Bid Abstract W912HN21B5004.pdf

PDF 222 KB Posted

Attached to
Powerhouse and Dam Pump Room Roof Replacement, Russel Dam, Elberton, Georgia
Solicitation number
W912HN21B5004
Issued by

About this file

This document is an abstract of bids for a federal construction contract solicitation to replace roofs at the Powerhouse and Dam Pump Room at Russell Dam in Elberton, Georgia. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Savannah and is set aside for small businesses. Eleven contractors submitted bids by the September 15th deadline to complete removal and replacement of the two existing roofs with new EPDM single-ply roof systems, including flashings, insulation, and accessories. An optional aluminum catwalk was also included. Bid amounts ranged from $1,389,373.09 to $5,151,922.00 for the base contract and from $162,500.00 to $420,000.00 for the optional catwalk. The government estimate was $3,349,574.00 for the base contract. The contract will be awarded as a firm fixed-price contract to the responsible bidder with the lowest priced, technically acceptable offer.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 4 PAGES

7A. ITEM

NO.

7C. EST.

QUANTITY D. UNIT E. UNIT PRICE F. ESTIMATED

AMOUNT D. UNIT PRICE D. UNIT PRICE

0001 1 Job $ 1,539,935.00 $ 1,539,935.00 $ 3,349,574.00 $ 1,989,930.61

(Option) 1 Job $ 638,690.00 $ 638,690.00 $ 731,723.00 $ 223,500.00

$ 1,539,935.00

$ 638,690.00

$ 2,178,625.00

AUTHORIZED FOR LOCAL REPRODUCTION NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

Previous edition is usable

C. REASONABLE CONTRACT

(Including Profit)

C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

2 Yes Yes

U.S. Army Corps of Engineers, Savannah District Whittni C. Hiscox, Contracting Officer

SIGNATURE

B. BID SECURITY (Type and amount)

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

PAGE OF

W912HN21B5004 8/9/2021 9/9/2021

DATE SIGNED

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED

5. PROJECT TITLE

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

9. OFFERS

Powerhouse & Dam Pump Roof Replacement, Russell Dam, Elberton, Georgia

NO. 1 NO. 2

A. OFFEROR A. OFFEROR

A. HIRED LABOR AAECON General Contracting, LLC dba AACON General Contractors Apex Business Solutions, LLC

4. ISSUING OFFICE

$ 223,500.00 Catwalk

$ 1,989,930.61

$ 731,723.00

B. REASONABLE CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount)

Replace RBR Powerhouse Roof and Pumphouse Roof include Portable Fall $ 3,349,574.00

20% NTE $2,906,374.00 20%

7B. DESCRIPTION OF OFFERED ITEM E. CLIN TOTAL E. CLIN TOTAL

$ 1,989,930.61

6. NUMBER OF AMENDMENTS ISSUED

$ 223,500.00

$ 2,213,430.61

TOTAL BASE BID (Items 0001)

TOTAL OPTIONS BID (Items 0002)

TOTAL OVERALL BID (Base Plus Options)

$ 731,723.00

$ 4,081,297.00

$ 3,349,574.00

15-Sep-2021

4 PAGES

D. UNIT

PRICE D. UNIT PRICE E. CLIN TOTAL D. UNIT PRICE E. CLIN TOTAL

0001 1 Job $ 2,993,500.00 $ 2,590,658.00 $ 2,590,658.00 $ 1,389,373.09 $ 1,389,373.09

(Option) 1 Job $ 330,000.00 $ 362,579.00 $ 362,579.00 $ 358,587.68 $ 358,587.68

$ 2,590,658.00 $ 1,389,373.09

$ 362,579.00 $ 358,587.68

$ 2,953,237.00 $ 1,747,960.77

AUTHORIZED FOR LOCAL REPRODUCTION OPTIONAL FORM 1419A (11-88)

Previous edition is usable

$ 859,934.00

$ 2,993,500.00 $ 2,565,377.00 $ 2,565,377.00

$ 3,323,500.00 $ 3,425,311.00

$ 330,000.00 $ 859,934.00 $ 859,934.00

$ 2,565,377.00

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT

Yes Yes Yes

E. CLIN TOTAL

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

E. CLIN TOTAL

20% 20% 20% 20% and $3M

Yes

D. UNIT PRICE

2. PROJECT TITLE 4. OFFERS (Continued) Powerhouse & Dam Pump Roof Replacement, Russell Dam, Elberton, Georgia

NO.3 NO.4 NO. 5 NO. 6

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

Ar6-Cram Roofing A-Vet Roofing & Construction, LLC Core Consolidated, LLC D.A. Nolt, Inc

B. BID SECURITY (Type and amount)

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

W912HN21B5004 2

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF1419. Use additional OF1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

TOTAL OVERALL BID (Base Plus Options)

$ 2,993,500.00

$ 330,000.00

TOTAL BASE BID (Item 0001)

TOTAL OPTIONS BID (Item 0002)

4 PAGES

D. UNIT

PRICE D. UNIT PRICE E. CLIN TOTAL D. UNIT PRICE E. CLIN TOTAL

0001 1 Job $ 3,044,106.11 $ 4,989,422.00 $ 4,989,422.00 $ 1,750,000.00 $ 1,750,000.00

(Option) 1 Job $ 335,876.63 $ 162,500.00 $ 162,500.00 $ 225,000.00 $ 225,000.00

$ 4,989,422.00 $ 1,750,000.00

$ 162,500.00 $ 225,000.00

$ 5,151,922.00 $ 1,975,000.00

AUTHORIZED FOR LOCAL REPRODUCTION OPTIONAL FORM 1419A (11-88)

Previous edition is usable

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

W912HN21B5004 3

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF1419. Use additional OF1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE 4. OFFERS (Continued) Powerhouse & Dam Pump Roof Replacement, Russell Dam, Elberton, Georgia

NO.7 NO. 8 NO. 9 NO. 10

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

D7, LLC dba Dawson D7 (DAWSON) Nair Contracting Group, LLC Pranam GlobalTech, Inc Swan Contracting, LLC

20% $3M 20% 20% and $400,000.00 20% B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT

Yes Yes

$ 335,876.63 $ 283,008.00 $ 283,008.00

Yes

E. CLIN TOTAL D. UNIT PRICE E. CLIN TOTAL

$ 3,044,106.11 $ 3,313,011.00 $ 3,313,011.00

Yes

TOTAL BASE BID (Items 0001) $ 3,044,106.11 $ 3,313,011.00

TOTAL OPTIONS BID (Items 0002) $ 335,876.63 $ 283,008.00

TOTAL OVERALL BID (Base Plus Options)

$ 3,379,982.74 $ 3,596,019.00

PAGE OF

4 4 PAGES

D. UNIT

PRICE

E. CLIN TOTAL

0001 1 Job $ 3,947,500.00 $ 3,947,500.00

(Option) 1 Job $ 420,000.00 $ 420,000.00

$ 3,947,500.00

$ 420,000.00

$ 4,367,500.00

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

ABSTRACT OF OFFERS -

CONSTRUCTION

CONTINUATION SHEET

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF1419. Use additional OF1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

1. SOLICITATION NUMBER

W912HN21B5004

2. PROJECT TITLE 4. OFFERS (Continued) Powerhouse & Dam Pump Roof Replacement, Russell Dam, Elberton, Georgia

NO.11

A. OFFEROR

20%

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED

Tri Coast Construction, LLC

B. BID SECURITY (Type and amount)

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT

Yes

TOTAL OVERALL BID (Base Plus Options)

TOTAL OPTIONS BID (Items 0002)

TOTAL BASE BID (Items 0001)

2021-09-15T14:23:46-0400
HISCOX.WHITTNI.CAROL.1402273395

File details come from the government source that posted it. Updated .