C.04 Bid Abstract W912HN21B5000.pdf
PDF 1002 KB Posted
- Attached to
- Savannah Harbor DMCA 1N Dike Raising Federal contract opportunity
- Solicitation number
- W912HN21B5000
About this file
This abstract of bids document summarizes offers received in response to Solicitation Number W912HN21B5000 for construction services at the Savannah Harbor Dredged Material Containment Area 1N in Georgia. The solicitation sought offers to raise the perimeter and cross dikes, relocate weirs, and perform other earthwork, clearing, and site preparation. Ten offerors provided pricing for 13 base line items including temporary fencing, grubbing, herbicide application, dike fill placement, modifications to weirs, seeding, stone furnishing and placement, and other work. Offer prices ranged from $3.7 million to $6.1 million for the base work. The apparent low offeror was RE Goodson Construction Co. at $3.7 million, while the highest offers came from Ashridge Inc. at $6.1 million and Property & Environmental Management at $5.2 million. The Corps of Engineers will award a firm fixed-price contract for the work to the responsible offeror with the lowest priced, technically acceptable offer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04 Bid Opening Attendee List.pdf | ||
| B.08 AMD 02 Solicitation W912HN21B5000.pdf | ||
| B.08 AMD 02 Conformed Solicitation W912HN21B5000.pdf | ||
| B.08 - Drawing - W912HN21B5000_AMD 02.pdf | ||
| B.08- Specs W912HN21B5000 _ Amd01.PDF | ||
| B.08 AMD 01 Solicitation W912HN21B5000.pdf | ||
| B.08 AMD 01 Conformed Solicitation W912HN21B5000.pdf | ||
| Savannah Harbor DMCA 1N Dike Raising W912HN21B5000 _ Site Visit 19Apr2021.pdf | ||
| B.08 - Specs W912HN21B5000.pdf | ||
| B.08 - Solicitation _ W912HN21B5000.pdf | ||
| B.08 - Drawings W912HN21B5000.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES
5-Apr-21 14-May-21 1 1
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
Shyloe Werner
Certifying Official Signature
DATE SIGNED
Whittni C. Hiscox
A. OFFEROR A. OFFEROR
A. HIRED LABOR
7A. ITEM NO.
7B. DESCRIPTION OF OFFERED ITEM 7C.
EST QTY.
7D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
0001 Temporary Silt Fence Installation & Removal
0001AA First 10,300 Linear Feet 10,300 Linear Foot 4.95$ 50,985.00$ 8.90$ 91,670.00$ 7.70$ 79,310.00$
0001AB All Over 10,300 Linear Feet 500 Linear Foot 4.95$ 2,475.00$ 1.90$ 950.00$ 7.70$ 3,850.00$
0002 Clearing and Grubbing of DMCA 1N
0002AA First 130 Acres 130 Acre $ 1,835.00 238,550.00$ $ 2,250.00 292,500.00$ $ 11,533.80 1,499,394.00$
0002AB All Over 130 Acres 1 Acre 1,835.00$ 1,835.00$ 500.00$ 500.00$ 5,245.30$ 5,245.30$
0003 Herbicide Application
0003AA First 130 Acres 130 Acre $ 350.00 45,500.00$ $ 750.00 97,500.00$ $ 367.90 47,827.00$
0003AB All Over 130 Acres 10 Acre $ 350.00 3,500.00$ $ 750.00 7,500.00$ $ 367.90 3,679.00$
0004 Dike Embankment Fill from within DMCA
0004AA First 332,000 Cubic Yards 332,000 Cubic Yard 7.35$ 2,440,200.00$ 6.00$ 1,992,000.00$ 4.30$ 1,427,600.00$
0004AB All Over 332,000 Cubic Yards 48,500 Cubic Yard $ 7.35 356,475.00$ $ 4.00 194,000.00$ $ 3.20 155,200.00$
0005 Modifications to Existing Weirs 1 Job $ 342,175.00 342,175.00$ $ 707,000.00 707,000.00$ $ 792,706.50 792,706.50$
0006 Grassing - Seed
0006AA First 28 Acres 28 Acres $ 1,545.00 43,260.00$ $ 1,500.00 42,000.00$ $ 19,456.30 544,776.40$
0006AB All Over 28 Acres 2 Acres 1,545.00$ 3,090.00$ 1,500.00$ 3,000.00$ 19,149.90$ 38,299.80$
0007 Agricultural Lime 85 Net Ton
(2,000 LB)
220.00$ 18,700.00$ 50.00$ 4,250.00$ 336.50$ 28,602.50$
0008 Fertilizer, Nitrogen 17 Net Ton
(2,000 LB)
$ 770.00 13,090.00$ $ 300.00 5,100.00$ $ 673.00 11,441.00$
0009 Fertilizer, Mixed Grade 17 Net Ton
(2,000 LB)
$ 785.00 13,345.00$ $ 550.00 9,350.00$ $ 673.00 11,441.00$
00010 Furnish and Place Bedding Stone and Filter Stone
0010AA First 660 Tons 660 Net Ton
(2,000 LB)
$ 105.00 69,300.00$ $ 70.00 46,200.00$ $ 113.40 74,844.00$
0010AB All Over 660 Tons 70 Net Ton
(2,000 LB)
$ 105.00 7,350.00$ $ 50.00 3,500.00$ $ 117.20 8,204.00$
0011 Furnish and Place Underlayer Stone
0011AA First 820 Tons 820 Net Ton
(2,000 LB)
$ 120.00 98,400.00$ $ 95.00 77,900.00$ $ 118.80 97,416.00$
0011AB All Over 820 Tons 90 Net Ton
(2,000 LB)
$ 120.00 10,800.00$ $ 75.00 6,750.00$ $ 129.20 11,628.00$
0012 Furnish and Place Armor Stone
0012AA First 2,300 Tons 2,300 Net Ton
(2,000 LB)
$ 150.00 345,000.00$ $ 100.00 230,000.00$ $ 143.90 330,970.00$
0012AB All Over 2,300 Tons 230 Net Ton
(2,000 LB)
$ 150.00 34,500.00$ $ 80.00 18,400.00$ $ 155.90 35,857.00$
0013 Furnish and Place Underlayer Stone at Weir Pipe Outfalls 100 Net Ton
(2,000 LB)
$ 120.00 12,000.00$ $ 60.00 6,000.00$ $ 359.60 35,960.00$
TOTAL AMOUNT OF BASE CLINS 0001-0013: 4,150,530.00$ 3,836,070.00$ 5,244,251.50$
“Source Selection Information -- See FAR 2.101 and 3.104.”
NO. 1
W912HN21B5000 Savannah Harbor, Dredged Material Containment Area (DMCA) 1N Dike Raise
ABSTRACT OF Bids - CONSTRUCTION
Department of the Army, Corps of Engineers Savannah District Contracting Office
100 W Oglethorpe Ave.
Savannah, GA 31401
9. OFFERS
NO. 25. PROJECT TITLE AND SET ASIDE:
CONTRACTING OFFICER SIGNATURE
Ashridge Inc Barnett Southern Corporation
6. NUMBER OF AMENDMENTS ISSUED: 2 C. REASONABLE CONTRACT
C. AMENDMENTS ACKNOWLEDGED- YES C. AMENDMENTS ACKNOWLEDGED
YES
B. REASONABLE CONTRACT
(WITHOUT PROFIT)
B. BID SECURITY (Type and Amount) Bid Bond 20%
B. BID SECURITY (Type and Amount) Bid Bond 20%
19-May-2021
1. SOLICITATION NUMBER PAGE OF PAGES
2 4 ABSTRACT OF OFFERS - CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on
CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional
Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
NO. 3 NO. 4 NO. 5 NO. 6
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A. B. C.
ITEM ESTIMATED UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001AA 10,300 Linear Foot 13.00$ 133,900.00$ 4.50$ 46,350.00$ 154,500.00$ 6.60$ 67,980.00$
0001AB 500 Linear Foot 11.00$ 5,500.00$ 4.50$ 2,250.00$ 7,500.00$ 6.60$ 3,300.00$
0002AA 130 Acre 4,000.00$ 520,000.00$ 795.00$ 103,350.00$ 780,000.00$ 500.00$ 65,000.00$
0002AB 1 Acre 4,000.00$ 4,000.00$ 795.00$ 795.00$ 6,000.00$ 500.00$ 500.00$
0003AA 130 Acre 140.00$ 18,200.00$ 330.00$ 42,900.00$ 130,000.00$ 385.00$ 50,050.00$
0003AB 10 Acre 140.00$ 1,400.00$ 330.00$ 3,300.00$ 10,000.00$ 385.00$ 3,850.00$
0004AA 332,000 Cubic Yard 9.00$ 2,988,000.00$ 8.55$ 2,838,600.00$ 1,660,000.00$ 4.95$ 1,643,400.00$
0004AB 48,500 Cubic Yard 9.00$ 436,500.00$ 3.25$ 157,625.00$ 242,500.00$ 0.50$ 24,250.00$
0005 1 Job 857,246.00$ 857,246.00$ 552,000.00$ 552,000.00$ 800,000.00$ 1,195,897.00$ 1,195,897.00$
0006AA 28 Acres 3,800.00$ 106,400.00$ 3,300.00$ 92,400.00$ 98,000.00$ 7,298.00$ 204,344.00$
0006AB 2 Acres 3,800.00$ 7,600.00$ 3,300.00$ 6,600.00$ 7,000.00$ 7,298.00$ 14,596.00$
0007 85 Net Ton (2,000 LB) 90.00$ 7,650.00$ 60.00$ 5,100.00$ 76,500.00$ 150.00$ 12,750.00$
0008 17 Net Ton (2,000 LB) 530.00$ 9,010.00$ 360.00$ 6,120.00$ 13,600.00$ 800.00$ 13,600.00$
0009 17 Net Ton (2,000 LB) 910.00$ 15,470.00$ 360.00$ 6,120.00$ 13,600.00$ 900.00$ 15,300.00$
00010
0010AA 660 Net Ton (2,000 LB) 320.00$ 211,200.00$ 110.00$ 72,600.00$ 42,900.00$ 65.00$ 42,900.00$
0010AB 70 Net Ton (2,000 LB) 400.00$ 28,000.00$ 110.00$ 7,700.00$ 4,550.00$ 65.00$ 4,550.00$
0011AA 820 Net Ton (2,000 LB) 200.00$ 164,000.00$ 110.00$ 90,200.00$ 53,300.00$ 85.00$ 69,700.00$
0011AB 90 Net Ton (2,000 LB) 250.00$ 22,500.00$ 110.00$ 9,900.00$ 5,850.00$ 85.00$ 7,650.00$
0012AA 2,300 Net Ton (2,000 LB) 200.00$ 460,000.00$ 135.00$ 310,500.00$ 276,000.00$ 89.00$ 204,700.00$
0012AB 230 Net Ton (2,000 LB) 250.00$ 57,500.00$ 135.00$ 31,050.00$ 27,600.00$ 89.00$ 20,470.00$
0013 100 Net Ton (2,000 LB) 220.00$ 22,000.00$ 110.00$ 11,000.00$ 6,500.00$ 100.00$ 10,000.00$
6,076,076.00$ 4,396,460.00$ 4,415,900.00$ 3,674,787.00$
YES YES
W912HN21B5000
Property & Environmental Management RE Goodson Construction Co
Bid Bond 20% Bid Bond 20% Bid Bond 20% Bid Bond 20%
TOTAL AMOUNT OF BASE CLINS 0001-0013:
W912HN21B5000 Savannah Harbor, Dredged Material Containment Area (DMCA) 1N Dike Raise BCSS L-J, Inc.
YES YES
ABSTRACT OF OFFERS - CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
NO. 7 NO. 8 NO. 9 NO. 10
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A. B. C.
ITEM ESTIMATED UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001AA 10,300 Linear Foot 10.00$ 103,000.00$ 6.75$ 69,525.00$ 0001AB 500 Linear Foot 10.00$ 5,000.00$ 2.66$ 1,330.00$
0002AA 130 Acre 1,000.00$ 130,000.00$ 1,595.49$ 207,413.70$
0002AB 1 Acre 1,000.00$ 1,000.00$ 111.01$ 111.01$
0003AA 130 Acre 100.00$ 13,000.00$ 334.75$ 43,517.50$
0003AB 10 Acre 100.00$ 1,000.00$ 99.33$ 993.30$
0004AA 332,000 Cubic Yard 6.70$ 2,224,400.00$ 6.48$ 2,151,360.00$ 0004AB 48,500 Cubic Yard 6.70$ 324,950.00$ 3.81$ 184,785.00$
0005 1 Job 400,000.00$ 400,000.00$ 1,081,496.39$ 1,081,496.39$
0006AA 28 Acres 2,500.00$ 70,000.00$ 8,177.30$ 228,964.40$
0006AB 2 Acres 2,500.00$ 5,000.00$ 2,337.12$ 4,674.24$ 0007 85 Net Ton (2,000 LB) 120.00$ 10,200.00$ 280.29$ 23,824.65$
0008 17 Net Ton (2,000 LB) 800.00$ 13,600.00$ 561.78$ 9,550.26$
0009 17 Net Ton (2,000 LB) 600.00$ 10,200.00$ 912.90$ 15,519.30$
00010
0010AA 660 Net Ton (2,000 LB) 65.20$ 43,032.00$ 238.27$ 157,258.20$
0010AB 70 Net Ton (2,000 LB) 65.20$ 4,564.00$ 45.11$ 3,157.70$
0011AA 820 Net Ton (2,000 LB) 81.20$ 66,584.00$ 224.91$ 184,426.20$
0011AB 90 Net Ton (2,000 LB) 81.20$ 7,308.00$ 66.84$ 6,015.60$
0012AA 2,300 Net Ton (2,000 LB) 84.70$ 194,810.00$ 208.08$ 478,584.00$
0012AB 230 Net Ton (2,000 LB) 84.70$ 19,481.00$ 69.76$ 16,044.80$
0013 100 Net Ton (2,000 LB) 81.20$ 8,120.00$ 381.60$ 38,160.00$
3,655,249.00$ 4,906,711.25$
Bid Bond 20% Bid Bond 20%
TOTAL AMOUNT OF BASE CLINS 0001-0013:
W912HN21B5000 Savannah Harbor, Dredged Material Containment Area (DMCA) 1N Dike Raise SCRIMGEOUR’S FARM ALL, LLC SES Civil and Environmental LLC
YES YES
| Bid Abstract W912HN21B5000 pg1 |
| Bid Abstract W912HN21B5000 pg2 |
| Bid Abstract W912HN21B5000 pg3 |
| 2021-05-19T16:51:38-0400 | |
| HISCOX.WHITTNI.CAROL.1402273395 |
| 2021-05-19T16:58:13-0400 | |
| WERNER.SHYLOE.A.1396102532 |