $ - 0 |
| RQ727 | MSG Dionisio Claudio Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A006 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A007 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5008AC (Items A006 Through A007) | $ - 0 |
| RQ740 | Fort Buchanan Area Maintenance Support Activity | ||||
| Firm Fixed-Price Work | |||||
| A008 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A009 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5008AD (Items A008 Through A009)) | $ - 0 |
| RQ74A | Ceiba Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A010 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A011 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A012 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5008AE (Items A010 Through A012) | $ - 0 |
| RQ777 | CPT Pedro J. Parra Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A013 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A014 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5008AF (Items A013 Through A014) | $ - 0 | ||||
| RQ810 | Ramey Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A015 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A016 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5008AG (Items A015 Through A016) | $ - 0 |
| RQ827 | PFC Santos Cruz Aviles Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A017 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A018 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5008AH (Items A017 Through A018) | $ - 0 | ||||
| RQ835 | PFC Luis G. Oliveras Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A019 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A020 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5008AI (Items A019 Through A020) | $ - 0 |
Total CLIN 5008 - Base Period - Firm Fixed-Price $ - 0
| CLIN 5009 - Base Period - Firm Fixed-Price Work - Service Levels C and D | |||||
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| RQ550 | CPT E. Rubio Jr. Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A021 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A022 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A023 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5009AA (Items A0021 Through A023) | $ - 0 |
| RQ627 | CPL Juan G. Rosario Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A024 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A025 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5009AB (Items A0024 Through A025) | $ - 0 |
| RQ727 | MSG Dionisio Claudio Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A026 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A027 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5009AC (Items A0026 Through A027) | $ - 0 |
| RQ740 | Fort Buchanan Area Maintenance Support Activity | ||||
| Firm Fixed-Price Work | |||||
| A028 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A029 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5009AD (Items A0028 Through A029) | $ - 0 |
| RQ74A | Ceiba Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A030 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A031 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| A032 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5009AE (Items A030 Through A032) | $ - 0 |
| RQ777 | CPT Pedro J. Parra Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A033 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A034 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5009AF (Items A0033 Through A034) | $ - 0 | ||||
| RQ810 | Ramey Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A035 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A036 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5009G (Items A0035Through A036) | $ - 0 |
| RQ827 | PFC Santos Cruz Aviles Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A037 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A038 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5009H (Items A0037Through A038) | $ - 0 | ||||
| RQ835 | PFC Luis G. Oliveras Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| A039 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| A040 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 5009I (Items A0039Through A040) | $ - 0 |
Total CLIN 5009 - Base Period - Firm Fixed-Price $ - 0
&F
Attachment J-0200000-07
&P of &N
ELIN BASE PERIOD IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A729 |
| CLIN 5010 - Base Period - Indefinite Quantity Work |
| EST | UNIT OF | UNIT | TOTAL | |||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| A701 | Special Event Grass Cutting | Grass shall be mowed and trimmed to a uniform height of 2 inches. All clippings and debris shall be removed. Work to be completed in 3 calendar days. | 500 | M.S.F. | $ - 0 | $0.00 | |
| A702 | Special Event Edging | Edging to provide a uniform edged cut. All clippings shall be removed. Work to be completed in 3 calendar days. | 5,000 | L.F | $ - 0 | $0.00 | |
| A703 | Special Event Raking | This work includes the raking and removal of leaves, pine straw and pinecones, limbs, and other debris from the raked area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 100 | M.S.F. | $ - 0 | $0.00 | |
| A704 | Tree and Stump Removal | ||||||
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | 1 | Each | $ - 0 | $0.00 |
| A705 | Tree and Stump Removal | |||
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | 1 | Each | $ - 0 | $0.00 |
| A706 | Tree and Stump Removal | |||
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | 1 | Each | $ - 0 | $0.00 |
| A707 | Shrub and Stump Removal | |||
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | 1 | Each | $ - 0 | $0.00 |
| A708 | Shrub and Stump Removal | |||
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | 1 | Each | $ - 0 | $0.00 |
| A709 | Shrub and Stump Removal | |||
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | 1 | Each | $ - 0 | $0.00 |
| A710 | Complete Tree Pruning | |||
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 1 calendar day. | 1 | Each | $ - 0 | $0.00 |
| A711 | Complete Tree Pruning | |||
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 2 calendar days. | 15 | Each | $ - 0 | $0.00 | |||
| A712 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | 25 | Each | $ - 0 | $0.00 | |
| A713 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | 20 | M.S.F. | $ - 0 | $0.00 |
| A714 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 5 | Each | $ - 0 | $0.00 |
| A715 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 25 | Each | $ - 0 | $0.00 |
| A716 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 5 | Each | $ - 0 | $0.00 | |||
| A717 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 250 | Each | $ - 0 | $0.00 | |
| A718 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | 10 | M.S.F. | $ - 0 | $0.00 |
| A719 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | 10 | M.S.F. | $ - 0 | $0.00 | |||
| A720 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | 100 | M.S.F. | $ - 0 | $0.00 | |
| A721 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | |||||
| Work shall be completed within 14 calendar days. | 100 | M.S.F. | $ - 0 | $0.00 | |||
| A722 | Aerate | Grass shall be aerated to promote health and growth. |
| Work shall be completed within 10 calendar days. | 100 | M.S.F. | $ - 0 | $0.00 |
| A723 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | 50 | Each | $ - 0 | $0.00 |
| A724 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | 1,000 | L.F. | $ - 0 | $0.00 | |||
| A725 | Erosion Control | Soil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days. | 5 | M.S.F. | $ - 0 | $0.00 | |
| A726 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | 5 | M.S.F. | $ - 0 | $0.00 | |
| A727 | Field Mowing | Vegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days. | 50 | M.S.F. | $ - 0 | $0.00 | |
| A728 | Control Undesired Vegetation | Remove vegetation along fence lines and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP). | |||||
| Work shall be completed within 10 calendar days. | 10 | M.S.F. | $ - 0 | $0.00 | |||
| A729 | Debris Removal | Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris. |
Work shall be completed within 10 calendar days. 25 M.S.F. $ - 0 $0.00
TOTAL IQ LINE ITEMS - A701 THROUGH A729 $ - 0
&F
&A &P of &N
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN OPTION 1 FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 - B040 | |||||
| CLIN 6008 - First Option Period - Firm Fixed-Price Work - Service Levels A and B | |||||
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| RQ550 | CPT E. Rubio Jr. Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B001 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B002 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B003 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6008AA (Items B001 Through B003) | $ - 0 |
| RQ627 | CPL Juan G. Rosario Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B004 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B005 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6008AB (Items B004 Through B005) | $ - 0 |
| RQ727 | MSG Dionisio Claudio Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B006 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B007 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6008AC (Items B006 Through B007) | $ - 0 |
| RQ740 | Fort Buchanan Area Maintenance Support Activity | ||||
| Firm Fixed-Price Work | |||||
| B008 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B009 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6008AD (Items B008 Through B009)) | $ - 0 |
| RQ74A | Ceiba Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B010 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B011 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B012 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6008AE (Items B010 Through B012) | $ - 0 |
| RQ777 | CPT Pedro J. Parra Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B013 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B014 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6008AF (Items B013 Through B014) | $ - 0 | ||||
| RQ810 | Ramey Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B015 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B016 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6008AG (Items B015 Through B016) | $ - 0 |
| RQ827 | PFC Santos Cruz Aviles Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B017 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B018 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6008AH (Items B017 Through B018) | $ - 0 | ||||
| RQ835 | PFC Luis G. Oliveras Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B019 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B020 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6008AI (Items B019 Through B020) | $ - 0 |
Total CLIN 6008 - First Option Period - Firm Fixed-Price $ - 0
| CLIN 6009 - First Option Period - Firm Fixed-Price Work - Service Levels C and D | |||||
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| RQ550 | CPT E. Rubio Jr. Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B021 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B022 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B023 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6009AA (Items B0021 Through B023) | $ - 0 |
| RQ627 | CPL Juan G. Rosario Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B024 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B025 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6009AB (Items B0024 Through B025) | $ - 0 |
| RQ727 | MSG Dionisio Claudio Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B026 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B027 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6009AC (Items B0026 Through B027) | $ - 0 |
| RQ740 | Fort Buchanan Area Maintenance Support Activity | ||||
| Firm Fixed-Price Work | |||||
| B028 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B029 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6009AD (Items B0028 Through B029) | $ - 0 |
| RQ74A | Ceiba Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B030 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B031 | Semi-Improved Grounds (Section C, 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B032 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6009AE (Items B030 Through B032) | $ - 0 |
| RQ777 | CPT Pedro J. Parra Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B033 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B034 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6009AF (Items B0033 Through B034) | $ - 0 | ||||
| RQ810 | Ramey Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B035 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B036 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6009G (Items B0035Through B036) | $ - 0 |
| RQ827 | PFC Santos Cruz Aviles Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B037 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B038 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6009H (Items B0037Through B038) | $ - 0 | ||||
| RQ835 | PFC Luis G. Oliveras Army Reserve Center | ||||
| Firm Fixed-Price Work | |||||
| B039 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B040 | Storm Drainage Systems (Spec Item 3.3) | 3 | Service | $ - 0 | $ - 0 |
| Total CLIN 6009I (Items B0039Through B040) | $ - 0 |
Total CLIN 6009 - First Option Period - Firm Fixed-Price $ - 0
&F
&P of &N
ELIN OPTION 1 IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS B701 - B729 |
| CLIN 6010 - First Option Period - Indefinite Quantity Work |
| EST | UNIT OF | UNIT | TOTAL | |||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| B701 | Special Event Grass Cutting | Grass shall be mowed and trimmed to a uniform height of 2 inches. All clippings and debris shall be removed. Work to be completed in 3 calendar days. | 500 | M.S.F. | $ - 0 | $0.00 | |
| B702 | Special Event Edging | Edging to provide a uniform edged cut. All clippings shall be removed. Work to be completed in 3 calendar days. | 5,000 | L.F | $ - 0 | $0.00 | |
| B703 | Special Event Raking | This work includes the raking and removal of leaves, pine straw and pinecones, limbs, and other debris from the raked area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 100 | M.S.F. | $ - 0 | $0.00 | |
| B704 | Tree and Stump Removal | ||||||
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | 1 | Each | $ - 0 | $0.00 |
| B705 | Tree and Stump Removal | |||
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | 1 | Each | $ - 0 | $0.00 |
| B706 | Tree and Stump Removal | |||
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | 1 | Each | $ - 0 | $0.00 |
| B707 | Shrub and Stump Removal | |||
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | 1 | Each | $ - 0 | $0.00 |
| B708 | Shrub and Stump Removal | |||
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | 1 | Each | $ - 0 | $0.00 |
| B709 | Shrub and Stump Removal | |||
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | 1 | Each | $ - 0 | $0.00 |
| B710 | Complete Tree Pruning | |||
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 1 calendar day. | 1 | Each | $ - 0 | $0.00 |
| B711 | Complete Tree Pruning | |||
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 2 calendar days. | 15 | Each | $ - 0 | $0.00 | |||
| B712 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | 25 | Each | $ - 0 | $0.00 | |
| B713 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | 20 | M.S.F. | $ - 0 | $0.00 |
| B714 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 5 | Each | $ - 0 | $0.00 |
| B715 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 25 | Each | $ - 0 | $0.00 |
| B716 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 5 | Each | $ - 0 | $0.00 | |||
| B717 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 250 | Each | $ - 0 | $0.00 | |
| B718 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | 10 | M.S.F. | $ - 0 | $0.00 |
| B719 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | 10 | M.S.F. | $ - 0 | $0.00 | |||
| B720 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | 100 | M.S.F. | $ - 0 | $0.00 | |
| B721 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | |||||
| Work shall be completed within 14 calendar days. | 100 | M.S.F. | $ - 0 | $0.00 | |||
| B722 | Aerate | Grass shall be aerated to promote health and growth. |
| Work shall be completed within 10 calendar days. | 100 | M.S.F. | $ - 0 | $0.00 |
| B723 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | 50 | Each | $ - 0 | $0.00 |
| B724 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | 1,000 | L.F. | $ - 0 | $0.00 | |||
| B725 | Erosion Control | Soil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days. | 5 | M.S.F. | $ - 0 | $0.00 | |
| B726 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | 5 | M.S.F. | $ - 0 | $0.00 | |
| B727 | Field Mowing | Vegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days. | 50 | M.S.F. | $ - 0 | $0.00 | |
| B728 | Control Undesired Vegetation | Remove vegetation along fence lines and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP). | |||||
| Work shall be completed within 10 calendar days. | 10 | M.S.F. | $ - 0 | $0.00 | |||
| B729 | Debris Removal | Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris. |
Work shall be completed within 10 calendar days. 25 M.S.F. $ - 0 $0.00
TOTAL IQ LINE ITEMS - B701 THROUGH B729 $ - 0
&F
&A &P of &N
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .