Outfall_X_Plans_RTA - 20200730_PART_1.pdf

PDF 47 MB Posted

Attached to
Repair Outfall X Stormwater System, Fort Gordon GA
Solicitation number
W912HN20B3011
Issued by

About this file

This document provides details on a federal contract opportunity for repair work on an outfall stormwater system at Fort Gordon, Georgia. The solicitation was posted on July 31, 2020 under number W912HN20B3011 by the Department of the Army Corps of Engineers Engineering District Savannah. One specification file and two drawing files are included related to repairs for Outfall X. The bid opening date is September 1, 2020 at 2:00pm Eastern Time. The opportunity involves repair of the Outfall X stormwater system located at Fort Gordon, Georgia according to the specification and drawing files provided with the solicitation.

View the file

Other files

File Type Posted
Outfall X - bid opening Webex screen shot with attendee list.pdf PDF
Abstract_W912HN20B3011 Outfall X.pdf PDF
B.08 W912HN20B30110003.pdf PDF
B.08 W912HN20B30110001.pdf PDF
B.08 W912HN20B30110002.pdf PDF
20B3011.pdf PDF
20B3011.pdf PDF
W912HN-20-B-3011_AMD2.pdf PDF
20B3011.pdf PDF
W912HN-20-B-3011_AMD1.pdf PDF
20B3011.pdf PDF
Outfall_X_Plans_RTA - 20200730_PART_2.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SD

SD

SD

SD

SDSD

SD

SD

SD

SD

SD SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD SD

SD

SD

SDSDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD

SD

SD

SD

SD

SD

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

EE

E

E

E

E

E

E

E

E

E

E

E

EE

E

E

EEEEEEEEEEEEEEE

EE

E

E E

E E

E E

E

EEEEEEEEEEEE

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

EEEEEEEEEEEEEEEEE

E E

E E

E E

E

E

EE

E E

E E

E E

E E

E

E

E

E E

E E

E E

E

E

E

E E E E E E E E E E

E E E E

E

E

E E

E E

E E

EEE

E E

E E

EEEE

E E

E

EEEE

E E

E E

E E

E E

E E

E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

E E

E E

E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

EE

E

E

E

E E E

E

E

E

E

E

E

E

E E

E E

E E

E

E

E E E E E E E

E E

E E

E E

E E

E E

EEEEEEEEEEEEEEEEEEEEEEEEEEE

E

E

E E

E E

E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E E E E E E E E E E E

E E E E E E E

E E

E E

E

EEE

EEEE

EEEEEEEEEEEEEEEEEE

E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

E

E

EEEEEEEEEEEEEEEEEEEEEEEEEEE

E E

E E E

E

E

E

E

EEE

E E

E E

E

E E E E E E E E E E

E

E E

E E

E E

E E

EE

E E

E E

EEEEE

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E E

E E

E E E

E E E E E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E

E E

E E

E E

E E

E

EEEEEE

E

E

E

E

E

E

E

SAN

SA

N

SAN SAN SAN SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SD SD SD SD SD SD SD

SD SD SD SD SD SD SD

SD

SD

SD

SD

SD

SAN

SAN

SAN

SAN

SAN

W

W

W

WW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W W

W

W

W

W

W W W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W W

W

W W

W W

W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WW W W

W W W W W W W WW

W W

W W

W W

W W

W

W W

W W

W W

W W

W W

W W

W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W W

W W W W W W W

W W

W W

WWWWWWWWWW

W W W W W W

W W

W W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W W W W

W W W W W W W W W W W W W

W W

W W

W W

W

SAN

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SAN

SAN

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SA

N

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SANSANSANSAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

US Army Corps of Engineers ®

CDM FEDERAL PROGRAMS CORPORATION

FORT GORDON

STATE MAP

NOT TO SCALENOT TO SCALE

CITY MAP

NOT TO SCALE

FORT GORDON VICINITY MAP

TENNESSEE NORTH CAROLINA

SOUTH CAROLINA

AT

LA

NT

IC

O

CE

ANSAVANNAH

ALABAMA

FLORIDA

GEORGIA

PROJECT SITE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

JU

LY

C

AT

EG

O

R Y

C O

D E:

FI

LE

N

AM

E:

D

S

IZ

E

W

2H N

-2 0-

B-

FO

R

T G

O R

D O

N , G

EO

R

G

IA

R

EP

AI

R

S

TO

O U

TF

AL

L X

AN

D

C O

N

TR

IB

U

TI

N

G S

TO

R

M S

EW

ER

N

ET

W O

R K

FY

P N

D E-

3- 8P

R

EA

D Y

FO

R

A D

VE

R

TI

SE

M

EN

T

C D

M F ed er al P ro gr am s

C or p.

F ai rv ie w

P ar k D riv e, Su ite

Fa lls

C hu rc h, V A

Te l:

(7

) 4

-8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

SAVANNAH DISTRICT

JULY 2020

W912HN-20-B-3011

FORT GORDON, GEORGIA

REPAIRS TO OUTFALL X AND CONTRIBUTING STORM SEWER NETWORK

FY19 PN DE-04833-8P

BEGINNING OF STORM SEWER NETWORK ON BRAINARD AVE

LAT 33.418659 LONG -82.141749

END OF OUTFALL X STORMWATER CHANNEL

LAT 33.419566 LONG -82.129345

CONSTRUCTION ENTRANCE LOCATION

LAT 33.418412 LONG -82.133501

EROSION AND SEDIMENT CONTROL NOTES

PRIMARY PERMITTEE

DEPARTMENT OF THE ARMY ATTN:

JOHN RAMEY, DIRECTOR

FORT GORDON DIRECTORATE OF PUBLIC WORKS

JOHN.I.RAMEY2.CIV@MAIL.MIL

(706) 791-3225

24-HOUR LOCAL CONTACT

ENVIRONMENTAL BRANCH

515 15TH STREET BLDG. 14600

FORT GORDON, GA 30905

DELAINE SCOTT (706) 306-6909

SHANNON.D.SCOTT20.CIV@MAIL.MIL

PROJECT SITE

NOT TO SCALE

PROJECT SITE

XR

EF

s:

[2

3_ G

-B S0

1, F Y1

9P N

0- V-

SV

, F

Y1 9P

N

0-

C -S

PL

oD

1, F

Y1 9P

N

0-

C -S

PL

oC

1, F

G

EP

ST

PL

0, F G

SI

TE

-T

ES

T, D

KN

_G

EO

R

G

IA

_P E_

SE

AL

_C O

R

PS

, D w eb b-

G A

PE

, G

As ea l_

TA

V]

Im ag es

La st s av ed b y:

H O

PP

ER

R V

T im e:

/1 4/

0:

:2

PM

C :\p w _p l1 \h op pe rrv \d

8\

FY

PN

0-

G -0

.d w g

IN

IT

IA

L

IN

IT

IA

L

SU

BM

IT

TA

L

FO

R E

S&

PC

P

PE

R M

IT

R

EV

IE

W 7/

2/

FY

PN

0-

G -0

D .N

EA

M

TU

A.

M

AH

D

I

S.

ZE

IL

ER

R .H

O

PP

ER

C

O

VE

R S

H

EE

T

G-001TRANSPORTATION, EROSION AND

SEDIMENTATION CONTROL

CIVIL AND GEOTECHNICAL STRUCTURAL

DAVID WEBB LEVEL II

CERT #0000058040

ISSUE DATE: APRIL 2019

EXPIRES: APRIL 2021

R

EA

D Y

TO

A

D

VE

R

TI

SE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

AS ADVERTISED

GENERAL

SURVEY/MAPPING

INDEX OF DRAWINGS

CG502

CG503

CROSS SECTIONS STILLING BASIN 1 SPILLWAY SHEET 2

CROSS SECTIONS STILLING BASIN 1 SHEET 3

CROSS SECTIONS OUTFALL X CHANNELSHEET 4

CROSS SECTIONS STILLING BASIN 1 SPILLWAY SHEET 1CG301

CG146

CG302

CG303

CG104

CG103

C-501 C-502

GI102

C-503

CD101

CIVIL STANDARD DETAILS FLARED END SECTION

CIVIL STANDARD DETAILS DROP INLET

CIVIL STANDARD DETAILS CONCRETE HEADWALL

V-102

V-101 TOPOGRAPHIC SURVEY PLAN 1

TOPOGRAPHIC SURVEY PLAN 2

COVER SHEET

INDEX OF DRAWINGSGI001

G-001

GI003

GI002

SPILLWAY PLUNGE POOL GRADING DETAILS

PLAN AND SECTION FOREBAY AND LOW-HEAD DROPS GRADING DETAILS 4

OUTFALL X PLUNGE POOL GRADING DETAILS

CIVIL DEMOLITION PLAN 1

C-504 CIVIL STANDARD DETAILS PAVEMENT PATCHING

GENERAL LEGENDS AND ABBREVIATIONS

C-505 CIVIL STANDARD DETAILS PRECAST CATCH BASINS IN SAG

CE509

CE510

CE511

CE512

GENERAL NOTES

CE513

EROSION AND SEDIMENTATION CONTROL NOTES 1

EROSION AND SEDIMENTATION CONTROL DETAILS 1

EROSION AND SEDIMENTATION CONTROL DETAILS 2

EROSION AND SEDIMENTATION CONTROL DETAILS 3

EROSION AND SEDIMENTATION CONTROL DETAILS 7

EROSION AND SEDIMENTATION CONTROL DETAILS 9

EROSION AND SEDIMENTATION CONTROL DETAILS 8

EROSION AND SEDIMENTATION CONTROL DETAILS 10

EROSION AND SEDIMENTATION CONTROL DETAILS 11

EROSION AND SEDIMENTATION CONTROL DETAILS 4

EROSION AND SEDIMENTATION CONTROL DETAILS 5

EROSION AND SEDIMENTATION CONTROL DETAILS 6

CE506

CE507

CE508

EROSION AND SEDIMENTATION CONTROL NOTES 2

CE504

CE505

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

JU

LY

C

AT

EG

O

R Y

C O

D E:

FI

LE

N

AM

E:

D

S

IZ

E

W

2H N

-2 0-

B-

FO

R

T G

O R

D O

N , G

EO

R

G

IA

R

EP

AI

R

S

TO

O U

TF

AL

L X

AN

D

C O

N

TR

IB

U

TI

N

G S

TO

R

M S

EW

ER

N

ET

W O

R K

FY

P N

D E-

3- 8P

R

EA

D Y

FO

R

A D

VE

R

TI

SE

M

EN

T

C D

M F ed er al P ro gr am s

C or p.

F ai rv ie w

P ar k D riv e, Su ite

Fa lls

C hu rc h, V A

Te l:

(7

) 4

-8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

V-103 TOPOGRAPHIC SURVEY PLAN 3

V-104 TOPOGRAPHIC SURVEY PLAN 4

V-105 TOPOGRAPHIC SURVEY PLAN 5

V-106 TOPOGRAPHIC SURVEY PLAN 6

V-107 TOPOGRAPHIC SURVEY PLAN 7

V-108 TOPOGRAPHIC SURVEY PLAN 8

V-109 TOPOGRAPHIC SURVEY PLAN 9

V-110 TOPOGRAPHIC SURVEY PLAN 10

V-111 TOPOGRAPHIC SURVEY PLAN 11

PLAN AND PROFILE CENTRAL STORM SEWER LINE A STA 25+00 TO 29+00

PLAN AND PROFILE DETENTION BASIN DISCHARGE CHANNEL LINE A STA 10+00 TO 13+00

PLAN AND PROFILE DETENTION BASIN DISCHARGE CHANNEL LINE A STA 13+00 TO 17+00

PLAN AND PROFILE CENTRAL STORM SEWER LINE A STA 21+00 TO 25+00

PLAN AND PROFILE OUTFALL X IMPROVEMENTS LINE A STA 17+00 TO 21+00

PLAN AND PROFILE CENTRAL STORM SEWER LINE A STA 29+00 TO 33+00

PLAN AND PROFILE CENTRAL STORM SEWER LINE A STA 33+00 TO 37+00

PLAN AND PROFILE CENTRAL STORM SEWER LINE A STA 37+00 TO 40+40

PLAN AND PROFILE CENTRAL STORM SEWER LINE A STA 40+40 TO 45+00

PLAN AND PROFILE CENTRAL STORM SEWER LINE A STA 45+00 TO 49+50

PLAN AND PROFILE CENTRAL STORM SEWER LINE A STA 49+50 TO 54+20

PLAN AND PROFILE CENTRAL STORM SEWER LINE B STA 60+00 TO 64+00

PLAN AND PROFILE CENTRAL STORM SEWER LINE B STA 64+00 TO 68+00

PLAN AND PROFILE CENTRAL STORM SEWER LINE C STA 80+00 TO 84+00

PLAN AND PROFILE CENTRAL STORM SEWER LINE C STA 88+00 TO 91+00

PLAN AND PROFILE BARTON FIELD STORM SEWER LINE D STA 100+00 TO 104+00

PLAN AND PROFILE BARTON FIELD STORM SEWER LINE D STA 104+00 TO 108+00

PLAN AND PROFILE BARTON FIELD STORM SEWER LINE D STA 108+00 TO 112+00

PLAN AND PROFILE BARTON FIELD STORM SEWER LINE D STA 112+00 TO 116+00

PLAN AND PROFILE BARTON FIELD STORM SEWER LINE D STA 116+00 TO 120+00

PLAN AND PROFILE BARTON FIELD STORM SEWER LINE D STA 120+00 TO 124+00

NOT USED

PLAN AND PROFILE RICE RD. STORM SEWER LINES E2 AND E3

NOT USED

PLAN AND PROFILE LANE AVE. SEWER LINE E STA 141+00 TO 144+60

PLAN AND PROFILE BARTON FIELD STORM SEWER LINE F STA 150+00 TO 154+00

PLAN AND PROFILE BARTON FIELD STORM SEWER LINE F STA 154+00 TO 158+00

PLAN AND PROFILE BARTON FIELD STORM SEWER LINE F STA 158+00 TO 162+00

PLAN AND PROFILE RING HALL STORM SEWER LINE G STA 170+00 TO 174+00

PLAN AND PROFILE RING HALL STORM SEWER LINE G STA 174+00 TO 178+00

PLAN AND PROFILE RING HALL STORM SEWER LINE G STA 178+00 TO 180+00

TRAFFIC CONTROL PHASING NOTESGC002

TRAFFIC CONTROL DETOUR ROUTES FOR AVE. OF THE STATESGC101

TRAFFIC CONTROL DETOUR ROUTES FOR BRAINARD AVE.

GC102

TRAFFIC CONTROL DETOUR ROUTES FOR KILBOURNE ST. AND RING HALL LINE

GC103

TRAFFIC CONTROL DETOUR ROUTE FOR PROVOST AVE. AND 3RD AVE.

GC104

GENERAL TRAFFIC CONTROL

TRAFFIC CONTROL GENERAL NOTESGC001

STANDARDS PORTABLE WORK ZONE SIGNS MOUNT HEIGHT AND LATERAL CLEARANCE GC509

GC502

GDOT STANDARDS TRAFFIC CONTROL DETAIL FOR LANE CLOSURE ON TWO-LANE HIGHWAYGC503

GDOT STANDARDS TRAFFIC CONTROL DETAIL FOR LANE CLOSURE ON MULTI-LANE UNDIVIDED HIGHWAYGC504

GDOT STANDARDS TRAFFIC CONTROL PEDESTRIAN ACCESSIBILITY I GC505

GDOT STANDARDS TRAFFIC CONTROL PEDESTRIAN ACCESSIBILITY II GC506

GDOT STANDARDS TRAFFIC CONTROL PEDESTRIAN ACCESSIBILITY III GC507

SPECIAL SIGN DESIGNS IGC501

C-506 CIVIL STANDARD DETAILS PRECAST MANHOLE

CG105

CG106

CROSS SECTIONS LOCATION PLAN

CG142

CG107

CG108

CG109

CG110

CG111

CG112

CG113

CG114

CG115

CG116

CG117

CG118

CG120

CG121

CG122

CG123

CG124

CG125

CG127

CG128

CG129

CG130

CG131

CG132

CG133

CG134

CG135

CG504 GRADING DETAILS

CE503

CE502

CE501

L-101

LANDSCAPING

L-102

CE104

CE103

EROSION AND SEDIMENTATION CONTROL FINAL PHASE PLAN

EROSION AND SEDIMENTATION CONTROL INTERMEDIATE PHASE PLAN

CD103 CIVIL DEMOLITION PLAN 3

CD102 CIVIL DEMOLITION PLAN 2

CD105 CIVIL DEMOLITION PLAN 5

CD106 CIVIL DEMOLITION PLAN 6

CD107 CIVIL DEMOLITION PLAN 7

STANDARDS DRUMSGC510

PLANTING PLAN AND SITE RESTORATION 1

PLANTING PLAN AND SITE RESTORATION 2

L-103

CG145

LATERAL PLAN AND PROFILES CENTRAL STORM SEWER LINE ACG136

CG137

CG138

CG139

CG140

LATERAL PLAN AND PROFILE CENTRAL STORM SEWER LINE D7

CD104 CIVIL DEMOLITION PLAN 4

CD108 CIVIL DEMOLITION PLAN 8

DEMOLITION

GI101

GEOTECHNICAL

B-101

B-301 GEOTECHNICAL SUBSURFACE PROFILES

GEOTECHNICAL SOIL BORING LOCATIONS PLAN

GEOTECHNICAL SOIL BORING LOGS 1

GEOTECHNICAL SOIL BORING LOGS 2

GEOTECHNICAL SOIL BORING LOGS 3

GEOTECHNICAL SOIL BORING LOGS 4

GEOTECHNICAL SOIL BORING LOGS 5

B-501 B-502 B-503 B-504 B-505

GEOTECHNICAL SOIL BORING LOGS 6B-506

GEOTECHNICAL SOIL BORING LOGS 7B-507

B-302 GEOTECHNICAL SUBSURFACE PROFILES

B-303 GEOTECHNICAL SUBSURFACE PROFILES

HORIZONTAL AND ALIGNMENT CONTROL PLAN I

OVERALL SITE PLAN

CIVIL

CG102 GRADING PLAN 2

CG101 GRADING PLAN 1

CG001 OVERALL GRADING PLAN

PLAN AND PROFILE AUXILLARY SPILLWAY CHANNEL STA 1+00 TO 6+40

PROFILE STORM SEWER LATERALS LINE A

PROFILE STORM SEWER LATERALS LINE C

PROFILE STORM SEWER LATERALS LINE D

CG505 ARTICULATED BLOCK LINING

CE105 BARTON FIELD LINE PLAN AND SECTION

CE106 CENTRAL LINE GRADING DETAILS

CT502

CT104

CT103

CT102

TRANSPORTATION PAVEMENT MARKING PLANS FOR BRAINARD AVE. AND PROVOST AVE.

GDOT STANDARDS PAVEMENT MARKING - ARROWS

TRANSPORTATION PAVEMENT MARKING PLANS FOR BRAINARD AVE.

TRANSPORTATION PAVEMENT MARKING PLANS FOR RICE RD.

CT101 TRANSPORTATION PAVEMENT MARKING PLANS FOR AVE. OF THE STATES AND BRAINARD AVE.

CE102

CE101

EROSION AND SEDIMENTATION CONTROL INITIAL PHASE PLAN

EROSION AND SEDIMENTATION CONTROL PRELIMINARY PHASE PLAN

CE001 EROSION AND SEDIMENTATION CONTROL NOTES AND LEGEND

GI103

S-001 STRUCTURAL GENERAL NOTES AND ABBREVIATIONS

STRUCTURAL

S-101 IMPACT BASINS PLAN AND SECTION

STANDARD STRUCTURAL DETAILS 1

STANDARD STRUCTURAL DETAILS 2

INFLUENT STRUCTURE PLAN AND SECTION

S-502

S-102

PIPE SUPPORT PILES AND PIPE COLLAR PLANS, SECTIONS, AND DETAILSS-103

PLANTING PLAN AND SITE RESTORATION 3

L-104 PLANTING PLAN AND SITE RESTORATION 4

L-105 PLANTING PLAN AND SITE RESTORATION 5

L-106 PLANTING PLAN AND SITE RESTORATION 6

L-107 PLANTING PLAN AND SITE RESTORATION 7

L-108 PLANTING PLAN AND SITE RESTORATION 8

XR

EF

s:

[2

3_ G

-B S0

1, D

KN

_G

EO

R G

IA

_P

E_

SE

AL

_C

O R

PS

, D w eb b- G

A

PE

Im ag es

La st s av ed b y:

H

O

PP

ER

R

V T im e:

/2

7/

:2 1:

A

M C

:\p w

_p l1

\h op pe rrv

\d

8\

FY

PN

0- G

I0

.d w g

CIVIL TRANSPORTATION

EROSION AND SEDIMENT CONTROL

CIVIL (CONTINUED)

C-507 CIVIL STANDARD DETAILS PRECAST CATCH BASIN ON GRADE

C-508 CIVIL STANDARD DETAILS CURB AND GUTTER

C-509 NOT USED

C-510 CIVIL STANDARD DETAILS STANDARD CONCRETE SAFETY END SECTION

C-511

C-512 CIVIL STANDARD DETAILS UTILITY CONFLICT PIPES THRU STORM DRAIN STRUCTURES

CE107 RING HALL GRADING DETAILS

SHEET TITLESHEET ID

CE108 EROSION AND SEDIMENTATION CONTROL STORM NETWORK ALIGNMENTS A THROUGH E

CE109 EROSION AND SEDIMENTATION CONTROL STORM NETWORK ALIGNMENTS A, D AND G

CE110 EROSION AND SEDIMENTATION CONTROL STORM NETWORK ALIGNMENTS A, B AND C

CG501

SHEET TITLESHEET ID

CG701 PIPE AND STRUCTURE DATA TABLES A, B, AND C

CG702 PIPE AND STRUCTURE DATA TABLES D, E, F, G, AND H

SHEET TITLESHEET ID

INDEX OF DRAWINGS (CONTINUED)

IN

IT

IA

L

IN

IT

IA

L

SU

BM

IT

TA

L

ES

AN

D

PC

P

PL

AN

F O

R R

EV

IE

W 7/

2/

FY

PN

0- G

I0

D . N

EA

M

TU

K.

R

EE

SE

S.

Z

EI

LE

R

R . H

O

PP

ER

IN

D

EX

O F

D R

AW

IN

G S

GI001

INDEX OF DRAWINGS (CONTINUED)

GI104

HORIZONTAL AND ALIGNMENT DATA TABLES IGI105

HORIZONTAL AND ALIGNMENT DATA TABLES II

TRAFFIC CONTROL DETOUR ROUTES FOR RICE RD.

GC105

STANDARDS CONES GC511

STANDARDS BARRICADES

DAVID WEBB LEVEL II

CERT #0000058040

ISSUE DATE: APRIL 2019

EXPIRES: APRIL 2021

TRAFFIC CONTROL DETOUR ROUTE FOR HERITAGE PARK LN.GC106

CT501 GDOT STANDARDS PAVEMENT MARKING PLACEMENT NON-LIMITED ACCESS ROAD

S-301 DROP WALL SECTION

S-501

GC508

CIVIL STANDARD DETAILS CATCH BASIN WITH HOOD - TYPE A

AND EXISTING WATER MAIN CROSSING

SPECIAL SIGN DESIGNS II

CG002 PLAN AND PROFILE KEY PLAN

PLAN AND PROFILE CENTRAL STORM SEWER LINE C STA 92+00 TO 95+50

CG119

CG126

PROFILE STORM SEWER LATERALS LINE DCG143

CG144 PROFILE STORM SEWER LATERALS LINE G

CG304

HORIZONTAL AND ALIGNMENT CONTROL PLAN II

HORIZONTAL AND ALIGNMENT CONTROL PLAN III

GI106

PLAN AND PROFILE BARTON FIELD STORM SEWER LINE F2 STA 1+00 TO 3+50

GI004 UTILITY CONFLICTS TABLE

GC512

STANDARDS TEMPORARY SHOULDER CLOSURES

CG141

PLAN AND PROFILE CENTRAL STORM SEWER LINE H STA 10+00 TO 14+00

PLAN AND PROFILE CENTRAL STORM SEWER LINE H STA 14+00 TO 18+00

R

EA

D Y

TO

A

D

VE

R

TI

SE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

D

AT

FY

PN

0- G

I0

R . H

O

PP

ER

A.

M

AH

D

I

S.

Z

EI

LE

R

D . N

EA

M

TU

G

EN

ER

AL

L

EG

EN

D S

AN

D

A

BB

R

EV

IA

TI

O N

S

GI002

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

JU

LY

C

AT

EG

O

R Y

C O

D E:

FI

LE

N

AM

E:

D

S

IZ

E

W

2H N

-2 0-

B-

FO

R

T G

O R

D O

N , G

EO

R

G

IA

R

EP

AI

R

S

TO

O U

TF

AL

L X

AN

D

C O

N

TR

IB

U

TI

N

G S

TO

R

M S

EW

ER

N

ET

W O

R K

FY

P N

D E-

3- 8P

R

EA

D Y

FO

R

A D

VE

R

TI

SE

M

EN

T

C D

M F ed er al P ro gr am s

C or p.

F ai rv ie w

P ar k D riv e, Su ite

Fa lls

C hu rc h, V A

Te l:

(7

) 4

-8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

THICK(NESS)

GND

MATERIAL INDICATIONS

EARTH (ORIGINAL GRADE)

EARTH (COMPACTED FILL)

GRAVEL

GRAVEL AGGREGATE DRIVE

ABBREVIATIONS

TBD TO BE DETERMINED

EG EXISTING GRADE

NGS NATIONAL GEODETIC SURVEY

POB POINT OF BEGINNING

STA STATION

POE

PROJ

POINT OF ENDING

L ANGLE

AB ANCHOR BOLT

ABV ABOVE

ACI AMERICAN CONCRETE INSTITUTE

ADDM ADDENDUM

ADJ ADJACENT, ADJOINING, ADJUSTABLE

AGGR AGGREGATE

AHR ANCHOR

AI AREA INLET

ALT ALTERNATE

ALUM ALUMINUM

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

APPD APPROVED

APPROX APPROXIMATE

ASPH

AVENUE

AVG AVERAGE

BDRY BOUNDARY

BITUM BITUMINOUS

BLW BELOW

BM BENCHMARK

BO BOTTOM OF

BOT BOTTOM

BS BOTH SIDES

BTWN BETWEEN

BW BOTH WAYS

CAP CAPACITY

CB CATCH BASIN

CE COVER ELEVATION

CEM CEMENT

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIRC CIRCULAR

CJ CONTROL JOINT

CJ CONSTRUCTION JOINT

CL CENTER LINE

CLR CLEAR(ANCE)

CMP CORRUGATED METAL PIPE

COL COLUMN

CONC CONCRETE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COV COVER

CRCMF CIRCUMFERENCE

C TO C CENTER TO CENTER

CTR CENTER

CU FT CUBIC FEET

CU YD CUBIC YARDS

DAT DATUM

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DEPR DEPRESSION

DEPT DEPARTMENT

DET DETAIL

DIA

DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DN DOWN

DR DRAIN

DWG DRAWING

E EAST

EA EACH

EF EACH FACE

EL ELEVATION - GRADE

EMER EMERGENCY

EQ EQUAL

EXST EXISTING

EXP EXPANSION

EXP EXPOSED

EXP BT EXPANSION BOLT

FDTN FOUNDATION

FIN FINISH

FN FENCE

FOC FACE OF CONCRETE

FOF FACE OF FINISH

THK

TO TOP OF

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TOW TOP OF WALL

TRANS TRANSVERSE

TYP TYPICAL

UTIL UTILITY

VC VITRIFIED CLAY

VERT VERTICAL

VOL VOLUME

W WEST

W/ WITH

W/O WITHOUT

WTH WIDTH

YD YARD

PSF POUNDS PER SQUARE FOOT

PV PAVED

PVG PAVING

QTY QUANTITY

R RADIUS

RCP REINFORCED CONCRETE PIPE

REF REFERENCE

REINF REINFORCE

REM REMOVE(ABLE)

REQD REQUIRED

REV REVISION

RND ROUND

ROW RIGHT OF WAY

RVS REVERSE

S SOUTH

SCHED SCHEDULE

SD STORM DRAIN

SECT SECTION

SEQ SEQUENCE

SHLDR SHOULDER

SHT SHEET

SIM SIMILAR

SPCL SPECIAL

SQ SQUARE

SST STAINLESS STEEL

STD STANDARD

STL STEEL

STRUCT STRUCTURAL

TAN TANGENT

TEMP TEMPORARY

N NORTH

NAT NATURAL

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

N’’REQD NOT REQUIRED

NTS NOT TO SCALE

OBSC OBSCURE

OC ON CENTER

OCEW ON CENTER EACH WAY

OD OUTSIDE DIAMETER

OH OVERHEAD

OPNG OPENING

OPP OPPOSITE

PAR PARALLEL

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PD PAVEMENT DRAIN

PERIM PERIMETER

PI POINT OF INTERSECTION

PL PROPERTY LINE

PROJECT

PS PIPE SPACE

FT FEET

FTG FOOTING

GAL GALLON(S)

GALV GALVANIZED

GALV STL GALVANIZED STEEL

GC GENERAL CONTRACTOR

GDOT

GEORGIA DEPTARTMENT OF TRANSPORTATION

GROUND

GOVT GOVERNMENT

GR LN GRADE LINE

GT GROUT

HPT HIGH POINT

HS HIGH STRENGTH

IN INCH

INTM INTERMEDIATE

INV INVERT

LD LOAD

LG LENGTH

LMST LIMESTONE

EJ EXPANSION JOINT

#57 STONE BEDDING

NOTES

1. THESE LEGENDS ARE COMPOSED OF STANDARD SYMBOLS AND ARE PERTINENT

TO THE CONDITIONS ON THIS SET OF DRAWINGS TO THE EXTENT APPLICABLE.

2. ADDITIONAL LEGENDS AND/OR ANOTHER LEGEND SHEET MAY APPEAR IN THIS

SET OF DRAWINGS TO INDICATE SPECIFIC CONDITIONS IN LIEU OF SYMBOLS

SHOWN ON THIS SHEET.

ARTICULATED CONCRETE BLOCK

ECB EROSION CONTROL BLANKET

CC CENTER OF CURVE

PC POINT OF CURVATURE

PT POINT, POINT OF TANGENT

5:1 5' HORIZONTAL : 1' VERTICAL

GENERAL SYMBOLOGY

NEW / EXISTING SYMBOLOGY

GEOTECHNICAL SYMBOLOGY

SECTION SYMBOLS

SYMBOL WHERE SECTION IS TAKEN

SECTION

IDENTIFICATION

NUMBER

SECTION ARROW

PLATE

REFERENCE

NUMBER

DP301

DP301

DP301

A

B

C

D

DETAIL CALLOUT

CG502

B2

SILT FENCE

UTILITY POLE

GRADELINE - MAJOR

PROJECT BASELINE

GRADELINE - MINOR

LIMITS OF DISTURBANCE/CONSTRUCTION LIMITS

SELECT OR COMMON FILL

REINFORCED CONCRETE SECTION

CONCRETE ROAD, DRIVEWAY OR

SIDEWALK

GRANULAR FILL OR GRAVEL ROAD

RIPRAP

BORING LOCATION AND NUMBER

BENCHMARK

COORDINATE LOCATION

POWER POLE

EXISTING POWER LINE

EXISTING TREE LINE

EXISTING MH STRUCTURED

SAN SAN

EXST-GRADELINE - MAJOR

EXST-GRADELINE - MINOR

CB INLET STRUCTURE

EXISTING PROPOSED

GENERAL LEGEND

NEW WORK

LINE WORK FOR EXISTING

ITEMS IS SHOWN IN A

CONTINUOUS LIGHT LINE

OR SCREENED

CALL OUTS FOR NEW

WORK IS VERTICAL

LETTERING

FUTURE LINE

WORK IS SHOWN IN

A PHANTOM LINE

CALL OUTS FOR EXISTING

& FUTURE WORK IS

SLANTED LETTERING

EXISTING

WET WELL

FUTURE

EXPANSION

NORTH

PLAN

W W W

SD SD

COMM COMM

G G

EXISTING WATER LINE

EXISTING SANITARY SEWER LINE

EXISTING STORM DRAIN LINE

EXISTING COMMUNICATIONS LINE

EXISTING GAS LINE

EXISTING FIRE HYDRANT

EXISTING WATER VALVE

EXISTING WATER MH

EXISTING GRATE INLET

EXISTING UTILITY MH

EXISTING COMMUNICATION MH

EXISTING COMMUNICATION JUNCTION BOX

EXISTING ROAD SIGN

EXISTING POWER POLE

EXISTING POWER GUY

EXISTING LIGHT POLE

CFS CUBIC FEET PER SECOND

IN

IT

IA

L

IN

IT

IA

L

SU

BM

IT

TA

L

ES

&P C

P

PL

AN

F

O R

R

EV

IE

W

6/

/2

SAN SANITARY SEWER

IE INVERT ELEVATION

CNA CANNOT ACCESS (CONCRETE TOP)

ELEC ELECTRIC W WITNESS POST

COMM COMMUNICATION

ES&PCP EROSION SEDIMENTATION & POLLUTION CONTROL PLAN

SSWR SANITARY SEWER

NORTH ARROW

XR

EF

s:

[2

3_ G

-B S0

1, D

KN

_G

EO

R G

IA

_P

E_

SE

AL

_C

O R

PS

Im ag es

La st s av ed b y:

Z

EI

LE

R

BS

T im e:

/1

5/

2:

:3

AM

pw cd m sm ith -a z0 2-pw .b en tle y.

co m :P

W _P

L1 \1

9\

\0

D es ig n

Se rv ic es

N M

_3 0%

\0

G en er al

\1

C

AD

D \F

Y1 9P

N

0-

G I0

.d w g

REMOVE TREE

CLEARING

PAVEMENT DEMOLITION/REMOVAL

DEMOLISH PIPING/STORM SEWER STRUCTURES

NATIVE STEEP SLOPE SEED MIX

TURF GRASS SEED MIX

PCCP PRESTRESSED CONCRETE CYLINDER PIPE

FT/S FEET PER SECOND

PAVEMENT REPLACEMENT

MAX MAXIMUM

MH MANHOLE

MTL METAL

L/P LIGHT POLE

GEN GENERAL

B BORING

GPS GLOBAL POSITIONING SYSTEM

CPP CORRUGATED PLASTIC PIPE

DIA

DUCTILE IRON

USBR US BUREAU OF RECLAMATION

ASPHALT

AVE

RD ROAD

ST STREET

SP POORLY GRADED SAND

SC CLAYEY SAND

SP-SC POORLY GRADED SAND WITH CLAY

SM SILTY SAND

SP-SM POORLY GRADED SAND WITH SILT

ML LOW PLASTICITY SILT

MH HIGH PLASTICITY SILT

CONCRETE

ACB ARTICULATING CONCRETE BLOCK

R

EA

D Y

TO

A

D

VE

R

TI

SE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

D

AT

PN

0-

G

3.

dg n

GI003

G

EN

ER

AL

N O

TE

S

S.

Z

EI

LE

R

OVERALL GENERAL NOTES

CONSTRUCTION CONSTRAINTS

UTILITY COORDINATION

1. TYPE OF SURVEY: TOPOGRAPHIC. NO PROPERTY BOUNDARY NOR RIGHT OF WAY NOR

ENVIRONMENTAL SURVEYS WERE PERFORMED. SUBSURFACE UTILITIES WERE LOCATED AS MARKED

BY OTHERS. STORM DRAINAGE AND SANITARY SEWER STRUCTURES WERE LOCATED BY FIELD

SURVEYS AND RECORDS AS SHOWN.

2. HORIZONTAL DATUM AND BEARING BASIS: NAD 83, GEORGIA EAST, STATE PLANE COORDINATE

SYSTEM, US SURVEY FEET.

3. NGS HORIZONTAL MONUMENT UTILIZED: MONUMENT “BV 121 219 AZ MARK” WAS OCCUPIED WITH A TRIMBLE R7 WITH A GEODDETIC ANTENA ON A 2 METER FIXED TRIPOD FOR A TWO-HOUR SESSION COLLECTING DATA ON THE SOUTH CAROLINA VRS NETWORK TO VERIY THE ACCURACY OF THE SC

VRS NETWORK VERSE THE POSTED MONUMENT COORDINATES. PROJECT CONTROL POINTS GPS1

THRU GPS7 WERE THEN SET THROUGH OUT THE PROJECT SITE USING A TRIMBLE R7 AND R8 RUNNING

TWO SEPARATE TEN MINUTE SESSIONS ON EACH POINT. TRAVERSES WERE THEN RUN BETWEEN

THESE PRIMARY CONTROL POINTS TO VERIFY CLOSURES OF 1 IN 10,000 OR BETTER ACCURACY.

4. VERTICAL DATUM: NAVD 88.

5. NGS MONUMENT “A 306” WAS OCCUPIED WITH A R8 TRIMBLE RECEIVER FOR TEN MINUTE SESSION

RESULTING IN AN ELEVATION OF 300.95' VERSUS THE POSTED ELEVEATION OF 301.03'.

PROJECT CONTROL POINT “GPS 1” WAS OCCUPIED WITH A TRIMBLE R7 WITH A GEODETIC ANTENA FOR TWO SEPARATE DAYS TEN MINUTE SESSION RESULTING IN AN ELEVEATION OF 457.84'. THIS IS THE BASIS OF THE PROJECT VERTICAL CONTROL. PRECISE TRIG LEVELS WERE THEN RUN THRU THE GPS1

AND GPS7 TO ESTABLISH ELEVATIONS ON THE PROJECT CONTROL POINTS.

6. FIELD DATES: NOVEMBER 4, 2019 - JUNE 19, 2020.

7. COORDINATES ARE GEORGIA EAST STATE PLANE GRID USING A COMBINED SCALE FACTOR OF 0.99988231.

8. THIS PROPERTY MAY BE SUBJECT TO COUNTY AND CITY REGULATIONS IN REGARDS TO SETBACKS, EASEMENTS AND BUILDING CODES.

9. THIS SURVEY WAS COMPLETED WITHOUT THE BENEFIT OF A TITLE SEARCH.

10. THIS DRAWING DOES NOT REFLECT ANY TITLE OR EASEMENT RESEARCH BY JOHN L. HUDSON, R.L.S., GEORGIA LICENSE NO. 2882, 1441 MAIN STREET, COLUMBIA, SOUTH CAROLINA, (803) 758-4500 OTHER

THAN WHAT IS VISIBLE ON THE GROUND OR PROVIDED BY THE CLIENT'S CONVEYANCE.

11. EQUIPMENT USED IN SURVEY: TRIMBLE R7 BASE UNIT WITH A TRIMBLE R8 ROVER GPS RECEIVER;

TRIMBLE M3 1" TOTAL STATION.

12. THIS SURVEY WAS PERFORMED BY GPS RTK AND CONVENTIONAL SURVEY METHODS.

GENERAL SURVEY NOTES

1. THE CONTRACTOR IS RESPONSIBLE FOR ALL POINTS OF CONTACT AND CONFIRMING

LOCATIONS FOR ALL UTILITIES. THE CONTRACTOR SHALL COORDINATE THE WORK OF THE

UTILITY COMPANIES.

2. THE CONTRACTOR SHALL CONTACT THE UTILITIES PROTECTION INC. "CALL BEFORE YOU DIG" SERVICE, GEORGIA (811) IN ORDER TO LOCATE UTILITIES PRIOR TO STARTING ANY EXCAVATION

OR CONSTRUCTION. THE LOCATIONS OF UNDERGROUND UTILITIES ARE APPROXIMATE AS

DETERMINED FROM EXISTING RECORDS. CONTRACTOR TO CONFIRM THE HORIZONTAL AND

VERTICAL LOCATION OF ALL EXISTING COMMUNICATIONS, ELECTRIC, GAS, WATER, IRRIGATION, AND SANITARY SEWER UTILITIES PRIOR TO CONSTRUCTION.

3. PRIOR TO CONSTRUCTION OF STORM SEWER REPLACEMENTS, A MEETING SHALL BE

CONDUCTED WITH ALL PRIVATE UTILITIES AND FORT GORDON DPW, DPS, AND NEC TO

COORDINATE AND COMMUNICATE THE SCHEDULE FOR CONSTRUCTION.

4. RELOCATION OF THE NATURAL GAS LINE EXPOSED IN THE OPEN CHANNEL AT RING HALL WILL

BE PERFORMED BY AGL PRIOR TO CONSTRUCTION IN THIS AREA. THE 2” NATURAL GAS LINE

WILL BE RELOCATED ALONG TO A ROUTE ALONG THE EAST SIDE OF BRAINARD AVE. THIS

RELOCATED LINE WILL BE EXPOSED AT TWO STORM SEWER CROSSINGS. MEASURES TO

SUPPORT AND PROTECT EXISTING EXPOSED PLASTIC GAS LINES WILL BE IMPLEMENTED BY

THE CONTRACTOR WITH DIRECTION PROVIDED BY AGL.

5. CONTRACTOR SHALL COORDINATE WITH PRIVATE UTILITY COMPANIES AT LEAST 14-DAYS IN

ADVANCE OF WORKING IN AN AREA WITH POTENTIAL CONFLICTS OR AERIAL EXPOSURE OF

LINES ASSOCIATED WITH STORM PIPE REPLACEMENTS TO SUPPORT AND PROTECT EXISTING

GAS, COMMUNICATIONS, IRRIGATION, AND OTHER UTILITIES.

6. EXISTING UTILITIES WILL REMAIN IN PLACE AND IN SERVICE DURING CONSTRUCTION UNLESS

NOT FEASIBLE. COSTS FOR TEMPORARY REMOVAL OR REPLACEMENT (TO BE CONDUCTED BY

TE PRIVATE UTILITY OWNER) WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. EXCAVATION IN LOCALIZED AREAS WHERE UTILITIES ARE KNOWN TO EXIST SHALL BE BY METHODS THAT DO

NOT CAUSE DAMAGE TO EXISTING UTILITIES.

7. TRENCHES SHALL BE LIMITED TO 25' WIDE TO LIMIT LENGTH OF CROSSING UTILITIES EXPOSED.

8. EXPOSURE OF UTILITIES IN PARALLEL WITH STORM SEWER REPLACEMENTS SHALL BE LIMITED

TO PREVENT DAMAGE TO EXISTING UTILITIES.

9. EXPOSED UTILITIES SHALL BE SUPPORTED AND PROTECTED TO AVOID DAMAGE DURING

CONSTRUCTION PER DIRECTION FROM THE PRIVATE UTILITY COMPANIES.

10. WATER LINES IN THE PROJECT AREA HAVE LEADED JOINTS AND SANITARY SEWER PIPES ARE

MOSTLY MADE OF VITRIFIED CLAY PIPE. AS SUCH, THE WATER AND SANITARY SEWER PIPES

ENCOUNTERED ARE EXPECTED TO BE BRITTLE AND CANNOT BE UNSUPPORTED FOR ANY

LENGTH OR DISTURBED BY PRESSURES FROM NEARBY EXCAVATIONS. THE UTILITY CONFLICTS

TABLE LISTS WATER AND SEWER CROSSINGS TO BE REPLACED, OFFSET, OR OTHERWISE

ADDRESSED PRIOR TO OR DURING EXCAVATION OF STORM SEWER REPLACEMENT TRENCHES.

AUD HAS EVALUATED THESE CROSSINGS AND IS PREPARED TO PERFORM THE WORK UNDER

CONTRACT WITH THE PRIME CONTRACTOR.

11. THE CONTRACTOR SHALL COORDINATE THE WORK OF THE UTILITY COMPANIES.

12. THE AUD ENGINEERING DIVISION SHALL BE NOTIFIED AT LEAST 48 HOURS (TWO WORKING DAYS) IN ADVANCE DURING REGULAR WORKING HOURS (8:30 AM TO 5:00 PM, MONDAY-FRIDAY, EXCLUDING AUGUSTA, GEORGIA HOLIDAYS) PRIOR TO ANY CONSTRUCTION EXPOSING WATER

OR WASTEWATER LINES. NO WORK SHALL PROCEED TO EXCAVATE BENEATH WATER OR

SANITARY SEWER LINES UNTIL CONTACT IS MADE WITH AN AUD REPRESENTATIVE. CONTACT

THE AUGUSTA UTILITIES CONSTRUCTION MANAGER AT (706-312-4141) OR THE AUD CONTACT

LISTED BELOW.

13. THE CONTRACTOR IS RESPONSIBLE FOR PAVEMENT PATCHING AND/OR REPLACEMENT AND

SITE RESTORATION ASSOCIATED WITH REQUIRED WATER AND SANITARY SEWER LINE REPAIR

OR REPLACEMENT WORK.

1. CONTRACTOR TO MAINTAIN INTEGRITY OF EXISTING FACILITIES DURING CONSTRUCTION.

2. REPLACEMENT OF STORM SEWER NETWORK PIPES SHALL BE CONDUCTED ONLY AFTER

OUTFALL X AREA STABILIZATION AND DETENTION BASIN EXPANSION COMPLETED

PROGRESSING FROM DOWNSTREAM TO UPSTREAM ON EACH LINE.

3. TRAFFIC MAINTENANCE PLAN TO BE FOLLOWED ON GC001-GC511 SHEETS. A SCHEDULE

FOR ROAD CLOSURES SHALL BE APPROVED BY FORT GORDON AT LEAST TWO WEEKS IN

ADVANCE OF WORK IN ANY ROADWAY. EXCEPTIONS TO TMP MUST BE APPROVED BY COR.

R . H

O

PP

ER

K.

R

EE

SE

1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ALL EXISTING UTILITIES,

STRUCTURES, SUBSTRUCTURES, PROPERTY LINES, SUBSURFACE SOIL OR ROCK

CONDITIONS, AND OTHER FEATURES ARE APPROXIMATE BASED ON AVAILABLE

INFORMATION AND ARE NOT GUARANTEED AS TO ACCURACY, NOR IS IT

WARRANTED THAT ALL POTENTIAL CONFLICTS ARE SHOWN. ALL EXISTING

UTILITIES ARE SHOWN FOR INFORMATION ONLY. PRIOR TO CONSTRUCTION, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD LOCATING ALL UTILITIES AND

AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT

OCCUR BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE

ANY AND ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES

AFFECTING HIS/HER WORK. EXISTING ITEMS SHOWN IN PROFILE ARE

APPROXIMATE ELEVATIONS ONLY. ALL OVERHEAD ELECTRICAL AND TELEPHONE

CABLES AND POLES ARE NOT WARRANTED TO BE SHOWN.

2. REPORT FINDINGS OF FIELD LOCATING OF EXISTING UTILITIES AND STRUCTURES

TO THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION. IT IS THE INTENT TO

SHOW , EXISTING UTILITIES AND UNDERGROUND STRUCTURES ON THE PLANS.

HOWEVER, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SATISFY

HIMSELF/HERSELF THAT ALL EXISTING UTILITIES AND OTHER ITEMS, SHOWN ON

THESE DRAWINGS OR NOT, HAVE BEEN PROPERLY LOCATED.

3. IF ANY UTILITY OR STRUCTURE REQUIRES RELOCATION, THE CONTRACTOR

SHALL NOTIFY THE CONTRACTING OFFICER OF THE ITEM WELL IN ADVANCE OF

APPROACH TO THE ITEM AND SHALL BE RESPONSIBLE FOR MAKING ALL

ARRANGEMENTS WITH THE CONTRACTING OFFICER FOR RELOCATION OF THE

ITEM.

4. THE CONTRACTOR SHALL NOTIFY GEORGIA 811- CALL AT LEAST THREE WORKING

DAYS IN ADVANCE OF EXCAVATION AND SHALL FOLLOW ALL REQUIREMENTS OF

EACH UTILITY WHEN AROUND THEIR FACILITIES.

5. EXCAVATIONS OR TRENCHING WITHIN CLOSE PROXIMITY TO UNDERGROUND

STRUCTURES, UTILITIES, OR UTILITY POLES SHALL BE PROTECTED TO PREVENT

DAMAGE OR INTERRUPTION TO SERVICE.

6. SLANTED AND SCREENED TEXT DENOTES INFORMATION TAKEN FROM OR

CALCULATED FROM AS-BUILT SOURCES THAT HAVE NOT BEEN FIELD VERIFIED.

THESE DRAWINGS ARE AVAILABLE FOR REVIEW BY CONTRACTOR AT THE

CONTRACTING OFFICER'S AND VARIOUS UTILITY COMPANY'S CONVENIENCE.

UNLESS OTHERWISE NOTED, ALL INFORMATION OBTAINED FROM AS-BUILT

SOURCES HAS NOT BEEN FIELD VERIFIED.

7. THE CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT SAFETY INCLUDING, BUT

NOT LIMITED TO, TRENCH EXCAVATION AND SHORING, TRAFFIC CONTROL AND

SECURITY. TEMPORARY SAFETY FENCING SHALL BE INSTALLED SURROUNDING

ACTIVE CONSTRUCTION AREA(S) PER SPECIFICATIONS SECTION 01 50 00.

TRAFFIC CONTROL PLANS ARE ON GC SHEETS.

8. THE CONTRACTOR SHALL REPAIR PAVEMENTS CUT OR DAMAGED DURING

CONSTRUCTION PER DETAILS AND SPECIFICATIONS AND REPLACE ALL

MARKINGS PRIOR TO SUBSTANTIAL COMPLETION.

9. THE CONTRACTOR SHALL GRADE, SEED, AND FERTILIZE ALL DISTURBED

VEGETATION AREAS AS DESCRIBED IN THE PLANS AND SPECIFICATIONS.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR STORMWATER, SEDIMENT, AND

EROSION CONTROL DURING ALL PHASES OF CONSTRUCTION AND SHALL BE

RESPONSIBLE FOR MAINTAINING ALL ASSOCIATED NPDES PERMITS. SEE

EROSION CONTROL NOTES ON THE CIVIL DRAWINGS AND SHEET CE001.

11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND DISPOSAL OF

ALL EXCESS EXCAVATED MATERIAL, SOILS, AND DEMOLITION DEBRIS TO AN

OFF-SITE LOCATION OUTSIDE OF FORT GORDON. EXCAVATED SOIL USED FOR

TRENCH BACK FILLING SHALL BE TEMPORARILY STOCKPILED AND SHALL NOT

CONTAIN CONSTRUCTION DEBRIS, OVERSIZE ROCK OR OTHER DELETERIOUS

SUBSTANCES. CONTAMINATED SOIL SHALL BE PROPERLY DISPOSED BY THE

CONTRACTOR AND SHALL BE REMOVED FROM THE SITE.

12. THE TERM "ACCEPTABLE TO ENGINEER" SHALL MEAN WRITTEN ACCEPTANCE BY

THE CONTRACTING OFFICER AND ENGINEER OF RECORD TO BE RECEIVED

BEFORE THE WORK IS STARTED.

13. ANY DEVIATION FROM CONTRACT DRAWINGS OR SPECIFICATIONS MUST BE

ACCEPTED BY THE CONTRACTING OFFICER IN WRITING PRIOR TO THE WORK

BEING DONE. ANY DEVIATION PERFORMED WITHOUT THE CONTRACTING

OFFICER'S ACCEPTANCE WILL NOT BE PAID FOR AND MAY BE REQUIRED TO BE

REDONE AT NO ADDITIONAL COST TO THE GOVERNMENT. THE CONTRACTOR IS

RESPONSIBLE FOR IMMEDIATELY CONTACTING THE CONTRACTING OFFICER

UPON FINDING ANY CONFLICTS DURING CONSTRUCTION ON ANY IMPROVEMENTS

SHOWN ON THE DRAWINGS.

14. EXCEPT AS MODIFIED BY THE CONTRACT DOCUMENTS, ALL WORK SHALL BE IN

ACCORDANCE WITH ALL FEDERAL OR STATE REQUIREMENTS. THE

CONTRACTOR SHALL HAVE A COPY OF ALL APPLICABLE STANDARD

SPECIFICATIONS AND DRAWINGS AT THE WORK SITE AT ALL TIMES.

15. PRIOR TO CONNECTION TO OR RELOCATION OF ANY EXISTING FACILITIES,

NOTIFY THE CONTRACTING OFFICER. ALL CONNECTIONS TO EXISTING FACILITIES

SHALL BE DONE AT THE CONVENIENCE OF THE CONTRACTING OFFICER AND

UTILITY DIRECTOR.

16. PERFORM THE MINIMUM CLEARING NECESSARY FOR WORK TO BE PERFORMED

AS SHOWN ON THE DRAWINGS.

17. ALL PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED TO A CONDITION

EQUAL TO OR BETTER THAN THE CONDITION EXISTING PRIOR TO COMMENCING

CONSTRUCTION UNLESS SPECIFICALLY EXEMPTED BY THE PLANS.

18. GEOTECHNICAL BORING AND TEST DATA ARE PROVIDED WITH THE

SPECIFICATIONS.

19. IF A SYMBOL AND CALL OUT CONFLICT WITH EACH OTHER, THE CALL OUT SHALL

BE USED FOR IDENTIFICATION.

20. PERMIT APPROVAL BY THE AUGUSTA ENGINEERING DEPARTMENT (LIA) IS

REQUIRED FOR THE EROSION CONTROL PLAN SHOWN IN THE SITE PLAN CE

SHEETS. ANY VARIATION FROM THE APPROVED SITE PLAN WHICH AFFECTS THE

PROJECT HYDRAULICS MUST BE APPROVED BY THE CITY OF

AUGUSTA-RICHMOND COUNTY LIA.

21. A PRECONSTRUCTION CONFERENCE SHALL BE HELD WITH THE CITY OF

AUGUSTA LIA PRIOR TO BEGINNING CONSTRUCTION. THIS MEETING SHALL BE

SCHEDULED WITH THE ENGINEERING DEPARTMENT AT THE TIME THE

NOTIFICATION OF WORK COMMENCEMENT IS GIVEN.

22. CONTRACTOR SHALL INFORM FORT GORDON DPW AT LEAST 96 HOURS PRIOR TO

STARTING WORK ON THE PROJECT. DPW SHALL CONTACT THE AUGUSTA

ENGINEERING DEPARTMENT (LIA) CONTACT FOR THE PROJECT AT LEAST 48

HOURS PRIOR TO STARTING WORK ON THE PROJECT.

23. THE CONTRACTOR SHALL BE REQUIRED TO HAVE ON SITE A COPY OF THE

GEORGIA DEPARTMENT OF TRANSPORTATION'S STANDARD SPECIFICATIONS

AND CONSTRUCTION STANDARD DETAILS, CURRENT EDITION.

24. ALL DISTURBED AREAS MUST BE PAVED, GRASSED, SODDED, OR LINED WITH

RIPRAP TO CONTROL EROSION IN ACCORDANCE WITH APPROVED ES&PCP.

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

JU

LY

C

AT

EG

O

R Y

C O

D E:

FI

LE

N

AM

E:

D

S

IZ

E

W

2H N

-2 0-

B-

FO

R

T G

O R

D O

N , G

EO

R

G

IA

R

EP

AI

R

S

TO

O U

TF

AL

L X

AN

D

C O

N

TR

IB

U

TI

N

G S

TO

R

M S

EW

ER

N

ET

W O

R K

FY

P N

D E-

3- 8P

R

EA

D Y

FO

R

A D

VE

R

TI

SE

M

EN

T

C D

M F ed er al P ro gr am s

C or p.

F ai rv ie w

P ar k D riv e, Su ite

Fa lls

C hu rc h, V A

Te l:

(7

) 4

-8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

XR

EF

s:

[2

3_ G

-B S0

1, D

KN

_G

EO

R G

IA

_P

E_

SE

AL

_C

O R

PS

Im ag es

La st s av ed b y:

Z

EI

LE

R

BS

T im e:

/1

5/

:2 0:

A

M pw cd m sm ith -a z0 2-pw .b en tle y.

co m :P

W _P

L1 \1

9\

\0

D es ig n

Se rv ic es

N M

_3 0%

\0

G en er al

\1

C

AD

D \F

Y1 9P

N

0-

G I0

.d w g

IN

IT

IA

L

IN

IT

IA

L

SU

BM

IT

TA

L

ES

&P C

P

PL

AN

F

O R

R

EV

IE

W

6/

/2

D

. N

EA

M

TU

R

EA

D Y

TO

A

D

VE

R

TI

SE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

D

AT

PN

0-

G I0

R . H

O

PP

ER

S.

Z

EI

LE

R

D . D

O R

AN

D . N

EA

M

TU

U

TI

LI

TY

C

O N

FL

IC

T

TA

BL

E

GI004

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

JU

LY

C

AT

EG

O

R Y

C O

D E:

FI

LE

N

AM

E:

D

S

IZ

E

W

2H N

-2 0-

B-

FO

R

T G

O R

D O

N , G

EO

R

G

IA

R

EP

AI

R

S

TO

O U

TF

AL

L X

AN

D

C O

N

TR

IB

U

TI

N

G S

TO

R

M S

EW

ER

N

ET

W O

R K

FY

P N

D E-

3- 8P

R

EA

D Y

FO

R

A D

VE

R

TI

SE

M

EN

T

C D

M F ed er al P ro gr am s

C or p.

F ai rv ie w

P ar k D riv e, Su ite

Fa lls

C hu rc h, V A

Te l:

(7

) 4

-8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

SHEET ID

A1 UTILITY CONFLICT TABLE

SCALE: NTS

R

EA

D Y

TO

A

D

VE

R

TI

SE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

SDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

EEEEEEE

E

E E

E E

EEEEEE

E

E

E

E

E

E

E

EEEEEEEEE

E E

E

EE

E E

E

E

E

E

E E

E

E

E E E E E

E E

E

E E

EE

E E

EE

E E

EE

E E

E E

E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

EE

E E

E

E

E

E

E E

E

E E E E

E E

E

E

EEEEEEEEEEEEEEE

E E

E E

E E

E

E E

E E

E E

E

E E E E E E E E E

E E

EEEEEEEE

E E E E E E E E E E E E E E E E E

EEEEEEEEEEEEEE

E

E

E

E

E

E E

E

E E E E E

E E

E E

E

E

EEE

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E E E E E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E

E E

E E

EEE

E

E

E

SD SD SD

SD SD SD

SD

SD

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W

W

W

W

W

W

W

W W

W W

W

W

W W

W W

W

W

W

W

W

W

W

W

W

WW W W W

W W

W W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W W W W

W W

WWWWW

W W W

W W

W

W

W

W

W

W

W

W W

W W

W W W W WW

W W

W

SA

N

SAN

SAN

SAN

SAN

SAN

SA

N

SAN

SAN

SA

N

SA

N

SA

N

SAN

SAN

SA

N

SA

N

SAN

SAN

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SAN

SAN

SANSAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

CP

CPCP

CP

S

S

FY

PN

0-

G I1

.D

W G

R . H

O

PP

ER

E.

V

AR

G

AS

D . D

O R

AN

D . N

EA

M

TU

O

VE

R

AL

L

SI

TE

P

LA

N

GI101

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

JU

LY

C

AT

EG

O

R Y

C O

D E:

FI

LE

N

AM

E:

D

S

IZ

E

W

2H N

-2 0-

B-

FO

R

T G

O R

D O

N , G

EO

R

G

IA

R

EP

AI

R

S

TO

O U

TF

AL

L X

AN

D

C O

N

TR

IB

U

TI

N

G S

TO

R

M S

EW

ER

N

ET

W O

R K

FY

P N

D E-

3- 8P

R

EA

D Y

FO

R

A D

VE

R

TI

SE

M

EN

T

C D

M F ed er al P ro gr am s

C or p.

F ai rv ie w

P ar k D riv e, Su ite

Fa lls

C hu rc h, V A

Te l:

(7

) 4

-8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

LINE F

(ALIGNMENT F)

BRAINARD AVE.

LINE D

(ALIGNMENT D)

LINE A

(ALIGNMENT A)

LINE B

(ALIGNMENT B)

LINE A

(ALIGNMENT A)

LINE G

(ALIGNMENT G)

LINE A

USBR TYPE VI STRUCTURE

LINE A

USBR TYPE VI

STRUCTURE

LINE D

USBR TYPE VI STRUCTURE

FORBAY

STRUCTURE

PLUNGE POOL

LINE G

OUTFALL

STRUCTURE

DETENTION BASIN

N

D S

T.

LANE AVE.

KILBOURNE S

T.

R

IC

E R

D

AVENUE OF THE STATES 36TH S

T.

KI

LB

O U

R N

E S

T.

PROVOST AVE.

BRAINARD AVE.

ST

S T.

XR

EF

s:

[2

3_ G

-B S0

1, F Y1

9P N

0- C

-G

PP

R

, F Y1

9P N

0- V-

SV

, D

KN

_G

EO

R

G

IA

_P E_

SE

AL

_C O

R

PS

, F Y1

9P N

0- C

-P

PS

C

Im ag es

La st s av ed b y:

T

AL

BO

TW

K

T im e:

/2 4/

2:

:5

AM

pw cd m sm ith

-a z0

2-pw

.b en tle y.

co m

:P W

_P L1

\1

9\

\0

D es ig n Se rv ic es N

M _3

0% \0

G en er al \1

C

AD

D

\F Y1

9P N

0- G

I1

.d w g

B1 PLAN: OVERALL SITE

1" = 200' 400'0 200'

1. SEE SURVEY NOTES ON V-101.

2. ALL DIMENSIONS IN PLANS ARE IN FEET UNLESS OTHERWISE NOTED.

NOTES

LINE C

(ALIGNMENT C)

LINE C

(ALIGNMENT C1)

LINE C

(ALIGNMENT C2)

LINE H

(ALIGNMENT H)

LINE H

(ALIGNMENT H1)

LINE H

(ALIGNMENT H2)

LINE E

(ALIGNMENT E3)

LINE E

(ALIGNMENT E)

LINE F

(ALIGNMENT F2)

LINE F

(ALIGNMENT F3)

LINE D

(ALIGNMENT D1)

LINE D

(ALIGNMENT D2)

LINE D

(ALIGNMENT D4)

LINE D

(ALIGNMENT D5)

LINE D

(ALIGNMENT D6)

LINE D

(ALIGNMENT D8)

LINE D

(ALIGNMENT D3)

LINE F

(ALIGNMENT F1)

LINE D

(ALIGNMENT D7) LINE G

(ALIGNMENT G5)

LINE G

(ALIGNMENT G1)

LINE G

(ALIGNMENT G3)

LINE E

(ALIGNMENT E2)

LINE A

(ALIGNMENT A8)

LINE A

(ALIGNMENT A9)

R

EA

D Y

TO

A

D

VE

R

TI

SE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

D

AT

127+76.19

115+00 120+00125+00

EP: 127+76.19

PI

: 1

+0

8.

PI: 121+07.89

PI: 122+94.88

PI: 123+50.25 PI: 117+28.18

PI

: 1

+0

0.

PI: 123+68.39

PI

: 1

+8

8.

35+

+0

+0

PI: 37+46.00

PI: 38+83.05

PI: 44+87.60

PI: 40+11.30

PI: 40+82.69

PI: 42+78.70

PI: 45+57.97

PI: 41+65.80

PI: 41+76.20

0+

155+00 160+00

162+00

BP: 150+00.00

EP

: 1

+0

0.

PI: 150+74.16

PI: 150+82.56

PI

: 1

+7

4.

PI

: 1

+0

3.

PI

: 1

+4

3.

PI

: 1

+7

6.

PI

: 1

+1

6.

PI

: 1

+2

5.

BP: 130+00.00

EP

: 1

+6

3.

PI: 138+11.62

PI: 138+55.80

PI: 139+26.18

PI: 139+30.57

PI: 140+09.86

PI: 135+63.14

PI

: 1

+5

6.

PI: 135+06.15

144+63.46

0+

5+

0+

60+00

BP: 60+00.00

PI: 62+12.74

PI: 6

3+75.15

80+00

BP

: 8

0+

.00

PI: 8

1+

.82

PI: 8

2+26.31

PI

: 8

0+

.00

+0

+0

+0

BP: 92+00.00

91+00 88+00

89+00 90+00

91+00

BP

: 8

8+

.0

EP

: 9

1+

.0

PI

: 8

9+

.6

2+00

1+

00 BP: 1+00.00

EP: 2+00.00

PI: 1+15.55

1+

00 BP: 1+00.00

1+

2+

3+

3+

.7

BP: 1+00.00

EP: 3+34.

PI: 1+17.91

PI: 1+77.52

2+50

1+

2+00

BP: 1+00.00

EP

: 2

+5 0.

PI: 1+28.42

PI: 1+38.42

PI: 1+99.64

1+

2+

3+00

BP: 1+00.00

PI: 2+37.61

EP: 3+00.00

1+

1+

00 BP: 1+00.00

EP: 1+45.00

PI: 1+06.78

2+13.29

1+

2+00

BP: 1+00.00

EP

: 2

+1 3.

29 PI: 1+78.72

0+

1+

1+

.1

BP: 0+00.00

EP: 1+18.16

1+00 1+48.99

BP: 1+00.00

EP: 1+48.99

1+66 1+00

BP: 1+00.00

EP

: 1

+6 6.

L15

L1

L1

L2

L28

L29

L3

L32 L33

L44

L45

L46

L52

L53

L54

L55

L6

L62 L63

L64

L73L74L75L76L77L78

L79

L8

L8

L8

L8

L8

L87

L8

L89

L9

L9

L9

L9

L94

L9

L96L9

L9

L9

L1

L1

L1

L1

L104L105

L1

L107 L108

L109L110L111L112L113 L114

1+

1+

BP: 1+00.00

EP: 1+60.00

L1

1+

2+

3+

BP: 1+00.00

PI: 1+74.19

PI: 3+18.77

L1

L1

1+00

1+80.01 BP

: 1

+0 0.0

0EP

: 1

+8 0.0

L119

1+00 2+00

BP

: 1

+0 0.

EP

: 2

+0 0.

1+001+60

BP

: 1

+0 0.

EP

: 1

+6 0.

10+00

11+00

12+00

BP: 10+00.00

PI: 10+15.42

PI: 11+79.75

EP:

L133

L134

L148

L149

FY

PN

0-

G I0

.D

W G

R . H

O

PP

ER

E.

V

AR

G

AS

D . D

O R

AN

D . N

EA

M

TU

C

O N

TR

O

L

PL

AN

I

H O

R

IZ

O N

TA

L

AN

D

A

LI

G N

M

EN

T

GI102

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

JU

LY

C

AT

EG

O

R Y

C O

D E:

FI

LE

N

AM

E:

D

S

IZ

E

W

2H N

-2 0-

B-

FO

R

T G

O R

D O

N , G

EO

R

G

IA

R

EP

AI

R

S

TO

O U

TF

AL

L X

AN

D

C O

N

TR

IB

U

TI

N

G S

TO

R

M S

EW

ER

N

ET

W O

R K

FY

P N

D E-

3- 8P

R

EA

D Y

FO

R

A D

VE

R

TI

SE

M

EN

T

C D

M F ed er al P ro gr am s

C or p.

F ai rv ie w

P ar k D riv e, Su ite

Fa lls

C hu rc h, V A

Te l:

(7

) 4

-8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

400'0 200'

BRAINARD AVE

R

IC

E R

D

LANE AVE

ALIGNMENT A

ALIGNMENT D

ALIGNMENT F

ALIGNMENT E

NOTES

ALIGNMENT B

ALIGNMENT C

ALIGNMENT C2

ALIGNMENT C1

ALIGNMENT C3

ALIGNMENT E

ALIGNMENT C4

ALIGNMENT D6

ALIGNMENT D5

ALIGNMENT D4

ALIGNMENT D3

ALIGNMENT D8

M

AT

C H

L

IN

E G

I1

MATCH LINE GI104

1. SEE SURVEY NOTES ON SHEET V-101.

B1 HORIZONTAL AND ALIGNMENT

SCALE: 1"=200'

KEY PLAN

SCALE: 1"=1000'C17 0 2000'1000'

XR

EF

s:

[2

3_ G

-B S0

1, F Y1

9P N

0- V-

SV

, F

Y1 9P

N

0-

C -K

P0

1, D

KN

_G

EO

R

G

IA

_P E_

SE

AL

_C O

R

PS

Im ag es

La st s av ed b y:

Z

EI

LE

R

BS

T im e:

/2 8/

:0

7:

P M pw cd m sm ith

-a z0

2-pw

.b en tle y.

co m

:P W

_P L1

\1

9\

\0

D es ig n Se rv ic es N

M _3

0% \0

G en er al \1

C

AD

D

\F Y1

9P N

0- G

I1

.d w g

GI104

GI103GI102

ALIGNMENT H

R

EA

D Y

TO

A

D

VE

R

TI

SE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

D

AT

100+00

105+00 110+00

BP

: 1

+0

0.

PI

: 1

+0

7.

PI

: 1

+8

5.

PI

: 1

+3

0.

PI

: 1

+7

4.

PI

: 1

+3

2.

10+00

15+00

20+00

25+00 30+00

BP: 10+00.00

PI: 12+05.66PI: 13+07.86

PI: 15+29.42

PI: 17+93.35

PI: 20+31.39

PI: 20+66.78PI: 21+73.42

PI: 23+22.27

PI: 24+39.13

PI

: 2

6+

.1

PI

: 2

8+

.1

PI

: 3

0+

.4

PI: 32+07.83

PI: 34+53.22

180+71.61

9+

.0

0+

5+

0+

BP: 169+78.02

EP

: 1

+7

1.

PI: 173+23.15

PI: 1

73+95.56

PI: 174+46.05

PI: 175+55.98

PI: 176+47.21

PI: 177+36.15

PI: 177+74.22

PI: 172+46.87

PI

: 1

+7

3.

PI: 180+23.39

PI: 170+00.00

PI: 170+91.98

0+41.11 0+00

BP: 0+00.00

EP: 0+41.11

1+

.55

0+

1+

BP: 0+00.00

EP: 1+02.55

3+24.92

0+82.43

1+00

2+00

3+00

BP: 0+82.43

PI: 2+95.55

EP: 3+24.92

1+

.6

1+

BP: 1+00.00

EP: 1+59.65

PI: 1+15.50

L1

L2

L3

L4

L5

L6

L7

L8

L9

L10L11L12

L13

L14

L40

L4

L42

L43

L67

L68 L69L70L71L72

L8 0L

L1

L1

L122 L1

L124

L1

L1

L1

L1

L129

L130

L1 31L132

1+00

2+00

3+00

3+78.14

BP: 1

+0

0.0

EP: 3+78.14

PI: 3+56.32

PI: 2+90.23

PI: 1

+1

8.1

PI: 1

+9

9.3

6+

5+

BP: 5+00.00

EP: 6+00.00

8+

.4

7+

8+

BP: 7+00.00

EP: 8+80.42

PI: 7+05.54

PI: 8+00.42

9+50 9+00

BP: 9+00.00

EP: 9+50.00

1+00 2+00 2+66.28

BP: 1+00.00

EP

: 2

+6 6.

PI

: 2

+1 4.

L135

L136

L137

L138 L139

L1

L141

L1

L1

L144 L145

L154

FY

PN

0-

G I0

.D

W G

R . H

O

PP

ER

E.

V

AR

G

AS

D . D

O R

AN

D . N

EA

M

TU

C

O N

TR

O

L

PL

AN

II

H O

R

IZ

O N

TA

L

AN

D

A

LI

G N

M

EN

T

GI103

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

JU

LY

C

AT

EG

O

R Y

C O

D E:

FI

LE

N

AM

E:

D

S

IZ

E

W

2H N

-2 0-

B-

FO

R

T G

O R

D O

N , G

EO

R

G

IA

R

EP

AI

R

S

TO

O U

TF

AL

L X

AN

D

C O

N

TR

IB

U

TI

N

G S

TO

R

M S

EW

ER

N

ET

W O

R K

FY

P N

D E-

3- 8P

R

EA

D Y

FO

R

A D

VE

R

TI

SE

M

EN

T

C D

M F ed er al P ro gr am s

C or p.

F ai rv ie w

P ar k D riv e, Su ite

Fa lls

C hu rc h, V A

Te l:

(7

) 4

-8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

B1 SCALE: 1"=200'

HORIZONTAL AND ALIGNMENT

400'0 200'

BRAINARD AVE

PROVOST AVE

ALIGNMENT A

ALIGNMENTG

ALIGNMENT A

ALIGNMENT D

ALIGNMENT G

KILBORNE ST

KI

LB

O R

N E

ST

BRAINARD AVE

ALIGNMENT A7

ALIGNMENT A6

ALIGNMENT A8

M

AT

C H

L

IN

E G

I1

NOTES

1. SEE SURVEY NOTES ON SHEET V-101.

KEY PLAN

SCALE: 1"=1000'C17 0 2000'1000'

XR

EF

s:

[2

3_ G

-B S0

1, F Y1

9P N

0- V-

SV

, F

Y1 9P

N

0-

C -K

P0

1, D

KN

_G

EO

R

G

IA

_P E_

SE

AL

_C O

R

PS

Im ag es

La st s av ed b y:

Z

EI

LE

R

BS

T im e:

/2 8/

:0

7:

P M pw cd m sm ith

-a z0

2-pw

.b en tle y.

co m

:P W

_P L1

\1

9\

\0

D es ig n Se rv ic es N

M _3

0% \0

G en er al \1

C

AD

D

\F Y1

9P N

0- G

I1

.d w g

GI104

GI103GI102

ALIGNMENT G5

ALIGNMENT G3

ALIGNMENT G4

ALIGNMENT G2

ALIGNMENT G1

R

EA

D Y

TO

A

D

VE

R

TI

SE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

D

AT

54+12.26

50+00

EP: 54+12.26

PI: 48+89.26

PI: 4

9+

.23

PI

: 5

0+

.6

PI: 5

1+

.93

PI: 5

1+65.29

PI: 5

2+20.15

PI: 5

2+56.77

PI: 5

3+19.25

PI: 47+16.74 65+00

68+98.26

EP: 6

8+98.26

PI: 6

6+09.64

PI: 6

7+27.81

PI: 6

8+87.20

PI: 67+36.58

PI: 6

8+20.17

89+94.23

85+00

EP: 89+94.23

PI: 8

3+97.92

PI: 8

9+89.42

PI: 8

8+27.36

PI: 8

6+72.42

1+

2+

2+

BP: 1+00.00

EP: 2+50.00

1+

2+

2+

BP: 1+00.00

EP: 2+00.00

PI: 1+16.66

2+00

1+00

BP: 1+00.00

EP: 2+00.00

1+

2+

BP: 1+00.00

EP: 2+00.00

2+

1+

BP: 1+00.00

EP: 2+00.00

95+00

95+50

PI: 94+90.72

EP: 95+50.00

2+61.56

2+

EP: 2

+61.56

PI: 2+19.90

L1

L19

L20

L21

L22 L23

L24 L25

L26

L3

L3

L35

L3

L37

L3

L3

L47

L48

L50 L51

L56

L57

L58

L59

L60 L66

13+00

14+00

15+00

16+00

17+00

17+90.70

EP: 17+90.70

PI: 1

3+49.72

PI: 1

6+25.24

PI: 1

7+83.20

1+00 1+59.42

BP: 1+00.00

1+59.42

1+00 1+37.45

BP: 1+00.00

EP: 1+37.45

L146

L147

L150

L151

L152

L153

ALIGNMENTS: A

NUMBER

L1

L2

L3

L4

L5

L6

L7

L8

L9

L10

L11

L12

L13

L14

L15

L16

L27

L28

L32

L33

L29

L17

L30

L31

L18

L19

L20

L21

L22

L23

L24

L25

L26

START STAT

10+00.00

12+05.66

13+07.86

15+29.42

17+93.35

20+31.39

20+66.78

21+73.42

23+22.27

24+39.13

26+88.18

28+91.14

30+76.40

32+07.83

34+53.22

37+46.00

38+83.05

40+11.30

40+82.69

41+65.80

41+76.20

42+78.70

44+87.60

45+57.97

47+16.74

48+89.26

49+66.23

50+32.64

51+22.93

51+65.29

52+20.15

52+56.77

53+19.25

START NORTH

1243859.35

1243757.00

1243708.37

1243602.95

1243474.24

1243335.40

1243318.06

1243261.72

1243160.89

1243074.57

1243074.24

1243073.99

1243062.25

1242985.17

1242832.54

1242656.25

1242563.13

1242434.88

1242389.61

1242335.65

1242328.90

1242400.58

1242214.15

1242149.68

1242009.37

1241836.93

1241782.41

1241746.75

1241680.29

1241647.49

1241601.71

1241571.20

1241519.36

START EAST

667548.24

667369.86

667279.97

667085.10

666854.68

666661.32

666630.47

666539.94

666430.42

666351.66

666102.61

665899.65

665714.76

665608.31

665416.17

665182.40

665081.85

665081.90

665026.69

664963.49

664955.58

664882.30

664788.06

664759.85

664685.56

664690.89

664745.23

664801.24

664862.37

664889.18

664919.39

664939.66

664974.53

END STAT

12+05.66

13+07.86

15+29.42

17+93.35

20+31.39

20+66.78

21+73.42

23+22.27

24+39.13

26+88.18

28+91.14

30+76.40

32+07.83

34+53.22

37+46.00

38+83.05

40+11.30

40+82.69

41+65.80

41+76.20

42+78.70

44+87.60

45+57.97

47+16.74

48+89.26

49+66.23

50+32.64

51+22.93

51+65.29

52+20.15

52+56.77

53+19.25

54+12.26

END NORTH

1243757.00

1243708.37

1243602.95

1243474.24

1243335.40

1243318.06

1243261.72

1243160.89

1243074.57

1243074.24

1243073.99

1243062.25

1242985.17

1242832.54

1242656.25

1242563.13

1242434.88

1242389.61

1242335.65

1242328.90

1242400.58

1242214.15

1242149.68

1242009.37

1241836.93

1241782.41

1241746.75

1241680.29

1241647.49

1241601.71

1241571.20

1241519.36

1241443.47

END EAST

667548.24

667369.86

667279.97

667085.10

666854.68

666661.32

666630.47

666539.94

666430.42

666351.66

666102.61

665899.65

665714.76

665608.31

665416.17

665182.40

665081.85

665081.90

665026.69

664963.49

664955.58

664882.30

664788.06

664759.85

664685.56

664690.89

664745.23

664801.24

664862.37

664889.18

664919.39

664939.66

664974.53

LENGTH

205.66

102.20

221.56

263.93

238.04

35.39

106.63

148.86

116.86

249.05

202.96

185.26

131.43

245.39

292.78

137.05

128.25

71.39

83.11

10.40

102.51

208.90

70.37

158.76

172.52

76.97

66.41

90.29

42.36

54.86

36.63

62.48

93.01

BEARING

S60° 09' 09.60"W

S61° 35' 17.39"W

S61° 35' 17.39"W

S60° 48' 45.80"W

S54° 19' 14.15"W

S60° 40' 00.53"W

S58° 06' 08.96"W

S47° 21' 52.88"W

S42° 22' 48.32"W

S89° 55' 29.18"W

S89° 55' 37.80"W

S86° 22' 03.54"W

S54° 05' 36.64"W

S51° 32' 13.40"W

S52° 58' 47.15"W

S47° 11' 48.98"W

S00° 01' 13.66"E

S50° 38' 37.69"W

S49° 30' 49.83"W

S49° 30' 49.83"W

N45° 37' 48.52"W

S26° 48' 58.15"W

S23° 37' 53.26"W

S27° 54' 04.20"W

S01° 46' 19.27"E

S44° 54' 04.23"E

S57° 31' 17.24"E

S42° 36' 28.31"E

S39° 15' 38.06"E

S33° 25' 15.21"E

S33° 35' 40.67"E

S33° 55' 33.75"E

S35° 19' 09.53"E

FY

PN

0-

G I1

.D

W G

R . H

O

PP

ER

E.

V

AR

G

AS

D . D

O R

AN

D . N

EA

M

TU

C

O N

TR

O

L

PL

AN

II

I H

O R

IZ

O

N

TA

L

AN

D A

LI

G

N M

EN

T

GI104

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

JU

LY

C

AT

EG

O

R Y

C O

D E:

FI

LE

N

AM

E:

D

S

IZ

E

W

2H N

-2 0-

B-

FO

R

T G

O R

D O

N , G

EO

R

G

IA

R

EP

AI

R

S

TO

O U

TF

AL

L X

AN

D

C O

N

TR

IB

U

TI

N

G S

TO

R

M S

EW

ER

N

ET

W O

R K

FY

P N

D E-

3- 8P

R

EA

D Y

FO

R

A D

VE

R

TI

SE

M

EN

T

C D

M F ed er al P ro gr am s

C or p.

F ai rv ie w

P ar k D riv e, Su ite

Fa lls

C hu rc h, V A

Te l:

(7

) 4

-8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

BRAINARD AVE

AVE OF THE AMERICAS ALIGNMENT A

ALIGNMENT C

ALIGNMENT B

ALIGNMENT A2

HERITAGE PARK LN

ALIGNMENT A1

ALIGNMENT A3

ALIGNMENT A4

ALIGNMENT C1

ALIGNMENT C4

MATCH LINE GI102

KEY PLAN

SCALE: 1"=1000'C17 0 2000'1000'

GI104

B1 HORIZONTAL AND ALIGNMENT

SCALE: 1"=100' 100' 200'0

GI103GI102

NOTES

1. SEE SURVEY NOTES ON SHEET V-101.

ALIGNMENT A5

R

EA

D Y

TO

A

D

VE

R

TI

SE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

D

AT

ALIGNMENTS: A

NUMBER

L1

L2

L3

L4

L5

L6

L7

L8

L9

L10

L11

L12

L13

L14

L15

L16

L27

L28

L32

L33

L29

L17

L30

L31

L18

L19

L20

L21

L22

L23

L24

L25

L26

START STAT

10+00.00

12+05.66

13+07.86

15+29.42

17+93.35

20+31.39

20+66.78

21+73.42

23+22.27

24+39.13

26+88.18

28+91.14

30+76.40

32+07.83

34+53.22

37+46.00

38+83.05

40+11.30

40+82.69

41+65.80

41+76.20

42+78.70

44+87.60

45+57.97

47+16.74

48+89.26

49+66.23

50+32.64

51+22.93

51+65.29

52+20.15

52+56.77

53+19.25

START NORTH

1243859.35

1243757.00

1243708.37

1243602.95

1243474.24

1243335.40

1243318.06

1243261.72

1243160.89

1243074.57

1243074.24

1243073.99

1243062.25

1242985.17

1242832.54

1242656.25

1242563.13

1242434.88

1242389.61

1242335.65

1242328.90

1242400.58

1242214.15

1242149.68

1242009.37

1241836.93

1241782.41

1241746.75

1241680.29

1241647.49

1241601.71

1241571.20

1241519.36

START EAST

667548.24

667369.86

667279.97

667085.10

666854.68

666661.32

666630.47

666539.94

666430.42

666351.66

666102.61

665899.65

665714.76

665608.31

665416.17

665182.40

665081.85

665081.90

665026.69

664963.49

664955.58

664882.30

664788.06

664759.85

664685.56

664690.89

664745.23

664801.24

664862.37

664889.18

664919.39

664939.66

664974.53

END STAT

12+05.66

13+07.86

15+29.42

17+93.35

20+31.39

20+66.78

21+73.42

23+22.27

24+39.13

26+88.18

28+91.14

30+76.40

32+07.83

34+53.22

37+46.00

38+83.05

40+11.30

40+82.69

41+65.80

41+76.20

42+78.70

44+87.60

45+57.97

47+16.74

48+89.26

49+66.23

50+32.64

51+22.93

51+65.29

52+20.15

52+56.77

53+19.25

54+12.26

END NORTH

1243757.00

1243708.37

1243602.95

1243474.24

1243335.40

1243318.06

1243261.72

1243160.89

1243074.57

1243074.24

1243073.99

1243062.25

1242985.17

1242832.54

1242656.25

1242563.13

1242434.88

1242389.61

1242335.65

1242328.90

1242400.58

1242214.15

1242149.68

1242009.37

1241836.93

1241782.41

1241746.75

1241680.29

1241647.49

1241601.71

1241571.20

1241519.36

1241443.47

END EAST

667548.24

667369.86

667279.97

667085.10

666854.68

666661.32

666630.47

666539.94

666430.42

666351.66

666102.61

665899.65

665714.76

665608.31

665416.17

665182.40

665081.85

665081.90

665026.69

664963.49

664955.58

664882.30

664788.06

664759.85

664685.56

664690.89

664745.23

664801.24

664862.37

664889.18

664919.39

664939.66

664974.53

LENGTH

205.66

102.20

221.56

263.93

238.04

35.39

106.63

148.86

116.86

249.05

202.96

185.26

131.43

245.39

292.78

137.05

128.25

71.39

83.11

10.40

102.51

208.90

70.37

158.76

172.52

76.97

66.41

90.29

42.36

54.86

36.63

62.48

93.01

BEARING

S60° 09' 09.60"W

S61° 35' 17.39"W

S61° 35' 17.39"W

S60° 48' 45.80"W

S54° 19' 14.15"W

S60° 40' 00.53"W

S58° 06' 08.96"W

S47° 21' 52.88"W

S42° 22' 48.32"W

S89° 55' 29.18"W

S89° 55' 37.80"W

S86° 22' 03.54"W

S54° 05' 36.64"W

S51° 32' 13.40"W

S52° 58' 47.15"W

S47° 11' 48.98"W

S00° 01' 13.66"E

S50° 38' 37.69"W

S49° 30' 49.83"W

S49° 30' 49.83"W

N45° 37' 48.52"W

S26° 48' 58.15"W

S23° 37' 53.26"W

S27° 54' 04.20"W

S01° 46' 19.27"E

S44° 54' 04.23"E

S57° 31' 17.24"E

S42° 36' 28.31"E

S39° 15' 38.06"E

S33° 25' 15.21"E

S33° 35' 40.67"E

S33° 55' 33.75"E

S35° 19' 09.53"E

ALIGNMENTS: A1

NUMBER

L34

START STAT

1+00.00

START NORTH

1242026.10

START EAST

664700.48

END STAT

2+50.00

END NORTH

1241914.15

END EAST

664700.48

LENGTH

150.00

BEARING

S41° 43' 33.99"W

ALIGNMENT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .