This federal contract amendment modifies the solicitation to repair school buildings at Maxwell Air Force Base. The U.S. Army Corps of Engineers seeks to award a firm-fixed-price construction contract valued at $10 million to repair existing school buildings at Maxwell Elementary-Middle School. The work includes replacing fire alarms, HVAC systems, flooring, lighting, ceilings, roofs, and repairs to two restrooms and a corridor. The period of performance is 420 days with an option to extend 120 additional days.

View the file

Other files

File Type Posted
C.04 - Bid Abstract (signed) - W912HN22B4009.pdf PDF
B.08- Solicitation AMD 5 (Conformed) - W912HN22B4009_Repair School Bldgs Maxwell.pdf PDF
B.08- Solicitation AMD 4-(SF30) - W912HN22B4009_Repair School Bldgs Maxwell.pdf PDF
B.08- Solicitation AMD 4 (Conformed) - W912HN22B4009_Repair School Bldgs Maxwell.pdf PDF
W912HN-B-4009_FIO_AS-BUILTS.pdf PDF
W912HN-B-4009_DRAWINGS_AMD3.pdf PDF
B.08- Solicitation AMD 3 (SF30) - W912HN22B4009_Repair School Bldgs Maxwell.pdf PDF
B.08- Solicitation AMD 3(Conformed) - W912HN22B4009_Repair School Bldgs Maxwell.pdf PDF
W912HN-22-B-4009_SPECS_VOL1_AMD2.pdf PDF
B.08- Solicitation AMD 2 (Conformed) - W912HN22B4009_Repair School Bldgs Maxwell.pdf PDF
B.08- Solicitation AMD 2 (SF30) - W912HN22B4009_Repair School Bldgs Maxwell.pdf PDF
W912HN-22-B-4009_SPECS_VOL2_AMD2.pdf PDF
W912HN-B-4009_DRAWINGS_AMD2.pdf PDF
W912HN-22-B-4009_SPECS_VOL1_AMD1.pdf PDF
B.08- Solicitation AMD 1 (SF30) - W912HN22B4009_Repair School Bldgs Maxwell.pdf PDF
B.08- Solicitation AMD 1 (Conformed) - W912HN22B4009_Repair School Bldgs Maxwell.pdf PDF
W912HN-B-4009_DRAWINGS_AMD1.pdf PDF
W912HN22B4009 - Site Visit 20220802.pdf PDF
W912HN-22-B-4009_SPECS_VOL2 (1).pdf PDF
B.08- Solicitation (Released) - W912HN22B4009_Repair School Bldgs Maxwell.pdf PDF
W912HN-B-4009_DRAWINGS.pdf PDF
W912HN-22-B-4009_SPECS_VOL1 (1).pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to change CLIN 0003 to read and Building 538A East and Building 538A.1 (Zone 4) as indicated in the plans and specifications.

All other terms and conditions herein remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN22B4009

X 9B. DATED (SEE ITEM 11)

26-Jul-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Aug-2022

CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN22B4009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

CLIN 0002

The CLIN extended description has changed from:

Re Roof Work includes all demolition, preparation, repair and construction work required for the re-roof of Buildings 538A and 538A1 ( Zones 1,2 and 3) as indicated in the plans and specifications.

To:

Re Roof Work includes all demolition, preparation, repair and construction work required for the re-roof of Buildings 538A and 538A.1 ( Zones 1,2 and 3) as indicated in the plans and specifications.

CLIN 0003

Substainment , Restoration and Maintenance of select restroom and circulation area including all selective demolition and construction work required for the renovation of Building 538A East and Buidling 538( Zone 4) as indicated in the plans and specifications.

Substainment , Restoration and Maintenance of select restroom and circulation area including all selective demolition and construction work required for the renovation of Building 538A East and Buidling 538A.1( Zone 4) as indicated in the plans and specifications.

CLIN 0004

Sustainment, restoration and Maintenance of Maxwell Elementary/Middle School Facility includes all selective demolition and construction work required for the renovation of Building 538A East and Building 538A1 (zone2) as indicated in the plans and specifications.

Sustainment, restoration and Maintenance of Maxwell Elementary/Middle School Facility includes all selective demolition and construction work required for the renovation of Building 538A East and Building 538A.1 (zone2)

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

CONTRACT LINE ITEM SCHEDULE

OFFEROR'S NAME: ___________________________________________________________________

CONTRACT LINE ITEM SCHEDULE

Estimate Item No. Description of Item Quantity Unit Amount

0001 Base Bid - Sustainment, Restoration and Maintenance of Maxwell Elementary/ Middle School Facility 1 Job $_____________ includes all selective demolition and construction work required for the renovation of Building 538A West (Zone 1 and 3)

Complete.

0002 Base Bid - Re-Roof Work includes all demolition, 1 Job $ _ preparation, repair and construction work required for the re-roof of Buildings 538A and 538A.1 (Zones 1, 2 and 3) as indicated in the plans and specifications.

0003 Base Bid – Sustainment, Restoration and Maintenance 1 Job $ _ of select restroom and circulation area including including all selective demolition and construction work required for the renovation of Building 538A East and Building 538A.1 (Zone 4) as indicated in the plans and specifications.

Complete.

0004 Option 1 - Sustainment, Restoration and Maintenance of Maxwell Elementary/ Middle School Facility 1 Job $_____________ includes all selective demolition and construction work required for the renovation of Building 538A East and Building 538A.1 (Zone 2) as indicated in the plans and specifications.

Contract Duration: 420 days

Option will be exercised in accordance with FAR 52.217-7 Option for Increased Quantity-Separately Priced Line Item. CLIN 0004, Option 1 may be exercised by written notice to the Contractor within 120 calendar days after issuance of the Notice to Proceed. If Option 1 is exercised, period of performance will be extended by 120 calendar days. Total period of performance if option is exercised is not to exceed 540 calendar days.

Total Amount for Base CLINs 0001 - 0003 $_____________

Total Amount for Option CLIN 0004 $_____________

Total Amount for Base and Option CLINs 0001-00004 $_____________

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so will disqualify the Offer.

NOTE NO. 3. All the extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

NOTE NO. 4. If any or all Options are exercised, the contract completion date will be extended by 120 days, not to exceed 540 calendar days.

END OF CLIN SCHEDULE

(End of Summary of Changes)

File details come from the government source that posted it. Updated .