This document outlines a federal contract opportunity for repair work at Antilles Middle School. The contract involves replacing two exterior chillers, providing temporary chillers, replacing approximately 13 rooftop dehumidifiers, repairing and replacing failing ductwork insulation, replacing 13 roof-mounted packaged dehumidification and cooling units, installing a new split system condenser and two new chilled water pumps with associated variable frequency drives, replacing control devices in chilled water piping and other locations, replacing chilled water valves and integrating them with the BACNET controller. The work also includes start-up, connectivity and commissioning of all repaired and replaced systems. The solicitation number is W912HN22B4015 and was issued by the Department of the Army Corps of Engineers Engineering District Savannah.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIXON.KATHRYN.TEN

EYCK.1267610769

Digitally signed by DIXON.KATHRYN.TEN

EYCK.1267610769

Date: 2022.08.11 13:17:16 -04'00'

DIXON.KATHRYN.TEN EYCK.1267610769 Digitally signed by DIXON.KATHRYN.TEN EYCK.1267610769 Date: 2022.08.11 13:17:39 -04'00'

BATH.STEVEN.M.1058162643 Digitally signed by BATH.STEVEN.M.1058162643 Date: 2022.08.11 13:43:57 -04'00'

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

J

H A

IR

E

J

H A

IR

E

J

M C

T

IE

R N

A N

S

B A

R B

IN

A

A U

G U

S T

W

H N -2

-B -4

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

A

IR

F Y

SHEET ID

READY TO ADVERTISE (RTA)

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps

$$USERNAME$$

$$SYSTIME$$

$$DGNSPEC$$

C A

T E

G O

R Y C

O D

E

N O

N E

GI001

IN

D

E X O

F D

R A

W

IN

G S

F

IL

E N

A M

E

G-001 COVER SHEET

GI001 INDEX OF DRAWINGS

M-001 MECHANICAL LEGEND

MD101 MECHANICAL DEMOLITION PLAN BUILDING 1085

MD102 MECHANICAL DEMOLITION PLAN BUILDING 1071

MD103 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1075

MD104 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1077

MD105 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1083

MD106 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1087

MD107 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1085

MD108 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1081

MD109 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1073

MD110 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1079

MH101 MECHANICAL PLAN BUILDING 1085

MH102 MECHANICAL PLAN BUILDING 1071

MH103 MECHANICAL ROOF PLAN BUILDING 1075

MH104 MECHANICAL ROOF PLAN BUILDING 1077

MH105 MECHANICAL ROOF PLAN BUILDING 1083

MH106 MECHANICAL ROOF PLAN BUILDING 1087

MH107 MECHANICAL ROOF PLAN BUILDING 1085

MH108 MECHANICAL ROOF PLAN BUILDING 1081

MH109 MECHANICAL ROOF PLAN BUILDING 1073

MH110 MECHANICAL ROOF PLAN BUILDING 1079

MH501 MECHANICAL DETAILS

MH601 MECHANICAL SCHEDULES

MI001 MECHANICAL CONTROLS ABBREVIATIONS & LEGEND

MI002 MECHANICAL CONTROLS GENERAL NOTES

MI003 MECHANICAL CONTROLS NETWORK SYSTEM DIAGRAM

MI801 PACKAGED DEHUMIDIFICATION AND COOLING UNIT CONTROL SCHEMATIC

MI802 PACKAGED DEHUMIDIFICATION AND COOLING UNIT SEQUENCE OF OPERATIONS

MI803 PACKAGED DEHUMIDIFICATION AND COOLING UNIT POINTS SCHEDULE

E-001 ELECTRICAL LEGEND

ED102 ELECTRICAL DEMOLITION PLAN BUILDING 1071

ED103 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1075

ED104 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1077

ED105 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1083

ED106 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1087

ED107 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1085

ED108 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1081

ED109 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1073

ED110 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1079

EP102 ELECTRICAL PLAN BUILDING 1071

EP103 ELECTRICAL ROOF PLAN BUILDING 1075

EP104 ELECTRICAL ROOF PLAN BUILDING 1077

EP105 ELECTRICAL ROOF PLAN BUILDING 1083

EP106 ELECTRICAL ROOF PLAN BUILDING 1087

EP107 ELECTRICAL ROOF PLAN BUILDING 1085

EP108 ELECTRICAL ROOF PLAN BUILDING 1081

EP109 ELECTRICAL ROOF PLAN BUILDING 1073

EP110 ELECTRICAL ROOF PLAN BUILDING 1079

EP601 ELECTRICAL SCHEDULES

SHEET ID.

INDEX OF DRAWINGS

D E

S C

R

IP

T

IO

N

W

O G

L E

T H

O R

P E A

V E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S A

V A

N N

A H D

IS

T R

IC

T

S A

V A

N N

A H

G A

SHEET ID.

TITLESHEET ID.

TITLETITLE

MECHANICAL LEGEND

SYMBOL DESCRIPTION

AHU

VAV VARIABLE AIR VOLUME

AD ACCESS DOOR

GPM GALLONS PER MINUTE

GPH GALLONS PER HOUR

CFM CUBIC FEET PER MINUTE

RPM REVOLUTIONS PER MINUTE

BTUH BRITISH THERMAL UNITS PER HOUR

MBH BTUH X 1000

EWT ENTERING WATER TEMPERATURE

LWT LEAVING WATER TEMPERATURE

PD PRESSURE DROP

SP STATIC PRESSURE

ESP EXTERNAL STATIC PRESSURE

HP HORSEPOWER

EAT ENTERING AIR TEMPERATURE

LAT LEAVING AIR TEMPERATURE

DB DRY BULB TEMPERATURE

WB WET BULB TEMPERATURE

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

EA EXHAUST AIR

SEER SEASON ENERGY EFFICIENCY RATIO

EER ENERGY EFFICIENCY RATIO

EXISTING TO REMAIN

EXISTING TO BE REMOVED

NEW FLOOR PLAN

MANUAL BALANCING DAMPER

THERMOSTAT

HUMIDISTAT

SUPPLY DIFFUSER WITH PATTERN

RETURN GRILLE

EXHAUST REGISTER

SUPPLY DUCT - CROSS SECTION

EXHAUST DUCT - CROSS SECTION

RETURN DUCT - CROSS SECTION

RECTANGLE DUCT SIZE

ROUND DUCT SIZE

OVAL DUCT SIZE

FIRE DAMPER

CONNECT TO EXISTING

T

H

_x_

FD

LDU PACKAGED DEHUMIDIFICATION AND COOLING UNIT

PCHP

CH

CU

CHILLED WATER PUMP

CONDENSING UNIT

AIR COOLED CHILLER

AIR HANDLING UNIT

VFD VARIABLE FREQUENCY DRIVE

GENERAL MECHANICAL NOTESGENERAL STRUCTURAL NOTES

ADDITIONAL MEMBERS ARE TO BE CONNECTED BY ALL-AROUND FIELD WELDS.

AND KICKER SUPPORTS ARE TO BE AT A MINIMUM, THE SAME SIZE AS THE EXISTING MEMBERS. ALL

MAY NEED TO BE SUPPLIED TO SUPPORT THE CANTILEVERED FRAMING. CANTILEVERED MEMBERS

MAY NEED TO BE CANTILEVERED OUT FROM THE EXISTING HSS POSTS AND ADDITIONAL KICKERS

ADDITIONAL SUPPORT LARGER THAN THAT GIVEN BY THE EXISTING FRAMES, ADDITIONAL MEMBERS

ADDITIONAL WEIGHT OF THE HEAVIER UNITS. IF THE DIMENSIONS OF THE NEW UNITS REQUIRE

AS ANY OTHER STRUCTURAL ELEMENT IN THE EXISTING BUILDING BELOW THAT IS SUPPORTING THE

UNITS SHALL ALSO BE CHECKED FOR ADEQUACY BY A LICENSED STRUCTURAL ENGINEER AS WELL

MANUFACTURER THAT IS QUALIFIED TO DO SO. THE STEEL SUPPORT FRAME FOR THESE HEAVIER

ADEQUACY AND SERVICEABILITY BY A LICENSED STRUCTURAL ENGINEER OR JOIST

EXISTING JOISTS THAT SUPPORT THESE HEAVIER UNITS SHALL BE CHECKED FOR STRUCTURAL

SUPPORT FRAME AND BUILDING ELEMENTS BELOW BY A SIGNIFICANT AMOUNT (~190%). ANY

WEIGH 3230 LBS, THEREFORE THESE NEW UNITS WILL INCREASE THE LOAD ON THE EXISTING

ONTO BUILDING 1087 AND BUILDING 1077 RESPECTIVELY. ALL EXISTING UNITS ARE STATED TO

UNITS LDU-B1 AND LDU-H1 WEIGH APPROXIMATELY 5200 LBS +/- 10% AND ARE TO BE INSTALLED

E. PER THE BASIS OF DESIGN EQUIPMENT, THE NEW PACKAGED DEHUMIDIFICATION AND COOLING

ALL-AROUND FILLET WELD.

UNITS SHALL BE WELDED TO THE OUTER HSS STEEL MEMBERS FORMING THE FRAME USING 1/4"

RE-POSITIONED INTERNAL STEEL CHANNEL FRAMING MEMBERS THAT ARE TO SUPPORT THE NEW

PREVENT ANY MOISTURE INTRUSION TO THE ROOFING MATERIAL BELOW. ALL NEW AND

ROOFING MATERIAL SHALL BE APPLIED AROUND THE NEW STEEL MEMBER AND SEAMS SEALED TO

BE RE-USED. ADDITIONALLY, IF DAMAGED HSS TUBE COLUMNS NEED TO BE REPLACED, THE EXISTING

ANY FRAMING MEMBERS IN ORDER TO NOT DAMAGE ANY STEEL MEMBERS THAT ARE TO REMAIN OR

THE CONTRACTOR SHALL TAKE SPECIAL CARE WHEN MODIFYING, REPLACING, RE-POSITIONING, ETC.

ACCOMMODATE THE DIMENSIONS OF THE NEW PACKAGED DEHUMIDIFICATION AND COOLING UNITS.

D. INTERNAL STEEL CHANNEL FRAMING MEMBERS MAY NEED TO BE REMOVED AND RE-POSITIONED TO

REQUIRED BY THIS DETAIL, CONTRACTOR SHALL PROVIDE STIFFENERS AS NEEDED.

PER THE JOIST REINFORCING DETAIL ON SHEET MH501. IF STIFFENERS ARE NOT PRESENT AS

C. VERIFY THAT ALL EXISTING JOISTS SUPPORTING EXISTING MECHANICAL UNITS ARE STIFFENED

FRAMING MEMBERS AS REQUIRED.

STRENGTHEN THE EXISTING JOISTS TO SUPPORT THE REQUIRED LOADS OR TO ADD ADDITIONAL

BEFORE ANY NEW UNIT IS INSTALLED. OPTIONS TO CORRECT THIS ISSUE MAY BE TO

ABOVE SHALL BE REMOVED, AND A LICENSED STRUCTURAL ENGINEER SHALL BE CONSULTED

B. IF ANY EXISTING ROOF JOISTS SHOW SIGNS OF STRUCTURAL DISTRESS, THE EXISTING UNIT

STRUCTURAL DISTRESS.

6. INSPECT ALL EXISTING ROOF JOISTS UNDER EXISTING ROOFTOP FRAMES FOR SIGNS OF

RICH PAINT TO ALL NEW WELDS AND OTHER EXPOSED STEEL.

- IF ANY NEW WELDS ARE APPLIED TO FRAME MEMBERS, APPLY CORROSION-INHIBITING ZINC

REPLACE ANY WELDS AS NEEDED BASED ON INSPECTION.

5. INSPECT ALL WELDS FOR CORROSION, FRACTURES, OR OTHER DAMAGE AND GRIND OFF AND

CORROSION OR OTHER FACTORS.

- REPLACE ANY FASTENERS THAT HAVE EXPERIENCED ANY SECTION LOSS OR DAMAGE DUE TO

DAMAGE.

4. INSPECT ALL FASTENERS FOR SECTION LOSS DUE TO CORROSION, FRACTURES, OR OTHER

LARGER SECTIONS THAT ARE STRUCTURALLY ADEQUATE FOR THE REQUIRED LOADS.

- IF OUT-OF-PLUMBNESS OR ANY SIGNS OF STRUCTURAL DISTRESS IS OBSERVED, REPLACE WITH

DISTRESS.

3. INSPECT ALL FRAME MEMBERS FOR PLUMBNESS AND ANY OTHER SIGNS OF STRUCTURAL

CORROSION-INHIBITING ZINC RICH PAINT TO ANY EXPOSED SURFACES.

- IF ANY CUTTING, WELDING, OR OTHER MODIFYING OF FRAME MEMBERS ARE NEEDED, APPLY

PAINT TO ANY EXPOSED STEEL PER THE MANUFACTURER'S REQUIREMENTS.

2. REMOVE ANY EXISTING SURFACE CORROSION AND APPLY CORROSION-INHIBITING ZINC RICH

STEEL IN-KIND IF REQUIRED.

1. REPAIR ALL DAMAGED FRAME MEMBERS, FASTENERS, PLATES, ETC. AND REPLACE WITH NEW

DEHUMIDIFICATION AND COOLING UNITS AS FOLLOWS:

A. CONTRACTOR SHALL INSPECT ALL EXISTING STEEL FRAMES THAT ARE TO RECEIVE NEW PACKAGED

EQUIPMENT.

O. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT AIR OPENING LOCATIONS PRIOR TO ORDERING

MOUNTING SUPPORTS SHALL BE COORDINATED WITH THE ACTUAL EQUIPMENT INSTALLED.

ADEQUATELY-SIZED PRE-FABRICATED EQUIPMENT MOUNTING SUPPORTS. CONFIGURATION OF

N. ALL INTERIOR, FLOOR-MOUNTED EQUIPMENT (I.E. CHILLED WATER PUMPS) SHALL BE ATTACHED TO

CAN BE ACCOMPLISHED WITHOUT THE REMOVAL OF ANY OTHER PIPING, DUCTS, AND/OR EQUIPMENT.

M. ALL PIPING, DUCTS, AND EQUIPMENT SHALL BE INSTALLED SO THAT MAINTENANCE OR REMOVAL

AND MATERIALS FROM MOISTURE DAMAGE AND CONTAMINATION.

L. DURING CONSTRUCTION THE CONTRACTOR SHALL PROTECT ALL STORED AND ON-SITE EQUIPMENT

DESIGNED FOR VARIABLE SPEED APPLICATIONS.

K. ALL FAN AND PUMP MOTORS USED IN VARIABLE FLOW SYSTEMS SHALL BE SUITABLE AND

IN A HIGH VELOCITY HURRICANE ZONE.

MOUNTING SUPPORTS SHALL BE WEATHER RESISTENT AND SUITABLE FOR WIND SPEED CONDITIONS

MOUNTING SUPPORTS SHALL BE COORDINATED WITH THE ACTUAL EQUIPMENT INSTALLED.

ADEQUATELY-SIZED PRE-FABRICATED EQUIPMENT MOUNTING SUPPORTS. CONFIGURATION OF

EQUIPMENT AT GRADE (I.E. AIR COOLED CHILLERS AND CONDENSING UNIT) SHALL BE ATTACHED TO

J. ALL ROOF-MOUNTED EQUIPMENT (I.E. PACKAGED DEHUMIDIFICATION AND COOLING UNITS) AND ALL

I. CHILLER AND CONDENSING UNIT COLOR SHALL BE APPROVED BY CONTRACTING OFFICER.

H. ALL ROOF-MOUNTED EQUIPMENT SHALL BE COLOR-KEYED WITH ADJACENT EXTERIOR COLOR.

TRADES.

G. CONTRACTOR SHALL COORDINATE ALL HVAC EQUIPMENT, PIPING, AND DUCTWORK WITH ALL OTHER

THE CONTRACTOR TO COORDINATE PLACEMENTS.

F. DRAWINGS ARE SCHEMATIC AND ARE TO SHOW DESIGN INTENT, AND IT IS THE RESPONSIBILITY OF

MOTOR EFFICIENCIES SHALL BE IN ACCORDANCE WITH ELECTRICAL SPECIFICATIONS.

E. ALL WIRING AND ELECTRICAL CONTROLS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 (N.E.C.)

AND SPECIFICATIONS.

BODY THESE STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE DRAWINGS

ANSI, ASME, ASA, ASHRAE, ASTM, ARI, NEC, NFPA, SMACNA, OR THE FIRE INSURANCE REGULATORY

D. WHERE APPROVAL CODES HAVE BEEN ESTABLISHED BY OSHA, UNDERWRITERS LABORATORY,

SPECIFIED OTHERWISE.

AUTHORITIES HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED, UNLESS

APPLICABLE STATUTES, ORDINANCES, CODES OR REGULATIONS OF FEDERAL, STATE AND LOCAL

C. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS, AMENDMENTS, OR

B. ALL DUCTWORK SIZES SHOWN ARE FREE AIR STREAM DIMENSIONS.

A. REFER TO SPECIFICATIONS FOR MATERIALS AND METHODS OF CONSTRUCTION.

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 08:44

IP_PWP:dms28895\puem-001.dgn

C A

T E

G O

R Y C

O

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

IR

F Y

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

M

C H

A N

IC

A L

L E

G E

N

M-001

1/8"=1'-0"

GPC

C008

C009

C010

C011

JANITOR

C006

TOILET

C012

C005

MECH

C013

C004

C003

C002

C001

CORRIDOR

C007

665 CFM

16x16/R1

665 CFM

16x16/R1

665 CFM

16x16/R1

1015 CFM

18x18/R1

230 CFM

310 CFM EA.

190 CFM

200 CFM

230 CFM

220 CFM EA.

220 CFM EA.

MECHANICAL DEMOLITION PLAN - BUILDING 1085

X

PLAN NORTH

8' 16'0 4'

T

T

T

T

T

T

T

T

VAV-C1

VAV-C2

VAV-C3

VAV-C4

VAV-C7

VAV-C6

VAV-C5

VAV-C8

x6

13x9 x6 x6 x6 x6 x6

12x10 x6 x6

12x9 8x x5 x6 x6 x6 x6

13x9 x6 x6 x6 x6

13x9

12x9

11x5

8x x6 x6 x6 x6 x6 x6 x6 x6

14x11

13x9 x6 x6 x6 x6

13x9 x6 x6 x6 x6

13x9

11x6

FD

FD

FD

FD

FD

FD

FD

FD

FD

14x12 x1 x1

14x12

12x6

12x8

12x8

12x6

12x6

12x8

12x8

12x6

26x16

26x16 x1 x1

16x12

16x14 x1

20x10

30x18 x1 x1

26x16

26x16

20x16 x1

20x10 x1 x1

16x14

18x14 x8

12x8

22x14

22x14 x1 x1 2 14x12

14x12 x1

18x10

18x14 x1

26x14

26x14 x1 x1

26x18

18x10

FD

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 08:44

IP_PWP:dms28895\puemd101.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

KEY PLAN

KEY NOTES

AS INDICATED BY:

SCHEDULE WITH THE OWNER.

AND INTERRUPTIONS WITH THE BUILDING OWNER. VERIFY THE EXACT

CONTRACTOR SHALL COORDINATE ALL MECHANICAL DISCONNECTIONS C.

THE CONTRACTOR.

CONSTRUCTION SHALL BE REPAIRED OR REPLACED AT THE EXPENSE OF

SYSTEMS. ANY EXISTING SYSTEMS THAT ARE DAMAGED DURING

CONTRACTOR SHALL TAKE CARE TO PROTECT ALL OPERATIONAL B.

AND DUCTWORK.

VERIFICATION OF EXACT SIZE AND LOCATION OF ALL EXISTING EQUIPMENT

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

REPAIR/REPLACE ANY DAMAGED DUCTWORK.

CONTRACTOR SHALL INSPECT ALL EXISTING DUCTWORK AND SHALL

EXISTING DUCTWORK AS REQUIRED TO ACCEPT NEW INSULATION.

REMOVE ALL EXISTING DUCTWORK INSULATION (TYP.) AND CLEAN 2.

(TYP.).

EXISTING DUCTWORK, VAVS, AND AIR DISTRIBUTION DEVICES TO REMAIN 1.

M E

C H

A N

IC

A L D

E M

O L

IT

IO

N P

L A

N

B U

IL

D

IN

G

MD101

STORAGE

F003

F002

GYM

F001

SHOWER

F005

VEST

F010

OFFICE

F009

LOCKER ROOM

F006

F008

TOILET

F007

F016

F015

LOCKER ROOM

F017

F014

F012

OFFICE

F013

F011

F004

MECHANICAL DEMOLITION PLAN - BUILDING 1071

PLAN NORTH

8' 16'0 4'

CHR

CHS

C H

R

C H S

6"

1"

C H

R

C H S

CHR

CHS

CHR

CHS

CHS

CHR

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 08:45

IP_PWP:dms28895\puemd102.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

KEY PLAN

AS INDICATED BY:

KEY NOTES

SCHEDULE WITH THE OWNER.

EXACT SIZE AND LOCATION OF ALL EXISTING EQUIPMENT AND PIPING.

DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF

EXISTING EQUIPMENT AND PIPING LOCATIONS ARE BASED ON AS-BUILT A.

WATER PUMPS AND THEIR ASSOCIATED VFDS.

EXISTING DIRECT DIGITAL CONTROLS WIRING FROM EXISTING CHILLED

EXISTING DIRECT DIGITAL CONTROLS WIRING TO REMAIN. DISCONNECT

PUMP ANCHORS AND REPAIR ANY CRACKS IN EXISTING PUMP PADS.

TO REMAIN. INSPECT AND CLEAN EXISTING PUMP PADS. REMOVE EXISTING

WATER PIPING TO REMAIN (TYP.). EXISTING CHILLED WATER PUMP PADS

(PCHP-01 AND PCHP-02) AND THEIR ASSOCIATED VFDS. EXISTING CHILLED

DISCONNECT AND REMOVE THE 2 EXISTING CHILLED WATER PUMPS 4.

DIGITAL CONTROLS WIRING FROM EXISTING CHILLER.

DIGITAL CONTROLS WIRING TO REMAIN. DISCONNECT EXISTING DIRECT

AND REPAIR ANY CRACKS IN EXISTING CHILLER PAD. EXISTING DIRECT

AND CLEAN EXISTING CHILLER PAD. REMOVE EXISTING CHILLER ANCHORS

REMOVE EXISTING CHILLER. EXISTING CHILLER PAD TO REMAIN. INSPECT 3.

INSULATION AND JACKET.

JACKET AND CLEAN EXISTING PIPING AS REQUIRED TO ACCEPT NEW

REMOVE ALL EXISTING EXTERIOR CHILLED WATER PIPING INSULATION AND 2.

EXISTING CHILLED WATER PIPING FROM EXISTING CHILLER.

EXISTING CHILLED WATER PIPING TO REMAIN (TYP.). DISCONNECT 1.

MD102

M E

C H

A N

IC

A L D

E M

O L

IT

IO

N P

L A

N

B U

IL

D

IN

G

G008

G009

G010

G011

G006

GO12

G005

G013

G004

G003

G002

G001

G007

MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1075

PLAN NORTH

8' 16'0 4'

24x12

24x12

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 11:37

IP_PWP:dms28895\puemd103.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

AS INDICATED BY:

KEY NOTES

KEY PLAN

SCHEDULE WITH THE OWNER.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

UNIT.

WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING

WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS

APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS

EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN

REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.

DEHUMIDIFICATION AND COOLING UNIT.

DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.

MECHANICAL UNIT SUPPORT FRAME.

APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING

PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND

REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.

REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.

112.5". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.

MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 129" X

EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.

REMAIN.

EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME TO 2.

UNIT OUTSIDE AIR OPENING TO REMAIN.

EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.

MD103

B U

IL

D

IN

G

M E

C H

A N

IC

A L D

E M

O L

IT

IO

N R

O O

F P

L

ART

H013

WORK/STOR

H015

H016

H014

H017

KILN

H019

H018

MPR

H020

H020B

H020A

H001

CHEM LAB

H021

PREP

H022

H023

H024

H025

SCIENCE LAB

H012

H009

H011

H010

H008

H007

H006

H005

H004

H002

H003

MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1077

2 2

PLAN NORTH

8' 16'0 4'

20x18

26x18 x

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 11:38

IP_PWP:dms28895\puemd104.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

AS INDICATED BY:

KEY NOTES

KEY PLAN

SCHEDULE WITH THE OWNER.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

UNIT.

WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING

WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS

APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS

EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN

REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.

DEHUMIDIFICATION AND COOLING UNIT.

DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.

MECHANICAL UNIT SUPPORT FRAME.

APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING

PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND

REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.

REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.

112.5". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.

MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 129" X

EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.

REMAIN.

EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME TO 2.

UNIT OUTSIDE AIR OPENING TO REMAIN.

EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.

MD104

M E

C H

A N

IC

A L D

E M

O L

IT

IO

N R

O O

F P

L A

N

B U

IL

D

IN

G

J011

J010

J009

J008

J007

J004

J003

J002

J001

J013

J005

J006

J012

MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1083

PLAN NORTH

8' 16'0 4' x1 x1

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 11:38

IP_PWP:dms28895\puemd105.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

AS INDICATED BY:

KEY NOTES

SCHEDULE WITH THE OWNER.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

UNIT.

WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING

WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS

APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS

EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN

REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.

DEHUMIDIFICATION AND COOLING UNIT.

DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.

MECHANICAL UNIT SUPPORT FRAME.

APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING

PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND

REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.

REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.

112.5". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.

MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 129" X

EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.

REMAIN.

EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME TO 2.

UNIT OUTSIDE AIR OPENING TO REMAIN.

EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.

MD105

M E

C H

A N

IC

A L D

E M

O L

IT

IO

N R

O O

F P

L A

N

B U

IL

D

IN

G

B004

DRY STORAGE

B006

COLD STORAGE

B002B

B002A

B003

KITCHEN

B002

B005

B007

B010

B009

LOCKERS

B008

B001

STOR

B1A

B1B

B1C

B1D

LIFT

B027A

B027

B026

B011

STAGE

B012

B016

B015

HALL

B028

B014

MUSIC

B017

B018

PRACTICE

B019

B020

B021

B022

B023

B024

MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1087

PLAN NORTH

8' 16'0 4'

Down

24"x18"

"x

Side View

Side View

12" x 12" 16" x 12"

24" x 12"

24" x 18"

ROOF

"x

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 08:45

IP_PWP:dms28895\puemd106.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

AS INDICATED BY:

KEY NOTES

KEY PLAN

SCHEDULE WITH THE OWNER.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

UNIT.

WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING

WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS

APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS

EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN

REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 7.

EXISTING ROOF MOUNTED EQUIPMENT TO REMAIN.6.

CONNECTED TO EXISTING OUTSIDE AIR DUCT BELOW ROOF TO REMAIN.

EXISTING ROOF MOUNTED DUCT TURNED DOWN THRU ROOF AND 5.

DEHUMIDIFICATION AND COOLING UNIT.

DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.

EXISTING MECHANICAL UNITS SUPPORT FRAME.

FRAME AND APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO

FRAME. PREPARE SURFACE OF EXISTING MECHANICAL UNITS SUPPORT

FRAME. REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNITS SUPPORT

FRAME. REMOVE ANY RUST FROM EXISTING MECHANICAL UNITS SUPPORT

X 114". INSPECT AND CLEAN EXISTING MECHANICAL UNITS SUPPORT

MECHANICAL UNITS SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 184"

EXISTING MECHANICAL UNITS SUPPORT FRAME TO REMAIN. EXISTING 3.

REMAIN.

EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME TO 2.

UNIT OUTSIDE AIR OPENING TO REMAIN.

EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.

MD106

M E

C H

A N

IC

A L D

E M

O L

IT

IO

N R

O O

F P

L A

N

B U

IL

D

IN

G

MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1085

PLAN NORTH

8' 16'0 4'

24x12

24x12

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 11:43

IP_PWP:dms28895\puemd107.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

AS INDICATED BY:

KEY NOTES

KEY PLAN

SCHEDULE WITH THE OWNER.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

UNIT.

WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING

WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS

APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS

EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN

REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.

DEHUMIDIFICATION AND COOLING UNIT.

DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.

MECHANICAL UNIT SUPPORT FRAME.

APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING

PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND

REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.

REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.

112.5". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.

MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 129" X

EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.

REMAIN.

EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME TO 2.

UNIT OUTSIDE AIR OPENING TO REMAIN.

EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.

MD107

M E

C H

A N

IC

A L D

E M

O L

IT

IO

N R

O O

F P

L A

N

B U

IL

D

IN

G

D012

D013

D014

D011

D009

NURSE

D007

D005

REST AREA

D004

D003

D002

D029

BREAKROOM

D027

D026

WORKROOM

D022

D030

D021

D025

VAULT

D023

CONFERENCE

D010

D016

D015

ASST. PRIN.

D017

D031

CLOSET

D032

PRINCIPAL

D018

D020

D019

D008

D006

D001

D028

MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1081

PLAN NORTH

8' 16'0 4' x1 x1 x1

12x12

12x12

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 08:46

IP_PWP:dms28895\puemd108.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

KEY PLAN

KEY NOTES

AS INDICATED BY:

SCHEDULE WITH THE OWNER.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

UNIT.

WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING

WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS

APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS

EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN

REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.

DEHUMIDIFICATION AND COOLING UNIT.

DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.

MECHANICAL UNIT SUPPORT FRAME.

APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING

PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND

REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.

REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.

120". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.

MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 202" X

EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.

CONNECTED TO EXISTING OUTSIDE AIR DUCT BELOW ROOF TO REMAIN.

EXISTING ROOF MOUNTED DUCT TURNED DOWN THRU ROOF AND 2.

CONNECTED TO EXISTING RETURN AIR DUCT BELOW ROOF TO REMAIN.

EXISTING ROOF MOUNTED DUCT TURNED DOWN THRU ROOF AND 1.

MD108

M E

C H

A N

IC

A L D

E M

O L

IT

IO

N R

O O

F P

L A

N

B U

IL

D

IN

G

E008

E009

E010

E011

E007

E006

E005

E013

E004

E003

E002

E001

MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1073

1 2

PLAN NORTH

8' 16'0 4' x1 x1

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 11:44

IP_PWP:dms28895\puemd109.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

AS INDICATED BY:

KEY NOTES

KEY PLAN

SCHEDULE WITH THE OWNER.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

UNIT.

WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING

WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS

APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS

EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN

REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.

DEHUMIDIFICATION AND COOLING UNIT.

DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.

MECHANICAL UNIT SUPPORT FRAME.

APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING

PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND

REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.

REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.

112.5". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.

MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 129" X

EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.

REMAIN.

EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME TO 2.

UNIT OUTSIDE AIR OPENING TO REMAIN.

EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.

MD109

M E

C H

A N

IC

A L D

E M

O L

IT

IO

N R

O O

F P

L A

N

B U

IL

D

IN

G

INFO CENTER

K001

ADMIN/WORK

K010

K009

COMPUTER

K012

INSTRUCTION

K011

K008

K007

K005

K006

SERVER

K003

K013

K004

MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1079

PLAN NORTH

8' 16'0 4' x

20x16

14x14

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 11:47

IP_PWP:dms28895\puemd110.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

KEY PLAN

AS INDICATED BY:

KEY NOTES

SCHEDULE WITH THE OWNER.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

EXISTING SPLIT SYSTEM CONDENSER.

REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS WIRING FROM

CONDENSER PAD. EXISTING DIRECT DIGITAL CONTROLS WIRING TO

CONDENSER ANCHORS AND REPAIR ANY CRACKS IN EXISTING

INSPECT AND CLEAN EXISTING CONDENSER PAD. REMOVE EXISTING

REFRIGERANT. EXISTING SPLIT SYSTEM CONDENSER PAD TO REMAIN.

EXISTING REFRIGERANT PIPING TO REMAIN (TYP.). RECYCLE EXISTING

DISCONNECT AND REMOVE THE EXISTING SPLIT SYSTEM CONDENSER. 7.

EXISTING SPLIT SYSTEM CONDENSER TO REMAIN.6.

UNIT.

WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING

WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS

APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS

EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN

REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.

DEHUMIDIFICATION AND COOLING UNIT.

DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.

MECHANICAL UNIT SUPPORT FRAME.

APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING

PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND

REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.

REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.

120". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.

MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 240" X

EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.

CONNECTED TO EXISTING OUTSIDE AIR DUCT BELOW ROOF TO REMAIN.

EXISTING ROOF MOUNTED DUCT TURNED DOWN THRU ROOF AND 2.

CONNECTED TO EXISTING OUTSIDE AIR DUCT BELOW ROOF TO REMAIN.

EXISTING 14X12 ROOF MOUNTED DUCT EXTENDED DOWN THRU ROOF AND 1.

MD110

M E

C H

A N

IC

A L D

E M

O L

IT

IO

N R

O O

F P

L A

N

B U

IL

D

IN

G

MECHANICAL PLAN - BUILDING 1085

665 CFM

16x16/R1

665 CFM

16x16/R1

230 CFM

190 CFM

200 CFM

230 CFM

220 CFM EA.

PLAN NORTH

8' 16'0 4'

T

T

T

T

T

T

T

T

VAV-C1

VAV-C2

VAV-C3

VAV-C4

VAV-C7

VAV-C6

VAV-C5

VAV-C8

x6

13x9 x6 x6 x6 x6 x6 x6 x6

12x9 8x x5 x6 x6 x6 x6

13x9 x6 x6 x6 x6

13x9

12x9

11x5

8x x6 x6 x6 x6 x6 x6 x6 x6

14x11

13x9 x6 x6 x6 x6

13x9 x6 x6 x6 x6

13x9

11x6

FD

FD

FD

FD

FD

FD

FD

FD

FD

18x10 x1 x1

26x18

26x14

26x14 x1

18x14 x1

18x10

18x14 x1 x1

12x6

12x8

12x6

12x8

12x6

12x8

12x6

12x8

16x14 x8

12x8

12x10

26x16

26x16 x1 x1

14x12

14x12

14x12

14x12 x1 x1

22x14

22x14

FD

16x12

16x14 x1 x1 x1 x1

20x10

20x16

26x16 x1

26x16 x1

20x10

30x18

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 08:47

IP_PWP:dms28895\puemh101.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

KEY PLAN

KEY NOTES

AS INDICATED BY:

MECHANICAL SYSTEMS (UFGS - 23 07 00).

FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR

DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED D.

INSTALLATION.

SPECIFIED, AND AS REQUIRED TO PROVIDE A VIBRATION-FREE

ALL EQUIPMENT AND DUCTWORK SHALL BE SUPPORTED AS DETAILED, C.

AND AS REQUIRED BY CODE.

OPERATIONAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED,

PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND

CONTRACTOR SHALL PROVIDE ALL MATERIALS AND EQUIPMENT AND B.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

REPLACE ALL EXISTING DUCTWORK INSULATION (TYP.).2.

EXISTING DUCTWORK, VAVS, AND AIR DISTRIBUTION DEVICES (TYP.).1.

MH101

B U

IL

D

IN

G

M E

C H

A N

IC

A L P

L

MECHANICAL PLAN - BUILDING 1071

F003

F002

GYM

F001

F005

F010

OFFICE

F009

LOCKER ROOM

F006

F008

TOILET

F007

F016

F015

LOCKER ROOM

F017

F014

F012

F013

F011

F004

PLAN NORTH

8' 16'0 4'

CHR

CHS

C H

R

C H S

6"

1"

C H

R

C H S

CHR

CHS

CHR

CHS

CHS

CHR

CH-1

CH-2

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 08:47

IP_PWP:dms28895\puemh102.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

KEY PLAN

AS INDICATED BY:

KEY NOTES

NEW PUMPS ON ALL SIDES.

CONCRETE PUMP PADS SHALL BE AT LEAST 6 INCHES LARGER THAN THE

MODIFYING THEM AS NEEDED TO ACCOMMODATE THE NEW PUMPS.

VERIFYING PADS DIMENSIONS ARE ADEQUATE FOR THE NEW PUMPS OR

EXISTING CONCRETE CHILLED WATER PUMP PADS DIMENSIONS AND

REQUIREMENTS. CONTRACTOR IS RESPONSIBLE FOR DETERMINING

CONNECTION TO THE 2 NEW CHILLED WATER PUMPS. FIELD VERIFY EXACT

CHILLED WATER PIPING AND INSULATION AS REQUIRED TO MAKE PROPER

SCHEDULE ON SHEET MH601. CONTRACTOR SHALL MODIFY EXISTING

PCHP-02) AND THEIR ASSOCIATED VFDS. SEE AIR COOLED CHILLER

PROVIDE AND INSTALL 2 NEW CHILLED WATER PUMPS (PCHP-01 AND 4.

LEAST 6 INCHES LARGER THAN THE NEW CHILLER ON ALL SIDES.

ACCOMMODATE THE NEW CHILLER. CONCRETE CHILLER PAD SHALL BE AT

ADEQUATE FOR THE NEW CHILLER OR MODIFYING THEM AS NEEDED TO

CHILLER PAD DIMENSIONS AND VERIFYING PAD DIMENSIONS ARE

CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTING CONCRETE 3.

LONGITUDINAL JOINTS.

AND ALUMINUM JACKET WITH A 0.016 INCH MINIMUM THICKNESS AND

NEW PIPE INSULATION WITH A WEATHER PROOF MEMBRANE AND MASTIC

CHILLED WATER PIPING AND FITTINGS. CONTRACTOR SHALL COVER THE

WITH A MINIMUM 2 INCH THICKNESS ON ALL NEW AND EXISTING EXTERIOR

CONTRACTOR SHALL INSTALL PREFORMED CELLULAR GLASS INSULATION 2.

CONNECTION TO THE NEW CHILLER. FIELD VERIFY EXACT REQUIREMENTS.

EXISTING CHILLED WATER PIPING AS REQUIRED TO MAKE PROPER

EXISTING CHILLED WATER PIPING (TYP.). CONTRACTOR SHALL MODIFY 1.

BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.

ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.

120 PSI.

TESTED FOR A PERIOD OF THREE HOURS, TO A MAXIMUM PRESSURE OF

GROOVED TYPE JOINTS SHALL BE CONSIDERED. ALL PIPING SHALL BE

SCHEDULE 40 (ASTM A53) GRADE B ERB PIPE. FOR EASE OF INSTALLATION,

CHILLED WATER PIPING MODIFICATIONS SHALL UTILIZE CARBON STEEL E.

PAD DETAIL ON SHEET MH501.

CONCRETE AND COMPLY WITH THE REQUIREMENTS OF THE EQUIPMENT

MECHANICAL EQUIPMENT PAD MODIFICATIONS SHALL UTILIZE 3000 PSI D.

INSTALLATION.

ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED AS DETAILED, C.

EXACT SIZE AND LOCATION OF ALL EXISTING EQUIPMENT AND PIPING.

DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF

EXISTING EQUIPMENT AND PIPING LOCATIONS ARE BASED ON AS-BUILT A.

M E

C H

A N

IC

A L P

L A

N

B U

IL

D

IN

G

MH102

MECHANICAL ROOF PLAN - BUILDING 1075

G008

G009

G010

G011

G006

GO12

G005

G013

G004

G003

G002

G001

G007

PLAN NORTH

8' 16'0 4'

24x12

24x12

LDU-G2

LDU-G1

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 11:49

IP_PWP:dms28895\puemh103.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

AS INDICATED BY:

KEY NOTES

KEY PLAN

BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.

ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.

MECHANICAL SYSTEMS (UFGS - 23 07 00).

FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR

DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED E.

MECHANICAL UNIT.

2019, TO SUPPORT A MINIMUM OF THE OPERATING WEIGHT OF THE NEW

CRITERIA - STRUCTURAL ENGINEERING (UFC 3-301-01), REVISED 1 OCT

SHALL MEET THE DESIGN REQUIREMENTS OF UNIFORM FACILITIES

ANY ALTERATION REQUIRED TO THE MECHANICAL UNIT SUPPORT FRAMES D.

INSTALLATION.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

VERIFY EXACT REQUIREMENTS. BALANCE AIR FLOW AS SCHEDULED.

MISSING/REMOVED ROOF MOUNTED DUCTWORK INSULATION. FIELD

INSULATE NEW ROOF MOUNTED DUCTWORK AND REPLACE ALL

MOUNTED DUCTWORK AND REPAIR/REPLACE ANY DAMAGED DUCTWORK.

DEHUMIDIFICATION AND COOLING UNIT. INSPECT ALL EXISTING ROOF

THE PROPER TRANSITION AND CONNECT TO THE NEW PACKAGED

MODIFY EXISTING ROOF MOUNTED DUCTWORK AS REQUIRED TO MAKE 4.

STRUCTURAL NOTES ON SHEET M-001 FOR FURTHER INFORMATION.

NEEDED TO ACCOMMODATE THE NEW UNIT. REFERENCE THE GENERAL

PACKAGED DEHUMIDIFICATION AND COOING UNIT OR MODIFYING THEM AS

AND VERIFYING FRAME DIMENSIONS ARE ADEQUATE FOR THE NEW

RESPONSIBLE FOR DETERMINING EXISTING SUPPORT FRAME DIMENSIONS

EXISTING MECHANICAL UNIT SUPPORT FRAME. CONTRACTOR IS 3.

EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME.2.

UNIT OUTSIDE AIR OPENING.

EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.

B U

IL

D

IN

G

MH103

M E

C H

A N

IC

A L R

O O

F P

L

MECHANICAL ROOF PLAN - BUILDING 1077

ART

H013

H015

H016

H014

H017

KILN

H019

H018

H020

H020B

H020A

H001

H021

H022

H023

H024

H025

H012

H009

H011

H010

H008

H007

H006

H005

H004

H002

H003

2 2

PLAN NORTH

8' 16'0 4'

20x18

26x18

LDU-H1

x

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 11:53

IP_PWP:dms28895\puemh104.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

AS INDICATED BY:

KEY NOTES

KEY PLAN

BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.

ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.

MECHANICAL SYSTEMS (UFGS - 23 07 00).

FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR

DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED E.

MECHANICAL UNIT.

2019, TO SUPPORT A MINIMUM OF THE OPERATING WEIGHT OF THE NEW

CRITERIA - STRUCTURAL ENGINEERING (UFC 3-301-01), REVISED 1 OCT

SHALL MEET THE DESIGN REQUIREMENTS OF UNIFORM FACILITIES

ANY ALTERATION REQUIRED TO THE MECHANICAL UNIT SUPPORT FRAMES D.

INSTALLATION.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

VERIFY EXACT REQUIREMENTS. BALANCE AIR FLOW AS SCHEDULED.

MISSING/REMOVED ROOF MOUNTED DUCTWORK INSULATION. FIELD

INSULATE NEW ROOF MOUNTED DUCTWORK AND REPLACE ALL

MOUNTED DUCTWORK AND REPAIR/REPLACE ANY DAMAGED DUCTWORK.

DEHUMIDIFICATION AND COOLING UNIT. INSPECT ALL EXISTING ROOF

THE PROPER TRANSITION AND CONNECT TO THE NEW PACKAGED

MODIFY EXISTING ROOF MOUNTED DUCTWORK AS REQUIRED TO MAKE 4.

STRUCTURAL NOTES ON SHEET M-001 FOR FURTHER INFORMATION.

NEEDED TO ACCOMMODATE THE NEW UNIT. REFERENCE THE GENERAL

PACKAGED DEHUMIDIFICATION AND COOING UNIT OR MODIFYING THEM AS

AND VERIFYING FRAME DIMENSIONS ARE ADEQUATE FOR THE NEW

RESPONSIBLE FOR DETERMINING EXISTING SUPPORT FRAME DIMENSIONS

EXISTING MECHANICAL UNIT SUPPORT FRAME. CONTRACTOR IS 3.

EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME.2.

UNIT OUTSIDE AIR OPENING.

EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.

MH104

M E

C H

A N

IC

A L R

O O

F P

L A

N

B U

IL

D

IN

G

MECHANICAL ROOF PLAN - BUILDING 1083

J011

J010

J009

J008

J007

J004

J003

J002

J001

J013

J005

J006

J012

PLAN NORTH

8' 16'0 4' x1 x1

LDU-J1

LDU-J2

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 11:55

IP_PWP:dms28895\puemh105.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

AS INDICATED BY:

KEY NOTES

BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.

ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.

MECHANICAL SYSTEMS (UFGS - 23 07 00).

FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR

DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED E.

MECHANICAL UNIT.

2019, TO SUPPORT A MINIMUM OF THE OPERATING WEIGHT OF THE NEW

CRITERIA - STRUCTURAL ENGINEERING (UFC 3-301-01), REVISED 1 OCT

SHALL MEET THE DESIGN REQUIREMENTS OF UNIFORM FACILITIES

ANY ALTERATION REQUIRED TO THE MECHANICAL UNIT SUPPORT FRAMES D.

INSTALLATION.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

VERIFY EXACT REQUIREMENTS. BALANCE AIR FLOW AS SCHEDULED.

MISSING/REMOVED ROOF MOUNTED DUCTWORK INSULATION. FIELD

INSULATE NEW ROOF MOUNTED DUCTWORK AND REPLACE ALL

MOUNTED DUCTWORK AND REPAIR/REPLACE ANY DAMAGED DUCTWORK.

DEHUMIDIFICATION AND COOLING UNIT. INSPECT ALL EXISTING ROOF

THE PROPER TRANSITION AND CONNECT TO THE NEW PACKAGED

MODIFY EXISTING ROOF MOUNTED DUCTWORK AS REQUIRED TO MAKE 4.

STRUCTURAL NOTES ON SHEET M-001 FOR FURTHER INFORMATION.

NEEDED TO ACCOMMODATE THE NEW UNIT. REFERENCE THE GENERAL

PACKAGED DEHUMIDIFICATION AND COOING UNIT OR MODIFYING THEM AS

AND VERIFYING FRAME DIMENSIONS ARE ADEQUATE FOR THE NEW

RESPONSIBLE FOR DETERMINING EXISTING SUPPORT FRAME DIMENSIONS

EXISTING MECHANICAL UNIT SUPPORT FRAME. CONTRACTOR IS 3.

EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME.2.

UNIT OUTSIDE AIR OPENING.

EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.

MH105

M E

C H

A N

IC

A L R

O O

F P

L A

N

B U

IL

D

IN

G

MECHANICAL ROOF PLAN - BUILDING 1087

B004

DRY STORAGE

B006

B002B

B002A

B003

KITCHEN

B002

B005

B007

B010

B009

LOCKERS

B008

B001

B1A

B1B

B1C

B1D

LIFT

B027A

B027

B026

B011

STAGE

B012

B016

B015

B028

B014

MUSIC

B017

B018

B019

B020

B021

B022

B023

B024

PLAN NORTH

8' 16'0 4'

Down

24"x12"

"x

Side View

LDU-B2 LDU-B1

Side View

12" x 12" 16" x 12"

24" x 12"

24" x 18"

ROOF

"x

24"x18"

"x

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 08:48

IP_PWP:dms28895\puemh106.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

AS INDICATED BY:

KEY NOTES

KEY PLAN

BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.

ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.

MECHANICAL SYSTEMS (UFGS - 23 07 00).

FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR

DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED E.

MECHANICAL UNIT.

2019, TO SUPPORT A MINIMUM OF THE OPERATING WEIGHT OF THE NEW

CRITERIA - STRUCTURAL ENGINEERING (UFC 3-301-01), REVISED 1 OCT

SHALL MEET THE DESIGN REQUIREMENTS OF UNIFORM FACILITIES

ANY ALTERATION REQUIRED TO THE MECHANICAL UNIT SUPPORT FRAMES D.

INSTALLATION.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

EXISTING ROOF MOUNTED EQUIPMENT.6.

CONNECTED TO EXISTING OUTSIDE AIR DUCT BELOW ROOF.

EXISTING ROOF MOUNTED DUCT TURNED DOWN THRU ROOF AND 5.

VERIFY EXACT REQUIREMENTS. BALANCE AIR FLOW AS SCHEDULED.

MISSING/REMOVED ROOF MOUNTED DUCTWORK INSULATION. FIELD

INSULATE NEW ROOF MOUNTED DUCTWORK AND REPLACE ALL

MOUNTED DUCTWORK AND REPAIR/REPLACE ANY DAMGED DUCTWORK.

DEHUMIDIFICATION AND COOLING UNIT. INSPECT ALL EXISTING ROOF

THE PROPER TRANSITION AND CONNECT TO THE NEW PACKAGED

MODIFY EXISTING ROOF MOUNTED DUCTWORK AS REQUIRED TO MAKE 4.

INFORMATION.

GENERAL STRUCTURAL NOTES ON SHEET M-001 FOR FURTHER

AS NEEDED TO ACCOMMODATE THE NEW UNITS. REFERENCE THE

PACKAGED DEHUMIDIFICATION AND COOING UNITS OR MODIFYING THEM

AND VERIFYING FRAME DIMENSIONS ARE ADEQUATE FOR THE NEW

RESPONSIBLE FOR DETERMINING EXISTING SUPPORT FRAME DIMENSIONS

EXISTING MECHANICAL UNITS SUPPORT FRAME. CONTRACTOR IS 3.

EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME.2.

UNIT OUTSIDE AIR OPENING.

EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.

MH106

M E

C H

A N

IC

A L R

O O

F P

L A

N

B U

IL

D

IN

G

MECHANICAL ROOF PLAN - BUILDING 1085

PLAN NORTH

8' 16'0 4'

24x12

24x12

LDU-C2

LDU-C1

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 11:58

IP_PWP:dms28895\puemh107.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

AS INDICATED BY:

KEY NOTES

KEY PLAN

BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.

ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.

MECHANICAL SYSTEMS (UFGS - 23 07 00).

FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR

DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED E.

MECHANICAL UNIT.

2019, TO SUPPORT A MINIMUM OF THE OPERATING WEIGHT OF THE NEW

CRITERIA - STRUCTURAL ENGINEERING (UFC 3-301-01), REVISED 1 OCT

SHALL MEET THE DESIGN REQUIREMENTS OF UNIFORM FACILITIES

ANY ALTERATION REQUIRED TO THE MECHANICAL UNIT SUPPORT FRAMES D.

INSTALLATION.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

VERIFY EXACT REQUIREMENTS. BALANCE AIR FLOW AS SCHEDULED.

MISSING/REMOVED ROOF MOUNTED DUCTWORK INSULATION. FIELD

INSULATE NEW ROOF MOUNTED DUCTWORK AND REPLACE ALL

MOUNTED DUCTWORK AND REPAIR/REPLACE ANY DAMAGED DUCTWORK.

DEHUMIDIFICATION AND COOLING UNIT. INSPECT ALL EXISTING ROOF

THE PROPER TRANSITION AND CONNECT TO THE NEW PACKAGED

MODIFY EXISTING ROOF MOUNTED DUCTWORK AS REQUIRED TO MAKE 4.

STRUCTURAL NOTES ON SHEET M-001 FOR FURTHER INFORMATION.

NEEDED TO ACCOMMODATE THE NEW UNIT. REFERENCE THE GENERAL

PACKAGED DEHUMIDIFICATION AND COOING UNIT OR MODIFYING THEM AS

AND VERIFYING FRAME DIMENSIONS ARE ADEQUATE FOR THE NEW

RESPONSIBLE FOR DETERMINING EXISTING SUPPORT FRAME DIMENSIONS

EXISTING MECHANICAL UNIT SUPPORT FRAME. CONTRACTOR IS 3.

EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME.2.

UNIT OUTSIDE AIR OPENING.

EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.

MH107

M E

C H

A N

IC

A L R

O O

F P

L A

N

B U

IL

D

IN

G

MECHANICAL ROOF PLAN - BUILDING 1081

D012

D013

D014

D011

D009

NURSE

D007

D005

REST AREA

D004

D003

D002

D029

BREAKROOM

D027

D026

WORKROOM

D022

D030

D021

D025

VAULT

D023

CONFERENCE

D010

D016

D015

ASST. PRIN.

D017

D031

D032

PRINCIPAL

D018

D020

D019

D008

D006

D001

D028

4 4

PLAN NORTH

8' 16'0 4'

LDU-D1

x1 x1 x1

12x12

12x12

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

R

Y E

A R

W O

O D

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

11-AUG-2022 08:48

IP_PWP:dms28895\puemh108.dgn

C A

T E

G O

R Y C

O

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

S C

R

IP

T

IO

N

S A

V A

N N

A H D

IS

T R

IC

T

W

O G

L E

T H

O R

P E A

V E

S A

V A

N N

A H

G A

S

B A

R B

IN

A

K

D

IX

O N

R

Y E

A R

W O

O D

F O

R T B

U C

H A

N A

N P

U E

R T

O R

IC

O

A N

T

IL

L E

S S

C H

O O

L H

V A

C R

E P

N O

N E

READY TO ADVERTISE (RTA)

W

H N -2

-B -4

A U

G U

S T

GENERAL NOTES

KEY PLAN

KEY NOTES

AS INDICATED BY:

BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.

ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.

MECHANICAL SYSTEMS (UFGS - 23 07 00).

FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR

DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED E.

MECHANICAL UNIT.

2019, TO SUPPORT A MINIMUM OF THE OPERATING WEIGHT OF THE NEW

CRITERIA - STRUCTURAL ENGINEERING (UFC 3-301-01), REVISED 1 OCT

SHALL MEET THE DESIGN REQUIREMENTS OF UNIFORM FACILITIES

ANY ALTERATION REQUIRED TO THE MECHANICAL UNIT SUPPORT FRAMES D.

INSTALLATION.

AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.

VERIFY EXACT REQUIREMENTS. BALANCE AIR FLOW AS SCHEDULED.

MISSING/REMOVED ROOF MOUNTED DUCTWORK INSULATION. FIELD

INSULATE NEW ROOF MOUNTED DUCTWORK AND REPLACE ALL

MOUNTED DUCTWORK AND REPAIR/REPLACE ANY DAMAGED DUCTWORK.

DEHUMIDIFICATION AND COOLING UNIT.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .