Repair Outfall X Stormwater System, Fort Gordon GA
Solicitation number
W912HN20B3011
Issued by

About this file

This solicitation package seeks bids for the repair of Outfall X stormwater system at Fort Gordon, Georgia. Key requirements include repairing and contributing storm sewer networks, with bid opening scheduled for September 1, 2020 at 1:00pm Eastern Time. The Army Corps of Engineers Savannah District will administer the contract, with a period of performance of 450 days from notice to proceed. Bidders must submit pricing for all line items in the bid schedule along with current financial statements and a list of current contracts. The solicitation incorporates wage determinations from the Department of Labor setting prevailing rates for construction types in Richmond, McDuffie, and Burke Counties in Georgia.

View the file

Other files

File Type Posted
Outfall X - bid opening Webex screen shot with attendee list.pdf PDF
Abstract_W912HN20B3011 Outfall X.pdf PDF
B.08 W912HN20B30110003.pdf PDF
B.08 W912HN20B30110001.pdf PDF
20B3011.pdf PDF
20B3011.pdf PDF
W912HN-20-B-3011_AMD2.pdf PDF
20B3011.pdf PDF
W912HN-20-B-3011_AMD1.pdf PDF
Outfall_X_Plans_RTA - 20200730_PART_1.pdf PDF
20B3011.pdf PDF
Outfall_X_Plans_RTA - 20200730_PART_2.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DE-04833-8P

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

A. Update Bid opening time and Include updated Wage Determination GA202000078 8-21-2020.

B. Clarif iy Period of Performance in FAR Clause 52.211-10 to 450 days.

C. Post Site Visit roster and memorandum, ProjNet Report.

D. Draw ing adjustments.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 26

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN20B3011

X 9B. DATED (SEE ITEM 11)

31-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Aug-2020

CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

ProjNet: Logged In User Page 2 of 7 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl... 8/24/2020

W912HN20B3011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

A. CONTRACT CHANGES: Adjust Bid Opening Time (see Block 13A of SF1442), Updated Wage Determination GA202000078, update FAR Clause 52.211-10, post Site Visit Roster and memorandum and ProjNet report.

B. TECHNICAL SPECIFICATION CHANGES: There are no technical specification changes with this amendment.

C. CONTRACT DRAWINGS:

Sheets GI004, GI102, GI103, GI104, GI105, GI106, CD103, CD105, CG108, CG109, CG110, CG111, CG112, CG113, CG114, and CG115 with Revision 1 dated 21 August 2020 are hereby added to and made a part of the Contract Drawings.

BID INQUIRY CONTRACTOR REPORT

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: Repairs to Outfall X and Contributing Storm Sewer Network Review: Bidder Inquiries (00001) (sorted by CommentID ) Displaying 23 inquiries.

Id Discipline Sheet Detail Spec 8756006 Civil 33 40 00 2.6 Resilient Connectors Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specifications call for Resilient Connectors, flexible, watertight connectors used for connecting pipe to manholes and inlets.

This specification is not depicted in the details or typical for GDOT piping. Will these connectors be required for all manhole connections ?

On: Aug 10 2020.

Government Response. . Section 33 40 00 2.6 Resilient Connectors is deleted. Pipe connections to manholes and inlets shall be grouted per GDOT Standards as shown on GDOT 1019A. Specification revisions to be incorporated by amendment. On: Aug 17 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

ProjNet: Logged In User Page 3 of 7

8756032 Civil 33 40 00 3.9.1.1 Leakeage Test Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specifications call for leakage testing by low pressure air or water testing prior to completing backfill and goes further into detail. This type of testing is quite expensive for such a large quantity amount of piping. Would the government consider deleting this specification in lieu of other quality testing procedures?

On: Aug 10 2020.

Government Response. . Section 33 40 00 3.9.1.1 Leakage Testing is deleted. GDOT Standard Section

550.3.06 is included by reference which includes video, laser profiling, and inspection reports. Specification revisions to be incorporated by amendment. On: Aug 17 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8756042 Civil 33 40 00 2.4.7.2 External Sealing Bands Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specifications call for External Sealing Bands, will this be required ? This is not typical for GDOT specified piping installation.

Government Response. . : 33 40 00 2.4.7.2 External Sealing Bands are required as well as internal joint seals. On: Aug 17 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8756058 Civil 33 40 00 3.2.1 Concrete Pipe Requirements

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specifications mention variable bedding depths for the piping. Will there be a uniform typical section provided for the pipe bedding based on sizes and locations? No details found for bedding, not typical for GDOT unless called for by typical section.

Government Response. . GDOT Construction Standards 1030d1 and 1030d2 are included by reference.

Specification revisions to be incorporated by amendment. On: Aug 17 2020

ProjNet: Logged In User Page 4 of 7

8756464 Utilities Engineering GI004 Utility Conflict

Table

Will additional information for Utility conflicts be given? Replace and Repair resolutions are broad and can only be assumed without further clarifications.

I.e. 51. 118+20 Brainard Ave 8" Sanitary : Replace length of VC with DI.

What quantifies the length to satisfy utility owner? Is it from manhole to manhole or just in the footprint of the proposed piping?

Government Response. . Augusta Utilities Department (AUD) will provide USACE and bidders with a firm lump sum cost proposal to perform work on AUD utility assets to resolve the utility conflicts listed in Table 1 Utility Conflicts on plan sheet GI004. Please note as described in the resolution column that the Outfall X Contractor will remove and dispose of AUD utilities noted as abandon and remove utilities that are within the excavation limits to construct the storm sewer. This work by the Outfall X Contractor is not included in the AUD cost proposal.

AUD is working to design resolutions to each conflict, which will consist of standard details and/or specific designs appropriate for each conflict difficulty. In general, AUD will attempt to minimize disturbance to AUD's systems. For example, cutting and replacing smaller sanitary sewer lines are expected to be limited to the storm drain excavation limits. However, the sanitary sewer trunk main crossings will require a significant more effort to resolve.

AUD expects to work closely with the Outfall X Contractor regarding the project scheduling to coordinate AUD work that may be done prior to, during, or in sequence with Outfall X storm drain construction On:

Aug 17 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8756501 Utilities Engineering GI004 Utility Conflict

Should the contractor assume there will be further utility conflicts and include this into their LS utility pricing or will further unknown conflicts be addressed during construction.

Government Response. . All known utility conflicts associated with project are identified in GI004 Utility

Conflict Table. Utility information is approximate however, and more conflicting conditions may exist than are shown on the plans. Contractor shall confirm all existing utilities prior to the start of construction.

Unforeseen or differing conditions will have to be addressed during construction. On: Aug 17 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8760972 Utilities Engineering GI004 Utility Conflict

Pg 4 of 63 Utility Notes

Specifications call for All utility work to be designed and constructed by privatized utility providers. Several utility owner representatives contacts were provided for contact. However it does not appear communications, fiber, NEC, At&T were included. Based on history and location of project we anticipate several conflicts with these utilities.

Without representatives and known conflicts these cannot be included in the ITEM NO 0002 pricing. Please clarify.

On: Aug 11 2020.

Government Response. . All known Utility conflicts are identified in bid package. NEC Point of Contact will be added to bid schedule (via Amendment) for bidders to obtain price quote for related communications work. It is understood that AT&T maintains their own infrastructure. Contractor to confirm all existing utilities prior to the start of construction. On: Aug 19 2020

ProjNet: Logged In User Page 5 of 7

8771519 Civil CG108-CG111

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

A Discrepancy between the Demolition and Plan/Profile sheets was discovered concerning the existing 30" RCP found between 31+00 to 43+00.

The Demolition plans do not recognize any action to be made to this pipe or it's structures (AIP,REMOVE,RETAIN) between Provost Ave and Avenue of the States.

CG111 Notes to Retain the 30" RCP along with the Existing CB at the corner of AOS. If following the proposed retained pipe, there is no Inverts provided for Structure A15.

It also does not appear to be any ditch grading in this area proposed, please clarify the intent of moving the surface water to the new structures.

Please Clarify the intent of the pipe and structure beyond this retained structure.

On: Aug 15 2020.

Government Response. . Responses are provided directly below each inquiry as follows:

Inquiry: discrepancy concerning 30" RCP between 31+00 to 43+00 Response: The existing line is to remain in parallel with the proposed line. An adjustment is made to structure A5 to reconnect to the existing line at Provost Ave on CG108. This change shifts the upstream Stationing about 5 feet upstream of this point on sheets CG108-113.

Inquiry: The Demolition plans do not recognize any action to be made to this pipe or it's structures (AIP, REMOVE, RETAIN) between Provost Ave and Avenue of the States.

Response: A note is added to the Demolition Plan sheet CD103 and CD105 to Retain this pipe segment and the associated structures.

Inquiry: Question regarding inverts for Structure A15

Response: Inverts for proposed pipes at Structure A15 are shown on the profile on CG111.

Inquiry: It also does not appear to be any ditch grading in this area proposed, please clarify the intent of moving the surface water to the new structures.

Response: New pipe/structures are for additional conveyance capacity of piped system. Surface water will continue to flow into the existing inlets in parallel to the new line.

Revisions noted above will be incorporated into contract documents via Amendment. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8771521 Civil CG114-CG115

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Demolition Plans do not recognize the intent of the existing 18" RCP Trunk Line between Structure A11 & B4.

Shall this line be AIP,REMOVED,Or RETAINED?

Please clarify the Pipe sizing for the B3 and B4 tie ins. Plans say to Retain EXST 18" RCP but denote 24" RCP in these areas.

On: Aug 15 2020.

Government Response. . Responses are provided directly below inquiries as follows:

Inquiry: Demolition Plans do not recognize the intent of the existing 18" RCP Trunk Line between Structure A11 & B4.

Response: New pipe/structures are for additional conveyance capacity of piped system while avoiding

ProjNet: Logged In User Page 6 of 7 water/sanitary utility conflicts and damage to road/curb and retaining existing inlets.

Inquiry: Shall this line be AIP,REMOVED,Or RETAINED?

Response: Shall be Retained

Inquiry: Please clarify the Pipe sizing for the B3 and B4 tie ins. Plans say to Retain EXST 18" RCP but denote 24" RCP in these areas.

Response: Note realigned on CG115 to point to existing 18" line parallel to Avenue of the States to be retained. Tie-in connector pipe added between existing and new line at manhole B1 at 24" RCP on CG114 consistent with the other 24" RCP connectors.

Revisions identified above to be incorporated into contract documents via Amendment. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8773558 General page 4 Specs Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Due to the size and scope of this project we request an extension for submission of the bid to September 29, 2020 from the published date of September 1, 2020. This will allow more time to coordinate with the utility contractors as well as all suppliers required for this project.

On: Aug 17 2020.

Government Response. . Any changes to the bid opening date/time will be addressed by amendment to the solicitation. This project is an FY20 project with possible award by 30 September 2020. Therefore, an extension to 29 September 2020 is not feasible. Please bid the solicitation as issued. On: Aug 19 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8782256 Civil CE102 DC-A

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Several of the CE Sheets denote the use of DC-A for Temporary Stream Diversion Channel.

A1 CE-106/107 Details Call for 2' Type 3 Rip Rap lining.

DC-A in the soil erosion manual allows Geotextile, polyethylene film, or sod.

Please clarify which temporary BMP will be accepted.

On: Aug 20 2020.

Government Response. . Temporary Stream Diversion Channels shall be GSWCC Type DC-C, riprap lined as shown on CE106/107. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8782260 Civil 33 40 00 3.2.1 Concrete Pipe

Requirements Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Would the Owner/DOR consider the use of Double Gasketed HP Piping in lieu of the proposed RCP Piping?

HP is approved on similar USACE and GDOT Projects.

On: Aug 20 2020.

Government Response. . Substitutions for RCP will not be considered. On: Aug 21 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8782487 CAD-BIM Drawings

ProjNet: Logged In User Page 7 of 7

Please provide the CADD files for this project for estimating purposes.

On: Aug 20 2020.

Government Response. . Cadd files will not be provided for estimating purposes. On: Aug 21 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8782884 Civil CG106

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

On CG106 at approximately STA 23+20, it appears that there are two headwalls shown, however there is only one detail provided (GDOT Standard 1125). Can the Government please clarify the drawing?

Government Response. . The smaller headwall shown at Sta 23+20 is a symbol in the CAD. The larger headwall footprint shown reflects the approximate size required for the GDOT STD. 1125 headwall to fit the pipe. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8783778 Specifications Geotechnical Design Report Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The supplemental Geotechinical Report, section 3.9.2 states "Crushed stone should be placed around the pipelines as shown on the Contract Drawings and extend from a minimum of 6 inches below the pipe to the pipe springline."

The contract drawings do not indicate a typical section for RCP installation. A previous question submitted regarding pipe bedding was answered by the Government and refers Contractors to GDOT Standard 1031d1 and 1031d2.

When looking at the GDOT standard drawings, no pipe bedding is indicated. Due to conflicting answers, will the Government please clarify the bedding requirements as it pertains to RCP installation?

Government Response. . GDOT Standards 1030d1 and 1030d2 were intended for reference in

Amendment 1 and include the bedding details. On: Aug 24 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8783828 Specifications Geotechnical Design Report Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The supplemental Geotechnical Report, section 4.5.3, states "We recommend that SMP's, DMP's, ESMP's, and crack monitors be established ont he existing structures and utilities within 50 feet of the excavations. The points should be monitored during demolition, support of excavation installation, excavation, foundation installation, and backfilling work." This is not typical industry standard for pipe installation and will add a significant as well as unnecessary cost.

Will the Government please clarify if the Contractor will be mandated to implement SMP's, DMP's, ESMP's, and crack monitoring?

On: Aug 20 2020.

Government Response. . These recommendations are not required in the specifications and therefore are at the Contractor's discretion. On: Aug 24 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8783845 Specifications Geotechnical Design Report Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The supplemental Geotechnical Report, section 4.5.4, states that "A minimum of two seismographs should be located at adjacent/nearby structures and utilities during all demolition, excavation support installation, and pile installation activities to confirm compliance with the recommendations herein and record actual impact vibrations." While it is understandable for vibratory monitoring when installing pile, is it actually the Government's intention for vibratory monitoring during demolition? This will result in a significant and unnecessary cost when considering the amount of pipe demolition scheduled for the project. Please clarify if this requirement is will be mandatory.

ProjNet: Logged In User Page 8 of 7

Government Response. . These recommendations are not required in the specifications and therefore are at the Contractor's discretion. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8783873 Specifications Geotechnical Design Report Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The supplemental Geotechnical Report, section 4.9, states "It is recommended that a qualified Geotechnical Engineer or experienced technician under the direction of the Geotechnical Engineer be present during construction to confirm that the Contractor complies with the intent of these recommendations." Having a geotechinical engineer on site at all times during construction will result in significant and unnecessary cost, as this is not typical of pipe installation. Will the Government please clarify if the Contractor will be mandated to have a Geotechnical Engineer on site at all times during construction?

Government Response. . These recommendations are not required in the specifications and therefore are at the Contractor's discretion. On: Aug 24 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8786577 Plumbing SECTION 01 30 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Can HP or HDPE pipe be used in place of RCP?

On: Aug 21 2020.

Government Response. . HP or HDPE piping cannot be substituted for RCP for this project. On: Aug 24

Current Request Status: Request Closed Information for this report is procurement sensitive.

8787353 Civil All Sheets

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will orange fencing be required around the site perimeter to prevent others from accessing the job site? If so, can you please provide a detail of the fencing required.

On: Aug 21 2020.

Government Response. . Construction limits fencing will be required as indicated in Step 4 of the

Erosion and Sedimentation Control Sequence of Construction on Plan Sheet CE001 and in Specification 01 50 00, Section 2.3.

Section 01 50 00 - 2.3.1 specifies the color, materials, and dimensions for the construction limits fencing. A detail will not be provided. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8787359 Civil All Sheets

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Will a time extension to the bid date be considered?

On: Aug 21 2020.

Government Response. . All time extension requests are considered. Please see response to Inquiry 8773558. On: Aug 21 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8787382 Civil CE510

Will SD2_F be considered as an alternate for the sod inlet protection SD2-S?

On: Aug 21 2020.

Government Response. . Yes, SD2_F (Filter Fabric with Supporting Frame) may be considered as an alternate for the Sod Inlet Protection SD2-S. However, approval of this substitution, as part of the Erosion, Sedimentation, and Pollution Control Plan, will be required from the Augusta-Richmond County Local Issuing Authority. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8787384 Civil CT501

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Can GDOT High-build paint be utilized as an acceptable alternate to the thermoplastic striping?

On: Aug 21 2020.

Government Response. . GDOT High-build paint cannot be utilized as an acceptable alternate to the thermoplastic striping. On: Aug 24 2020

Current Request Status: Request Closed

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.

SITE VISIT ROSTER MEMORANDUM

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 01-Sep-2020 02:00 PM to 01-Sep-2020 01:00 PM.

The contractor period of performance end date has increased by 85 days from 365 days to 450 days.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTIONS

1. BASIS FOR AWARD:

A. IN ORDER TO BE DETERMINED RESPONSIVE AND RESPONSIBLE, ALL PROSPECTIVE BIDDER

MUST FURNISH THE FOLLOWING INFORMATION WITHIN THE ELECTRONICALLY

SUBMITTED BID:

1) Standard Form 1442, completed and signed by an authorized person.

2) Unit and Total Pricing for all line items in the bid schedule (except CLINS marked “DO NOT BID THIS

CLIN.”, if any)

3) Current Financial Statements (e.g. the last three years financial statements, Annual Reports, Dun and

Bradstreet ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. (The financial statement information will be protected from disclosure by the Contracting Officer.)

4) Bidders are required to submit a bid guarantee for this project in accordance with FAR Clause 52.228- 1, Bid Guarantee. An electronically copy of the bid guarantee must be submitted with the electronic bid submission. Also, the original bid guarantee shall be mailed to:

U.S. Army Corps of Engineers Savannah District CECT-SAS-E (Tonja Dreke) 100 W. Oglethorpe Ave.

Savannah, GA. 31401

2. SUBMISSION OF BIDS:

The Offeror’s bid shall be submitted electronically, as described below. The Offeror’s bid shall not contain classified data. The use of hyperlinks in bids is prohibited. The Offeror’s bid is due at the time and date specified in Block 13 of the SF1442.

The only authorized transmission method for bids in response to this solicitation is electronically via DODSAFE online submission. NO OTHER TRANSMISSION METHOD (EMAIL, FACSIMILE, US POSTAL MAIL, HAND CARRIED, ETC) WILL BE ACCEPTED other than original bid guarantee as indicated above.

The Offeror’s bid must be received by the Government by the date/time specified in the solicitation. Offerors shall submit their bid using the following link:

https://safe.apps.mil/

Please send bids using the link above to Contract Specialist, Tonja Dreke at tonja.j.dreke@usace.mil AND to Contracting Officer, Bruce Helms at bruce.a.helms@usace.army.mil.

INSTRUCTIONS FOR SUBMITTING ELECTRONIC BIDS: Due to the current COVID-19 pandemic, all bids shall be submitted electronically through the DODSAFE website. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or

ZIP your files before uploading to the DODSAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

REQUEST FOR UPLOAD CODE FOR SAFE WEBSITE: Offerors must email Contract Specialist, Tonja Dreke at tonja.j.dreke@usace.army.mil and to Contracting Officer, Bruce Helms at bruce.a.helms@usace.army.mil no later than five (5) working days prior to the bid due date to receive a request code which will allow for file uploads via the DODSAFE website. Offerors that fail to email for request of a code five (5) working days before bid submission date may not be able to receive a request code in time to upload their submission. The request created for the bidder to upload will only be valid for 14 days.

FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be in the email notice to each of the recipients you choose to have access your file(s).

NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII) in the File Description.)

Submission shall be in Adobe PDF format.

3. INSTRUCTION TO FOLLOW ON THE DODSAFE WEBSITE:

a. Once at the SAFE website, select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the DODSAFE site as a guest.

b. After selecting the “Click Here” link you will be prompted to add your personal information, file information, receipt (Government representative) information and emails email settings.

c. When completing your file information for transmittal via the SAFE website, you will be required to enter email address for all recipients. For this solicitation, the receipts are the Contract Specialist and the Contracting Officer. The Contract Specialist for this solicitation Tonja Dreke at tonja.j.dreke@usace.army.mil, and the Contracting Officer is Bruce Helms at bruce.a.helms@usace.army.mil. The bidder must enter the E-Mail address for both the Contracting Specialist and Officer. After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your bid is submitted, a notification will be sent to the recipients you added.

NOTE: Do NOT send the SAFE site packages to group email accounts.

Even if you successfully upload your bid to the DODSAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. A Bidder can confirm proper submission by the “Drop-Off Completed” screen which generates based on proper file submission.

NOTE: It has been reported that documents may more quickly upload in the DODSAFE website when using the Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.

RECEIPT OF SUBMISSIONS: For the purposes of establishing whether a bid submission is considered timely, the government considers the date and time the submission is completely uploaded in the DODSAFE website. For bids larger than the 2GB capacity of the DODSAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded in to the DODSAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.

The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive bids. Offerors are responsible for ensuring that bids are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.

4. QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 01 45 01 for additional information.

5. TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder

Inquiry in Projnet (https://www.projnet.org) at least 10 calendar days prior to the date established in the IFB for receipt of bids.

If a Bidder believes that the requirements in this Invitation for bid contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this Information for Bid based on the initial bid, as received, without discussion.

6. BIDDER INQUIRIES: To submit and review inquiry items, prospective vendors will need to use the

Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment or question will receive an acknowledgement via email, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted to the Solicitation Notice on the Contract Opportunities site (https://beta.sam.gov) in the form of a report generated from ProjNet as soon as the bidder inquiry period is over and answers are all finalized.

INVITATION FOR BID NO: W912HN20B3011

TITLE OF PROJECT: (DE-04833-8P) Outfall X, Fort Gordon, GA Bidder Inquiry Key: S2BR3A-EXPQNS

Specific Instructions for Initial ProjNet Bid Inquiry Access:

1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.

2. Identify the Agency as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time

Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

Steps 1 through 3: same as above.

4. Email. Enter the email address you used to register previously in ProjNet.

5. Click Continue. A page will then open asking for the answer to your Secret Question.

6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.

Individuals interested in participating in the virtual bid opening can participate by following these instructions:

Interested individuals will navigate to the WEBEX link below and enter their email address and name. Please provide your full name and information. This information will be utilized to obtain the list of attendees at the virtual bid opening.

Upon entering the WEBEX ROOM, you will choose the audio option for “CALL Me” and enter your phone number, WEBEX will call the number you entered. Answer the phone, enter the security code noted below, and speak your name clearly. You will now have entered the audio portion of the WEBEX meeting. The bids will be read aloud and individuals will be able to view the information on the WEBEX screen as the bid are entered into a bid tabulation sheet.

WEBEX Meeting Information:

https://usace.webex.com/meet/benjamin.s.jones

Call-in toll-free number: 1-877-402-9753 Access Code: 4763168 Security code: 1234

The WEBEX virtual bid opening will begin at 2:00 3:00 p.m. ET on the bid opening due date (see Block 13 of the SF1442). WEBEX participants should be logged into the WEBEX room and audio portion at least 5 minutes prior to avoid missing any of the virtual bid opening.

A list of attendees and a bid abstract will be posted to the solicitation notice on https://beta.SAM.gov approximately within 2 days after the virtual bid opening.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGE DETERMINATION

"General Decision Number: GA20200078 08/21/2020

Superseded General Decision Number: GA20190078

State: Georgia

Construction Type: Heavy Heavy Construction, Includes Water and Sewer Lines, and Heavy Construction on Treatment Plant Sites and Industrial Sites (Refineries, Power Plants, Chemical and Manufacturing Plants, Paper Mills, Etc.)

Counties: Burke, McDuffie and Richmond Counties in Georgia.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 08/21/2020

ELEC1579-002 10/01/2018

Rates Fringes

ELECTRICIAN......................$ 24.93 14.17

ENGI0474-029 07/01/2017

BURKE & RICHMOND COUNTIES

Rates Fringes

POWER EQUIPMENT OPERATOR:

Crane: 119 Tons and Under...$ 24.55 13.83 Crane: 120 to 249 Tons......$ 27.85 13.83 Crane: 250 to 499 Tons......$ 28.85 13.83 Crane: 500 Tons and Larger..$ 29.85 13.83 Mechanic....................$ 26.85 13.83

* ENGI0926-032 07/01/2020

MCDUFFIE COUNTY

Rates Fringes

POWER EQUIPMENT OPERATOR:

Crane, Mechanic.............$ 32.63 13.83

SUGA2012-108 08/11/2012

Rates Fringes

CARPENTER (Form Work Only).......$ 15.44 0.00

CARPENTER, Excludes Form Work....$ 14.76 0.00

CEMENT MASON/CONCRETE FINISHER...$ 16.96 0.00

IRONWORKER, REINFORCING..........$ 13.30 1.66

LABORER: Common or General......$ 9.84 0.00

LABORER: Pipelayer..............$ 9.48 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 12.80 0.00

OPERATOR: Bulldozer.............$ 14.58 0.00

OPERATOR: Grader/Blade..........$ 20.24 0.00

OPERATOR: Loader................$ 16.59 4.13

OPERATOR: Piledriver............$ 18.72 2.06

OPERATOR: Roller................$ 12.04 0.69

TRUCK DRIVER: Dump Truck........$ 12.79 0.00

TRUCK DRIVER: Lowboy Truck......$ 17.28 1.84

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

"General Decision Number: GA20200153 01/31/2020

Superseded General Decision Number: GA20190153

State: Georgia

Construction Type: Building

County: Richmond County in Georgia.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/31/2020

BOIL0026-001 03/01/2018

Rates Fringes

BOILERMAKER......................$ 28.97 22.39

* ELEV0032-001 01/01/2020

Rates Fringes

ELEVATOR MECHANIC................$ 42.72 35.245

PAID HOLIDAYS:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.

ENGI0474-003 07/01/2017

Rates Fringes

POWER EQUIPMENT OPERATOR:

Backhoe/Excavator, Bobcat/Skid Steer/Skid Loader, Bulldozer, Forklift (under 15 tons), and Loader..................$ 25.02 13.83 Crane (over 10 tons) and Forklift (15 tons and over).$ 26.85 13.83 Crane (over 120 tons).......$ 27.85 13.83 Crane (over 250 tons).......$ 28.85 13.83 Oiler.......................$ 22.68 13.83

PLUM0150-006 10/01/2019

Rates Fringes

PLUMBER/PIPEFITTER...............$ 29.87 14.86

SHEE0085-013 07/01/2017

Rates Fringes

SHEET METAL WORKER (HVAC Duct

Installation Only)...............$ 29.78 12.31

SUGA2012-072 08/11/2012

Rates Fringes

BRICKLAYER.......................$ 16.00 0.00

CARPENTER, Includes Drywall Hanging and Metal Stud Installaton......................$ 15.29 0.00

CEMENT MASON/CONCRETE FINISHER...$ 16.58 0.00

DRYWALL FINISHER/TAPER...........$ 17.00 0.00

ELECTRICIAN......................$ 19.72 3.79

HVAC MECHANIC (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)............................$ 18.00 3.89

IRONWORKER, REINFORCING..........$ 17.94 0.00

IRONWORKER, STRUCTURAL...........$ 20.00 0.35

LABORER: Common or General......$ 10.18 0.32

LABORER: Mason Tender - Brick...$ 9.00 0.00

LABORER: Pipelayer..............$ 12.00 0.23

OPERATOR: Grader/Blade..........$ 17.52 0.00

PAINTER: Brush, Roller and Spray............................$ 16.00 1.62

ROOFER, Excludes Installation of Metal Roofs...................$ 10.27 0.00

SHEET METAL WORKER (Metal Roofs Installation)..............$ 22.40 0.00

SHEET METAL WORKER, Excludes HVAC Duct and Metal Roof Installation.....................$ 22.40 0.00

TILE FINISHER....................$ 10.31 0.00

TILE SETTER......................$ 19.50 0.00

TRUCK DRIVER: Dump Truck........$ 12.70 0.00

TRUCK DRIVER: Lowboy Truck......$ 17.41 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be…