This amendment modifies a solicitation for a roof replacement project. The delivery schedule for the base contract and option items under CLINs 0001 and 0002 have been extended from 210 to 300 days. The period of performance for the base contract is also increased from 210 to 300 days, with an option to extend up to 390 days. The project involves removing and replacing roofs on the Powerhouse and Pump Room buildings at Russell Dam in Elberton, Georgia. A site visit was held on August 19th. Sealed bids are due under a 100% small business set-aside and will result in a firm fixed-price contract awarded by the US Army Corps of Engineers Savannah District.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. CONTRACT CHANGES: The delivery date has changed to 300 days after Notice to Proceed.
B. TECHNICAL SPECIFICATION CHANGES: The added Sections listed below (added by Amendment No. 0002) are hereby added to and made a part of the solicitation; such Sections are replaced and added in their entirety and changes are neither underlined nor struck out.
Added Sections Appendix B
C. CONTRACT DRAWINGS: Sheets A-101 and A-102 w ith Revision 1 dated 30 August 2021 are hereby added to and made a part of the Contract Draw ings.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Sep-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN21B5004
X 9B. DATED (SEE ITEM 11)
09-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Sep-2021
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN21B5004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
The contractor period of performance end date has increased by 90 days from 210 days to 300 days.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 300 days after receipt of the Notice to Proceed. See 52.217-7 for the time to complete the work if the option for additional work is exercised. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Government may exercise the option at the time of the award and the contract completion date will remain 300 days after Notice to Proceed (NTP). The Government reserves the right to exercise the option within 90 days after contract award which will extend the time for completion to 390 days after issuance of NTP.
(End of clause)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
210 dys. ANP 1 SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
SCHEDULE GA 99999
999-999-9999 FOB: Destination
W912HN
W912HN21B5004
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
300 dys. ANP 1 SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
SCHEDULE GA 99999
999-999-9999
The following Delivery Schedule item for CLIN 0002 has been changed from:
CAGE
210 dys. ANP 1 SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
SCHEDULE GA 99999
999-999-9999
To:
CAGE
300 dys. ANP 1 SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
SCHEDULE GA 99999
999-999-9999
(End of Summary of Changes)