W912HN-22-B-4009_SPECS_VOL1 (1).pdf
PDF 4 MB Posted
- Solicitation number
- W912HN22B4009
About this file
This document describes a federal construction contract opportunity. The U.S. Army Corps of Engineers, Savannah District is soliciting bids for a firm fixed-price contract valued at $10 million to repair Maxwell Elementary-Middle School Buildings at Maxwell Air Force Base in Alabama. The scope of work involves replacing fire alarm and mass notification systems, HVAC systems, flooring, lighting, acoustic ceilings, and roofing at Buildings 538A and 538A1. It also includes painting walls and incidental repairs to two restrooms and a corridor in Building 538B. The school provides educational services for military dependents living on Maxwell AFB and is part of the Georgia/Alabama Community under the Defense Education Activity Americas.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maxwell Air Force Base, Alabama
Solicitation Number
W912HN-22-B-4009
Maxwell Elementary / Middle School Renovation Volume 1 of 2: Specifications Divisions 00 - 14 June 2022
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps Of Engineers Savannah District
MAXWELL
ELEMENTARY / MIDDLE SCHOOL
RTA (READY TO ADVERTISE)
TECHNICAL SPECIFICATIONS
JUNE 24TH, 2022
AT MAXWELL AIR FORCE BASE, AL
Volume 1 of 2 Divisions 00 - 14
Maxwell Elementary / Middle School Renovation 22B4009 Maxwell Air Force Base, Alabama
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 11 00.01 CONSTRUCTION TRAFFIC CIRCULATION AND LOGISTICS MAINTENANCE
PLANS
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 00.01 AUTHORITY TO CONNECT (ATC) COVER SHEET
01 33 00.02 AUTHORITY TO CONNECT (ATC) QUESTIONNAIRE
01 33 00.03 2021 DODEA APPROVED SOFTWARE LIST (ASL)
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 91 00.00 37 COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 42 51 CARPET REMOVAL AND RECLAMATION
02 82 00 ASBESTOS REMEDIATION
02 82 00.01 ACM SUMMARY TABLE
02 82 00.02 RESPONSE ACTION AND SETUP SHEETS
02 82 00.03 AHERA ASBESTOS MANAGEMENT PLAN
02 82 00.04 ACM REPORT (2015)
02 82 00.05 HAZARDOUS BUILDING MATERIALS SURVEY (2015)
02 82 01 INDIVIDUAL WORK TASK DATA ELEMENTS
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 51 13 CEMENTITIOUS WOOD FIBER DECKS
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
PROJECT TABLE OF CONTENTS Page 1
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 72 00 DECORATIVE METAL SPECIALTIES
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 16 16 CRYSTALLINE WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 71 00 DOOR HARDWARE
08 71 00.01 DOOR HARDWARE GROUPS
DI VI SI ON 09 - FI NI SHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 CEMENT STUCCO
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WINDOW SHADES
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
PROJECT TABLE OF CONTENTS Page 2
22 07 19.00 40 PLUMBING PIPING INSULATION
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 20 FACILITY GAS PIPING
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 31 13.00 40 METAL DUCTS
23 34 23.00 40 HVAC POWER VENTILATORS
23 36 00.00 40 AIR TERMINAL UNITS
23 41 13.00 40 PANEL FILTERS
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23 82 16.00 40 AIR COILS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND
INTEGRATION
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19.00 10 INSULATED WIRE AND CABLE
26 05 71.00 40 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 INTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 23 INTERCOMMUNICATION SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
PROJECT TABLE OF CONTENTS Page 3
APPENDICIES
APPENDIX A STANDARD FORMS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
Contract drawings are as defined in the Index sheets of the Drawings
1.3 SUPPLEMENTARY DRAWINGS
These supplementary drawings may not be a part of the contract but are included with the drawings for information.
1.3.1 Reference Drawings
Reference drawings are intended only to show the original construction.
Drawings are the property of the Government and shall not be used for any purpose other than that intended by the contract. The drawings are full size an d are available at the bidder's or Contractor's expense.
Information on procuring these full-size drawings may be obtained from the Contracting Officer. Full size drawings may be inspected during regular working hours at the station.
-- End of Document --
00 01 15
THIS PAGE INTENTIONALLY LEFT BLANK
00 01 15
SECTION 01 00 00
ADDITIONAL SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
Contractor to take special note of Sections 01 11 00 Summary of Work.
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
a. The Contractor shall be required to commence work under this contract within 8 calendar days after the date the Contractor receives the notice to proceed and to prosecute the work diligently, and to complete the construction ready for use not later than the times set forth in Section 01 10 00 Summary of Work. The times stated for completion shall include final clean-up of the premises.
b. Provisions stipulated for conducting test on heating and air conditioning systems and planting and maintenance of grass are excluded from the completion times stated above.
1.2 LIQUIDATED DAMAGES--CONSTRUCTION
(a) If the Contractor fails to complete the work within the time specified in the contract phasing schedule, the Contractor shall pay liquidated damages to the Government in the amount of $2,748.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed.
These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
1.3 SPECIAL CONSTRUCTION PROCEDURES
This clause applies to the construction of the buildings only. Following receipt of approval for all color and finish selections from the Contracting Officer's Representative, the Contractor shall completely mock-up one typical room unit to include; a classroom studio, closets, rest room and vanity area with all approved finish materials. These finish materials shall include all wall covering, paint, floor coverings, trim, doors, hardware, woodwork, cabinetry, countertops, glass, electrical, mechanical, and plumbing fixtures as called for in the contract. If mock-up is not approved by the Contracting Officer's Representative, the Government will indicate acceptance of the quality of the finishes prior to permitting the Contractor to complete the remainder of the units. The Contractor shall maintain the level of quality approved for the typical room unit throughout the project.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
01 00 00
SD-01 Preconstruction Submittals
Electronic Mail System Plan ; G, Hazard Analysis G, SD-02 Shop Drawings
Shop Drawings ; G, Equipment Layout ; G, SD-07 Certificates
Requuest For Interruption of Utility Services ; G, Asbestos and Lead Based Paint Certification Letter ; G.
Certificates of Compliance ; G.
Equipment List ; G.
SD-10 Operation and Maintenance Data
Manuals ; G, Equipment List ; G
SD-11 Closeout Submittals
As-built Drawings (Mylar and Electronic Files) ; G,
1.5 CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS
a) The Contractor will be furnished one CD-ROM containing a reproducible copy of the advertised solicitation, including contract clauses, plans and specifications. The work shall conform to the specifications and the contract drawings listed in the technical provisions.
b) Omissions from the drawings or specifications, the mis-description of details of work which are manifestly necessary to carry out the intent of the drawings and specifications which are customarily performed shall not relieve the Contractor from performing such omitted or mis-described details of the work but they shall be performed as if fully and correctly set forth and described in the drawings and specifications.
c) The Contractor shall check all drawings furnished him immediately upon their receipt and shall promptly notify the Contracting Officer's Representative of any discrepancies. Figures marked on drawings shall in general be followed in preference to scale measurements. Large scale drawings shall in general govern small scale drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby.
d)Any schedules included in the drawings are for the purpose of defining requirements other than quantities.
NOTE: Refer to the folio of drawings for the index of drawings in this solicitation.
1.6 PHYSICAL DATA
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
a. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys.
b. Weather Conditions. The location is subject to atmospheric temperature ranging from minus 5 degrees to plus 107 degrees F. as determined from U.S. Weather Bureau Station at Montgomery, Alabama. The mean annual precipitation at Montgomery, Alabama, is 51.56 inches and the mean monthly precipitation varies from a low of 2.29 inches in October to a high of 6.31 inches in March.
c. Transportation facilities.
i) Railroads: Maxwell Air Force Base is served by a spur line of the Illinois Central Gulf Railroad which connects with the Western Railway of Alabama, the Seaboard System Railroad, Central of Georgia, and the Seaboard Coastline Railroads. The Contractor shall investigate the availability of sidings and shall make all arrangements for the use of any sidings for the delivery of any material and equipment to be used in the work.
ii) Highways: Maxwell Air Force Base is served by U.S. Highway 31 and paved connection to U. S. Highway 80. The City of Montgomery on the outskirts of which the site is located, is served by U. S. Highways 31, 80, and 231 and State Highways 9, 11, and 45. The Contractor shall make his own investigation of available roads for transportation, load limits for roads and bridges, and other road and bridge conditions affecting the transportation of materials and equipment to the site of the work.
1.7 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
a. This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the contract clause entitled "Default: (Fixed Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
b. The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
c. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
d. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
5 5 6 5 4 5 7 4 4 3 5 5
e. Upon acknowledgement of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally schedule work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.
f. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph 2, above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the Contract Clause entitled "Default (Fixed Price Construction)".
1.8 HAZARD ANALYSIS PLAN
A hazard analysis plan, as described in Section 1, Article 01.A.05 of the Corps of Engineers Safety and Health Requirements Manual, EM 385 1 1, latest edition, is required for this contract. Refere to Section 01 35 26 for additional clarification and requirements.
1.9 ELECTRONIC INTERFACE
a. The Contractor shall utilize an Open Database Connectivity (ODBC) compliant construction management software package such as WORKSITE (available from Advanced Services Technology, Birmingham, Alabama) to manage a database for the following items as a minimum:
i) Quality Control Testing
ii) Quality Control Inspections
iii) Correspondence and RFI tracking
iv) Submittal Register
b. These four items are a minimum. Additional contract information may also be required to be shared in the same manner. The contractor shall make such database available for access by the Corps of Engineers and others through the internet. Such access must be to the actual database in use by the contractor so that real time data is always available for review. This requirement for electronic sharing of information does not negate any requirement contained elsewhere in this specification for submission of hard copy reports and data to the Government.
c. The Contractor shall also provide software as necessary to view his database through the internet from various remote locations. Such capability must be provided at the Resident Engineer Office at Maxwell AFB, the Area Engineer Office at Fort Rucker, at the District Office in Mobile, AL, and the Base Civil Engineer Office at Maxwell. All of these locations currently have access to the internet. Contractor may provide this capability of viewing data over the internet by providing copies of the same software he is using at the remote locations or other means approved by the Contracting Officer. Access must be set up at each location to allow data to be viewed by mere click of an icon on the various workstations.
1.10 SCHEDULE OF AVAILABLE UTILITIES
The Government will make available at no cost to the Contractor, electricity and water from existing distribution lines, outlets and supplies. It shall be the Contractor's responsibility to install and maintain all necessary temporary connections and distribution lines for his own use. Any other required utilities shall be furnished by the Contractor in accordance with Section 01 50 00 paragraph entitled "Availability and Use of Utility Services."
1.11 INTERRUPTION OF UTILITY SERVICES
Planned interruptions of utility services (electrical power, water, natural gas, etc.) shall be detailed and coordinated by the Contractor.
Requests for interruptions which will involve base facilities other than in this contract shall be submitted in writing by the Contractor to the Contracting Officer at least 10 (ten) working days before the planned outage. If the outage affects only the facility in this contract, the request shall be submitted at least 3 (three) working days before the planned outage.
Contractor shall not interrupt service(s) until approval has been granted. Requests shall include facility/facilities affected, date of scheduled outage, and duration. Requests for interruption of service(s) will not be approved until all equipment and materials required for that particular phase of work are on the job site. Interruptions will be granted Monday through Friday for the following times: 7:15 A.M. until 11:00 A.M. and 12:30 P.M. until 4:00 P.M. If weekend (Saturday and Sunday) outages are required or are preferred, they shall be coordinated as specified above.. Service to maintain the operations of the existing School is to remain under full operation at all times school is in session. Refer to section 01 14 00 for additional requirements.
1.12 BULLETIN BOARD
Immediately upon beginning of work under this contract, the Contractor shall provide at the job site a weatherproof glass-covered bulletin board for displaying the fair employment poster, wage rates, and safety bulletins and posters. Emergency telephone numbers and reporting instructions for ambulance, physician, hospital, fire and police shall be posted. The bulletin board shall be located in a conspicuous place easily accessible to all and legible copies of the aforementioned data shall be displayed until work under the contract is completed. No direct payment will be made for the bulletin board.
1.13 ROAD CLOSURES
Planned road closures shall be detailed and coordinated by the Contractor.
Requests for road closures shall be submitted in writing by the Contractor to the Contracting Officer's Representative at least 10 (ten) working days before the planned closure. When it becomes necessary to close roads for construction, the contractor shall immediately put in place the necessary signs and barricades required. All traffic control devices (signs, barricades, pavement markings, traffic signals, intersection control beacons, delineators, etc.) shall conform to the FHWA Manual on Uniform Traffic Control Devices and the FHWA publication Standard Highway Signs, most current edition. These include but are not limited to begin/end construction signs, standard traffic control signs including clearly marked detours and barricades with yellow flashing caution lights. Hand painted plywood signs (or other materials) are not allowed or acceptable.
Upon completion of road work, all signs and barricades shall be immediately removed and all normal traffic control devices and signs returned to their original condition. Signs and barricades shall not be left along sides of roadways.
1.14 CONTRACTOR PREPARED AS-BUILT DRAWINGS
a. General.
In accordance with SPECIAL CONTRACT REQUIREMENT paragraph: CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS, the Government will furnish the Contractor on CD ROM one electronic set of solicitation drawing files and any amendments for use in preparation of as-built drawings by the Contractor. Copies of the drawings will be the responsibility of the Contractor. The as-built drawings shall be a record of the construction as installed and completed by the Contractor. They shall include all the information shown on the contract set of drawings and a record of all deviations, modifications, or changes from those drawings, however minor, which were incorporated in the work, all additional work not appearing on the contract drawings, and all changes which are made after final inspection of the contract work. In the event the Contractor accomplishes additional work which changes the as-built conditions of the facility after submission of the as-built drawings, the Contractor shall furnish revised and/or additional drawings as required to depict as-built conditions. The requirements for these additional drawings will be the same as for the as-built drawings included in the original submittal.
b. Red line as-built drawings.
The Contractor shall have on his staff, personnel to mark up a set of paper copy construction drawings to show the as-built conditions. These as-built marked copies shall be kept current and available on the job site at all times. All changes from the contract plans which are made in the work or additional information which might be uncovered in the course of construction shall be accurately and neatly recorded, as the events occur, by means of details and notes. The Contractor shall call attention to entries by redlining areas affected. The red line as-built will be jointly inspected for accuracy and completeness by the Contracting Officer's representative and a responsible representative of the Contractor prior to submittal of each request for payment. The Contracting Officer's approval of the current status of the as-built drawings shall be a prerequisite to the Contracting Officer's approval of request for progress payment and request for final payment under the contract. The drawings shall show the following information, but not be limited thereto:
i) The location and description of any utility lines or other installations of any kind or description known to exist within the construction area. The location includes dimensions to permanent features.
ii) The location and dimensions of any changes within the building or structures.
iii) Correct grade or alignment of roads, structures or utilities if any changes were made from contract plans.
iv) Changes in details of design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor including but not limited to fabrication, erection, installation plans and placing details, pipe sizes, insulation material, dimensions of equipment foundations, etc.
v) All changes or modifications which result from the final inspection.
1) Options: Where contract drawings or specifications allow options, only the option selected for construction shall be shown on the as-built drawings.
2) Extensions of Design: Shop Drawings such as structural fabrication and erection drawings, fire alarm systems, and sprinkler systems that will require extensive redrafting effort in order to create a electronic set will not be required to be incorporated into the electronic set. They will be included as an Appendix to the paper copy set.
c. Submittal of as-built drawings for review and approval.
The Contractor shall participate in monthly review meetings with the Contracting Officer to show the progress made the preceding month and make all required changes. At time of final construction inspection, the Contractor shall submit one copy of the red lined as-built drawings to the Contracting Officer for his review and approval. The as-built drawings shall be certified as to their correctness by the signature of an authorized representative of the Contractor. Upon Government approval of the Contractor's redlined copy of the as-built drawings, the Contractor shall prepare and provide two electronic sets of as-built drawings by incorporating the red line marked up notations on the construction drawings into the electronic set of solicitation drawings and amendments.
In addition to the electronic sets of as-built drawings which shall be submitted on a CD-ROM, the Contractor shall also submit a full size set of as-built paper drawings. Submittals are to be to the Contracting Officer not later than ten (10) calendar days after project completion date.
d. Final Drawing Format.
i) The solicitation drawing files and any amendments thereto will be furnished to the Contractor in electronic format. The solicitation drawing files have been prepared in AutoCadd format. The drawing file indicates the format which the drawing was developed. The Contractor shall utilize the latest version of AutoCadd to revise/redraft each solicitation drawing and/or amendment drawing to reflect all changes made during construction as indicated by the red line marked up notations on the construction drawings. Revisions/redrafting shall match the font styles, sizes, and formats; line weights/thicknesses and styles/types; and all other drafting elements used on the solicitation drawing/amendments.
All elements must be incorporated into each as-built drawing file; the use of reference files shall not be permitted.
ii) All revisions made to the solicitation drawings and/or amendment drawings to reflect changes made during construction shall be flagged and shall have the revision block completed as follows. The entry in the description column of the revision block shall read "AS-BUILT". The date of the revision and one approving initial from a responsible person within the Contractor's Firm shall also be included in the revision block. Above the drawing title block the drawing will be labeled in bold letters "AS-BUILT". The flagged changes and revision block format shall be in accordance with the examples shown in the Mobile District Design Manual located on the Internet at http://www.sam.usace.army.mil/sam/en/guides/DesMan/desman.htm. The Contractor shall also furnish a revised index of drawings to match the actual design drawings. The drawing title blocks shall be in a uniform format to match the requirements as specified in the Design Manual.
iii) The two electronic sets of as-built drawing files shall be submitted in AutoCadd format.
iv) The hard copy reproducible set of as-built drawings shall be submitted unbound on paper. The drawings shall be the full size.
e. Payment. No separate payment will be made for the as-built drawings required under this contract, and all costs in connection there-with will be considered a subsidiary obligation of the Contract.
1.15 AIR FORCE PROJECT SIGN
The Contractor shall furnish and install a project sign at the location designated by the Contracting Officer within 30 days after notice to proceed. The sign shall be constructed with a face sheet of 1/2-inch thick, grade A-C, exterior plywood mounted on a substantial framework of treated wood, sized and detailed as shown on Figure 4E, Erection Details, bound herein. Lettering, color, and paint shall conform to the details shown in the Construction Sign figure, bound herein. The sign shall receive one coat of primer paint followed by 2 coats of gloss exterior enamel. Lettering shall be with gloss exterior enamel. The HQ USAF Engineering and Services Directorate Emblem shall be provided by the Contractor, and shall be acquired through the Federal Industries (ENCOR), the Fort Leavenworth sign shop, or commercial sources. The Contractor shall coordinate emblem acquisition with the Base Civil Engineer. The Contractor shall maintain the sign in a "like new" condition throughout the life of the project, repainting and replacing members as necessary to accomplish this requirement. Upon completion of the work under this contract, the project sign shall be removed from the job site and shall remain the property of the Contractor. No direct payment will be made for the sign nor for maintenance of the sign. Refer to Section 01 58 00 for additional requirements.
1.16 EQUIPMENT LAYOUT DRAWINGS
The Contractor shall submit "layout drawings" in plan and necessary elevation, of all mechanical, electrical, heating, and ventilating equipment space(s) showing the proposed equipment, ductwork, piping, conduits, etc., with clearances, for approval of the Contracting Officer, whether or not such layout drawings are specified under the various technical sections of the specifications. In spaces having more than one type of equipment, the layout drawings shall indicate the composite arrangement of all types of equipment and all associated work with all clearances. The layouts of equipment and associated work shall provide adequate and acceptable clearances for entry, servicing, and maintenance.
The submittal and approval of equipment layout drawings shall conform to the requirements as herein before specified for shop drawings. Should the Contractor propose to furnish any equipment or standard products requiring allocations of space, or electrical, mechanical, or piping connections thereto, or supports different from those shown or indicated on the plans or in the specifications, he shall prepare and submit full detail drawings to the Contracting Officer for approval showing all changes. The approved detailed drawings shall become a part of the contract and any changes in the construction resulting from revisions in the details and dimensions on the drawings which are required by the substitution of alternate equipment and/or products shall be made at the expense of the Contractor.
1.17 CERTIFICATES OF COMPLIANCE
Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in four copies. Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the address of the testing laboratory and the date or dates of the tests to which the report applies. Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.
1.18 EQUIPMENT DATA
(a) Major Equipment. The Contractor shall be required to make a list of all installed equipment furnished under this contract. This list shall include but not be limited to each piece of equipment which has a serial number. This list shall include all information usually listed on manufacturer's name plate, so as to positively identify the piece of property. This list shall also include the cost of each piece of installed property (less installation costs) F.O.B. construction site.
The above referenced list shall be furnished as soon as possible after equipment is purchased. The list shall be furnished as one (1) reproducible and three (3) copies and shall be furnished to Contracting Officer not later than thirty calendar days prior to completion of any segment of the contract work which has an incremental completion date.
Listing will be on Government furnished MOB Form 897, available from the Contracting Officer.
(b) Other Equipment. The Contractor will be required to furnish a brochure, catalog cut, parts list, manufacturer's data sheet or other publication (including the manufacturer's name and address) which will show detailed parts data on all other equipment, such as hardware, plumbing and lighting fixtures, etc., subject to repair and maintenance procedures. The data shall be furnished in four (4) copies to the Contracting Officer not later than thirty calendar days prior to completion of any segment of the contract work which has an incremental completion date.
1.19 LAYOUT OF WORK
The Contractor shall lay out work from the Government-established base lines, ranges, and gages indicated on the drawings and shall be responsible for all measurements in connection therewith. The Contractor shall furnish, at it's own expense, all stakes, templates, platforms, equipment, range markers and labor as may be required in laying out any part of the work from the ranges and gages established by the Government.
The Contractor will be held responsible for the execution of the work to such lines and grades as may be established or indicated by the Contracting Officer. It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through its negligence prior to their authorized removal, they may be replaced by the Contracting Officer at its discretion. The expense of replacement will be deducted from any amounts due, or to become due, the Contractor.
1.20 TEMPORARY ELECTRICAL SERVICE
All temporary electrical service on the project, and within all temporary and permanent structures shall be installed and maintained in compliance with the provisions of EM 385-1-1, latest edition, Corps of Engineers Safety and Health Requirements, and APPENDIX T of Mobile District Regulation 385-1-1, Electrical Service Requirements for Construction and Maintenance Operations. Copies of these publications are available for inspection in the District Office by Prospective bidders, and will be furnished to the successful bidder. Refer to Section 01 50 00 for addditonal requirements.
1.21 ASBESTOS MATERIALS AND LEAD BASED PAINTS
The Contractor shall not use materials containing Asbestos or Lead Based Paints in the construction of this facility.
Upon completion of the construction, the Contractor shall submit two copies of a Certified Letter to the Contracting Officer's Representative (COR) stating that no lead based paints or materials containing asbestos were used in the construction of the new facilities. One copy of the letter will be filed with project documents in the Resident Engineer's Office. The COR will deliver the remaining copy to the Base Environmental Office.
1.22 SUBMISSION OF FINAL DD FORM 1354 - TRANSFER AND ACCEPTANCE OF
MILITARY REAL PROPERTY
Using the blank DD Form 1354 provided at the end of this section and the Interim DD Form 1354 obtained from the Contracting Officer's Representative, the Contractor shall submit the Final DD Form 1354 for the project no later than fourteen (14) days prior to the Beneficial Occupancy Date (BOD). Category Code numbers found on the DD Form 1354 Checklist provided at the end of this section shall be used in completing the Final DD Form 1354. Additional Category Codes can be found in the publication entitled "Air Force Real Property Category Code Descriptions" which can be obtained from the Directorate of Technical Support, Air Force Civil Engineer Support Agency, Tyndall AFB, FL 32403-5319. Refer to Section 01 78 00 for additional requirements.
1.23 RATES OF WAGES
Pages of wage rates follow the end of this section.
PART 2 PRODUCTS
(Not used.)
PART 3 EXECUTION
(Not used.)
-- End of Section --
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 RELATED SECTIONS
Contractor to take special note of Sections 01 00 00 Additional Special Contract Requirements.
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes the interior renovation of the Maxwell Elementary / Middle School Building 538A and 538A.1 and incidental related work.
1.2.2 Location
The work is located at the Maxwell Airforce Base, Alabama , approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local
01 11 00 utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.
Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
] 1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
01 11 00
SECTION 01 11 00.01
CONSTRUCTION TRAFFIC CIRCULATION AND LOGISTICS MAINTENANCE PLANS
PART 1 GENERAL
] PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section --
01 11 00.01
THIS PAGE INTENTIONALLY LEFT BLANK
01 11 00.01
SECTION 01 14 00
WORK RESTRICTIONS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. The school campus and portions of the existing building(s) will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
b. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
01 14 00
1.3.2 Working Hours
Regular working hours must consist of a minimum 9-1/2 hour period as established by the Contracting Officer, and can start as early as 7 a.m. , and must end by 4:30 p.m. Monday through Friday , excluding Government holidays. Deliveries shall be restricted for up to 60 minutes prior to and 30 minutes after the scheduled student drop-off and pick-up times respectively.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
1.3.4 Exclusionary Period
No work may be performed during the period 11:00 p.m. to 6:00 a.m. , inclusive, without prior written approval of the Contracting Officer.
This period has not been considered in computing the time allowed for the performance of this contract. No noise or vibration generating activites (work) shall be performed during testing schedule period as coordinated with the School administration.
1.3.5 Occupied Buildings
The Contractor shall be working in an existing building and around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains during the construction period.
] Relocate movable furniture as required to perform the work, protect the furniture, and replace the furniture in their original locations upon completion of the work. Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work.
The Government will remove and relocate other Government property in the areas of the buildings scheduled to receive work.
1.3.6 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
1.4 SECURITY REQUIREMENTS
Contract Clause FAR 52.204-2 Security Requirements and Alternate II apply .
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Weight Certificates
1.2 PAYMENTS TO THE CONTRACTOR
Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.
1.2.1 Obligation of Government Payments
The obligation of the Government to make payments required under the provisions of this Contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR FAR
32.103 Progress Payments Under Construction Contracts:
a. Reasonable deductions due to defects in material or workmanship;
b. Claims which the Government may have against the Contractor under or in connection with this Contract;
c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and
d. Failure to maintain accurate "as-built" or record drawings in accordance with FAR 52.236.21.
1.2.2 Payment for Onsite and Offsite Materials
Progress payments may be made to the Contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:
a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.
b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress payment must be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage
01 20 00 in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings, precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs), and high-voltage electrical cable. Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.
c. Materials to be considered for progress payment prior to installation must be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with [Schedule of Prices][Earned Value Report] requirement of this Contract. Requests for progress payment consideration for such items must be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 Payments Under Fixed-Price Construction Contracts have been met.
d. Materials are adequately insured and protected from theft and exposure.
e. Provide a written consent from the surety company with each payment request for offsite materials.
f. Materials to be considered for progress payments prior to installation must be stored either in Hawaii, Guam, Puerto Rico, or the Continental United States. Other locations are subject to written approval by the Contracting Officer.
g. Materials in transit to the job site or storage site are not acceptable for payment.
1.3 LUMP SUM PAYMENT ITEMS
Payment items for the work of this Contract for which Contract lump sum payments will be made are listed in the BIDDING PROPOSAL SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, are included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided. 1.3.1 Mobilization and Demobilization
1.3.1.1 Payment
Payment will be made for costs associated with mobilization and demobilization, as defined in Special…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .