Memorandum for Record for W912HN25BA021 - Amendment 0005(combined).pdf

PDF 210 KB Posted

Attached to
W912HN25BA021 - Brunswick Entrance Channel Widener Dredging Project.
Solicitation number
W912HN25BA021
Issued by

About this file

This document is a Memorandum for Record and Contract Amendment for a Maintenance Dredging project in Brunswick Harbor, Georgia, issued by the Army Corps of Engineers (Contract No. W912HN25BA021). The amendment addresses technical system issues and provides a revised Bid Schedule for maintenance dredging work, with base and optional line items totaling multiple dredging locations and quantities. The contract includes base CLINs for mobilization, performance bonds, and dredging at various channel stations, with option line items for additional maintenance dredging at different locations, stand-by time, and trawling requirements, ranging from 250,000 to 300,000 cubic yards of dredging work. The Contracting Officer can exercise options within ten calendar days after the base contract award, with delivery of added items continuing at the same rate as the original contract specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CESAS-CTC 9 9 December 2025

MEMORANDUM FOR RECORD

NOTE: Due to technical issues with the new Army Contract Writing System (ACWS), a system generated SF30 amendment 0005 cannot be issued at this time for W912HN25BA021. Once this system issue is resolved, this memo will serve as an official amendment 0005 for

W912HN25BA021.

A revised Bid Schedule is attached to this memo.

FAR Clause 52.217-7- Option for Increased Quantity-Separately Priced Line Item. (Mar 1989) has also been updated.

There are no Technical or Contract Drawings changes with this amendment.

Rohan Bryan Contract Specialist

Attachments

• Revised FAR Clause 52.217-7

• Revised Bid Schedule

• FAR clause 52.217-7 Option for Increased Quantity-Separately Priced Line Item. (Mar 1989)

Option for Increased Quantity-Separately Priced Line Item (Mar 1989) The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within any time after award, but no later than ten (10) calendar days after award of the base contract. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

CLIN SCHEDULE

TOTAL BID ITEMS

TOTAL BASE(Items 0001 through 0003) $______________________

TOTAL OPTIONS(Items 0004 through 0007) $______________________

TOTAL BID(Items 0001 through 0007) $______________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

Performance of Payment Bonds FFP $__________________ $_______________________ FOB: Destination

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003AA 1,400,000

First 1,400,000 cubic yards FFP $__________________ $_______________________ FOB: Destination

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003AB 200,000

All over 1,400,000 cubic yards FFP $__________________ $_______________________ FOB: Destination

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004 Maintenance Dredging (STA -38+000 to -56+000). 300,000

OPTION All 300,000 cubic yards FFP $__________________ $_______________________ FOB: Destination

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005 Maintenance Dredging (STA 0+000 to -11+000). 250,000

OPTION All 250,000 cubic yards FFP $__________________ $_______________________ FOB: Destination

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

OPTION Stand By Time FFP Do not bid this CLIN (see Sub-CLINs 0006AA and 0006AB).

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

ITEM NO. 1 Days

0006AA Stand By Time, First Day FFP $__________________ $_______________________ OPTION FOB: Destination

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

ITEM NO. 1 Days

0006AB Stand By Time, All over One Day *NTE FFP $__________________ $_______________________ OPTION FOB: Destination

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Trawling Requirements Abundance/Relocation FFP

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0007AA 5 Days

Trawling Requirements Abundance/Relocation FFP $__________________ $_______________________ First five (5) days FOB: Destination

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0007AB 60 Days

Trawling Requirements Abundance/Relocation FFP $__________________ $_______________________ All over five (5) days *NTE FOB: Destination

OPTION

Do not bid this CLIN (see Sub-CLINs 0007AA and 0007AB).

OPTION

OPTION

Cubic Yard

Cubic Yard

MAINTENANCE DREDGING

ENTRANCE CHANNEL WIDENER, BRUNSWICK HARBOR, GEORGIA

FOR BID ITEM 0001 - 0007AB SEE SECTION 35 20 23

Cubic Yard

0001 1 Job

Maintenance Dredging (STA -14+000 to -29+000).

Do not bid this CLIN (see Sub-CLINs 0003AA and 0003AB).

Cubic Yard

BASE

BASE

ESTIMATED LINE ITEMS SHALL NOT EXCEED THE ESTIMATED AMOUNT WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER.

BASE

BASE

Mobilization and Demobilization FFP Mobilization and demobilization dredging in Brunswick Entrance Channel.

BASE

Memorandum for Record for W912HN26B001 - Amendment 0005
Copy of Copy of Final Bid schedule - updated 12.3.2025
Sheet1