W912HN-22-B-4015_DRAWINGS.pdf
PDF 14 MB Posted
- Attached to
- Antilles Middle School Repair HVAC System
- Solicitation number
- W912HN22B4015
About this file
This document outlines a federal contract opportunity for repair work at Antilles Middle School. The contract involves replacing two exterior chillers, providing temporary chillers, replacing approximately 13 rooftop dehumidifiers, repairing and replacing failing ductwork insulation, replacing 13 roof-mounted packaged dehumidification and cooling units, installing a new split system condenser and two new chilled water pumps with associated variable frequency drives, replacing control devices in chilled water piping and other locations, replacing chilled water valves and integrating them with the BACNET controller. The work also includes start-up, connectivity and commissioning of all repaired and replaced systems. The solicitation number is W912HN22B4015 and was issued by the Department of the Army Corps of Engineers Engineering District Savannah.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIXON.KATHRYN.TEN
EYCK.1267610769
Digitally signed by DIXON.KATHRYN.TEN
EYCK.1267610769
Date: 2022.08.11 13:17:16 -04'00'
DIXON.KATHRYN.TEN EYCK.1267610769 Digitally signed by DIXON.KATHRYN.TEN EYCK.1267610769 Date: 2022.08.11 13:17:39 -04'00'
BATH.STEVEN.M.1058162643 Digitally signed by BATH.STEVEN.M.1058162643 Date: 2022.08.11 13:43:57 -04'00'
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
J
H A
IR
E
J
H A
IR
E
J
M C
T
IE
R N
A N
S
B A
R B
IN
A
A U
G U
S T
W
H N -2
-B -4
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
A
IR
F Y
SHEET ID
READY TO ADVERTISE (RTA)
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps
$$USERNAME$$
$$SYSTIME$$
$$DGNSPEC$$
C A
T E
G O
R Y C
O D
E
N O
N E
GI001
IN
D
E X O
F D
R A
W
IN
G S
F
IL
E N
A M
E
G-001 COVER SHEET
GI001 INDEX OF DRAWINGS
M-001 MECHANICAL LEGEND
MD101 MECHANICAL DEMOLITION PLAN BUILDING 1085
MD102 MECHANICAL DEMOLITION PLAN BUILDING 1071
MD103 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1075
MD104 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1077
MD105 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1083
MD106 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1087
MD107 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1085
MD108 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1081
MD109 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1073
MD110 MECHANICAL DEMOLITION ROOF PLAN BUILDING 1079
MH101 MECHANICAL PLAN BUILDING 1085
MH102 MECHANICAL PLAN BUILDING 1071
MH103 MECHANICAL ROOF PLAN BUILDING 1075
MH104 MECHANICAL ROOF PLAN BUILDING 1077
MH105 MECHANICAL ROOF PLAN BUILDING 1083
MH106 MECHANICAL ROOF PLAN BUILDING 1087
MH107 MECHANICAL ROOF PLAN BUILDING 1085
MH108 MECHANICAL ROOF PLAN BUILDING 1081
MH109 MECHANICAL ROOF PLAN BUILDING 1073
MH110 MECHANICAL ROOF PLAN BUILDING 1079
MH501 MECHANICAL DETAILS
MH601 MECHANICAL SCHEDULES
MI001 MECHANICAL CONTROLS ABBREVIATIONS & LEGEND
MI002 MECHANICAL CONTROLS GENERAL NOTES
MI003 MECHANICAL CONTROLS NETWORK SYSTEM DIAGRAM
MI801 PACKAGED DEHUMIDIFICATION AND COOLING UNIT CONTROL SCHEMATIC
MI802 PACKAGED DEHUMIDIFICATION AND COOLING UNIT SEQUENCE OF OPERATIONS
MI803 PACKAGED DEHUMIDIFICATION AND COOLING UNIT POINTS SCHEDULE
E-001 ELECTRICAL LEGEND
ED102 ELECTRICAL DEMOLITION PLAN BUILDING 1071
ED103 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1075
ED104 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1077
ED105 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1083
ED106 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1087
ED107 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1085
ED108 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1081
ED109 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1073
ED110 ELECTRICAL DEMOLITION ROOF PLAN BUILDING 1079
EP102 ELECTRICAL PLAN BUILDING 1071
EP103 ELECTRICAL ROOF PLAN BUILDING 1075
EP104 ELECTRICAL ROOF PLAN BUILDING 1077
EP105 ELECTRICAL ROOF PLAN BUILDING 1083
EP106 ELECTRICAL ROOF PLAN BUILDING 1087
EP107 ELECTRICAL ROOF PLAN BUILDING 1085
EP108 ELECTRICAL ROOF PLAN BUILDING 1081
EP109 ELECTRICAL ROOF PLAN BUILDING 1073
EP110 ELECTRICAL ROOF PLAN BUILDING 1079
EP601 ELECTRICAL SCHEDULES
SHEET ID.
INDEX OF DRAWINGS
D E
S C
R
IP
T
IO
N
W
O G
L E
T H
O R
P E A
V E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S A
V A
N N
A H D
IS
T R
IC
T
S A
V A
N N
A H
G A
SHEET ID.
TITLESHEET ID.
TITLETITLE
MECHANICAL LEGEND
SYMBOL DESCRIPTION
AHU
VAV VARIABLE AIR VOLUME
AD ACCESS DOOR
GPM GALLONS PER MINUTE
GPH GALLONS PER HOUR
CFM CUBIC FEET PER MINUTE
RPM REVOLUTIONS PER MINUTE
BTUH BRITISH THERMAL UNITS PER HOUR
MBH BTUH X 1000
EWT ENTERING WATER TEMPERATURE
LWT LEAVING WATER TEMPERATURE
PD PRESSURE DROP
SP STATIC PRESSURE
ESP EXTERNAL STATIC PRESSURE
HP HORSEPOWER
EAT ENTERING AIR TEMPERATURE
LAT LEAVING AIR TEMPERATURE
DB DRY BULB TEMPERATURE
WB WET BULB TEMPERATURE
OA OUTSIDE AIR
RA RETURN AIR
SA SUPPLY AIR
EA EXHAUST AIR
SEER SEASON ENERGY EFFICIENCY RATIO
EER ENERGY EFFICIENCY RATIO
EXISTING TO REMAIN
EXISTING TO BE REMOVED
NEW FLOOR PLAN
MANUAL BALANCING DAMPER
THERMOSTAT
HUMIDISTAT
SUPPLY DIFFUSER WITH PATTERN
RETURN GRILLE
EXHAUST REGISTER
SUPPLY DUCT - CROSS SECTION
EXHAUST DUCT - CROSS SECTION
RETURN DUCT - CROSS SECTION
RECTANGLE DUCT SIZE
ROUND DUCT SIZE
OVAL DUCT SIZE
FIRE DAMPER
CONNECT TO EXISTING
T
H
_x_
FD
LDU PACKAGED DEHUMIDIFICATION AND COOLING UNIT
PCHP
CH
CU
CHILLED WATER PUMP
CONDENSING UNIT
AIR COOLED CHILLER
AIR HANDLING UNIT
VFD VARIABLE FREQUENCY DRIVE
GENERAL MECHANICAL NOTESGENERAL STRUCTURAL NOTES
ADDITIONAL MEMBERS ARE TO BE CONNECTED BY ALL-AROUND FIELD WELDS.
AND KICKER SUPPORTS ARE TO BE AT A MINIMUM, THE SAME SIZE AS THE EXISTING MEMBERS. ALL
MAY NEED TO BE SUPPLIED TO SUPPORT THE CANTILEVERED FRAMING. CANTILEVERED MEMBERS
MAY NEED TO BE CANTILEVERED OUT FROM THE EXISTING HSS POSTS AND ADDITIONAL KICKERS
ADDITIONAL SUPPORT LARGER THAN THAT GIVEN BY THE EXISTING FRAMES, ADDITIONAL MEMBERS
ADDITIONAL WEIGHT OF THE HEAVIER UNITS. IF THE DIMENSIONS OF THE NEW UNITS REQUIRE
AS ANY OTHER STRUCTURAL ELEMENT IN THE EXISTING BUILDING BELOW THAT IS SUPPORTING THE
UNITS SHALL ALSO BE CHECKED FOR ADEQUACY BY A LICENSED STRUCTURAL ENGINEER AS WELL
MANUFACTURER THAT IS QUALIFIED TO DO SO. THE STEEL SUPPORT FRAME FOR THESE HEAVIER
ADEQUACY AND SERVICEABILITY BY A LICENSED STRUCTURAL ENGINEER OR JOIST
EXISTING JOISTS THAT SUPPORT THESE HEAVIER UNITS SHALL BE CHECKED FOR STRUCTURAL
SUPPORT FRAME AND BUILDING ELEMENTS BELOW BY A SIGNIFICANT AMOUNT (~190%). ANY
WEIGH 3230 LBS, THEREFORE THESE NEW UNITS WILL INCREASE THE LOAD ON THE EXISTING
ONTO BUILDING 1087 AND BUILDING 1077 RESPECTIVELY. ALL EXISTING UNITS ARE STATED TO
UNITS LDU-B1 AND LDU-H1 WEIGH APPROXIMATELY 5200 LBS +/- 10% AND ARE TO BE INSTALLED
E. PER THE BASIS OF DESIGN EQUIPMENT, THE NEW PACKAGED DEHUMIDIFICATION AND COOLING
ALL-AROUND FILLET WELD.
UNITS SHALL BE WELDED TO THE OUTER HSS STEEL MEMBERS FORMING THE FRAME USING 1/4"
RE-POSITIONED INTERNAL STEEL CHANNEL FRAMING MEMBERS THAT ARE TO SUPPORT THE NEW
PREVENT ANY MOISTURE INTRUSION TO THE ROOFING MATERIAL BELOW. ALL NEW AND
ROOFING MATERIAL SHALL BE APPLIED AROUND THE NEW STEEL MEMBER AND SEAMS SEALED TO
BE RE-USED. ADDITIONALLY, IF DAMAGED HSS TUBE COLUMNS NEED TO BE REPLACED, THE EXISTING
ANY FRAMING MEMBERS IN ORDER TO NOT DAMAGE ANY STEEL MEMBERS THAT ARE TO REMAIN OR
THE CONTRACTOR SHALL TAKE SPECIAL CARE WHEN MODIFYING, REPLACING, RE-POSITIONING, ETC.
ACCOMMODATE THE DIMENSIONS OF THE NEW PACKAGED DEHUMIDIFICATION AND COOLING UNITS.
D. INTERNAL STEEL CHANNEL FRAMING MEMBERS MAY NEED TO BE REMOVED AND RE-POSITIONED TO
REQUIRED BY THIS DETAIL, CONTRACTOR SHALL PROVIDE STIFFENERS AS NEEDED.
PER THE JOIST REINFORCING DETAIL ON SHEET MH501. IF STIFFENERS ARE NOT PRESENT AS
C. VERIFY THAT ALL EXISTING JOISTS SUPPORTING EXISTING MECHANICAL UNITS ARE STIFFENED
FRAMING MEMBERS AS REQUIRED.
STRENGTHEN THE EXISTING JOISTS TO SUPPORT THE REQUIRED LOADS OR TO ADD ADDITIONAL
BEFORE ANY NEW UNIT IS INSTALLED. OPTIONS TO CORRECT THIS ISSUE MAY BE TO
ABOVE SHALL BE REMOVED, AND A LICENSED STRUCTURAL ENGINEER SHALL BE CONSULTED
B. IF ANY EXISTING ROOF JOISTS SHOW SIGNS OF STRUCTURAL DISTRESS, THE EXISTING UNIT
STRUCTURAL DISTRESS.
6. INSPECT ALL EXISTING ROOF JOISTS UNDER EXISTING ROOFTOP FRAMES FOR SIGNS OF
RICH PAINT TO ALL NEW WELDS AND OTHER EXPOSED STEEL.
- IF ANY NEW WELDS ARE APPLIED TO FRAME MEMBERS, APPLY CORROSION-INHIBITING ZINC
REPLACE ANY WELDS AS NEEDED BASED ON INSPECTION.
5. INSPECT ALL WELDS FOR CORROSION, FRACTURES, OR OTHER DAMAGE AND GRIND OFF AND
CORROSION OR OTHER FACTORS.
- REPLACE ANY FASTENERS THAT HAVE EXPERIENCED ANY SECTION LOSS OR DAMAGE DUE TO
DAMAGE.
4. INSPECT ALL FASTENERS FOR SECTION LOSS DUE TO CORROSION, FRACTURES, OR OTHER
LARGER SECTIONS THAT ARE STRUCTURALLY ADEQUATE FOR THE REQUIRED LOADS.
- IF OUT-OF-PLUMBNESS OR ANY SIGNS OF STRUCTURAL DISTRESS IS OBSERVED, REPLACE WITH
DISTRESS.
3. INSPECT ALL FRAME MEMBERS FOR PLUMBNESS AND ANY OTHER SIGNS OF STRUCTURAL
CORROSION-INHIBITING ZINC RICH PAINT TO ANY EXPOSED SURFACES.
- IF ANY CUTTING, WELDING, OR OTHER MODIFYING OF FRAME MEMBERS ARE NEEDED, APPLY
PAINT TO ANY EXPOSED STEEL PER THE MANUFACTURER'S REQUIREMENTS.
2. REMOVE ANY EXISTING SURFACE CORROSION AND APPLY CORROSION-INHIBITING ZINC RICH
STEEL IN-KIND IF REQUIRED.
1. REPAIR ALL DAMAGED FRAME MEMBERS, FASTENERS, PLATES, ETC. AND REPLACE WITH NEW
DEHUMIDIFICATION AND COOLING UNITS AS FOLLOWS:
A. CONTRACTOR SHALL INSPECT ALL EXISTING STEEL FRAMES THAT ARE TO RECEIVE NEW PACKAGED
EQUIPMENT.
O. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT AIR OPENING LOCATIONS PRIOR TO ORDERING
MOUNTING SUPPORTS SHALL BE COORDINATED WITH THE ACTUAL EQUIPMENT INSTALLED.
ADEQUATELY-SIZED PRE-FABRICATED EQUIPMENT MOUNTING SUPPORTS. CONFIGURATION OF
N. ALL INTERIOR, FLOOR-MOUNTED EQUIPMENT (I.E. CHILLED WATER PUMPS) SHALL BE ATTACHED TO
CAN BE ACCOMPLISHED WITHOUT THE REMOVAL OF ANY OTHER PIPING, DUCTS, AND/OR EQUIPMENT.
M. ALL PIPING, DUCTS, AND EQUIPMENT SHALL BE INSTALLED SO THAT MAINTENANCE OR REMOVAL
AND MATERIALS FROM MOISTURE DAMAGE AND CONTAMINATION.
L. DURING CONSTRUCTION THE CONTRACTOR SHALL PROTECT ALL STORED AND ON-SITE EQUIPMENT
DESIGNED FOR VARIABLE SPEED APPLICATIONS.
K. ALL FAN AND PUMP MOTORS USED IN VARIABLE FLOW SYSTEMS SHALL BE SUITABLE AND
IN A HIGH VELOCITY HURRICANE ZONE.
MOUNTING SUPPORTS SHALL BE WEATHER RESISTENT AND SUITABLE FOR WIND SPEED CONDITIONS
MOUNTING SUPPORTS SHALL BE COORDINATED WITH THE ACTUAL EQUIPMENT INSTALLED.
ADEQUATELY-SIZED PRE-FABRICATED EQUIPMENT MOUNTING SUPPORTS. CONFIGURATION OF
EQUIPMENT AT GRADE (I.E. AIR COOLED CHILLERS AND CONDENSING UNIT) SHALL BE ATTACHED TO
J. ALL ROOF-MOUNTED EQUIPMENT (I.E. PACKAGED DEHUMIDIFICATION AND COOLING UNITS) AND ALL
I. CHILLER AND CONDENSING UNIT COLOR SHALL BE APPROVED BY CONTRACTING OFFICER.
H. ALL ROOF-MOUNTED EQUIPMENT SHALL BE COLOR-KEYED WITH ADJACENT EXTERIOR COLOR.
TRADES.
G. CONTRACTOR SHALL COORDINATE ALL HVAC EQUIPMENT, PIPING, AND DUCTWORK WITH ALL OTHER
THE CONTRACTOR TO COORDINATE PLACEMENTS.
F. DRAWINGS ARE SCHEMATIC AND ARE TO SHOW DESIGN INTENT, AND IT IS THE RESPONSIBILITY OF
MOTOR EFFICIENCIES SHALL BE IN ACCORDANCE WITH ELECTRICAL SPECIFICATIONS.
E. ALL WIRING AND ELECTRICAL CONTROLS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 (N.E.C.)
AND SPECIFICATIONS.
BODY THESE STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE DRAWINGS
ANSI, ASME, ASA, ASHRAE, ASTM, ARI, NEC, NFPA, SMACNA, OR THE FIRE INSURANCE REGULATORY
D. WHERE APPROVAL CODES HAVE BEEN ESTABLISHED BY OSHA, UNDERWRITERS LABORATORY,
SPECIFIED OTHERWISE.
AUTHORITIES HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED, UNLESS
APPLICABLE STATUTES, ORDINANCES, CODES OR REGULATIONS OF FEDERAL, STATE AND LOCAL
C. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS, AMENDMENTS, OR
B. ALL DUCTWORK SIZES SHOWN ARE FREE AIR STREAM DIMENSIONS.
A. REFER TO SPECIFICATIONS FOR MATERIALS AND METHODS OF CONSTRUCTION.
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 08:44
IP_PWP:dms28895\puem-001.dgn
C A
T E
G O
R Y C
O
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
IR
F Y
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
M
C H
A N
IC
A L
L E
G E
N
M-001
1/8"=1'-0"
GPC
C008
C009
C010
C011
JANITOR
C006
TOILET
C012
C005
MECH
C013
C004
C003
C002
C001
CORRIDOR
C007
665 CFM
16x16/R1
665 CFM
16x16/R1
665 CFM
16x16/R1
1015 CFM
18x18/R1
230 CFM
310 CFM EA.
190 CFM
200 CFM
230 CFM
220 CFM EA.
220 CFM EA.
MECHANICAL DEMOLITION PLAN - BUILDING 1085
X
PLAN NORTH
8' 16'0 4'
T
T
T
T
T
T
T
T
VAV-C1
VAV-C2
VAV-C3
VAV-C4
VAV-C7
VAV-C6
VAV-C5
VAV-C8
x6
13x9 x6 x6 x6 x6 x6
12x10 x6 x6
12x9 8x x5 x6 x6 x6 x6
13x9 x6 x6 x6 x6
13x9
12x9
11x5
8x x6 x6 x6 x6 x6 x6 x6 x6
14x11
13x9 x6 x6 x6 x6
13x9 x6 x6 x6 x6
13x9
11x6
FD
FD
FD
FD
FD
FD
FD
FD
FD
14x12 x1 x1
14x12
12x6
12x8
12x8
12x6
12x6
12x8
12x8
12x6
26x16
26x16 x1 x1
16x12
16x14 x1
20x10
30x18 x1 x1
26x16
26x16
20x16 x1
20x10 x1 x1
16x14
18x14 x8
12x8
22x14
22x14 x1 x1 2 14x12
14x12 x1
18x10
18x14 x1
26x14
26x14 x1 x1
26x18
18x10
FD
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 08:44
IP_PWP:dms28895\puemd101.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
KEY PLAN
KEY NOTES
AS INDICATED BY:
SCHEDULE WITH THE OWNER.
AND INTERRUPTIONS WITH THE BUILDING OWNER. VERIFY THE EXACT
CONTRACTOR SHALL COORDINATE ALL MECHANICAL DISCONNECTIONS C.
THE CONTRACTOR.
CONSTRUCTION SHALL BE REPAIRED OR REPLACED AT THE EXPENSE OF
SYSTEMS. ANY EXISTING SYSTEMS THAT ARE DAMAGED DURING
CONTRACTOR SHALL TAKE CARE TO PROTECT ALL OPERATIONAL B.
AND DUCTWORK.
VERIFICATION OF EXACT SIZE AND LOCATION OF ALL EXISTING EQUIPMENT
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
REPAIR/REPLACE ANY DAMAGED DUCTWORK.
CONTRACTOR SHALL INSPECT ALL EXISTING DUCTWORK AND SHALL
EXISTING DUCTWORK AS REQUIRED TO ACCEPT NEW INSULATION.
REMOVE ALL EXISTING DUCTWORK INSULATION (TYP.) AND CLEAN 2.
(TYP.).
EXISTING DUCTWORK, VAVS, AND AIR DISTRIBUTION DEVICES TO REMAIN 1.
M E
C H
A N
IC
A L D
E M
O L
IT
IO
N P
L A
N
B U
IL
D
IN
G
MD101
STORAGE
F003
F002
GYM
F001
SHOWER
F005
VEST
F010
OFFICE
F009
LOCKER ROOM
F006
F008
TOILET
F007
F016
F015
LOCKER ROOM
F017
F014
F012
OFFICE
F013
F011
F004
MECHANICAL DEMOLITION PLAN - BUILDING 1071
PLAN NORTH
8' 16'0 4'
CHR
CHS
C H
R
C H S
6"
1"
C H
R
C H S
CHR
CHS
CHR
CHS
CHS
CHR
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 08:45
IP_PWP:dms28895\puemd102.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
KEY PLAN
AS INDICATED BY:
KEY NOTES
SCHEDULE WITH THE OWNER.
EXACT SIZE AND LOCATION OF ALL EXISTING EQUIPMENT AND PIPING.
DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF
EXISTING EQUIPMENT AND PIPING LOCATIONS ARE BASED ON AS-BUILT A.
WATER PUMPS AND THEIR ASSOCIATED VFDS.
EXISTING DIRECT DIGITAL CONTROLS WIRING FROM EXISTING CHILLED
EXISTING DIRECT DIGITAL CONTROLS WIRING TO REMAIN. DISCONNECT
PUMP ANCHORS AND REPAIR ANY CRACKS IN EXISTING PUMP PADS.
TO REMAIN. INSPECT AND CLEAN EXISTING PUMP PADS. REMOVE EXISTING
WATER PIPING TO REMAIN (TYP.). EXISTING CHILLED WATER PUMP PADS
(PCHP-01 AND PCHP-02) AND THEIR ASSOCIATED VFDS. EXISTING CHILLED
DISCONNECT AND REMOVE THE 2 EXISTING CHILLED WATER PUMPS 4.
DIGITAL CONTROLS WIRING FROM EXISTING CHILLER.
DIGITAL CONTROLS WIRING TO REMAIN. DISCONNECT EXISTING DIRECT
AND REPAIR ANY CRACKS IN EXISTING CHILLER PAD. EXISTING DIRECT
AND CLEAN EXISTING CHILLER PAD. REMOVE EXISTING CHILLER ANCHORS
REMOVE EXISTING CHILLER. EXISTING CHILLER PAD TO REMAIN. INSPECT 3.
INSULATION AND JACKET.
JACKET AND CLEAN EXISTING PIPING AS REQUIRED TO ACCEPT NEW
REMOVE ALL EXISTING EXTERIOR CHILLED WATER PIPING INSULATION AND 2.
EXISTING CHILLED WATER PIPING FROM EXISTING CHILLER.
EXISTING CHILLED WATER PIPING TO REMAIN (TYP.). DISCONNECT 1.
MD102
M E
C H
A N
IC
A L D
E M
O L
IT
IO
N P
L A
N
B U
IL
D
IN
G
G008
G009
G010
G011
G006
GO12
G005
G013
G004
G003
G002
G001
G007
MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1075
PLAN NORTH
8' 16'0 4'
24x12
24x12
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 11:37
IP_PWP:dms28895\puemd103.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
AS INDICATED BY:
KEY NOTES
KEY PLAN
SCHEDULE WITH THE OWNER.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
UNIT.
WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING
WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS
APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS
EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN
REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.
DEHUMIDIFICATION AND COOLING UNIT.
DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.
MECHANICAL UNIT SUPPORT FRAME.
APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING
PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND
REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.
REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.
112.5". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.
MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 129" X
EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.
REMAIN.
EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME TO 2.
UNIT OUTSIDE AIR OPENING TO REMAIN.
EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.
MD103
B U
IL
D
IN
G
M E
C H
A N
IC
A L D
E M
O L
IT
IO
N R
O O
F P
L
ART
H013
WORK/STOR
H015
H016
H014
H017
KILN
H019
H018
MPR
H020
H020B
H020A
H001
CHEM LAB
H021
PREP
H022
H023
H024
H025
SCIENCE LAB
H012
H009
H011
H010
H008
H007
H006
H005
H004
H002
H003
MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1077
2 2
PLAN NORTH
8' 16'0 4'
20x18
26x18 x
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 11:38
IP_PWP:dms28895\puemd104.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
AS INDICATED BY:
KEY NOTES
KEY PLAN
SCHEDULE WITH THE OWNER.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
UNIT.
WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING
WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS
APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS
EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN
REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.
DEHUMIDIFICATION AND COOLING UNIT.
DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.
MECHANICAL UNIT SUPPORT FRAME.
APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING
PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND
REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.
REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.
112.5". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.
MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 129" X
EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.
REMAIN.
EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME TO 2.
UNIT OUTSIDE AIR OPENING TO REMAIN.
EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.
MD104
M E
C H
A N
IC
A L D
E M
O L
IT
IO
N R
O O
F P
L A
N
B U
IL
D
IN
G
J011
J010
J009
J008
J007
J004
J003
J002
J001
J013
J005
J006
J012
MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1083
PLAN NORTH
8' 16'0 4' x1 x1
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 11:38
IP_PWP:dms28895\puemd105.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
AS INDICATED BY:
KEY NOTES
SCHEDULE WITH THE OWNER.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
UNIT.
WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING
WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS
APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS
EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN
REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.
DEHUMIDIFICATION AND COOLING UNIT.
DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.
MECHANICAL UNIT SUPPORT FRAME.
APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING
PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND
REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.
REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.
112.5". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.
MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 129" X
EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.
REMAIN.
EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME TO 2.
UNIT OUTSIDE AIR OPENING TO REMAIN.
EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.
MD105
M E
C H
A N
IC
A L D
E M
O L
IT
IO
N R
O O
F P
L A
N
B U
IL
D
IN
G
B004
DRY STORAGE
B006
COLD STORAGE
B002B
B002A
B003
KITCHEN
B002
B005
B007
B010
B009
LOCKERS
B008
B001
STOR
B1A
B1B
B1C
B1D
LIFT
B027A
B027
B026
B011
STAGE
B012
B016
B015
HALL
B028
B014
MUSIC
B017
B018
PRACTICE
B019
B020
B021
B022
B023
B024
MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1087
PLAN NORTH
8' 16'0 4'
Down
24"x18"
"x
Side View
Side View
12" x 12" 16" x 12"
24" x 12"
24" x 18"
ROOF
"x
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 08:45
IP_PWP:dms28895\puemd106.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
AS INDICATED BY:
KEY NOTES
KEY PLAN
SCHEDULE WITH THE OWNER.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
UNIT.
WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING
WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS
APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS
EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN
REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 7.
EXISTING ROOF MOUNTED EQUIPMENT TO REMAIN.6.
CONNECTED TO EXISTING OUTSIDE AIR DUCT BELOW ROOF TO REMAIN.
EXISTING ROOF MOUNTED DUCT TURNED DOWN THRU ROOF AND 5.
DEHUMIDIFICATION AND COOLING UNIT.
DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.
EXISTING MECHANICAL UNITS SUPPORT FRAME.
FRAME AND APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO
FRAME. PREPARE SURFACE OF EXISTING MECHANICAL UNITS SUPPORT
FRAME. REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNITS SUPPORT
FRAME. REMOVE ANY RUST FROM EXISTING MECHANICAL UNITS SUPPORT
X 114". INSPECT AND CLEAN EXISTING MECHANICAL UNITS SUPPORT
MECHANICAL UNITS SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 184"
EXISTING MECHANICAL UNITS SUPPORT FRAME TO REMAIN. EXISTING 3.
REMAIN.
EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME TO 2.
UNIT OUTSIDE AIR OPENING TO REMAIN.
EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.
MD106
M E
C H
A N
IC
A L D
E M
O L
IT
IO
N R
O O
F P
L A
N
B U
IL
D
IN
G
MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1085
PLAN NORTH
8' 16'0 4'
24x12
24x12
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 11:43
IP_PWP:dms28895\puemd107.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
AS INDICATED BY:
KEY NOTES
KEY PLAN
SCHEDULE WITH THE OWNER.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
UNIT.
WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING
WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS
APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS
EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN
REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.
DEHUMIDIFICATION AND COOLING UNIT.
DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.
MECHANICAL UNIT SUPPORT FRAME.
APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING
PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND
REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.
REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.
112.5". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.
MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 129" X
EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.
REMAIN.
EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME TO 2.
UNIT OUTSIDE AIR OPENING TO REMAIN.
EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.
MD107
M E
C H
A N
IC
A L D
E M
O L
IT
IO
N R
O O
F P
L A
N
B U
IL
D
IN
G
D012
D013
D014
D011
D009
NURSE
D007
D005
REST AREA
D004
D003
D002
D029
BREAKROOM
D027
D026
WORKROOM
D022
D030
D021
D025
VAULT
D023
CONFERENCE
D010
D016
D015
ASST. PRIN.
D017
D031
CLOSET
D032
PRINCIPAL
D018
D020
D019
D008
D006
D001
D028
MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1081
PLAN NORTH
8' 16'0 4' x1 x1 x1
12x12
12x12
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 08:46
IP_PWP:dms28895\puemd108.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
KEY PLAN
KEY NOTES
AS INDICATED BY:
SCHEDULE WITH THE OWNER.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
UNIT.
WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING
WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS
APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS
EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN
REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.
DEHUMIDIFICATION AND COOLING UNIT.
DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.
MECHANICAL UNIT SUPPORT FRAME.
APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING
PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND
REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.
REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.
120". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.
MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 202" X
EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.
CONNECTED TO EXISTING OUTSIDE AIR DUCT BELOW ROOF TO REMAIN.
EXISTING ROOF MOUNTED DUCT TURNED DOWN THRU ROOF AND 2.
CONNECTED TO EXISTING RETURN AIR DUCT BELOW ROOF TO REMAIN.
EXISTING ROOF MOUNTED DUCT TURNED DOWN THRU ROOF AND 1.
MD108
M E
C H
A N
IC
A L D
E M
O L
IT
IO
N R
O O
F P
L A
N
B U
IL
D
IN
G
E008
E009
E010
E011
E007
E006
E005
E013
E004
E003
E002
E001
MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1073
1 2
PLAN NORTH
8' 16'0 4' x1 x1
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 11:44
IP_PWP:dms28895\puemd109.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
AS INDICATED BY:
KEY NOTES
KEY PLAN
SCHEDULE WITH THE OWNER.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
UNIT.
WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING
WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS
APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS
EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN
REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.
DEHUMIDIFICATION AND COOLING UNIT.
DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.
MECHANICAL UNIT SUPPORT FRAME.
APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING
PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND
REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.
REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.
112.5". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.
MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 129" X
EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.
REMAIN.
EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME TO 2.
UNIT OUTSIDE AIR OPENING TO REMAIN.
EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.
MD109
M E
C H
A N
IC
A L D
E M
O L
IT
IO
N R
O O
F P
L A
N
B U
IL
D
IN
G
INFO CENTER
K001
ADMIN/WORK
K010
K009
COMPUTER
K012
INSTRUCTION
K011
K008
K007
K005
K006
SERVER
K003
K013
K004
MECHANICAL DEMOLITION ROOF PLAN - BUILDING 1079
PLAN NORTH
8' 16'0 4' x
20x16
14x14
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 11:47
IP_PWP:dms28895\puemd110.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
KEY PLAN
AS INDICATED BY:
KEY NOTES
SCHEDULE WITH THE OWNER.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
EXISTING SPLIT SYSTEM CONDENSER.
REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS WIRING FROM
CONDENSER PAD. EXISTING DIRECT DIGITAL CONTROLS WIRING TO
CONDENSER ANCHORS AND REPAIR ANY CRACKS IN EXISTING
INSPECT AND CLEAN EXISTING CONDENSER PAD. REMOVE EXISTING
REFRIGERANT. EXISTING SPLIT SYSTEM CONDENSER PAD TO REMAIN.
EXISTING REFRIGERANT PIPING TO REMAIN (TYP.). RECYCLE EXISTING
DISCONNECT AND REMOVE THE EXISTING SPLIT SYSTEM CONDENSER. 7.
EXISTING SPLIT SYSTEM CONDENSER TO REMAIN.6.
UNIT.
WIRING FROM EXISTING PACKAGED DEHUMIDIFICATION AND COOLING
WIRING TO REMAIN. DISCONNECT EXISTING DIRECT DIGITAL CONTROLS
APPROXIMATE WEIGHT OF 3,230 LBS. EXISTING DIRECT DIGITAL CONTROLS
EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT HAS AN
REMOVE EXISTING PACKAGED DEHUMIDIFICATION AND COOLING UNIT. 5.
DEHUMIDIFICATION AND COOLING UNIT.
DISCONNECT EXISTING ROOF MOUNTED DUCT FROM EXISTING PACKAGED 4.
MECHANICAL UNIT SUPPORT FRAME.
APPLY MARINE GRADE EPOXY MULTI-COAT SYSTEM TO EXISTING
PREPARE SURFACE OF EXISTING MECHANICAL UNIT SUPPORT FRAME AND
REPAIR ANY DAMAGE TO EXISTING MECHANICAL UNIT SUPPORT FRAME.
REMOVE ANY RUST FROM EXISTING MECHANICAL UNIT SUPPORT FRAME.
120". INSPECT AND CLEAN EXISTING MECHANICAL UNIT SUPPORT FRAME.
MECHANICAL UNIT SUPPORT FRAME HAS AN APPROXIMATE SIZE OF 240" X
EXISTING MECHANICAL UNIT SUPPORT FRAME TO REMAIN. EXISTING 3.
CONNECTED TO EXISTING OUTSIDE AIR DUCT BELOW ROOF TO REMAIN.
EXISTING ROOF MOUNTED DUCT TURNED DOWN THRU ROOF AND 2.
CONNECTED TO EXISTING OUTSIDE AIR DUCT BELOW ROOF TO REMAIN.
EXISTING 14X12 ROOF MOUNTED DUCT EXTENDED DOWN THRU ROOF AND 1.
MD110
M E
C H
A N
IC
A L D
E M
O L
IT
IO
N R
O O
F P
L A
N
B U
IL
D
IN
G
MECHANICAL PLAN - BUILDING 1085
665 CFM
16x16/R1
665 CFM
16x16/R1
230 CFM
190 CFM
200 CFM
230 CFM
220 CFM EA.
PLAN NORTH
8' 16'0 4'
T
T
T
T
T
T
T
T
VAV-C1
VAV-C2
VAV-C3
VAV-C4
VAV-C7
VAV-C6
VAV-C5
VAV-C8
x6
13x9 x6 x6 x6 x6 x6 x6 x6
12x9 8x x5 x6 x6 x6 x6
13x9 x6 x6 x6 x6
13x9
12x9
11x5
8x x6 x6 x6 x6 x6 x6 x6 x6
14x11
13x9 x6 x6 x6 x6
13x9 x6 x6 x6 x6
13x9
11x6
FD
FD
FD
FD
FD
FD
FD
FD
FD
18x10 x1 x1
26x18
26x14
26x14 x1
18x14 x1
18x10
18x14 x1 x1
12x6
12x8
12x6
12x8
12x6
12x8
12x6
12x8
16x14 x8
12x8
12x10
26x16
26x16 x1 x1
14x12
14x12
14x12
14x12 x1 x1
22x14
22x14
FD
16x12
16x14 x1 x1 x1 x1
20x10
20x16
26x16 x1
26x16 x1
20x10
30x18
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 08:47
IP_PWP:dms28895\puemh101.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
KEY PLAN
KEY NOTES
AS INDICATED BY:
MECHANICAL SYSTEMS (UFGS - 23 07 00).
FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR
DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED D.
INSTALLATION.
SPECIFIED, AND AS REQUIRED TO PROVIDE A VIBRATION-FREE
ALL EQUIPMENT AND DUCTWORK SHALL BE SUPPORTED AS DETAILED, C.
AND AS REQUIRED BY CODE.
OPERATIONAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED,
PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND
CONTRACTOR SHALL PROVIDE ALL MATERIALS AND EQUIPMENT AND B.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
REPLACE ALL EXISTING DUCTWORK INSULATION (TYP.).2.
EXISTING DUCTWORK, VAVS, AND AIR DISTRIBUTION DEVICES (TYP.).1.
MH101
B U
IL
D
IN
G
M E
C H
A N
IC
A L P
L
MECHANICAL PLAN - BUILDING 1071
F003
F002
GYM
F001
F005
F010
OFFICE
F009
LOCKER ROOM
F006
F008
TOILET
F007
F016
F015
LOCKER ROOM
F017
F014
F012
F013
F011
F004
PLAN NORTH
8' 16'0 4'
CHR
CHS
C H
R
C H S
6"
1"
C H
R
C H S
CHR
CHS
CHR
CHS
CHS
CHR
CH-1
CH-2
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 08:47
IP_PWP:dms28895\puemh102.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
KEY PLAN
AS INDICATED BY:
KEY NOTES
NEW PUMPS ON ALL SIDES.
CONCRETE PUMP PADS SHALL BE AT LEAST 6 INCHES LARGER THAN THE
MODIFYING THEM AS NEEDED TO ACCOMMODATE THE NEW PUMPS.
VERIFYING PADS DIMENSIONS ARE ADEQUATE FOR THE NEW PUMPS OR
EXISTING CONCRETE CHILLED WATER PUMP PADS DIMENSIONS AND
REQUIREMENTS. CONTRACTOR IS RESPONSIBLE FOR DETERMINING
CONNECTION TO THE 2 NEW CHILLED WATER PUMPS. FIELD VERIFY EXACT
CHILLED WATER PIPING AND INSULATION AS REQUIRED TO MAKE PROPER
SCHEDULE ON SHEET MH601. CONTRACTOR SHALL MODIFY EXISTING
PCHP-02) AND THEIR ASSOCIATED VFDS. SEE AIR COOLED CHILLER
PROVIDE AND INSTALL 2 NEW CHILLED WATER PUMPS (PCHP-01 AND 4.
LEAST 6 INCHES LARGER THAN THE NEW CHILLER ON ALL SIDES.
ACCOMMODATE THE NEW CHILLER. CONCRETE CHILLER PAD SHALL BE AT
ADEQUATE FOR THE NEW CHILLER OR MODIFYING THEM AS NEEDED TO
CHILLER PAD DIMENSIONS AND VERIFYING PAD DIMENSIONS ARE
CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTING CONCRETE 3.
LONGITUDINAL JOINTS.
AND ALUMINUM JACKET WITH A 0.016 INCH MINIMUM THICKNESS AND
NEW PIPE INSULATION WITH A WEATHER PROOF MEMBRANE AND MASTIC
CHILLED WATER PIPING AND FITTINGS. CONTRACTOR SHALL COVER THE
WITH A MINIMUM 2 INCH THICKNESS ON ALL NEW AND EXISTING EXTERIOR
CONTRACTOR SHALL INSTALL PREFORMED CELLULAR GLASS INSULATION 2.
CONNECTION TO THE NEW CHILLER. FIELD VERIFY EXACT REQUIREMENTS.
EXISTING CHILLED WATER PIPING AS REQUIRED TO MAKE PROPER
EXISTING CHILLED WATER PIPING (TYP.). CONTRACTOR SHALL MODIFY 1.
BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.
ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.
120 PSI.
TESTED FOR A PERIOD OF THREE HOURS, TO A MAXIMUM PRESSURE OF
GROOVED TYPE JOINTS SHALL BE CONSIDERED. ALL PIPING SHALL BE
SCHEDULE 40 (ASTM A53) GRADE B ERB PIPE. FOR EASE OF INSTALLATION,
CHILLED WATER PIPING MODIFICATIONS SHALL UTILIZE CARBON STEEL E.
PAD DETAIL ON SHEET MH501.
CONCRETE AND COMPLY WITH THE REQUIREMENTS OF THE EQUIPMENT
MECHANICAL EQUIPMENT PAD MODIFICATIONS SHALL UTILIZE 3000 PSI D.
INSTALLATION.
ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED AS DETAILED, C.
EXACT SIZE AND LOCATION OF ALL EXISTING EQUIPMENT AND PIPING.
DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF
EXISTING EQUIPMENT AND PIPING LOCATIONS ARE BASED ON AS-BUILT A.
M E
C H
A N
IC
A L P
L A
N
B U
IL
D
IN
G
MH102
MECHANICAL ROOF PLAN - BUILDING 1075
G008
G009
G010
G011
G006
GO12
G005
G013
G004
G003
G002
G001
G007
PLAN NORTH
8' 16'0 4'
24x12
24x12
LDU-G2
LDU-G1
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 11:49
IP_PWP:dms28895\puemh103.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
AS INDICATED BY:
KEY NOTES
KEY PLAN
BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.
ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.
MECHANICAL SYSTEMS (UFGS - 23 07 00).
FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR
DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED E.
MECHANICAL UNIT.
2019, TO SUPPORT A MINIMUM OF THE OPERATING WEIGHT OF THE NEW
CRITERIA - STRUCTURAL ENGINEERING (UFC 3-301-01), REVISED 1 OCT
SHALL MEET THE DESIGN REQUIREMENTS OF UNIFORM FACILITIES
ANY ALTERATION REQUIRED TO THE MECHANICAL UNIT SUPPORT FRAMES D.
INSTALLATION.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
VERIFY EXACT REQUIREMENTS. BALANCE AIR FLOW AS SCHEDULED.
MISSING/REMOVED ROOF MOUNTED DUCTWORK INSULATION. FIELD
INSULATE NEW ROOF MOUNTED DUCTWORK AND REPLACE ALL
MOUNTED DUCTWORK AND REPAIR/REPLACE ANY DAMAGED DUCTWORK.
DEHUMIDIFICATION AND COOLING UNIT. INSPECT ALL EXISTING ROOF
THE PROPER TRANSITION AND CONNECT TO THE NEW PACKAGED
MODIFY EXISTING ROOF MOUNTED DUCTWORK AS REQUIRED TO MAKE 4.
STRUCTURAL NOTES ON SHEET M-001 FOR FURTHER INFORMATION.
NEEDED TO ACCOMMODATE THE NEW UNIT. REFERENCE THE GENERAL
PACKAGED DEHUMIDIFICATION AND COOING UNIT OR MODIFYING THEM AS
AND VERIFYING FRAME DIMENSIONS ARE ADEQUATE FOR THE NEW
RESPONSIBLE FOR DETERMINING EXISTING SUPPORT FRAME DIMENSIONS
EXISTING MECHANICAL UNIT SUPPORT FRAME. CONTRACTOR IS 3.
EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME.2.
UNIT OUTSIDE AIR OPENING.
EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.
B U
IL
D
IN
G
MH103
M E
C H
A N
IC
A L R
O O
F P
L
MECHANICAL ROOF PLAN - BUILDING 1077
ART
H013
H015
H016
H014
H017
KILN
H019
H018
H020
H020B
H020A
H001
H021
H022
H023
H024
H025
H012
H009
H011
H010
H008
H007
H006
H005
H004
H002
H003
2 2
PLAN NORTH
8' 16'0 4'
20x18
26x18
LDU-H1
x
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 11:53
IP_PWP:dms28895\puemh104.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
AS INDICATED BY:
KEY NOTES
KEY PLAN
BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.
ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.
MECHANICAL SYSTEMS (UFGS - 23 07 00).
FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR
DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED E.
MECHANICAL UNIT.
2019, TO SUPPORT A MINIMUM OF THE OPERATING WEIGHT OF THE NEW
CRITERIA - STRUCTURAL ENGINEERING (UFC 3-301-01), REVISED 1 OCT
SHALL MEET THE DESIGN REQUIREMENTS OF UNIFORM FACILITIES
ANY ALTERATION REQUIRED TO THE MECHANICAL UNIT SUPPORT FRAMES D.
INSTALLATION.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
VERIFY EXACT REQUIREMENTS. BALANCE AIR FLOW AS SCHEDULED.
MISSING/REMOVED ROOF MOUNTED DUCTWORK INSULATION. FIELD
INSULATE NEW ROOF MOUNTED DUCTWORK AND REPLACE ALL
MOUNTED DUCTWORK AND REPAIR/REPLACE ANY DAMAGED DUCTWORK.
DEHUMIDIFICATION AND COOLING UNIT. INSPECT ALL EXISTING ROOF
THE PROPER TRANSITION AND CONNECT TO THE NEW PACKAGED
MODIFY EXISTING ROOF MOUNTED DUCTWORK AS REQUIRED TO MAKE 4.
STRUCTURAL NOTES ON SHEET M-001 FOR FURTHER INFORMATION.
NEEDED TO ACCOMMODATE THE NEW UNIT. REFERENCE THE GENERAL
PACKAGED DEHUMIDIFICATION AND COOING UNIT OR MODIFYING THEM AS
AND VERIFYING FRAME DIMENSIONS ARE ADEQUATE FOR THE NEW
RESPONSIBLE FOR DETERMINING EXISTING SUPPORT FRAME DIMENSIONS
EXISTING MECHANICAL UNIT SUPPORT FRAME. CONTRACTOR IS 3.
EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME.2.
UNIT OUTSIDE AIR OPENING.
EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.
MH104
M E
C H
A N
IC
A L R
O O
F P
L A
N
B U
IL
D
IN
G
MECHANICAL ROOF PLAN - BUILDING 1083
J011
J010
J009
J008
J007
J004
J003
J002
J001
J013
J005
J006
J012
PLAN NORTH
8' 16'0 4' x1 x1
LDU-J1
LDU-J2
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 11:55
IP_PWP:dms28895\puemh105.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
AS INDICATED BY:
KEY NOTES
BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.
ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.
MECHANICAL SYSTEMS (UFGS - 23 07 00).
FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR
DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED E.
MECHANICAL UNIT.
2019, TO SUPPORT A MINIMUM OF THE OPERATING WEIGHT OF THE NEW
CRITERIA - STRUCTURAL ENGINEERING (UFC 3-301-01), REVISED 1 OCT
SHALL MEET THE DESIGN REQUIREMENTS OF UNIFORM FACILITIES
ANY ALTERATION REQUIRED TO THE MECHANICAL UNIT SUPPORT FRAMES D.
INSTALLATION.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
VERIFY EXACT REQUIREMENTS. BALANCE AIR FLOW AS SCHEDULED.
MISSING/REMOVED ROOF MOUNTED DUCTWORK INSULATION. FIELD
INSULATE NEW ROOF MOUNTED DUCTWORK AND REPLACE ALL
MOUNTED DUCTWORK AND REPAIR/REPLACE ANY DAMAGED DUCTWORK.
DEHUMIDIFICATION AND COOLING UNIT. INSPECT ALL EXISTING ROOF
THE PROPER TRANSITION AND CONNECT TO THE NEW PACKAGED
MODIFY EXISTING ROOF MOUNTED DUCTWORK AS REQUIRED TO MAKE 4.
STRUCTURAL NOTES ON SHEET M-001 FOR FURTHER INFORMATION.
NEEDED TO ACCOMMODATE THE NEW UNIT. REFERENCE THE GENERAL
PACKAGED DEHUMIDIFICATION AND COOING UNIT OR MODIFYING THEM AS
AND VERIFYING FRAME DIMENSIONS ARE ADEQUATE FOR THE NEW
RESPONSIBLE FOR DETERMINING EXISTING SUPPORT FRAME DIMENSIONS
EXISTING MECHANICAL UNIT SUPPORT FRAME. CONTRACTOR IS 3.
EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME.2.
UNIT OUTSIDE AIR OPENING.
EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.
MH105
M E
C H
A N
IC
A L R
O O
F P
L A
N
B U
IL
D
IN
G
MECHANICAL ROOF PLAN - BUILDING 1087
B004
DRY STORAGE
B006
B002B
B002A
B003
KITCHEN
B002
B005
B007
B010
B009
LOCKERS
B008
B001
B1A
B1B
B1C
B1D
LIFT
B027A
B027
B026
B011
STAGE
B012
B016
B015
B028
B014
MUSIC
B017
B018
B019
B020
B021
B022
B023
B024
PLAN NORTH
8' 16'0 4'
Down
24"x12"
"x
Side View
LDU-B2 LDU-B1
Side View
12" x 12" 16" x 12"
24" x 12"
24" x 18"
ROOF
"x
24"x18"
"x
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 08:48
IP_PWP:dms28895\puemh106.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
AS INDICATED BY:
KEY NOTES
KEY PLAN
BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.
ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.
MECHANICAL SYSTEMS (UFGS - 23 07 00).
FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR
DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED E.
MECHANICAL UNIT.
2019, TO SUPPORT A MINIMUM OF THE OPERATING WEIGHT OF THE NEW
CRITERIA - STRUCTURAL ENGINEERING (UFC 3-301-01), REVISED 1 OCT
SHALL MEET THE DESIGN REQUIREMENTS OF UNIFORM FACILITIES
ANY ALTERATION REQUIRED TO THE MECHANICAL UNIT SUPPORT FRAMES D.
INSTALLATION.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
EXISTING ROOF MOUNTED EQUIPMENT.6.
CONNECTED TO EXISTING OUTSIDE AIR DUCT BELOW ROOF.
EXISTING ROOF MOUNTED DUCT TURNED DOWN THRU ROOF AND 5.
VERIFY EXACT REQUIREMENTS. BALANCE AIR FLOW AS SCHEDULED.
MISSING/REMOVED ROOF MOUNTED DUCTWORK INSULATION. FIELD
INSULATE NEW ROOF MOUNTED DUCTWORK AND REPLACE ALL
MOUNTED DUCTWORK AND REPAIR/REPLACE ANY DAMGED DUCTWORK.
DEHUMIDIFICATION AND COOLING UNIT. INSPECT ALL EXISTING ROOF
THE PROPER TRANSITION AND CONNECT TO THE NEW PACKAGED
MODIFY EXISTING ROOF MOUNTED DUCTWORK AS REQUIRED TO MAKE 4.
INFORMATION.
GENERAL STRUCTURAL NOTES ON SHEET M-001 FOR FURTHER
AS NEEDED TO ACCOMMODATE THE NEW UNITS. REFERENCE THE
PACKAGED DEHUMIDIFICATION AND COOING UNITS OR MODIFYING THEM
AND VERIFYING FRAME DIMENSIONS ARE ADEQUATE FOR THE NEW
RESPONSIBLE FOR DETERMINING EXISTING SUPPORT FRAME DIMENSIONS
EXISTING MECHANICAL UNITS SUPPORT FRAME. CONTRACTOR IS 3.
EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME.2.
UNIT OUTSIDE AIR OPENING.
EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.
MH106
M E
C H
A N
IC
A L R
O O
F P
L A
N
B U
IL
D
IN
G
MECHANICAL ROOF PLAN - BUILDING 1085
PLAN NORTH
8' 16'0 4'
24x12
24x12
LDU-C2
LDU-C1
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 11:58
IP_PWP:dms28895\puemh107.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
AS INDICATED BY:
KEY NOTES
KEY PLAN
BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.
ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.
MECHANICAL SYSTEMS (UFGS - 23 07 00).
FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR
DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED E.
MECHANICAL UNIT.
2019, TO SUPPORT A MINIMUM OF THE OPERATING WEIGHT OF THE NEW
CRITERIA - STRUCTURAL ENGINEERING (UFC 3-301-01), REVISED 1 OCT
SHALL MEET THE DESIGN REQUIREMENTS OF UNIFORM FACILITIES
ANY ALTERATION REQUIRED TO THE MECHANICAL UNIT SUPPORT FRAMES D.
INSTALLATION.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
VERIFY EXACT REQUIREMENTS. BALANCE AIR FLOW AS SCHEDULED.
MISSING/REMOVED ROOF MOUNTED DUCTWORK INSULATION. FIELD
INSULATE NEW ROOF MOUNTED DUCTWORK AND REPLACE ALL
MOUNTED DUCTWORK AND REPAIR/REPLACE ANY DAMAGED DUCTWORK.
DEHUMIDIFICATION AND COOLING UNIT. INSPECT ALL EXISTING ROOF
THE PROPER TRANSITION AND CONNECT TO THE NEW PACKAGED
MODIFY EXISTING ROOF MOUNTED DUCTWORK AS REQUIRED TO MAKE 4.
STRUCTURAL NOTES ON SHEET M-001 FOR FURTHER INFORMATION.
NEEDED TO ACCOMMODATE THE NEW UNIT. REFERENCE THE GENERAL
PACKAGED DEHUMIDIFICATION AND COOING UNIT OR MODIFYING THEM AS
AND VERIFYING FRAME DIMENSIONS ARE ADEQUATE FOR THE NEW
RESPONSIBLE FOR DETERMINING EXISTING SUPPORT FRAME DIMENSIONS
EXISTING MECHANICAL UNIT SUPPORT FRAME. CONTRACTOR IS 3.
EXISTING AIR HANDLING UNIT AND MECHANICAL UNIT SUPPORT FRAME.2.
UNIT OUTSIDE AIR OPENING.
EXISTING ROOF MOUNTED DUCT CONNECTED TO EXISTING AIR HANDLING 1.
MH107
M E
C H
A N
IC
A L R
O O
F P
L A
N
B U
IL
D
IN
G
MECHANICAL ROOF PLAN - BUILDING 1081
D012
D013
D014
D011
D009
NURSE
D007
D005
REST AREA
D004
D003
D002
D029
BREAKROOM
D027
D026
WORKROOM
D022
D030
D021
D025
VAULT
D023
CONFERENCE
D010
D016
D015
ASST. PRIN.
D017
D031
D032
PRINCIPAL
D018
D020
D019
D008
D006
D001
D028
4 4
PLAN NORTH
8' 16'0 4'
LDU-D1
x1 x1 x1
12x12
12x12
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
R
Y E
A R
W O
O D
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps k6enxjlh
11-AUG-2022 08:48
IP_PWP:dms28895\puemh108.dgn
C A
T E
G O
R Y C
O
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D E
S C
R
IP
T
IO
N
S A
V A
N N
A H D
IS
T R
IC
T
W
O G
L E
T H
O R
P E A
V E
S A
V A
N N
A H
G A
S
B A
R B
IN
A
K
D
IX
O N
R
Y E
A R
W O
O D
F O
R T B
U C
H A
N A
N P
U E
R T
O R
IC
O
A N
T
IL
L E
S S
C H
O O
L H
V A
C R
E P
N O
N E
READY TO ADVERTISE (RTA)
W
H N -2
-B -4
A U
G U
S T
GENERAL NOTES
KEY PLAN
KEY NOTES
AS INDICATED BY:
BE APPLIED TO ALL NEW OUTDOOR HVAC EQUIPMENT.
ADSIL'S MICROGUARD CORROSION PROTECTION, OR EQUIVALENT SHALL F.
MECHANICAL SYSTEMS (UFGS - 23 07 00).
FACILITIES GUIDE SPECIFICATION - THERMAL INSULATION FOR
DUCTWORK INSULATION SHALL MEET THE REQUIREMENTS OF UNIFIED E.
MECHANICAL UNIT.
2019, TO SUPPORT A MINIMUM OF THE OPERATING WEIGHT OF THE NEW
CRITERIA - STRUCTURAL ENGINEERING (UFC 3-301-01), REVISED 1 OCT
SHALL MEET THE DESIGN REQUIREMENTS OF UNIFORM FACILITIES
ANY ALTERATION REQUIRED TO THE MECHANICAL UNIT SUPPORT FRAMES D.
INSTALLATION.
AS-BUILT DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING EQUIPMENT AND DUCTWORK LOCATIONS ARE BASED ON A.
VERIFY EXACT REQUIREMENTS. BALANCE AIR FLOW AS SCHEDULED.
MISSING/REMOVED ROOF MOUNTED DUCTWORK INSULATION. FIELD
INSULATE NEW ROOF MOUNTED DUCTWORK AND REPLACE ALL
MOUNTED DUCTWORK AND REPAIR/REPLACE ANY DAMAGED DUCTWORK.
DEHUMIDIFICATION AND COOLING UNIT.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .