This document provides specifications for the construction of Army family housing at Fort Gordon, Georgia under solicitation number W912HN20B3004. The work includes building 9 housing units along with site work and utilities. Construction must comply with the specifications, plans provided in two volumes, and all applicable federal, state and local regulations. Bids are due by April 7, 2020 with award by the U.S. Army Corps of Engineers, Savannah District. The contract will be a 100% small business set-aside. The contractor must provide insurance, comply with security requirements including background checks, and coordinate any utility outages with the Contracting Officer. The project superintendent is required to have 10 years of construction experience including 5 years as a superintendent on similar projects. Partnering between the government and contractor is also required.

View the file

Other files

File Type Posted
C.04 -Abstract W912HN20B3004 Family Housing Ft Gordon.pdf PDF
C.04 - Virtual bid opening attendance roster-W912HN20B3002.pdf PDF
Amd2.pdf PDF
B.08- W912HN20B3004 Conformed.pdf PDF
20B3004vol1.PDF PDF
amd1.pdf PDF
W912HN-20-B-3004_VOL1_AMD1.pdf PDF
W912HN-20-B-3004_VOL1.pdf PDF
20B3004vol2.PDF PDF
20B3004vol2.PDF PDF
W912HN-20-B-3004_VOL1.pdf PDF
W912HN-20-B-3004_VOL2.pdf PDF
20B3004vol1.PDF PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Gordon, Georgia

Solicitation Number

W912HN-20-B-3004

Family Housing Replacement Volume 1 of 2: Procurement and Contracting Requirements and Specification Divisions 01 - 07

PN 87205

February 2019

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

CORPS OF ENGINEERS

100 WEST OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640

US Army Corps of Engineers Savannah District

Family Housing Replacement 20B3004

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 03 - CONCRETE

03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00 CONCRETE ACCESSORIES

03 20 00 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

03 35 00 CONCRETE FINISHING

03 39 00 CONCRETE CURING

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 21 23 LOOSE FILL THERMAL INSULATION

07 27 10 BUILDING WEATHER (AIR AND WATER) BARRIER SYSTEM

07 31 13 ASPHALT SHINGLE ROOFING

07 46 20 FIBER CEMENT LAP SIDING AND TRIM

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 32 13 MULTI-SLIDING GLASS DOORS

08 36 13 SECTIONAL OVERHEAD DOORS

08 53 00 VINYL WINDOWS

PROJECT TABLE OF CONTENTS Page 1

08 71 00 DOOR HARDWARE

DI VI SI ON 09 - FI NI SHES

09 29 00 GYPSUM BOARD

09 30 10 PORCELAIN, STONE, AND GLASS MOSAIC TILING

09 64 29 WOOD STRIP AND PLANK FLOORING

09 68 00 CARPETING

09 72 00 WALLCOVERINGS

09 90 00 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 28 13 TOILET ACCESSORIES

10 82 19 SCREEN WALL PORCH FRAMING AND SCREENING SYSTEM

DI VI SI ON 11 - EQUI PMENT

11 31 13 KITCHEN EQUIPMENT

DI VI SI ON 12 - FURNI SHI NGS

12 21 00 WINDOW SHADES AND BLINDS

12 36 00 COUNTERTOPS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 21 00 FIRE EXTINGUISHING SPRINKLER SYSTEMS (RESIDENTIAL)

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 81 00 UNITARY AIR CONDITIONING EQUIPMENT

DI VI SI ON 26 - ELECTRI CAL

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 51 00 INTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 05 14 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 05 29 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET

COMMUNICATION SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 21 13 RADON MITIGATION

31 31 16.13 CHEMICAL TERMITE CONTROL

PROJECT TABLE OF CONTENTS Page 2

31 31 16.19 TERMITE CONTROL BARRIERS

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 32 23 *1 DELETED SEGMENTAL CONCRETE BLOCK RETAINING WALL

32 92 19 SEEDING

32 92 23 SODDING

DI VI SI ON 33 - UTI LI TI ES

33 40 00 STORM DRAINAGE UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

APPENDICES

Appendix A GEOTECHNICAL REPORT Appendix B FIRE FLOW DATA Appendix C FURNITURE, FIXTURES AND EQUIPMENT Appendix D STRUCTURAL INTERIOR DESIGN

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

A. Project Number: 87205, Family Housing Replacement at Fort Gordon, GA

B. This project is being solicited as a 100% Small Business Set-Aside.

C. This acquisition w ill be aw arded in accordance w ith FAR Part 14 (Sealed Bidding).

D. Offerors must be registered in the System for Aw ard Management (w w w .sam.gov.)

E. IAW FAR 36.204, the magnitude of this requirement is betw een $5M and $10M.

F. Contractual POC is Mr. Iria V. (Sean) Morrissette, E-Mail: iria.v.morrissette@usace.army.mil, Phone: 912-652-6033.

G. Technical POC is Mr. Ben Jones, E-Mail: benjamin.s.jones@usace.army.mil, Phone: 912-652-5568.

X

IRIA V MORRISSETTE 912-652-6033

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

25-Feb-2020

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________540 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________07 Apr 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912HN20B3004 76

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912HN20B3004

Section SF 30 - Block 14 Continuation Page (SF 30)

AMENDMENT 0001

A. CONTRACT CHANGES:

1. The Site Visit Meeting Minutes and Sign-In Sheet from the Site Visit held on 12 March 2020 are hereby incorporated as a result of this amendment (see attached).

2. Under Notes for Bid Schedule, #5: the phone number to reach Mr. Chris Dodgen, GA Power – Electrical is 706.831.0281 Cell.

B. TECHNICAL SPECIFICATION CHANGES: The replaced Section listed below (replaced by Amendment No. 0001) is hereby added to and made a part of the solicitation; such Sections are replaced in their entirety and changes are neither underlined nor struck out. Deleted Section is also indicated below.

Replaced Section Deleted Sections 01 30 00 32 32 23

C. CONTRACT DRAWINGS – File No. 711-15-01:

Sheets CE101, CE102, CE103, CE104, CE105, CE106, CE107, CE108, CE109, CE110, CE111, CE112, CE112A, CE201, CE202, CE501, CE502, CE503, CE504, CE505, CE506,CE507, CE508, CE509, CE510, LS101, LS102, LS102A, LS501, LS502 and LS503with Revision 1 dated 13 MARCH 2020 are hereby added to and made a part of the Contract Drawings.

D. All other terms and conditions remain unchanged.

ATTACHMENT 1 TO SECTION 00 73 00

LIST OF ATTACHMENTS

Attachment 1 - 1

Army Project Sign

Project Sign Legend Defined

Project Sign Erection Detail

Safety Performance Sign

Corps of Engineers Logo

Accident Prevention Plan Checklist

Construction Quality Control Report

Weekly Temporary Electrical Inspection

Minimum Standard for Temporary Electrical Service (Ref. FAR 52.236-14)

SAS FL 363 - Foundation Data

SAS Form 9 - Activity Hazard Analysis

SAD FL198 - Report of Safety Meeting

DA Form 5418-R - Cost Estimate Analysis

DD Form 1354 - Transfer and Acceptance of Military Real Property

DD Form 1354 Checklist

DD Form 1532 - Pest Management Report

DD Form 1532 - Pest Management Maintenance Record

DHS Form I-9 - Employment Eligibility Verification

ENG Form 16-1 - Certificate of Compliance for LHE and Rigging

ENG Form 2454 - Construction Progress Chart

ENG Form 3394 – Accident Investigation Report

ENG Form 4025 - Transmittal of Shop Drawings, Equipment Data, Material

Samples, or Manufacturer's Certificates of Compliance

Real Property Inventory and BIS Worksheet

Landfill Permit Application

Standard Form LLL-A - Disclosure of Lobbying Activities

Contractor Hazardous Material Inventory Log (EPRCA)

Contractor-Furnished Spoil, Disposal Areas

PROJECT SIGN LEGEND DEFINED

Legend Group 1: The words:

"Construction or "Design and Construction Supervised by:" Supervised by:"

shall be placed on two lines using black, 1.25" Helvetica regular typeface.

Maximum line length is 19".

10.5" Reverse Signature: The Corps symbol shall be a 10.5" white reverse signature using a 6" castle on a red background. The castle and surrounding border lines shall be white. The castle windows, door, and logo background are to be red. The words "U.S. Army Corps of Engineers" shall be black.

Legend Group 2: The words:

"Savannah District South Atlantic Division" shall be placed on two lines below the 10.5" reverse signature, using black, 1.25" Helvetica regular typeface.

Legend Group 3: The "Name of Project" shall be placed on one to three lines using white 3" Helvetica bold typeface. Maximum line length is 42".

Legend Group 4: The "Army Installation" shall be a one or two line identification of the facility or name of the sponsoring department.

Lettering is to be white, 1.5" Helvetica regular typeface. Maximum line length is 42".

NOTE: Cross-align the first line of legend group 4 with the first line of the Corps signature (U.S. Army Corps) as shown.

Legend Group 5a: The words:

"Architects:" or "Engineers:" or "Architect-Engineers:"

shall be a one to five line identification of the prime architect or engineering corporate or firm name, city, and State. Lettering shall be white, 1.25" Helvetica regular typeface. Maximum line length is 21".

Legend Group 5b: The "Contractor:" shall be a one to five line identification of the prime Contractor corporate or firm name, city, and State. Include type of Contractor, i.e. General Contractor, etc. Lettering shall be white, 1.25" Helvetica regular typeface. Maximum line length is 21".

NOTE: All typography shall be flush left and rag right, upper and lower case with initial capitals only as shown.

Safety Performance Sign EP 310-1-6a 01 Jun 06

16-3

Each contractor’s safety record is to be posted on Corps managed or supervised construction projects and mounted with the Construction Project Identification sign specified on page 16-2.

The graphic format, color, size and type-faces used on the sign are to be repro-duced exactly as specified below. The title with First Aid logo in the top section of the sign, and the performance record captions are standard for all signs of this type. Legend groups 2 and 3 below identify the project and the contractor and are to be placed on the sign as shown.

Safety record numbers are mounted on individual metal plates and are screw-mounted to the background to allow for daily revisions to posted safety perfor-mance record.

Special applications or situations not covered in these guidelines should be referred to the district Sign Program Manager.

Legend Group 1: Standard two-line title “Safety is a Job Requirement” with 8” (outside diameter) Safety Green first aid logo.

Color: To match Pantone system 347 Typeface: 3" Helvetica Bold Color: Black

Legend Group 2: One- to two-line project title legend describes the work being done under this contract and name of host project.

Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"

Legend Group 3: One- to two-line identifica-tion: name of prime contractor and city, state address. Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"

Legend Group 4: Standard safety record captions as shown.

Color: Black Typeface: 1.25” Helvetica Regular

Replaceable numbers are to be mounted on white .060 aluminum plates and screw-mounted to background.

Color: Black Typeface: 3" Helvetica Regular Plate size: 2.5" x 4.5"

All typography is flush left and rag right, upper and lower case with initial capitals only as shown. Letter- and word-spacing to follow Corps standards as specified in Appendix D.

3” 33.030” eq. 8” eq.

6”

4.5”

10.5”

2.25” 3”

2.25” 3”

4.875”

4.875”

6.75”

4.875” .75” 4.875”

4.5”

3”

3” 42” 3”

2.25” 2.25” 2.25” 2.25”

.75”

3”

.75”

Sign Legend Panel Post Specification Mounting Color Type Size (A) Size Size Code Height Bkg/Lgd

CID-02 various 4’x4’ 4”x4” HDO-3 48” WH/BK-SG

CORPS OF ENGINEERS LOGO

HALF SIZE

CESO Form A-02 MAR 15

Form A-02 U.S. Army Corps of Engineers

Accident Prevention Plan Checklist

Date of Inspection

Location (Plant or Facility) Contract Number

Contractor Name Project Name

Inspector Name (Print) Inspector Signature

This checklist serves as a guide only, it does not replace or eliminate the need to comply with the requirements set forth in Engineering Manual 385-1-1, Safety and Health Requirements Manual, dated 30 Nov 2014. The references included in this checklist correspond to the applicable sections of EM 385-1-1.

Item Description Yes No N/A Remarks (Any NO or N/A item)

a. Signature sheet

1. Includes the name, title, signature, telephone number, and qualifications of the Plan Preparer (Qualified person, i.e. corporate safety staff person, QC)

2. Includes the name, title, signature, telephone number, and qualifications of the Plan Approver (e.g. owner, company president, regional vice president) (HTRW activities require approval of a Certified Industrial Hygienist, a Certified Safety Professional may approve the plan for operations involving UST removal where contaminants are known to be petroleum, oils, or lubricants).

3. Includes the name(s), title(s), signature(s), telephone number(s), and qualifications for Plan Concurrence (provide concurrence of other applicable corporate and project personnel (contractor)) (e.g. Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional, project QC.)

b. Background information

1. Includes the Contractor Name.

2. Includes the Contract Number.

3. Includes the Project Name.

4a. Includes the Brief Project Description.

4b. Includes a Discription of the Work to be Performed.

4c. Includes the Location of the Project (map).

4d. Includes the Equipment to be Used.

4e. Includes the Anticipated High Risk Activities.

5. Includes the Major Phases of Work Anticipated.

(Within these major phases of work identified, activities [includes Definable features of Work (DFOWs) and tasks] to be performed that will require an AHA shall be specifically highlighted. This information can then be used by QC, QA and Safety personnel to track AHA submittals. The AHAs for these activities, tasks of DFOWs are NOT submitted at this time (AHAs created/submitted at this time would not be activity-specific as they are intended to be). > See Sections 01.A.14 and 01.A.15.)

U.S. Army Corps of Engineers

Accident Prevention Plan Checklist (cont’d)

Date of Inspection

Item Description Yes No N/A Remarks (Any NO or N/A item)

c. Statement of Safety and Health Policy.

1. Provide a copy of current corporate/company Safety and Health Policy Statement, detailing commitment to providing a safe and healthful workplace for all employees. (In addition to the corporate policy statement, a copy of the corporate safety program may provide a portion of the information required by the accident prevention plan.)

2. Includes Contractor’s written safety program goals.

3. Includes Contractor’s written safety program objectives.

4. Includes the Contractor Accident Experience (Copy of OSHA 300 Forms, or equivalent documentation).

d. Responsibilities and Lines of Authority.

1. Includes statement of the employer’s ultimate responsibility for the implementation of his SOH program for his own employees, all sub-contractors and all others on the worksite (includes the strict enforcement of the program).

2. Includes the identification and accountability of personnel responsible for safety and health at both the corporate and project level – including their resumes. Qualifications shall be in accordance with Section 01.A.17. (Only official OSHA 30-Hour cards will be accepted or, if equivalent training is provided, appropriate instructor qualifications.)

3. Includes equivalent training to the OSHA 30-Hour classes is being presented as qualification, the training shall cover, as a minimum, the areas discussed in Appendix A, Section 3.d.3.(a-d).

4. Includes the names of Competent (CP) and/or Qualified Person(s) (QP) and proof of competency/qualification to meet specific OSHA CP/QP requirements. (Must include copies of proof of CP/QP).

5. Includes requirements and details of the employer’s Risk Management Process. (USACE uses the Activity Hazard Analysis (AHA) as part of a total risk management process. Contractors and other individual employer’s may use the AHAs or their own version [Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools]. These documents are considered equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA.)

6. Includes requirements for initial activity-specific AHAs to be submitted and accepted at preparatory meetings, prior to work being performed;

7. Includes requirements that no work by the Contractor shall be performed unless a designated Competent Person/SSHO is present on the job site.

8. Includes policies and procedures regarding non-compliance with safety requirements (to include disciplinary actions for violation of safety requirements).

9. Lines of authority.

10. Includes written company procedures for holding managers and supervisors accountable for safety.

U.S. Army Corps of Engineers

Accident Prevention Plan Checklist (cont’d)

Date of Inspection

Item Description Yes No N/A Remarks (Any NO or N/A item)

e. Subcontractors and Suppliers.

1. Includes the list of subcontractors and suppliers.

(If not known at the time of initial APP submittal, the contractor shall include the following statement in their initial APP: “The subcontractors for the following DFOWs/activities are not known at this time, but additional information will be submitted to the APP for acceptance prior to the start of any activities listed”)

2. Includes safety responsibilities of subcontractors and suppliers.

f. Training

1. Includes requirements for new hire SOH orientation training at the time of initial hire of each new employee.

2. Includes requirements for mandatory training and certifications that are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, diver, vehicle operator, HAZWOPER training and certification, PPE) and any requirements for periodic retraining / recertification.

3. Includes procedures for periodic safety and health training for supervisors and employees.

4. Includes the requirements for emergency response training.

g. Safety and Health Inspections

1. Includes specific assignment of responsibilities for a minimum daily jobsite SOH inspection during periods of work activity.

1a. Includes the name(s) of individual(s) responsible for conducting safety inspections. (e.g., PM, safety professional, QC, supervisors, employees) 1b. Includes proof of inspector's training / qualifications.

1c. Indicates when inspections will be conducted.

1d. Indicates procedures for documentation. (Furnished sample forms upon which inspections will be recorded.)

1e. Indicates deficiency tracking system and follow-up procedures.

2. Includes any external inspections / certifications which may be required. (e.g., US Coast Guard)

h. Mishap Reporting and Investigation

1. The plan identifies how, when, and who shall complete the Exposure data (man-hours worked).

2a. The plan identifies how, when, and who shall complete mishap investigations, reports, and logs. (The contractor shall report, thoroughly investigate, and analyze all mishaps occurring incidentally to an operation, project or facility for which this manual is applicable.)

2b. The plan identifies how, when, and who shall make immediate notification of major mishaps. (Mishaps shall be reported as soon as possible but not more than 24 hours afterwards to the KO/COR.)

2c. Includes how, when, and who will provide notice to the KO/COR when corrective actions are completed. (Implement corrective actions as soon as reasonably possible.)

U.S. Army Corps of Engineers

Accident Prevention Plan Checklist (cont’d)

Date of Inspection

Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable safety and occupational health risks and associated compliance plans. Using the EM 385-1-1 as a guide, plans, programs, procedures (assessments and evaluations), may include but not be limited to:

(1)Include a project-specific compliance plan, as applicable to the work being performed, and as identified below. The plans shall incorporate project-wide procedures to control hazards to which the employees of all project employers may be exposed.

(2) These procedures shall be coordinated with all project employers and shall include project-specific, project-wide emergency response and evacuation procedures, PPE requirements, recordkeeping and reporting requirements, and training requirements.

(3) The plans shall be prepared prior to the start of any work activities on the job site (as much as the information can be known at that point in time). The plans shall be updated throughout the life of the project to include changes in personnel, equipment, conditions, etc. Additional revisions shall be incorporated as necessary to reflect changing site conditions, construction methods, personnel roles and responsibilities and construction schedules.

(4) No activity (DFOW) shall be started on site until the APP is revised and submitted to the GDA for acceptance, with the site-specific plans, programs and procedures required to complete the project.

Item Description Yes No N/A Remarks (Any NO or N/A item)

i. Plans (Programs, Procedures, Assessments, and Evaluations) required by the Safety Manual

1. Fatigue Management Plan (01.A.20)

2. Emergency Plans (01.E):

(a) Procedures & Test (01.E.01)

(b) Spill Plans (01.E.01, 06.A.02)

(c) Fire Fighting Plan (01.E.01; 19.A)

(d) Posting of Emergency Telephone Numbers (01.E.05)

(e) Man overboard/abandon ship (19.A.04)

(f) Plan for prevention of alcohol and drug abuse (01.C.02 & Specs)

3. Site Sanitation/Housekeeping Plan (02.B)

4. Medical Support Agreement. Outline on-site medical support and off-site medical arrangements including rescue and medical duties for those employees who are to perform them, and the name(s) of on-site Contractor personnel trained in first aid and CPR. A minimum of two employees shall be certified in CPR and first-aid per shift/site (03.A.01, 03.A.03)

5. Blood-borne Pathogen Program (03.A.05)

6. Exposure Control Plan (03.A.05)

7. Automatic External Defibrillator (AED) Program (03.B.04)

8. Site Layout Plan (04.A)

9. Access/Haul Road Plan (04.B)

10. Hearing Conservation Program (05.C)

11. Respiratory Protection Plan (05.G)

12. Health Hazard Control Program (06.A)

13. Hazard Communication Program (06.B.01)

14. Process Safety Management Plan (06.B.04)

15. Lead Compliance Plan (06.C.02 & Specifications)

16. Asbestos Abatement Plan (06.C.03 & Specifications)

U.S. Army Corps of Engineers

Accident Prevention Plan Checklist (cont’d)

Date of Inspection

Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans, programs, procedures (assessments and evaluations), may include but not be limited to:

Item Description Yes No N/A Remarks (Any NO or N/A item)

i. Plans (Programs, Procedures) continued.

17. Radiation Safety Program (06.F)

18. Abrasive Blasting Plan (06.I)

19. Heat Stress Monitoring Plan (HSMP) (06.J.02)

20. Cold Stress Monitoring Plan (CSMP) (06.J.04)

21. Indoor Air Quality Management Plan (06.L)

22. Mold Remediation Plan (06.L.04)

23. Chromium (VI) Exposure Evaluation (06.M)

24. Crystalline Silica Assessment (06.N.02)

25. Lighting Plan for Night Operations (07.A.06)

26. Traffic Control Plan (08.C.05)

27. Fire Prevention Plan (09.A.01)

28. Wild Land Fire Management Plan (09.L)

29. Arc Flash Hazard Analysis (11.B)

30. Assured Equipment Grounding Control Program (AEGCP), (11.D.05, Appendix E)

31. Hazardous Energy Control Program and Procedures (12.A.01)

32. Standard Pre-Lift Plan – LHE (16.A.03)

33. Critical Lift Plan – LHE (16.H)

34. Naval Architectural Analysis – LHE (Floating) (16.L)

35. Floating Plant Inspection and Certification (19.A.01)

36. Severe Weather Plan for Marine Activities (19.A.03)

37. Emergency Plan for Marine Activities (19.A.04)

38. Man Overboard/Abandon Ship Procedures (19.A.04)

39. Float Plan for Launches, Motorboats, Skiffs (19.F.04)

40. Fall Protection and Prevention Plan (21.D)

41. Demolition/Renovation Plan (to include engineering survey) (23.A)

42. Rope Access Work Plan (24.H)

43. Excavation/Trenching Plan (25.A.01)

44. Fire Prevention and Protection Plan for Underground Construction (26.D.01)

45. Compressed Air Work Plan for Underground Construction (26.I.01)

46. Erection and Removal Plan for Formwork and Shoring (27.C)

47. Precast Concrete Plan (27.D)

U.S. Army Corps of Engineers

Accident Prevention Plan Checklist (cont’d)

Date of Inspection

Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans, programs, procedures (assessments and evaluations), may include but not be limited to:

Item Description Yes No N/A Remarks (Any NO or N/A item)

i. Plans (Programs, Procedures) continued.

48. Lift-slab Plans (27.E)

49. Masonry Bracing Plan (27.F.01)

50. Steel Erection Plan (28.B)

51. Explosives Safety Site Plan (ESSP) (29.A)

52. Blasting Plan (29.A; 26.J)

53. Dive Operations Plan (30.A.14, 30.A.16)

54. Safe Practices Manual for Diving Activities (30.A.15)

55. Emergency Management Plan for Diving (30.A.18)

56. Tree Felling/Maintenance Program (31.A.01)

57. Aircraft/Airfield Construction Safety & Phasing Plan (CSPP) (32.A.02)

58. Aircraft/Airfield Safety Plan Compliance Document (SPCD) (32.A.02)

59. Site Safety and Health Plan (HTRW) (33.B)

60. Confined Space Entry Procedures (34.A.05)

61. Confined Space Program (34.A.06)

j. Risk Management Processes (AHAs). Detailed project-specific hazards and controls shall be provided by Activity Hazard Analysis for each activity (DFOW). No work will begin on an activity (DFOW) until the initial AHA has been accepted by the GDA addressing the project-specific hazards. (01.A.14 & 01.A.15) Note: USACE uses the Activity Hazard Analysis (AHA) as part of a total risk management process. Contractors and other individual employer’s may use the AHAs or their own version [Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools].

These documents are considered equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA.

Remarks:

U.S. Army Corps of Engineers

Accident Prevention Plan Checklist (cont’d)

Date of Inspection

Other Remarks:

CONTRACTOR'S NAME

(Address)

DAILY CONTRACTOR QUALITY CONTROL REPORT

Date: ______________ Report No. _____

Contract No. _____________________________

Description and Location of Work: ___________________________________________

Weather: (Clear) (P. Cloudy) (Cloudy); Temperature: ___ Min. ___ Max; ___

Rainfall ______ inches

Contractor/Subcontractors and Area of Responsibility

1. Work Performed Today: (Indicate location and description of work performed. Refer to work performed by prime and/or subcontractors by letter in table above.)

2. Results of Surveillance: (Include satisfactory work completed, or deficiencies with action to be taken.)

3. Tests required by Plans and/or Specifications Performed and Results of tests:

4. Verbal Instructions Received: (List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with action to be taken.)

5. Remarks: (Cover delays and any conflicts in plans, specifications, or instructions.)

6. Safety Inspection: (Report violations noted; corrective instructions given; and corrective actions taken.)

7. Equipment Data: (Indicate items of construction equipment, other than hand tools, at jobsite, and whether or not used.)

CONTRACTOR'S VERIFICATION: The above report is complete and correct and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

Contractor's Approved Authorized Representative

WEEKLY TEMPORARY ELECTRICAL INSPECTION

Week ending ________________

Contract No. __________________________

Contract Description _______________________________________________________

The following items were inspected in accordance with requirements in National Electrical Code and Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1.

1. Wire (size, type, condition).

2. Systems and devices (polarity, continuity of ground, resistance to ground).

3. Resistance of ground rods (25 OHMS) measured and recorded.

4. Check GFI for 15/20 amp 120 volt circuits.

5. Plugs and receptacles (type, NEMA rating).

6. Circuit breakers and disconnect (size, type, weatherproof).

7. Extension cords (type, UL listed, insulation condition, splices, location).

8. Open wiring on insulators, nonmetallic sheathed cable, outside clearance (600 volts or less), Festoon lighting (as applicable).

Signature Electrician/Electrical Engineer

MINIMUM STANDARD FOR TEMPORARY ELECTRICAL SERVICE

(DIMENSIONS ARE APPROXIMATE)

A. The backboard for temporary service shall consist of not less than 1/2 inch plywood of exterior grade.

B. Numbers above correspond to the item below:

Item 1 - NEMA 3R circuit breaker type panelboard. This panelboard shall consist of 1 two-pole 60 amp main circuit breaker, 4* one pole 20 AMP branch circuit breakers, and 1* two pole 20 AMP branch circuit breaker. Breakers shall meet Federal Specifications Standards for Class 1A breakers and shall be plug-in type. (*Number of breakers to be adjusted to suit the job requirements.)

Item 2 - Duplex grounding type convenience outlets in standard utility type outlet boxes with covers, meeting the NEC and NEMA requirements for wet locations.

Connections to the branch circuit breakers shall be grounded by two conductors #12 NMC cable.

Item 3 – (Optional) A single three-conductor grounding type outlet rated for 250 volt service meeting the NEC and NEMA requirements for wet locations. Connections from this outlet to the two pole breaker shall be by two conductor grounded type NMC cable.

Item 4 - 3/4 inch PVC. This shall be used to support extension cords.

Item 5 – NEMA 3R service disconnect safety switch – 60 amp minimum.

C. The panelboard shall be grounded by #6 copper wire connected to a 3/4 inch by 10-foot long ground rod.

D. Service to the panel shall consist of three copper conductor #6 minimum service entrance cable. This cable may enter the top or side of the panelboard.

E. Periodic inspections of systems and devices will be made by the Contractor at intervals not to exceed 1 week, and a report will be submitted indicating the results.

F. All receptacle outlets that provide temporary electrical power during construction, remodeling, maintenance, repair, or demolition shall have ground-fault circuit-interrupter (CFCI) protection for personnel. GFCI protection shall be provided on all circuits serving portable electric hand tools or semi-portable electric power tools (such as block/brick saws, table saws, air compressors, welding machines, and drill presses). See EM 385-1-1 for exceptions.

G. Per EM 385-1-1 all temporary power distribution systems shall be submitted to the field office before installation.

FOUNDATION DATA

SAS FL 363 Page 1

Project Title: __________________________________________________________________

FY: _______________ L.I. _______________

Location: ____________________________________________________________________

A-E Firm: ____________________________________________________________________

A-E Phone No. ___________________________________

1. The following information is furnished relative to the foundation analysis for the subject project. (A separate CESAS FL 363 shall be completed for each structure involved in the project.)

a. Type of structural system: (Brief Statement)

b. General Scope: __________ feet by __________ feet # of stories ______ (Check applicable blocks below)

Slab-on Grade Basement Walls:

Crawl Space (1) Fixed at 1st Floor

Retaining Walls (2) Fixed at Footings

Areas Recessed below F.F. (Provide with info for Item 2. below)

c. Type of Foundation: (Check applicable blocks and fill in loads)

Mat. Foundation Approx. Max. Load on Mat. Foundation ________ K/SF

Spread Footings Approx. Max. Col. Load ________ Kips

Wall Footings Approx. Max. Wall Load ________ K/ft.

Foundation Walls Grade Beams

Rolled Edge Slab Combined Footings (See Item 2. below)

Piles Underpinning (See Item 2. below)

d. Other:

Pre-Engineered Building: Yes ______ No ______

Basement and/or Crawl Space Elevation: _______________ MSL

Finished Floor Elevation: _______________ MSL

FOUNDATION DATA

SAS FL 363 Page 2

2. Specific information and details pertinent to the foundation analysis are attached to this form.

3. Attached is one reproducible copy (Sepia or Cronaflex) of the detail site plan and a plan showing the location of columns and walls. (If the maximum column load exceeds 100 Kips or the maximum wall load exceeds 3 K/ft., the individual load, dead and live, for each footing shall be provided on the location plan of columns and walls.)

4. Boring locations will be determined by Savannah District personnel.

AE Representative Date

ACTIVITY HAZARD ANALYSIS

1. Phase of Construction

2. Location 3. Contract No. 4. Project

5. Prime Contractor 6. Date of Preparatory 7. Estimated Start Date

Potential Safety Hazard Procedure to Control Hazard

8. Contractor=s Representative (signature)

9.

SAS Form 9 1 Jan 82

REPORTING OF SAFETY MEETING _________________________________________

(INSTALLATION, FIELD OFFICE, JOB, ETC.)

THRU EN

CD

OP

RE

TO SO

FROM:

DATE: _____________________________ TIME: _________________ (A.M./P.M.)

NO. EMPLOYEES PRESENT _____________ DURATION: _________________________

Old Business: (Review report of last meeting. Follow up on action taken or anticipated to correct any safety deficiencies brought up at last meeting. Discuss any unfinished business.)

New Business: (Discuss any unsafe acts or conditions observed since last safety meeting and any mishaps or injuries which occurred during the week.)

Safety Presentation: (Safety talk, movie, or slide presentation on subject that is relevant to operation at hand.)

DATE AND TIME OF NEXT MEETING

(Signature and Title)

SAD FL 198, 1 APR 80

# OF

UNITS

UNIT

AREAS

MIN

UNIT

TOTAL

HRS

UNIT

PRICE

COST

UNIT

PRICE

COST

UNIT

PRICE

COST

UNIT

WT

TOTAL

WT

TOTAL THIS SHEET

DA Form 5418-R

MATERIAL

TASK DESCRIPTION TOTAL

SHIPPING

COST ESTIMATE ANALYSIS

PROJECT

LOCATION

INVITATION/CONTRACTOR

CODE (Check one) ____A ____B ____C ____Other _________________

EFFFECTIVE PRICING DATE

QUANTITY LABOR EQUIPMENT

DRAWING NO.

ESTIMATOR

DATE PREPARED

SHEET OF SHEETS

CHECKED BY

1354 CHECKLIST for Project Closeout

PROJECT NUMBER: ______________________

BUILDING NUMBER: _____________________

DESCRIPTION OF PROJECT: ____________________________________________________________________ Describe description of work; i.e., New Construction, Addition, Modification, Renovation, etc…

DRAWING NUMBER : ______________________________

TOTAL COST OF BUILDING: _______________________ (Cost of building only, sometimes does not include the cost of systems or plants. Costs of installed equipment such as water coolers, urinals, etc. is included in the cost of the building) DEMOLITION COSTS: _____________________________ (if any)

ACTUAL PROJECT COMPLETION DATE: ____________________

CECMC PROJECT CLOSEOUT DATE: _______________________

CATEGORY CODES NOMENCLATURE TOTAL COST TOTAL SF

NOTE: Main Line Item Category Codes (A or B) may need clarification or approval sometimes by Real Property if there is a question as to the best definition of a facilities actual use. The CECB Programmer should be inputting the Main Category code prior to initiating an AFF 1391.

NUMBER OF FLOORS: _____________________________

OUTSIDE DIMENSIONS: (from outside wall to outside wall) _____________________________

Main building SF __________________________________________________

Wings SF __________________________________________________

Offsets SF __________________________________________________

CONSTRUCTION MATERIAL:

Foundations (such as concrete) TYPE _________________________________________

Floors (such as wood, concrete) TYPE _________________________________________

Walls (such as wood siding) TYPE _________________________________________

Roof (such as built-up, shingle) TYPE _________________________________________

UTILITIES ENTERING BUILDING from STREET:

Water Line (size of pipe ex: 1½”, 2”, 3 ½ ) SIZE___________________ LF __________________

Gas Line (size of pipe) SIZE___________________ LF __________________

Sewer Line (size of pipe) SIZE___________________ LF __________________ Electrical Service (phase, # wires, voltage, amperage capacity) SIZE___________________ LF __________________

PLANT SYTEMS - AIR CONDITIONING

Category Code Nomenclature Unit of

Measure Amount Cost Description

890-126 A/C Window Units

TN _______ _______ __________________________

SF _______ _______ __________________________

890-125 A/C System less than 5 Ton

TN _______ _______ __________________________

SF _______ _______ __________________________

890-121 A/C System 5 to 25 ton TN _______ _______ __________________________

826-122 A/C System (Plant) 25 to 100 ton TN _______ _______ __________________________

826-123 A/C System (Plant) Over 100 ton TN _______ _______ __________________________

826-234 A/C System from Central Plant TN _______ _______ __________________________ NOTE: Choose, which ever best applies. Include actual tonnage for each unit separately.

PLANT SYTEMS - HEATING

Category Code Nomenclature Unit of

Measure Amount Cost Description

821-113 Heating from a Central Plant MB _______ _______ __________________________ 821-115 Heating Plant 750-500 M Btu MB _______ _______ __________________________ 821-116 Heating Plant Over 3500 M Btu MB _______ _______ __________________________

NOTE: Heating Plants under 750 MB don’t need to be broken out as a plant on the DD Form 1354, but do need to be annotated on the Real Property Installed Equipment (RPIE) list. Related equipment such as boilers, hot water pumps, fans, etc., should be reflected in the cost for the plant on the DD Form 1354. See the last page for definition of RPIE and a short listing of RPIE items (not all-inclusive).

ELECTRICAL SYSTEMS:

135-583 Telephone Duct Facility LF _______ _______ __________________________ 135-586 Telephone Pole LF _______ _______ __________________________

811-147 Emergency Electric Power Generation Plant kW _______ _______ __________________________

GA _______ _______ __________________________

Type

FUEL

812-223 Primary Overhead Electrical Distribution Line LF _______ _______ __________________________

Transformers KVA _______ _______ __________________________ Power Poles LF _______ _______ __________________________

812-224 Secondary Overhead Electrical Distribution Line

LF _______ _______ __________________________

812-225 Primary Underground Electrical Distribution Line

LF _______ _______ __________________________

812-226 Secondary Underground Electrical Distribution Line

LF _______ _______ __________________________

812-926 Exterior Area Lighting (Street, Parking Area, Safety and Security Lighting) list type, mercury vapor, metal halide, high pressure, low pressure

EA _______ _______ __________________________

812-928 Traffic Lights EA _______ _______ __________________________ 890-181 Utility Line Duct LF 890-187 Utility Vault - Four or More

Transformers

SF _______ _______ __________________________

FIRE PROTECTION:

Code Nomenclature Unit of Measure Amount Cost Description

843-314 Fire Protection Water Main LF 843-315 Fire Hydrants EA _______ _______ __________________________

880-211 Closed Head Automatic Sprinklers SF _______ _______ __________________________

HD _______ _______ __________________________

880-212 Open Head Deluge System (normally found only in aircraft hangers)

SF _______ _______ __________________________

HD _______ _______ __________________________

880-221

Automatic Fire Detection System (fire alarm control panels with associated equip - strobes, lights, bells, heat detectors and pull boxes)

SF _______ _______ __________________________

EA _______ _______ __________________________

880-222 Manual Fire Alarm System - pull boxes only EA _______ _______ __________________________

880-231 CO2 Fire Suppression System EA _______ _______ __________________________ 880-232 Foam Fire Suppression System EA _______ _______ __________________________

880-234 Halon 1301 Fire Suppression System EA _______ _______ __________________________

880-233 Other Fire System EA _______ _______ __________________________ Choose whichever applies.

SECURITY:

Category Code Nomenclature Unit of

Measure Amount Cost Description

872-841 Security Alarm System EA _______ _______ __________________________ 872-247 Fence Security/Vehicle Barriers LF/LM _______ _______ __________________________ 872-248 Fence Interior LF/LM _______ _______ __________________________ 872-845 Security Alarm System EA _______ _______ __________________________

FACILITY INFRASTRUCTURE:

Code Nomenclature Unit of

Measure Amount Cost Description

824-464 Gas Lines (piping) list size and type (plastic, steel) in description block

LF _______ _______ __________________________

831-169 Sewage Septic Tank - tank size KG _______ _______ __________________________

832-266 Sanitary Sewer - list size line and type material LF _______ _______ __________________________

842-245 Water Distribution Mains - list size and type LF _______ _______ __________________________

851-143 Curbs & Gutters LF _______ _______ __________________________

851-145 Driveway - list type, Asphalt, Concrete, Gravel SY _______ _______ __________________________

851-147 Road - list type, Asphalt, Concrete, Gravel

SY _______ _______ __________________________

LF _______ _______ __________________________

852-261 Vehicle Parking, Operations SY _______ _______ __________________________ 852-262 Vehicle Parking, Non-Org SY _______ _______ __________________________

852-289 Sidewalk - list thickness and type of material SY _______ _______ __________________________

871-183 Storm Drain LF _______ _______ __________________________ 872-245 Fence, Boundary LF _______ _______ __________________________ 872-247 Fence, Security LF _______ _______ __________________________ 872-248 Fence, Interior LF _______ _______ __________________________ 890-269 Cathodic Protection System EA _______ _______ __________________________

NOTE: Generally, this 1354 Checklist for Category Codes to identify a Facility Infrastructure will suffice without have to reference the entire AF Category Codebook. However sometimes you will have to consult the AF Category Codebook or Real Property office for assistance.

ITEMS OFTEN FOUND IN SPECIALIZED FACILITIES

(Special Purpose)

INDUSTRIAL SHOP AREAS:

Code Item UM Amount Cost Description

RPIE Air Compressors HP _______ __________________________ RPIE Hoists, Cranes-Fixed TN _______ __________________________ RPIE Hydraulic Lifts TN _______ __________________________ RPIE Emergency Shower EA _______ __________________________

? Fixed Spray Paint Booth SF _______ __________________________ 890-158 Loading and Unloading Platform SF _______ _______ __________________________ 832-255 Industrial Waste Main LF _______ _______ __________________________ 890-144 Compressed Air Distribution LF _______ _______ __________________________

NOTE: Identify RPIE. Size, Amount or unit of measure (there is No Category Code for RPIE items).

CHAPEL:

Category Code Item UM Amount Description

RPIE Pews EA _______ __________________________ RPIE Altars EA _______ __________________________ RPIE Lecterns EA _______ __________________________ RPIE Pulpit EA _______ __________________________

THEATER:

Code Item UM Amount Description

RPIE Theater Seats Secured to Floor EA _______ __________________________

RPIE Stage and Auditorium Curtains EA _______ __________________________

BILLETING /TLF/VOQ:

Code Item UM Amount Description

RPIE Built-in Household Dishwasher EA _______ __________________________ RPIE Garbage Disposal EA _______ __________________________ RPIE Range Hood with Exhaust Fan EA _______ __________________________ RPIE Water Softener (house hold type) EA _______ __________________________

MWR FACILITIES:

Code Item UM Amount Description

RPIE Dishwashers (built-in) EA _______ __________________________ RPIE Walk-in Refrigerators (built-in) EA _______ __________________________ RPIE Garbage Disposal Unit EA _______ __________________________ RPIE Range Hood with Exhaust Fan EA _______ __________________________ RPIE PA Systems (built-in) EA _______ __________________________ RPIE Vault (built-in) EA _______ __________________________ RPIE Stage and Auditorium Curtains EA _______ __________________________

RPIE Playground Equipment (permanently affixed) EA _______ __________________________

RPIE Bowling Alley Lanes, Approaches, Ball Returns EA _______ __________________________

890-158 Loading and Unloading Platform SF _______ _______ __________________________

Post Office:

Category Code Item UM Amount Description

RPIE Post Office Lock Boxes EA _______ __________________________

ADDITION or ALTERATION to a FACILITY:

Item Yes No

a. Outside dimensions of addition _______ _______

b. Foundation _______ _______

c. Floors _______ _______

d. Walls _______ _______

e. Roof _______ _______

f. Utility plants or systems added, replaced, or removed _______ _______

g. Real property installed equipment removed, added, or replaced

h. Demolition costs _______ _______

i. Addition or deletion of related facilities _______ _______

j. Addition or deletion of porches, sheds, balconies, mezzanines, etc.

k. Real property installed equipment…