20B3011.pdf

PDF 13 MB Posted

Attached to
Repair Outfall X Stormwater System, Fort Gordon GA
Solicitation number
W912HN20B3011
Issued by

About this file

This document provides details for a federal contract solicitation issued by the Department of the Army Corps of Engineers Engineering District Savannah. Solicitation number W912HN20B3011 seeks bids for the repair of Outfall X Stormwater System at Fort Gordon, Georgia. Interested vendors can view one specification file and two drawings files related to the project. Bids are due by 2:00pm Eastern Time on September 1, 2020. The solicitation was issued on July 31, 2020 and involves repairing the stormwater drainage system at the specified outfall location at Fort Gordon.

View the file

Other files

File Type Posted
Outfall X - bid opening Webex screen shot with attendee list.pdf PDF
Abstract_W912HN20B3011 Outfall X.pdf PDF
B.08 W912HN20B30110003.pdf PDF
B.08 W912HN20B30110001.pdf PDF
B.08 W912HN20B30110002.pdf PDF
20B3011.pdf PDF
W912HN-20-B-3011_AMD2.pdf PDF
20B3011.pdf PDF
W912HN-20-B-3011_AMD1.pdf PDF
Outfall_X_Plans_RTA - 20200730_PART_1.pdf PDF
20B3011.pdf PDF
Outfall_X_Plans_RTA - 20200730_PART_2.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Gordon, Georgia

Solicitation Number

W912HN-20-B-3011

Repairs To Outfall X And Contributing Storm Sewer Network Procurement and Contracting Requirements, Specification Divisions 01 - 35, and Appendices

PN DE-4876-8P

July 2020

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

CORPS OF ENGINEERS

100 WEST OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640

US Army Corps of Engineers Savannah District

Repairs To Outfall X And Contributing Storm Sewer Network 20B3011 Ft. Gordon, GA

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 22 00 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DI VI SI ON 09 - FI NI SHES

09 90 00 PAINTS AND COATINGS

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 62 16.16 STEEL H-PILES

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCE

32 92 19 SEEDING

32 92 23 SODDING

DI VI SI ON 33 - UTI LI TI ES

33 40 00 STORM DRAINAGE UTILITIES

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 31 19 STONE CHANNEL PROTECTION FOR STRUCTURES

35 31 19.20 ARTICULATING CONCRETE BLOCK REVETMENTS

APPENDICES

PROJECT TABLE OF CONTENTS Page 1

Repairs To Outfall X And Contributing Storm Sewer Network 20B3011 Ft. Gordon, GA

Appendix A GEOTECHNICAL DESIGN REPORT

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

A. This is an Invitation for Bid for: DE-04833-8P Outfall X Stormw ater Demo and Reconstruction, Fort Gordon, GA B. This acquisition is being solicited as 100% Competitive Small Business acquisition under NAICS 237110, Water and Sew er Line Construction.

C. This acquisition w ill be aw arded in accordance w ith FAR Part 14 (Sealed Bidding).

D. In accordance w ith FAR 36.204(g), the magnitude of construction for this project is betw een $5,000,000 and $10,000,000 E. Bidders must be registered in the System for Aw ard Management (w w w .sam.gov).

F. The contractual POC for this Procurement is Ms. Tonja Dreke, (912) 652-6071 or tonja.j.dreke@usace.army.mil

X

TONJA J DREKE 912-652-6071

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

31-Jul-2020

(RFP)

(IFB)

CALL:

Outfall X Stormw ater reconstruction

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________450 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________02 Sep 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

DE-04833-8P

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912HN20B3011 77

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

ProjNet: Logged In User Page 3 of 7 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl... 8/24/2020

W912HN20B3011

Section SF 30 - Block 14 Continuation Page (SF 30)

AMENDMENT 0001

A. CONTRACT CHANGES: FAR Clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB

1995) – ALTERNATE I (FEB 1995) has been clarified.

Bid Schedule clarification for Utility information.

B. TECHNICAL SPECIFICATION CHANGES: The revised Section listed below (revised by Amendment No. 0001) is hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be found in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). The replaced Section listed below (replaced by Amendment No. 0001) is hereby added to and made a part of the solicitation; such Sections are replaced in their entirety and changes are neither underlined nor struck out.

Revised Section Replaced Section 33 40 00 01 42 00

C. CONTRACT DRAWINGS:

Sheets CE001, CE101, CE102, CE103, CE104, CE105, CE106, CE107, CE108, CE109, CE110, CE501, CE502, CE503, CE504, CE505, CE506, CE507, CE508, CE509, CE510, CE511, CE512, and CE513, dated 07 August 2020 are hereby added to and made a part of the Contract Drawings.

AMENDMENT 0002

A. CONTRACT CHANGES: Adjust Bid Opening Time (see Block 13A of SF1442), Updated Wage Determination GA202000078, update FAR Clause 52.211-10, post Site Visit Roster and memorandum and ProjNet report.

B. TECHNICAL SPECIFICATION CHANGES: There are no technical specification changes with this amendment.

C. CONTRACT DRAWINGS:

Sheets GI004, GI102, GI103, GI104, GI105, GI106, CD103, CD105, CG108, CG109, CG110, CG111, CG112, CG113, CG114, and CG115 with Revision 1 dated 21 August 2020 are hereby added to and made a part of the Contract Drawings.

ProjNet: Logged In User Page 4 of 7

AMENDMENT 0003

A. CONTRACT CHANGES: Add final Bidder Inquiry via ProjNet Inquiry Report.

B. TECHNICAL SPECIFICATION CHANGES: The added Section listed below (added by Amendment No. 0003) is hereby added to and made a part of the solicitation.

Added Section 31 32 11

C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.

SITE VISIT ROSTER MEMORANDUM

ProjNet: Logged In User Page 5 of 7

ProjNet: Logged In User Page 6 of 7

BID INQUIRY CONTRACTOR REPORT

ProjNet: Logged In User Page 7 of 7

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: Repairs to Outfall X and Contributing Storm Sewer Network Review: Bidder Inquiries (00001) (sorted by CommentID ) Displaying 23 inquiries.

Id Discipline Sheet Detail Spec 8756006 Civil 33 40 00 2.6 Resilient Connectors Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specifications call for Resilient Connectors, flexible, watertight connectors used for connecting pipe to manholes and inlets.

This specification is not depicted in the details or typical for GDOT piping. Will these connectors be required for all manhole connections ?

On: Aug 10 2020.

Government Response. . Section 33 40 00 2.6 Resilient Connectors is deleted. Pipe connections to manholes and inlets shall be grouted per GDOT Standards as shown on GDOT 1019A. Specification revisions to be incorporated by amendment. On: Aug 17 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8756032 Civil 33 40 00 3.9.1.1 Leakeage Test Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specifications call for leakage testing by low pressure air or water testing prior to completing backfill and goes further into detail. This type of testing is quite expensive for such a large quantity amount of piping. Would the government consider deleting this specification in lieu of other quality testing procedures?

On: Aug 10 2020.

Government Response. . Section 33 40 00 3.9.1.1 Leakage Testing is deleted. GDOT Standard Section

550.3.06 is included by reference which includes video, laser profiling, and inspection reports. Specification revisions to be incorporated by amendment. On: Aug 17 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8756042 Civil 33 40 00 2.4.7.2 External Sealing Bands Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specifications call for External Sealing Bands, will this be required ? This is not typical for GDOT specified piping installation.

Government Response. . : 33 40 00 2.4.7.2 External Sealing Bands are required as well as internal joint seals. On: Aug 17 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8756058 Civil 33 40 00 3.2.1 Concrete Pipe

Requirements Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specifications mention variable bedding depths for the piping. Will there be a uniform typical section provided for the pipe bedding based on sizes and locations? No details found for bedding, not typical for GDOT unless called for by typical section.

Government Response. . GDOT Construction Standards 1030d1 and 1030d2 are included by reference.

Specification revisions to be incorporated by amendment. On: Aug 17 2020

ProjNet: Logged In User Page 8 of 7

ProjNet: Logged In User Page 9 of 7

Current Request Status: Request Closed Information for this report is procurement sensitive.

8756464 Utilities Engineering GI004 Utility Conflict

Table

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will additional information for Utility conflicts be given? Replace and Repair resolutions are broad and can only be assumed without further clarifications.

I.e. 51. 118+20 Brainard Ave 8" Sanitary : Replace length of VC with DI.

What quantifies the length to satisfy utility owner? Is it from manhole to manhole or just in the footprint of the proposed piping?

Government Response. . Augusta Utilities Department (AUD) will provide USACE and bidders with a firm lump sum cost proposal to perform work on AUD utility assets to resolve the utility conflicts listed in Table 1 Utility Conflicts on plan sheet GI004. Please note as described in the resolution column that the Outfall X Contractor will remove and dispose of AUD utilities noted as abandon and remove utilities that are within the excavation limits to construct the storm sewer. This work by the Outfall X Contractor is not included in the AUD cost proposal.

AUD is working to design resolutions to each conflict, which will consist of standard details and/or specific designs appropriate for each conflict difficulty. In general, AUD will attempt to minimize disturbance to AUD's systems. For example, cutting and replacing smaller sanitary sewer lines are expected to be limited to the storm drain excavation limits. However, the sanitary sewer trunk main crossings will require a significant more effort to resolve.

AUD expects to work closely with the Outfall X Contractor regarding the project scheduling to coordinate AUD work that may be done prior to, during, or in sequence with Outfall X storm drain construction On:

Aug 17 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8756501 Utilities Engineering

Should the contractor assume there will be further utility conflicts and include this into their LS utility pricing or will further unknown conflicts be addressed during construction.

Government Response. . All known utility conflicts associated with project are identified in GI004 Utility

Conflict Table. Utility information is approximate however, and more conflicting conditions may exist than are shown on the plans. Contractor shall confirm all existing utilities prior to the start of construction.

Unforeseen or differing conditions will have to be addressed during construction. On: Aug 17 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8760972 Utilities Engineering

Pg 4 of 63 Utility Notes

Specifications call for All utility work to be designed and constructed by privatized utility providers. Several utility owner representatives contacts were provided for contact. However it does not appear communications, fiber, NEC, At&T were included. Based on history and location of project we anticipate several conflicts with these utilities.

Without representatives and known conflicts these cannot be included in the ITEM NO 0002 pricing. Please clarify.

On: Aug 11 2020.

Government Response. . All known Utility conflicts are identified in bid package. NEC Point of Contact will be added to bid schedule (via Amendment) for bidders to obtain price quote for related communications work. It is understood that AT&T maintains their own infrastructure. Contractor to confirm all existing utilities prior to the start of construction. On: Aug 19 2020

Current Request Status: Request Closed

ProjNet: Logged In User Page 10 of

8771519 Civil CG108-CG111

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

A Discrepancy between the Demolition and Plan/Profile sheets was discovered concerning the existing 30" RCP found between 31+00 to 43+00.

The Demolition plans do not recognize any action to be made to this pipe or it's structures (AIP,REMOVE,RETAIN) between Provost Ave and Avenue of the States.

CG111 Notes to Retain the 30" RCP along with the Existing CB at the corner of AOS. If following the proposed retained pipe, there is no Inverts provided for Structure A15.

It also does not appear to be any ditch grading in this area proposed, please clarify the intent of moving the surface water to the new structures.

Please Clarify the intent of the pipe and structure beyond this retained structure.

On: Aug 15 2020.

Government Response. . Responses are provided directly below each inquiry as follows:

Inquiry: discrepancy concerning 30" RCP between 31+00 to 43+00 Response: The existing line is to remain in parallel with the proposed line. An adjustment is made to structure A5 to reconnect to the existing line at Provost Ave on CG108. This change shifts the upstream Stationing about 5 feet upstream of this point on sheets CG108-113.

Inquiry: The Demolition plans do not recognize any action to be made to this pipe or it's structures (AIP, REMOVE, RETAIN) between Provost Ave and Avenue of the States.

Response: A note is added to the Demolition Plan sheet CD103 and CD105 to Retain this pipe segment and the associated structures.

Inquiry: Question regarding inverts for Structure A15

Response: Inverts for proposed pipes at Structure A15 are shown on the profile on CG111.

Inquiry: It also does not appear to be any ditch grading in this area proposed, please clarify the intent of moving the surface water to the new structures.

Response: New pipe/structures are for additional conveyance capacity of piped system. Surface water will continue to flow into the existing inlets in parallel to the new line.

Revisions noted above will be incorporated into contract documents via Amendment. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8771521 Civil CG114-CG115

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Demolition Plans do not recognize the intent of the existing 18" RCP Trunk Line between Structure A11 & B4.

Shall this line be AIP,REMOVED,Or RETAINED?

Please clarify the Pipe sizing for the B3 and B4 tie ins. Plans say to Retain EXST 18" RCP but denote 24" RCP in these areas.

On: Aug 15 2020.

Government Response. . Responses are provided directly below inquiries as follows:

Inquiry: Demolition Plans do not recognize the intent of the existing 18" RCP Trunk Line between Structure A11 & B4.

Response: New pipe/structures are for additional conveyance capacity of piped system while avoiding

ProjNet: Logged In User Page 11 of water/sanitary utility conflicts and damage to road/curb and retaining existing inlets.

Inquiry: Shall this line be AIP,REMOVED,Or RETAINED?

Response: Shall be Retained

Inquiry: Please clarify the Pipe sizing for the B3 and B4 tie ins. Plans say to Retain EXST 18" RCP but denote 24" RCP in these areas.

Response: Note realigned on CG115 to point to existing 18" line parallel to Avenue of the States to be retained. Tie-in connector pipe added between existing and new line at manhole B1 at 24" RCP on CG114 consistent with the other 24" RCP connectors.

Revisions identified above to be incorporated into contract documents via Amendment. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8773558 General page 4 Specs Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Due to the size and scope of this project we request an extension for submission of the bid to September 29, 2020 from the published date of September 1, 2020. This will allow more time to coordinate with the utility contractors as well as all suppliers required for this project.

On: Aug 17 2020.

Government Response. . Any changes to the bid opening date/time will be addressed by amendment to the solicitation. This project is an FY20 project with possible award by 30 September 2020. Therefore, an extension to 29 September 2020 is not feasible. Please bid the solicitation as issued. On: Aug 19 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8782256 Civil CE102 DC-A

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Several of the CE Sheets denote the use of DC-A for Temporary Stream Diversion Channel.

A1 CE-106/107 Details Call for 2' Type 3 Rip Rap lining.

DC-A in the soil erosion manual allows Geotextile, polyethylene film, or sod.

Please clarify which temporary BMP will be accepted.

On: Aug 20 2020.

Government Response. . Temporary Stream Diversion Channels shall be GSWCC Type DC-C, riprap lined as shown on CE106/107. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8782260 Civil 33 40 00 3.2.1 Concrete Pipe

Requirements Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Would the Owner/DOR consider the use of Double Gasketed HP Piping in lieu of the proposed RCP Piping?

HP is approved on similar USACE and GDOT Projects.

On: Aug 20 2020.

Government Response. . Substitutions for RCP will not be considered. On: Aug 21 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8782487 CAD-BIM Drawings

ProjNet: Logged In User Page 12 of

Please provide the CADD files for this project for estimating purposes.

On: Aug 20 2020.

Government Response. . Cadd files will not be provided for estimating purposes. On: Aug 21 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8782884 Civil CG106

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

On CG106 at approximately STA 23+20, it appears that there are two headwalls shown, however there is only one detail provided (GDOT Standard 1125). Can the Government please clarify the drawing?

Government Response. . The smaller headwall shown at Sta 23+20 is a symbol in the CAD. The larger headwall footprint shown reflects the approximate size required for the GDOT STD. 1125 headwall to fit the pipe. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8783778 Specifications Geotechnical Design Report Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The supplemental Geotechinical Report, section 3.9.2 states "Crushed stone should be placed around the pipelines as shown on the Contract Drawings and extend from a minimum of 6 inches below the pipe to the pipe springline."

The contract drawings do not indicate a typical section for RCP installation. A previous question submitted regarding pipe bedding was answered by the Government and refers Contractors to GDOT Standard 1031d1 and 1031d2.

When looking at the GDOT standard drawings, no pipe bedding is indicated. Due to conflicting answers, will the Government please clarify the bedding requirements as it pertains to RCP installation?

Government Response. . GDOT Standards 1030d1 and 1030d2 were intended for reference in

Amendment 1 and include the bedding details. On: Aug 24 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8783828 Specifications Geotechnical Design Report Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The supplemental Geotechnical Report, section 4.5.3, states "We recommend that SMP's, DMP's, ESMP's, and crack monitors be established ont he existing structures and utilities within 50 feet of the excavations. The points should be monitored during demolition, support of excavation installation, excavation, foundation installation, and backfilling work." This is not typical industry standard for pipe installation and will add a significant as well as unnecessary cost.

Will the Government please clarify if the Contractor will be mandated to implement SMP's, DMP's, ESMP's, and crack monitoring?

On: Aug 20 2020.

Government Response. . These recommendations are not required in the specifications and therefore are at the Contractor's discretion. On: Aug 24 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8783845 Specifications Geotechnical Design Report Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The supplemental Geotechnical Report, section 4.5.4, states that "A minimum of two seismographs should be located at adjacent/nearby structures and utilities during all demolition, excavation support installation, and pile installation activities to confirm compliance with the recommendations herein and record actual impact vibrations." While it is understandable for vibratory monitoring when installing pile, is it actually the Government's intention for vibratory monitoring during demolition? This will result in a significant and unnecessary cost when considering the amount of pipe demolition scheduled for the project. Please clarify if this requirement is will be mandatory.

ProjNet: Logged In User Page 13 of

Government Response. . These recommendations are not required in the specifications and therefore are at the Contractor's discretion. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8783873 Specifications Geotechnical Design Report Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The supplemental Geotechnical Report, section 4.9, states "It is recommended that a qualified Geotechnical Engineer or experienced technician under the direction of the Geotechnical Engineer be present during construction to confirm that the Contractor complies with the intent of these recommendations." Having a geotechinical engineer on site at all times during construction will result in significant and unnecessary cost, as this is not typical of pipe installation. Will the Government please clarify if the Contractor will be mandated to have a Geotechnical Engineer on site at all times during construction?

Government Response. . These recommendations are not required in the specifications and therefore are at the Contractor's discretion. On: Aug 24 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8786577 Plumbing SECTION 01 30 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can HP or HDPE pipe be used in place of RCP?

On: Aug 21 2020.

Government Response. . HP or HDPE piping cannot be substituted for RCP for this project. On: Aug 24

Current Request Status: Request Closed Information for this report is procurement sensitive.

8787353 Civil All Sheets

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will orange fencing be required around the site perimeter to prevent others from accessing the job site? If so, can you please provide a detail of the fencing required.

On: Aug 21 2020.

Government Response. . Construction limits fencing will be required as indicated in Step 4 of the

Erosion and Sedimentation Control Sequence of Construction on Plan Sheet CE001 and in Specification 01 50 00, Section 2.3.

Section 01 50 00 - 2.3.1 specifies the color, materials, and dimensions for the construction limits fencing. A detail will not be provided. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8787359 Civil All Sheets

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Will a time extension to the bid date be considered?

On: Aug 21 2020.

Government Response. . All time extension requests are considered. Please see response to Inquiry 8773558. On: Aug 21 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8787382 Civil CE510

Will SD2_F be considered as an alternate for the sod inlet protection SD2-S?

On: Aug 21 2020.

Government Response. . Yes, SD2_F (Filter Fabric with Supporting Frame) may be considered as an alternate for the Sod Inlet Protection SD2-S. However, approval of this substitution, as part of the Erosion, Sedimentation, and Pollution Control Plan, will be required from the Augusta-Richmond County Local Issuing Authority. On: Aug 24 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8787384 Civil CT501

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Can GDOT High-build paint be utilized as an acceptable alternate to the thermoplastic striping?

On: Aug 21 2020.

Government Response. . GDOT High-build paint cannot be utilized as an acceptable alternate to the thermoplastic striping. On: Aug 24 2020

Current Request Status: Request Closed

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.

BID INQUIRY CONTRACTOR REPORT

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Demo and Reconstruction of StormwaterFFP

Demolition and Reconstruction of (3) existing Stormwater Outfalls and Contributing Storm Sewer Networks, including stilling Basin and Channel Improvements complete.

FOB: Destination

PSC CD: Z2ND

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job Demo and Reconstruction of Utility workFFP

Demolition and Reconstruction of all Utility work associated with project.

PSC CD: Z2ND

NET AMT

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 450 dys. ANP 1 USACE - SAVANNAH DISTRICT

SEE SCHEDULE FOR DELIVERY

LOCATION

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

SEE SCHEDULE

W912HN

0002 450 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

W912HN

NOTES

BID SUMMARY

TOTAL BASE BID (CLIN 0001 THROUGH CLIN 0002) $ _______________

NOTES:

All utility work shall be designed and constructed by privatized/government utility providers. Bidders shall obtain costs for all utility work from privatized utility companies, and include this work in Bid Proposal. See below for Privatized Utility Provider Points of Contact:

Augusta Utilities Department – Domestic Water and Sewer Steven M. Behrend, PE sbehrend@augustaga.gov

706.312.5057 Office.

706.836.6157 Cell

GA Power – Electrical Chris Dodgen WCDODGEN@southernco.com

706.564.0281 Cell

GA Power – Lighting

Christopher Sailors CSAILORS@southernco.com

706.650.5204 Office

706.513.9776 Cell

Michael Goodwin MGGOODWI@southernco.com

706.650.5232 Office

706.533.4455 Cell

Southern Company / Atlanta Gas Light (Natural Gas)

Carl Corley icorley@aglresources.com

706.214.0858 Cell

Network Enterprise Center (NEC – Government/Communications) Randy Williams randolph.williams1@us.army.mil

(706) 830-6339 Office

(706) 791-3333 Cell

BID DATA SHEET

BID DATA SHEET

W912HN-20-B-3011

Project Number: DE 04833-8P Outfall X, Fort Gordon, GA

Name of Firm: _________________________________________________

Address:______________________________________________________

Phone: _______________________________________________________

Fax:__________________________________________________________

Person(s) Authorized to Sign Bid: ___________________________________

E-mail:________________________________________________________

DUNS # (used for accessing SAM, CPARS, PPIRS):_______________________

CAGE CODE: __________________________

TAX ID: _______________________________

Section 00 21 13 - Instructions to Bidders

INSTRUCTIONS

1. BASIS FOR AWARD:

A. IN ORDER TO BE DETERMINED RESPONSIVE AND RESPONSIBLE, ALL PROSPECTIVE BIDDER MUST

FURNISH THE FOLLOWING INFORMATION WITHIN THE ELECTRONICALLY SUBMITTED BID:

1) Standard Form 1442, completed and signed by an authorized person.

2) Unit and Total Pricing for all line items in the bid schedule (except CLINS marked “DO NOT BID THIS

CLIN.”, if any)

3) Current Financial Statements (e.g. the last three years financial statements, Annual Reports, Dun and

Bradstreet ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. (The financial statement information will be protected from disclosure by the Contracting Officer.)

4) Bidders are required to submit a bid guarantee for this project in accordance with FAR Clause 52.228- 1, Bid Guarantee. An electronically copy of the bid guarantee must be submitted with the electronic bid submission. Also, the original bid guarantee shall be mailed to:

U.S. Army Corps of Engineers Savannah District CECT-SAS-E (Tonja Dreke) 100 W. Oglethorpe Ave.

Savannah, GA. 31401

2. SUBMISSION OF BIDS:

The Offeror’s bid shall be submitted electronically, as described below. The Offeror’s bid shall not contain classified data. The use of hyperlinks in bids is prohibited. The Offeror’s bid is due at the time and date specified in Block 13 of the SF1442.

The only authorized transmission method for bids in response to this solicitation is electronically via DODSAFE online submission. NO OTHER TRANSMISSION METHOD (EMAIL, FACSIMILE, US POSTAL MAIL, HAND CARRIED, ETC) WILL BE ACCEPTED other than original bid guarantee as indicated above.

The Offeror’s bid must be received by the Government by the date/time specified in the solicitation. Offerors shall submit their bid using the following link:

https://safe.apps.mil/

Please send bids using the link above to Contract Specialist, Tonja Dreke at tonja.j.dreke@usace.mil AND to Contracting Officer, Bruce Helms at bruce.a.helms@usace.army.mil.

INSTRUCTIONS FOR SUBMITTING ELECTRONIC BIDS: Due to the current COVID-19 pandemic, all bids shall be submitted electronically through the DODSAFE website. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the DODSAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

REQUEST FOR UPLOAD CODE FOR SAFE WEBSITE: Offerors must email Contract Specialist, Tonja Dreke at tonja.j.dreke@usace.army.mil and to Contracting Officer, Bruce Helms at bruce.a.helms@usace.army.mil no later than five (5) working days prior to the bid due date to receive a request code which will allow for file uploads via the DODSAFE website. Offerors that fail to email for request of a code five (5) working days before bid submission date may not be able to receive a request code in time to upload their submission. The request created for the bidder to upload will only be valid for 14 days.

FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be in the email notice to each of the recipients you choose to have access your file(s).

NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII) in the File Description.)

Submission shall be in Adobe PDF format.

3. INSTRUCTION TO FOLLOW ON THE DODSAFE WEBSITE:

a. Once at the SAFE website, select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the DODSAFE site as a guest.

b. After selecting the “Click Here” link you will be prompted to add your personal information, file information, receipt (Government representative) information and emails email settings.

c. When completing your file information for transmittal via the SAFE website, you will be required to enter email address for all recipients. For this solicitation, the receipts are the Contract Specialist and the Contracting Officer. The Contract Specialist for this solicitation Tonja Dreke at tonja.j.dreke@usace.army.mil, and the Contracting Officer is Bruce Helms at bruce.a.helms@usace.army.mil. The bidder must enter the E-Mail address for both the Contracting Specialist and Officer. After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your bid is submitted, a notification will be sent to the recipients you added.

NOTE: Do NOT send the SAFE site packages to group email accounts.

Even if you successfully upload your bid to the DODSAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. A Bidder can confirm proper submission by the “Drop-Off Completed” screen which generates based on proper file submission.

NOTE: It has been reported that documents may more quickly upload in the DODSAFE website when using the Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.

RECEIPT OF SUBMISSIONS: For the purposes of establishing whether a bid submission is considered timely, the government considers the date and time the submission is completely uploaded in the DODSAFE website. For bids larger than the 2GB capacity of the DODSAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded in to the DODSAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.

The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive bids. Offerors are responsible for ensuring that bids are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.

4. QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 01 45 01 for additional information.

5. TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in Projnet (https://www.projnet.org) at least 10 calendar days prior to the date established in the IFB for receipt of bids.

If a Bidder believes that the requirements in this Invitation for bid contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this Information for Bid based on the initial bid, as received, without discussion.

6. BIDDER INQUIRIES: To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment or question will receive an acknowledgement via email, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet.

Approved answers to all timely questions will also be posted to the Solicitation Notice on the Contract Opportunities site (https://beta.sam.gov) in the form of a report generated from ProjNet as soon as the bidder inquiry period is over and answers are all finalized.

INVITATION FOR BID NO: W912HN20B3011

TITLE OF PROJECT: (DE-04833-8P) Outfall X, Fort Gordon, GA Bidder Inquiry Key: S2BR3A-EXPQNS

Specific Instructions for Initial ProjNet Bid Inquiry Access:

1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.

2. Identify the Agency as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time

Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

Steps 1 through 3: same as above.

4. Email. Enter the email address you used to register previously in ProjNet.

5. Click Continue. A page will then open asking for the answer to your Secret Question.

6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.

Individuals interested in participating in the virtual bid opening can participate by following these instructions:

Interested individuals will navigate to the WEBEX link below and enter their email address and name. Please provide your full name and information. This information will be utilized to obtain the list of attendees at the virtual bid opening.

Upon entering the WEBEX ROOM, you will choose the audio option for “CALL Me” and enter your phone number, WEBEX will call the number you entered. Answer the phone, enter the security code noted below, and speak your name clearly. You will now have entered the audio portion of the WEBEX meeting. The bids will be read aloud and individuals will be able to view the information on the WEBEX screen as the bid are entered into a bid tabulation sheet.

WEBEX Meeting Information:

https://usace.webex.com/meet/benjamin.s.jones

Call-in toll-free number: 1-877-402-9753 Access Code: 4763168 Security code: 1234

The WEBEX virtual bid opening will begin at 2:00 3:00 p.m. ET on the bid opening due date (see Block 13 of the SF1442). WEBEX participants should be logged into the WEBEX room and audio portion at least 5 minutes prior to avoid missing any of the virtual bid opening.

A list of attendees and a bid abstract will be posted to the solicitation notice on https://beta.SAM.gov approximately within 2 days after the virtual bid opening.

CLAUSES INCORPORATED BY REFERENCE

52.203-11 Certification And Disclosure Regarding Payments To

Influence Certain Federal Transactions

SEP 2007

52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.204-24 Representation Regarding Certain Telecommunications and

Video Surveillance Services or Equipment.

DEC 2019

52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.225-10 Notice of Buy American Requirement--Construction Materials

MAY 2014

CLAUSES INCORPORATED BY FULL TEXT

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

(a) Definitions. As used in this provision--

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) means that--

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;

(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.

(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(3) Company physical street address, city, state, and Zip Code.

(4) Company mailing address, city, state and Zip Code (if separate from physical).

(5) Company telephone number.

(6) Date the company was started.

(7) Number of employees at your location.

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company headquarters name and address (reporting relationship within your entity).

(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.

(End of Provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

27.2% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is is GA Columbia;

GA Richmond; SC Aiken.

52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014) ALTERNATE II (JUN 2009)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .