B.08 AMD0001 Solicitation W912HN21B5003.pdf
PDF 383 KB Posted
- Solicitation number
- W912HN21B5003
About this file
This document contains an amendment to a solicitation and the related federal contract opportunity. The solicitation is for maintenance dredging of the Atlantic Intracoastal Waterway in Georgia and South Carolina. The amendment revises the statement of work to remove estimated material quantities, adds a line item for standby time, and modifies technical specifications and instructions to bidders. Maintenance dredging will be performed at two sites to a depth of -12 feet below low water, with material placed at designated disposal areas. One site requires creation of a 13.2 acre bird nesting area. The estimated construction period is 180 days from notice to proceed. The solicitation is a 100% small business set-aside and will result in a fixed price contract valued between $1-5 million. Bids are due according to the instructions in the attached invitation for bid.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. CONTRACT CHANGES: Statement of Work is revised to remove estimated quantity of material to be removed. CLIN 0007 is added to the bid schedule for standby time. Please use the most recent conformed solicitation for your bid.
B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0001) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be found in the appropriate volume of specif ications by searching for an asterisk and amendment number (i.e., *1). The added Section listed below (added by Amendment No. 0001) is hereby added to and made a part of the solicitation; such Sections are replaced and added in their entirety and changes are neither underlined nor struck out. Revised Sections: 01 57 19 and 35 20 23. Added Sections: Appendix B.
C. CONTRACT DRAWING CHANGES: None.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jul-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN21B5003
X 9B. DATED (SEE ITEM 11)
01-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jul-2021
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN21B5003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
CLIN 0007 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Stand By TimeFFP
Stand by time.
Do not bid this CLIN (See Sub-CLIN 0007AA and 0007AB).
NET AMT
SUBCLIN 0007AA is added as follows:
0007AA 1 Days Stand By Time for First DayFFP
Stand by time for first day after 24 hours.
FOB: Destination
PSC CD: Z1KF
SUBCLIN 0007AB is added as follows:
0007AB 1 Days Stand By Time All Over One DayFFP
Stand by time for all time over one day.
PSC CD: Z1KF
The following Delivery Schedule for SUBCLIN 0007AA has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
180 dys. ANP 1 SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
SCHEDULE GA 99999
999-999-9999
W912HN
The following Delivery Schedule for SUBCLIN 0007AB has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
180 dys. ANP 1 SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
SCHEDULE GA 99999
999-999-9999
W912HN
The following have been modified:
TOTAL BID ITEMS
TOTAL BID (Items 0001 through 0007AB) $_______________________
BASE CLINS (Items 0001 through 0004AB and 0007 through 0007AB) $______________________
OPTION CLINS (Items 0005 through 0006AB) $____________________
Enter prices where space is provided for ALL items. Failure to follow this instruction may render the bid non-responsive and the bid will not be considered for award.
All bidders are advised materially unbalanced bids may be rejected as non-responsive. See FAR 52.214-19 Contract Award – Sealed Bidding – Construction.
*AA Items are based on available CY's in the required depth
*AB Items are based on the 25% of remaining overdepth + anticipated shoaling based on available funds.
**round all priced line items (0001 through 0006AB) to two (2) decimal places**
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
5152.211-9000
5152.211-9000 EVALUATION OF SUBLINE ITEMS (DEC 2019)
Item Nos. 0002, 0003, 0004, 0006, and 0007 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its subline items.
(End of provision)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following Acceptance/Inspection Schedule was added for CLIN 0007:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A N/A
The following Acceptance/Inspection Schedule was added for SUBCLIN 0007AA:
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for SUBCLIN 0007AB:
N/A N/A N/A Government
SECTION 01 00 00 - GENERAL REQUIREMENTS
STATEMENT OF WORK
Scope of Work
The Atlantic Intracoastal Waterway (AIWW) Altamaha Sound Beneficial Use of Dredged Material project and Selective Sites Maintenance Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging and the pilot project. This requirement has been traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be six months from Notice to Proceed (NTP).
The work is located within the Savannah District’s portion of the AIWW shallow draft waterway in the states of Georgia and South Carolina. The AIWW in Savannah District begins in Port Royal Sound, South Carolina (Mile
552) and ends in Cumberland Sound, Georgia (Mile 713). The AIWW project depth is -12.0’ Mean Lower Low Water (MLLW) to include -2.0’ of allowable pay overdepth (-14.0’ MLLW). The widths vary from 90 feet in land cuts to 150 feet in natural waterways
Maintenance dredging will be performed in two selected sites on the AIWW; Altamaha Sound and Elba Cut. The maintenance material from Elba Cut (mile 576 to mile 576.4) will be placed in Disposal Area (DA) 14B which is across the Savannah River from the dredging site.
The maintenance material in Altamaha Sound (mile 656.4 to mile 660) will be placed in an open water site to create a temporary 13.2 acre bird nesting site to assist Georgia Department of Natural Resources with available migratory shorebird habitat lost due to the last two hurricanes along the coast within the State. Any shoaled material not being use for the bird island will be placed on Tract 36A which is an unconfined placement site on an island (Hammock) in the Altamaha River.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .