W912HN-18-R-3007_AMD2.pdf

PDF 8 MB Posted

Attached to
Construct Tanker Truck Delivery System
Solicitation number
W912HN18R3007
Issued by

About this file

W912HN-18-R-3007 AMD2 DRAWINGS

View the file

Other files

File Type Posted
amd8.pdf PDF
18R3007vol3.PDF PDF
amd7.pdf PDF
18R3007vol1.PDF PDF
W912HN-18-R-3007_AMD7.PDF PDF
18R3007vol1.PDF PDF
amd6.pdf PDF
18R3007vol1.PDF PDF
amd4.pdf PDF
18R3007vol2.PDF PDF
18R3007vol3.PDF PDF
amd2.pdf PDF
18R3007vol1.PDF PDF
amd1.pdf PDF
18R3007vol1.PDF PDF
18R3007vol3.PDF PDF
18R3007vol2.PDF PDF
18R3007vol1.PDF PDF
W912HN-18-R-3007.PDF PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T E

M

-9

-0

ISSUED FOR CONSTRUCTION

MATCH LINE - AREA 1

M A

T C

H L

IN

E A

R E

A

MATCH LINE - AREA 5

MW

C

MW

E

E

MW

MW

N

RESPONSIBLE FOR REPAIR

IS RESPONSIBLE FOR REPAIRING/REPLACING ANY DAMAGED WELLS.

9. EXISTING MONITORING WELLS TO REMAIN & BE PROTECTED. THE CONTRACTOR

NEW CONSTRUCTION.

ASBESTOS COATED; REMOVAL IS ONLY REQUIRED WHERE CONFLICTING WITH

8. ABANDONED FUEL, WATER, & SANITARY SEWER LINES ARE KNOWN TO BE

SOURCE CONNECTION AS DEAD LEGS ARE NOT ALLOWED.

7. UTILITY LINES TO BE ABANDONED MUST BE CAPPED/TERMINATED AT THE

NECESSARY WHERE EXISTING PAVEMENT IS TO REMAIN.

6. REMOVAL ALL CURBING TO NEAREST JOINT LINE. REPLACE CURBING AS

WITH 3 FEET OF CONCRETE.

5. FOR STORMWATER UTILITY ABANDONMENT; PLUG ENDS OF PIPING & STRUCTURES

REMOVALS OCCURRED AND TESTED IN ACCORDANCE WITH SPEC 33 56 19.

WITH HDPE BOOTS. CONTRACTOR SHALL REPAIR & REPLACE HDPE LINER WHERE

WITHIN TANK CONTAINMENT AREAS SHALL BE COMPLETELY REMOVED ALONG

REMOVED WITH THE CONCRETE PIERS TO REMAIN. BID OPTION: PIPE SUPPORTS

REMOVED. BASIC BID: PIPE SUPPORTS WITHIN DIKED CONTAINMENT SHALL BE

4. ALL PIPE SUPPORTS OUTSIDE DIKED CONTAINMENT SHALL BE COMPLETELY

DEMOLITION.

3. FOR ADDITIONAL DEMOLITION REQUIREMENTS SEE SPECIFICATION 02 41 00

2. FOR PHASING REQUIREMENTS SEE SHEETS GC100, MD100, & MS100.

1. REFER TO SHEET MD101 FOR FUEL PIPING DEMOLITION AND ABANDONMENT.

E9

KEY PLAN

SCALE: 1" = 200'

20' 40'0

GENERAL DEMOLITION NOTES:

DEMOLITION PLAN LEGEND:

ASPHALT PAVEMENT REMOVAL

CONCRETE PAVEMENT REMOVAL

UTILITY REMOVAL

CURBING REMOVAL

R -11

R -11

R -11

R -11

CO

CO

1 2

3 4

5 6

7 8

CP

CP

CP

CP

CP

CP

CP

C

O N

D U

IT

S

BUSHES

1 CONDUIT

J A

B A

R A

V

E N

U E

B R

O O

K S

S T

MW

S

E

C

MW

"H" CURBING

REMOVE TYPE

GRADING

RELOCATED AFTER

REMOVED &

LIGHTPOLE TO BE

PAVEMENT

SAWCUT

VERITCAL15" RCP

REMOVE

10" CS

REMOVE

18" DIP

REMOVE

INLET #22

CURB

REMOVE

"L" CURBING

REMOVE TYPE

PIPING

ALL ASSOCIATED

STRUCTURE AND

CONTAINMENT

REMOVE

AND ASSOCIATED APPURTENANCES

STORAGE TANKS, PIPE SUPPORTS,

PIPING TO THE ABOVEGROUND

REMOVE ALL ABOVEGROUND

TO REMAIN

CURB INLET

ASPHALT EDGE

SAWCUT ALONG

PAD

& CONCRETE

REMOVE ESEW

"F" CURBING

REMOVE TYPE

TO REMAIN

BLDG #3426

PAVEMENT

ASPHALT

SAW CUT

VERTICAL

PAVEMENT

ASPHALT

SAW CUT

VERTICAL

"P" CURBING

REMOVE TYPE

INLET #25

REMOVE DROP

UNGD UTILTIES

REMOVE UNKNOWN

INLET #33

REMOVE DROP

"P" CURBING

REMOVE TYPE

INLET #34

REMOVE DROP

FULL EXTENT

UNGD UTILITY TO

REMOVE UNKNOWN

TO FULL EXTENT

UNGD UTILITY

UNKNOWN

REMOVE

AND APPURTENANCES

ASSOCIATED PADS

SEPARATOR & ALL

REMOVE OIL/WATER

& LINES TO REMAIN

ELECTRICAL PANELS

PAD

CONCRETE

REMOVE

"B" CURBING

REMOVE TYPE

REMOVE 8" DIP

REMOVE JB #18

REMOVE JB #21

TO REMAIN

MANHOLE

12" RCP

REMOVE

12" RCP

REMOVE

12" RCP

REMOVE

REMOVE 6" PVC REMOVE 6" PVC

REMOVE 6" PVC

6" PVC TO REMAIN

TO REMAIN

8" DIP

"P" CURBING

REMOVE TYPE

REMAIN

WELL TO

MONITORING

MONITOR

WELL

FULL EXTENT

UNGD UTILITY TO

REMOVE UNKNOWN

POLE #0794

REMOVE LIGHT

8" DIP

REMOVE

TO REMAIN

DI #20

ASSOCIATED EQUIPMENT

WATER TANKS (2), PADS, &

REMOVE CONTAMINATED

UNDERGROUND FUEL LINES

AS NECESSARY TO INSTALL

REMOVE ASPHALT PAVEMENT

UNDERGROUND FUEL LINES

AS NECESSARY TO INSTALL

REMOVE ASPHALT PAVEMENT

AT 2' OFFSET TO BUILDING

PAVEMENT & CURBING

TO REMAIN; SAWCUT

PAVEMENT BENEATH BUILDING

THE GOVT.

TURNED OVER TO

TO BE REMOVED &

BASKETBALL HOOP

FOR NEW CONSTRUCTION

REMOVE AS REQUIRED

COATED FUEL PIPELINE;

ABANDONED ASBESTOS

REMOVE CLEANOUT

TO REMAIN

MONITORING WELL

INLET TO REMAIN

ELECTRICAL EQUIP

RELOCATE REMAINING

& CATHODIC PROT.;

REMOVE LIGHTPOLE

ELECTRICAL

REMOVE UNGD

ELECTRICAL

REMOVE UNGD

ELECTRICAL

REMOVE UNGD

ELECTRICAL

REMOVE UNGD

TO REMAIN

ELETRICAL

REMOVE POLE

POWER LINE

REMOVE OVERHEAD

TO MAIN

& CAPPED AT CONNECTION

WATER TO BE ABANDONED

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXUCD103.dwg

9:56:00 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J U

L

C X

U C

D .d w g

R

G U

N K

E L

M A

N

M

R E

IN

IG

M

R E

IN

IG

E A

D E

M O

L

IT

IO

N P

L A

N

CD103

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

TF-4

TF-3

TF-2

OF-1

8"

PRODUCT RECOVERY TANK

4,000 GALLON ABOVEGROUND

PHASE 1 DEMOLITION

LIMITS DIRECTLY FOLLOWING

PHASE 1 CONSTRUCTION

PHASE 2 DEMOLITION

LIMITS DIRECTLY FOLLOWING

PHASE 2 CONSTRUCTION

CONNECTION

PIG LAUNCHER

OF-4 OF-3 OF-2

6"

PHASE 1 (TYP.)

10"

SYSTEM

10" TO TYPE III

FILLSTAND LOOP

10" TRUCK

PHASE 1 (TYP.)

PHASE 1 (TYP.)

FILLSTANDS

CONSTRUCT TRUCK

PHASE 1 (TYP.)

TF-1

4 - 400 GPM

OFFLOAD

PUMPS

SIDING

8" FROM MILLER

VALVE WITH MINIMAL DOWN TIME

TO NEW FULL PORT D.B.B. PLUG

CONNECT EXISTING FLANGE

8"

16"

8"

10"

ISSUE NOZZLE

PIPING TO NEW 16"

OPERATING ISSUE

CONNECT NEW 16"

RECEIPT NOZZLE

PROVIDE NEW 8" TANK

8" RECEIPT

16" ISSUE

8" RECEIPT

ISSUE NOZZLE

PIPING TO NEW 16"

OPERATING ISSUE

CONNECT NEW 16"

ISSUE

10" BULK

ISSUE NOZZLE

PIPING TO NEW 16"

OPERATING ISSUE

CONNECT NEW 16"

NOZZLE.

TO NEW 8" RECEIPT

TANK RECEIPT PIPING

CONNECT NEW 8"

PHASE 1 (TYP.)

PHASE 2 (TYP.)

TO EXISTING 8" TANK NOZZLE

CONNECT NEW 8" PIPING

ISSUE NOZZLE

PIPING TO NEW 16"

OPERATING ISSUE

CONNECT NEW 16"

CONNECT NEW WATER DRAW

OFF SYSTEM TO THE TWO

NEW 2" TANK NOZZLES.

(TYP. OF TANKS 1, 2, 3, 4 AND 5)

ISSUE

10" BULK

TO EXISTING 8" TANK NOZZLE

CONNECT NEW 8" PIPING

UNDERGROUND TRANSITION

ABOVEGROUND TO

N A1

OVERALL PIPING PLAN

SCALE: 1" = 30' 30' 60'0

8"10"6"

WASTEWATER TANK

4,000 GALLON ABOVEGROUND

SIDING

8" FROM MILLER

III SYSTEM

10" TO TYPE

1 WITH MINIMAL DOWNTIME

EXISTING AT THE END OF PHASE

RECEIPT LINE AND CONNECT TO

DEMO UNUSED MILLER SIDING

ISSUE

10" BULK

ISSUE NOZZLE

PIPING TO NEW 16"

OPERATING ISSUE

CONNECT NEW 16"

TO EXISTING 8" TANK NOZZLE

CONNECT NEW 8" PIPING

TO FLUSH THE SYSTEM AND TRUCK FILLSTAND LOOP.

6. FUEL CAN BE TRANSFERRED BETWEEN OPERATING TANKS IN ORDER

DROP TANKS OR MILLER SIDING IF NECESSARY.

5. OPERATING TANKS CAN RECEIVE FUEL FROM OFFLOAD

FILTERED.

4. BULK TANKS CAN TRANSFER TO OPERATING TANKS

FILTERED OR NOT FILTERED.

3. BULK TANKS CAN TRANSFER FROM BULK TANK TO BULK TANK

BULK ISSUE OF FUEL.

FUEL. BUT, ONLY TANKS 2, 3, & 5 CAN BE USED FOR BULK RECEIPT &

FILLSTANDS, DEPENDING ON IF THE TANK IS ISSUING OR RECEIVING

2. ANY OF THE TANKS CAN BE USED TO ISSUE FUEL TO THE TRUCK

TANKS.

CAN ISSUE FUEL TO THE TRUCK FILLSTANDS FROM THE OPERATING

TO THE TYPE III SYSTEM, SIMULTANEOUSLY, WHILE THE FUELING PUMPS

THE TRANSFER PUMPS CAN TRANSFER FUEL FROM THE BULK TANKS

TANK PUMPS AND MILLER SIDING, SIMULTANEOUSLY, WHILE

1. THE BULK TANKS CAN RECEIVE FUEL FROM THE OFFLOAD DROP

NOTES:

DROP TANKS

2-10,000 GAL

1. ALL LOCATIONS WHERE DISSIMILAR METAL FLANGED CONNECTIONS RESIDE, STAINLESS STEEL BOLTS, NUTS AND WASHERS SHALL BE USED FOR CONNECTIONS.

NOTES:

R

R

R

R

CO

CO

B 407

95.55

ex. tbank

94.65

ex. tbank

94.14

ex. tbank

94.03

ex. tbank

93.82

ex. tbank

93.22

ex. tbank

93.18

ex. tbank

93.63709

ex. tbank

92.95

ex. tbank

93.84

ex. tbank

94.91

E 407

95.57

B 700 CONDUIT X2

97.83

E 700 CONDUIT X2

93.12

B 700 AGST

89.14

E 700 AGST

89.40

B 70O CON X1

89.57

E 70O CON X1

89.58

B 70O CON X2

89.37

E 70O CON X2

89.27

B 514

94.18

ex. gas line

95.98

E 514

96.04

B 514

96.21

ex. gas line

96.08

E 514

94.13

B 514

94.23

ex. gas line

96.77

ex. gas line

96.78

E 514

96.79

B 514

96.82

E 514

96.83

B 514

96.86

E 514

96.80

B 514

96.81

ex. gas line

96.79

ex. gas line

95.17

E 514

95.19

ex. bldg

0.00

ex. bldg

0.00

ex. bldg

0.00

ex. bldg

0.00

B 300

85.23

ex. bldg

84.76

ex. bldg

84.91

ex. bldg

85.28

ex. bldg

84.93

E 300

85.64

B 303

88.91

B 303A

88.92

E 303A

88.95

E 303

88.94

B 303

88.95

B 303A

88.94

E 303A

88.93

E 303

88.94

B 303

88.93

B 303A

88.92

E 303A

88.93

E 303

88.88

ex. bldg

0.00

ex. bldg

0.00

B 303

88.94

B 303A

88.94

303A

88.94

303A

88.93

ex. wall

88.95

ex. wall

88.92

ex. wall

88.94

303A

88.93

303A

88.92

ex. wall

88.94

ex. wall

88.93

303A

88.74

303A

88.89

ex. wall

88.90

E 303

88.92

E 303A

88.90

ex. bldg

0.00

ex. bldg

0.00

B 700 CONTROL PANEL

88.17

E 700 CONTROL PANEL

88.06

B 303

88.91

B 303A

88.92

E 303A

88.86

E 303

88.69

ex. tele-ugl

93.77

25097

ex. tele-ugl

92.32

25098

ex. tele-ugl

89.84

25099

ex. tele-ugl

88.73

25100

E 516

89.26

25152

ex. tv-ugl

88.59

25153

ex. tv-ugl

88.18

25154

ex. tv-ugl

89.02

25155

ex. tv-ugl

89.08

25157

ex. tv-ugl

89.49

25158

ex. tv-ugl

89.16

25159

ex. tv-ugl

88.86

25160

ex. tv-ugl

89.11

25161

ex. tv-ugl

88.88

25162

ex. tv-ugl

88.63

25163

ex. tv-ugl

88.70

25164

ex. tv-ugl

89.40

25165

ex. tv-ugl

90.02

25166

ex. tv-ugl

89.45

25167

ex. tv-ugl

89.69

25168

ex. tv-ugl

90.28

25169

ex. tv-ugl

91.36

25426

706A

93.20

25427

E 706

92.97

25428

706A

92.54

25429

706A

91.68

25430

B 706

92.17

25638

ex. tv-ugl

97.13

25639

ex. tv-ugl

96.70

25640

ex. tv-ugl

96.04

25641

ex. tv-ugl

95.10

25642

ex. tv-ugl

94.71

25643

ex. tv-ugl

94.66

25644

ex. tv-ugl

94.24

25645

ex. tv-ugl

94.12

25646

ex. tv-ugl

94.02

25647

ex. tv-ugl

94.43

25648

ex. tv-ugl

94.57

25649

ex. tv-ugl

95.21

25650

ex. tv-ugl

95.96

25651

ex. tv-ugl

96.23

25869

ex. tele-ugl

95.33

25870

ex. tele-ugl

96.53

25871

ex. tele-ugl

97.37

25872

ex. tele-ugl

97.98

25873

E 516

93.14

25874

B 516

93.17

25875

ex. tele-ugl

97.94

25876

ex. tele-ugl

97.79

25877

ex. tele-ugl

97.34

25879

ex. tele-ugl

96.34

25880

ex. tele-ugl

95.16

25890

ex. tele-ugl

95.41

25891

ex. tele-ugl

95.37

25892

ex. tele-ugl

95.40

25893

ex. tele-ugl

95.34

25894

ex. tele-ugl

95.24

25895

ex. tele-ugl

95.34

25896

ex. tele-ugl

95.62

25897

ex. tele-ugl

95.43

25898

ex. tele-ugl

95.08

25899

ex. tele-ugl

95.74

25900

ex. tele-ugl

95.51

25901

ex. tele-ugl

94.24

25902

ex. tele-ugl

89.48

25903

E 516

89.34

25904

B 516

90.64

25905

B 516A

90.61

25906

ex. tele-ugl

95.22

25907

516A

95.38

ISSUE

RECEIVING

B 407

96.02

ex. tbank

95.92

ex. tbank

95.95

ex. tbank

96.08

ex. tbank

96.29

ex. tbank

97.84

ex. tbank

97.74

ex. tbank

97.52

ex. tbank

97.27

ex. tbank

97.20

ex. tbank

96.17

ex. tbank

95.69

ex. tbank

95.49

ex. tbank

95.51

E 407

95.63

B 406

93.95

ex. bbank

94.25

ex. bbank

94.78

ex. bbank

95.50

ex. bbank

95.80

ex. bbank

96.39

ex. bbank

96.40

ex. bbank

95.87

ex. bbank

95.31

ex. bbank

94.76

ex. bbank

94.33

E 406

93.96

B 407

89.91

ex. tbank

89.81

ex. tbank

89.58

ex. tbank

89.92

ex. tbank

89.96

E 407

90.33

B 406

93.94

ex. bbank

93.76

B 406

93.96

ex. bbank

93.82

ex. tbank

91.78

ex. tbank

91.61

ex. tbank

91.23

ex. tbank

90.79

ex. tbank

90.54

E 407

90.33

C M

C

LU

S

TE

R

ex. bldg

0.00

ex. bldg

0.00

ex. bldg

0.00

ex. bldg

0.00

B 303

92.14

ex. wall

93.02

ex. wall

92.86

ex. wall

ex. wall

92.72

ex. wall

92.88

ex. wall

93.02

ex. wall

92.23

ex. wall

92.23

ex. wall

93.05

ex. wall

92.90

ex. wall

92.72

ex. wall

92.77

ex. wall

92.95

E 303

92.07

ex. bldg

0.00

ex. bldg

0.00

ex. bldg

0.00

ex. bldg METAL

0.00

ex. bldg METAL

0.00

ex. bldg METAL

0.00

ex. bldg METAL

0.00

C

O N

D U

IT

S

C

O N

D U

IT

S

10043

ex. bldg

0.00

87.4

W/2 CONDUIT PIPES

EDGE OF CONC

W/2 CONDUIT PIPES

EDGE OF CONC

1 CONDUIT PIPE

EDGE OF CONC W/

" CONDUIT PIPE2

1(1) 1

(2) 1" CONDUIT PIPES

C

O N

D U

IT

S

1 CONDUIT

" CONDUIT PIPES4

1(2) 1

(3) 1" CONDUIT PIPES

PIPE

1" CONDUIT

(2) 1" CONDUIT PIPES

EDGE OF CONC

" CONDUIT PIPE4

MW

PP

LP #0794

E

S

S

MW

2 CONDUIT PIPES

(2) 1"

CONDUIT

PIPES

MW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

(A S P

H A L T

H U

M P

H R

Y

S T R E E T

(A S P

H A L T

H U

M P

H R

Y

S T R E E T

SS

'-2

6'-0"

N

A

P

IP

IN

G P

L A

N S

C A

L E : 1 /4

'-0

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXUMS100.dwg

9:52:45 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

X

U M

S .d w g

C

M A

R G

R A

V E

A

K Y

H N

A

K Y

H N

M

IC

H A

E L T S

M

IT

H P .E

V

E R

A L L P

IP

IN

G P

L A

N

MS100

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

DROP TANK NO. 1

DROP TANK NO. 2

OF-1

OF-2

OF-3

OF-4

SEE SHEET MS504. (TYP.)

TRUCK OFFLOAD EQUIPMENT,

COATED C.S.

6" U/G INT/EXT

COATED C.S.

6" U/G INT/EXT

COATED C.S.

8" U/G INT/EXT

COATED C.S.

10" U/G INT/EXT

INCREASER

8" X 10"

INCREASER

6"x8"

D.B.B. PLUG VALVE

10" FULL PORT

BEND DOWN

8" 45 DEGREE

SEE SHEET MS430

FOR CONTINUATION

8"

8"

VALVE

8" D.B.B. PLUG

DROP TANKS. SEE SHEET MS505

10,000 GALLON ABOVEGROUND

OFFLOAD NO. 4 ONLY

RTB CONNECTION

COATED C.S.

10" U/G INT/EXT

INCREASER

6" X 10"

DROP TANKS. SEE SHEET MS505

10,000 GALLON ABOVEGROUND

BEND OVER

8" 45 DEGREE

N

A1

ENLARGED OFFLOAD PIPING PLAN

SCALE: 1" = 10' 0 10' 20'

2. SEE SHEETS MS201-MS220 FOR PIPING PROFILES.

1. ALL LOCATIONS WHERE DISSIMILAR METAL FLANGED CONNECTIONS RESIDE, STAINLESS STEEL BOLTS, NUTS AND WASHERS SHALL BE USED FOR CONNECTIONS.

NOTES:

STA. 00+05.00

STA. 00+27.50

STA. 00+55.22

STA. 01+24.48

STA. 00+14.55

C O

S

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXUMS420.dwg

9:52:04 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

U M

S .d w g

C

M A

R G

R A

V E

A

K Y

H N

A K

Y H

N

M

IC

H A

E L T S

M

IT

H P

N

L A

R G

E D O

F F

L O

A D P

IP

IN

G P

L A

N

MS420

R

E V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

TF-1

TF-2

TF-3 TF-4

BEND DOWN

8" 45 DEGREE

8"

8"

PLUG VALVE

8" D.B.B.

DROP TANKS. SEE SHEET MS505

10,000 GALLON ABOVEGROUND

SEE SHEET MS420

FOR CONTINUATION

FROM OFFLOAD DROP TANKS

8" U/G INT/EXT COATED C.S.

FROM MILLER SIDING

8" U/G INT/EXT COATED C.S.

DRAIN PIT

LOW POINT

ISSUE (WITHDRAWAL)

C.S. - BULK STORAGE TANK

10" U/G INT/EXT COATED

C.S. - TRUCK FILLSTAND LOOP

10" U/G INT/EXT COATED

UP TO TRUCK FILLSTAND (TYP.)

6" U/G INT/EXT COATED C.S.

ABOVE GROUND

TRANSITION TO

MS502 FOR DETAIL

TANK, SEE SHEET

PRODUCT RECOVERY

4,000 GALLON 2085

BEND OVER

8" 45 DEGREE

N

A1

ENLARGED TRUCK FILLSTAND AND PUMP HOUSE PIPING PLAN

SCALE: 1" = 10' 0 10' 20'

DRAIN PIT

LOW POINT

D.B.B. PLUG VALVE

10" FULL PORT

C.S. FROM DROP TANKS

10" U/G INT/EXT COATED

2" U/G SS TO/FROM PUMPHOUSE

MS508 FOR DETAIL

TANK, SEE SHEET

WASTEWATER

4,000 GALLON 2085

TO U/G

TRANSITION

C.S. TO TYPE III SYSTEM

10" U/G INT/EXT COATED

SEE SHEET MS506

CONNECTION,

PIG LAUNCHER

DRAIN PIT

LOW POINT

C.S. TO TYPE III SYSTEM

10" U/G INT/EXT COATED

C.S. FROM MILLER SIDING

8" U/G INT/EXT COATED

DRAIN PIT

LOW POINT

C.S. - RECEIPT PIPING

8" U/G INT/EXT COATED

ISSUE (WITHDRAWAL)

C.S. - OPERATING TANK

16" U/G INT/EXT COATED

NO. 1 RECEIPT (FILL)

C.S. - OPERATING TANK

8" U/G INT/EXT COATED

NO. 4 RECEIPT (FILL)

C.S. - OPERATING TANK

8" U/G INT/EXT COATED

UP TO TRUCK FILLSTAND (TYP.)

6" U/G INT/EXT COATED C.S.

SEE SHEET MS503. (TYP.)

600 GPM TRUCK FILLSTAND.

TO U/G

TRANSITION

TO U/G

TRANSITION

TO U/G

TRANSITION

TO U/G

TRANSITION

TO U/G

TRANSITION

C.S. - TRUCK FILLSTAND LOOP

10" U/G INT/EXT COATED

AND SHOWER

EMERGENCY EYEWASH

SEE SHEET MS440

FOR CONTINUATION

2. SEE SHEETS MS201-MS220 FOR PIPING PROFILES.

1. ALL LOCATIONS WHERE DISSIMILAR METAL FLANGED CONNECTIONS RESIDE, STAINLESS STEEL BOLTS, NUTS AND WASHERS SHALL BE USED FOR CONNECTIONS.

NOTES:

STA. 00+14.55

STA. 01+16.03

STA. 04+42.99

STA. 05+23.47

STA. 02+45.88

STA. 07+97.30

R

R

R

R

C O

M W

M W

6'-2"

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXUMS430.dwg

9:51:20 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

U M

S .d w g

C

M A

R G

R A

V E

A

K Y

H N

A

K Y

H N

M

IC

H A

E L T S

M

IT

H P

L A

R G

E D F

IL

L S

T A

N D P

IP

IN

G P

L A

N

MS430

R

E V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

IN SLEEVE

ADJUSTABLE SEGMENTED SEAL

PIPE SLEEVE WITH MECHANICAL

IN ONE PIT

BOTH LOW POINTS

FUEL LINES WILL HAVE

PITS FOR PARALLEL

30"

18" CLEAR

M

IN

2" BALL VALVE

IF

2" SCH 80

OF BACKFILL AROUND PIT.

SEE SHEET S-903 FOR DETAILS

DETAILS, SHEET ES503

TO VALVE, SEE

BOLT GROUND

TO PIPE

COLLAR WELDED

STEEL BANDS

BUNA-N SEAL WITH STAINLESS

FROM TOP OF PIT LID.

" 2

1CONNECTOR W/FEMALE DUST CAP. 4

2" ALUMINUM MALE CAM TYPE

PIT COVER CAST "FUEL DRAIN"

BUTT WELD JOINTS

SLOPE

" THK. FIBERGLASS PIT4

PIT WALL

FIBERGLASSMANUFACTURER

FIBERGLASS PIT WALL BY

MOLDED INTO THE

"x2" STEEL ANCHOR RING

3"B" FUEL PIPING SLEEVE w/

PIPING C

INSIDE PIT

ATTACHMENT BANDS

w/ STAINLESS STEEL

BUNA-N BOOT COLLAR

"D" "C"

(TYP. OF 2 PLACES)

SEGMENTED SEAL IN SLEEVE

MECHANICAL ADJUSTABLE

PIPE ON CENTERLINE OF CASING

HOLD CENTERLINE OF FUEL

CASING INSULATOR SHALL

"A" FUEL LINE

OUTSIDE PIT

ATTACHMENT BANDS

STAINLESS STEEL

SHRINK SLEEVE w/

"A"

FUEL PIPE

DIAMETER

"B"

SLEEVE PIPE

DIAMETER EXTERIOR

SLEEVE LENGTH

"C" "D"

SLEEVE LENGTH

INTERIOR

3"

4"

12" 16"

8"

6"

18"

16"

16" 4"

4"

4"

INSIDE OUTSIDE

L

TANK SHELL

SLOPE

1" 10 GPM PUMP

SHUTOFF VALVE (TYP)

(TYP)

W/DENSITY BALL

SIGHT GLASS

BOTTOM AND REMOVABLE TOP

55 GALLON, W/CONE DOWN

WATER DRAW-OFF TANK

1" VENT

DISCONNECT WITH CAP

1" CAM TYPE QUICK

SSCS

LOCKABLE BALL VALVE

NEW 2" DBB

CHECK VALVE

GLOBE STYLE

FLANGES AT CS/SS INTERFACE

PROVIDE INSULATING KITS ON

CONCRETE HOUSEKEEPING PAD

W/QUICK DISCONNECT

1" MANUAL DRAIN

1" WATER DRAW-OFF

2" PRODUCT RETURN

1" PST DRAIN

ANCHORS (TYP)

EQUIPMENT

1"

1"

TANK NOZZLE.

CONNECT NEW VALVE TO NEW 2"

VARIES

CONTINUOUSLY WELD

U-BOLT SIZE VARIES

PIPE SUPPORT

"4

" X 2

" X 22

A TEFLON PAD SHALL BE INSERTED BETWEEN THE SUPPORT AND THE PIPE.2.

METAL OF THE U-BOLT.

U-BOLTS SHALL BE COATED OR OTHER MEANS TO PROTECT THE PIPING FROM THE 1.

NOTES:

4"4"

PL

TYP. 6

6"6"

BORE PIPE SUPPORTS ARE REQUIRED.

USE CONCRETE BASE IN AREAS W/O CONCRETE SLABS WHERE SMALL 1.

NOTES:

6"6"

EACH WAY

(2) #5 BARS

3"X3"X0.25" LEG

(TYP.)

" DIA. HOLE16

L E

N G

T H T

O S

U

IT

N T

S1" GROUT (TYP)

5'-0" (NTS)

TO NEW 2" TANK NOZZLE.

CONNECT NEW VALVE

SSCS

HLV FLOAT PILOT CHAMBER

HIGH-HIGH LEVEL SWITCHES &

1/2" TO/FROM HIGH AND

D2

NEW WATER DRAW OFF SYSTEM FOR EXISTING TANKS 1, 2, 3, 4, 5

SCALE: NO SCALE

D8

TYPICAL LOW POINT DRAIN PIT

SCALE: NO SCALE

A1

BASE PLATE FOR SMALL BORE PIPE SUPPORT

SCALE: NO SCALE

A8

FIBERGLASS PIT WALL PENETRATION

SCALE: NO SCALE

A4

CONCRETE BAE FOR SMALL BORE PIPE SUPPORT

SCALE: NO SCALE

C1

SMALL BORE PIPE SUPPORT DETAIL

SCALE: NO SCALE

PIPE SIZE VARIES

SHOWN ON SITE DRAWINGS

CONTAINMENT DIKES AS

EXTEND 2" DRAIN TO EDGE OF

WELDING BRANCH

RADIOGRAPHICAL

G8

PLAN VIEW OF DRAIN PIT

SCALE: NO SCALE

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXUMS501.dwg

9:50:36 AM 7/16/2018

U M

S .d w g

C

M A

R G

R A

V E

A

K Y

H N

A

K Y

H N

M

IC

H A

E L T S

M

IT

H P .E

W A

T E

R D

R A

W O

F F D

E T

A

IL

S

L O

W P

O

IN

T D

R A

IN

A

N D

MS501

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

DP

CL

20-1/8"

4"

R

R "R

" PLATE4

"4 12"x 2"x

ANGLE

CONCRETE

BOLTS

" DIA.2

1WITH 4 -

" x 6"x 6" PLATE4

PLATE

FLANGE

BACK

PLATE

FLANGE

FRONT

4"

" BENT PLATE4

FRONT VIEW SIDE VIEW

A8

ADJUSTABLE PIPE SUPPORT DETAIL (PS-2)

SCALE: NO SCALE

E7

HOSE RACK DETAILS

SCALE: 1 1/2" = 1'-0"

A1

SECTION

SCALE: 3/4" = 1'-0"

E1

TRUCK FILL STAND (W/ PANTOGRAPH)

SCALE: 3/4" = 1'-0"

MS503

A1

HOLDER, SEE DETAIL

DEADMAN HOSE

5' FROM EDGE OF DRIVE

(TYP. )

VALVE,

CHECK

PS-2

1"

6" PLUG VALVE

STRAINER

6" BASKET

SHEET ES530

ASSEMBLY. SEE DETAILS ON

STATIC GROUND RECEPTACLE

WITH PLUG

DRAIN VALVE

BALL VALVE

CONNECTION

SAMPLE

SYSTEM. SEE SHEET ES530.

OVERFILL PROTECTION

GROUND PROVING AND

R

DRYBREAK DISCONNECT

D-2 NOZZLE AND

3"

STRAINER

6" BASKET

6"

IF

STAND CONTROL VALVE

4" TRUCK FILL

GAUGE (0-300 PSI)

PRESSURE

PS-2

PLUG

DRAIN WITH

BALL VALVE

CONCRETE SUPPORT

SHEET ES530

ASSEMBLY, SEE DETAILS ON

STATIC GROUND RECEPTACLE

GAUGE (0-100 PSI)

PRESSURE

AND METER REGISTER.

PROTECT PRESSURE GAUGE

FLANGE AND LOCATED TO

STEEL PLATE BOLTED TO

3"

BOLTS EMBEDDED 9".

HEADED ANCHOR

" DIA. TYPE A 307 4

34-

CONDUCTOR

#1/O TW CU GND

STEEL GROUND ROD

0.75" x 10' GALVANIZED

CONNECTIONS

THE 6" PIPE. EXOTHERMIC WELD ALL

SIDE OF THE INSULATING FITTING ON

NON-CATHODICALLY PROTECTED

GND CONDUCTOR TO THE

CONTINUE THE #1/O TW CU

STRAP

NOZZLE HOLDER AND

PRESSURE FUELING

SYSTEM. SEE SHEET ES530.

OVERFILL PROTECTION

GROUND PROVING AND

FROM DRIVE SIDE)

METER (REGISTER TO READ

PLUG

DRAIN WITH

BALL VALVE

1"

SEE DETAIL

BASE PLATE,

PIPE SADDLE

STEEL PIPE

4" DIA. STD. WT.

0.25" DRAIN HOLE

EMBEDMENT

BOLTS WITH 3.5" MINIMUM

4.5" EXPANSION ANCHORS

REDUCER

(FIELD ADJUST FOR HEIGHT)

4" LONG PIPE NIPPLE

AND PIPE

BETWEEN SADDLE

INSULATION STRIP

PROVIDE 0.25" THICK

U-BOLT AND PIPE

TEFLON PAD BETWEEN

SEAL (TYP.)

SEGMENTED ELASTOMERIC

MECHANICALLY ADJUSTABLE

2'0 1' 4'

2'0 1' 4'

1' 2'0 6"

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXUMS503.dwg

9:50:00 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

U M

S .d w g

C

M A

R G

R A

V E

A

K Y

H N

A

K Y

H N

M

IC

H A

E L T S

M

IT

H P

T

U C

K F

IL

L S

T A

N D D

E T

A

IL

S

MS503

R

E V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

E4

TRUCK OFFLOAD

SCALE: 3/4" = 1'-0"

B4

SECTION

SCALE: 3/4" = 1'-0"

MS504

B4

2'0 1' 4'

2'0 1' 4'

RACK

HOSE HANGING

STRAINER

BASKET

D.B.B. PLUG VALVE

6" FULL PORT

IF

CHECK VALVE

6" SWING

INDICATOR

SITE FLOW

PLUG AND RING

DISCONNECT WITH

TYPE QUICK

4" ALUMINUM CAM-

OFFLOAD NO. 4.

TO BULK (RTB) ONLY ON

(D-1 NOZZLE ADAPTOR) RETURN

" SINGLE POINT RECEPTACLE 2

ELASTOMERIC SEAL (TYP.)

ADJUSTABLE SEGMENTED

SLEEVE WITH MECHANICALLY

RACK

HOSE HANGING

WITH PLUG AND RING

CAM-TYPE QUICK DISONNECT

HOSE WITH ALUMINUM

4" X 10' TRUCK OFFLOAD

STEEL SKIDCONNECTION

SAMPLE

PRESSURE GAUGE

DIFFERENTIAL

6" STRAINER WITH

CHECK VALVE

6" SWING

6" PIPING

3'-0"

PS-2

HOSE REEL

GROUNDING

IF

BALL VALVE

4" FULL PORT

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXUMS504.dwg

9:49:22 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

U M

S .d w g

C .R .M

A .P .K

A .P

K Y

H

U C

K O

F F

L O

A D S

K

ID

D

E T

A

IL

S

MS504

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

MAV

DROP TANK NO. 2 SIMILARNOTE:

PS PS

PS

PS

PS

R E

Q D

26'-8"

36" MANWAY

CONNECTION

4" FLANGED

DUST CAP

CONNECTION WITH

1.5" MALE CAM TYPE

LADDER

RELIEF VALVE

PRESSURE

(TYP.)

CONNECTION

SAMPLE

CHECK VALVE

4" NON-SURGE (CV)

PRESSURE GAUGE

VALVE

PRESSURE RELIEF

VALVE

PRESSURE RELIEF

4" BALL VALVE

VALVE

8" D.B.B PLUG

TEE

8"X8"X4" REDUCING

TO PUMP HOUSE

8" RECEIPT LINE

10" FROM OFFLOADS

FROM OP-3 AND OP-4

8" PUMP DISCHARGE

4"

SWITCH

FLOW

4"

FLOAT SWITCH

RESERVOIR

PRESSURE

VENT

EMERGENCY

36" MANWAY

ELECTRIC PUMP

5 GPM WATER DRAW OFF

BALL VALVE

10" FULL PORT

10" TO DROP TANK NO. 2

6" VENT

24" DIA

" 6

SLOPE DOWN 1.5%

TO 3% MAX.

95% FULL

OVERFILL VALVE AT

TESTER. FLOAT CLOSES

FLOAT WITH MANUAL

AT TOP

OVERFILL VALVE

10" FILL LINE WITH

LADDER

1"

1" GAP

MANWAYS FOR 3% SLOPE.

CORRECT PUMPWAYS &

SWITCH

FLOW

TURBINE PUMP

400 GPM VERTICAL

SWITCH

FLOW

RESERVOIR

PRESSURE

GRATING

REMOVABLE

EASILY

VENT

EMERGENCY GAUGING HATCH

SAMPLING AND

GRADE)

SURROUNDING

(MIN. 12' ABOVE

VACUUM VENT

PRESSURE

6"

ELECTRIC PUMP

PLATE (TYP.)

STRIKER

FOOT VALVE

VALVE

OVERFILL 4"

ASSEMBLY

FLOAT SWITCH

FLOAT SWITCH

FLOAT SWITCH

ASSEMBLY

STOPS BOTH PUMPS AT 20% FULL LEVEL;

SECOND PUMP AT 70% FULL LEVEL:

FIRST PUMP AT 50% FULL LEVEL; STARTS

OFFLOADING FUELING PUMPS: STARTS

STOPS THE FUEL DROP TANK

FLOAT SWITCH ASSEMBLY STARTS AND

LEVEL ALARM AT 98% FILL LEVEL.

90% FULL LEVEL. SOUNDS HIGH-HIGH

LEVEL. SOUNDS HIGH LEVEL ALARM AT

LOW LEVEL ALARM AT 15% FULL

FLOAT SWITCH ASSEMBLY: SOUNDS

ATG SYSTEM

4" FLANGE FOR

FOR PUMPS. MINIMUM 10"

VERIFY TANK FLANGE SIZE

E2

10,000 GALLON U.L. 142 ABOVE GROUND DROP TANK NO. 1 / NO. 2

SCALE: NO SCALE

A4

SECTION

SCALE: NO SCALE

MS505

PS

ATG SYSTEM

4" FLANGE FOR

MINIMUM 10" FLANGE

FLOAT SWITCH

A4

CV-12

CV-10

OP-3

OP-1

CV-11

CV-9

OP-4

OP-2

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXUMS505.dwg

9:48:11 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

C

T

IO

N S A

N D D

E T

A

IL

S

O F F

L O

A D D

R O

P T

A N

K

MS505

U M

S .d w g

C

M A

R G

R A

V E

A

K Y

H N

A

K Y

H N

M

IC

H A

E L T S

M

IT

H P .E

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

CONTAINMENT BERM CL

PIPE C

L

PIPE C

LPIPE C

L

BOOT CLAMPS

STAINLESS STEEL

BUNA-N BOOT SEAL (TYP)

SLEEVE SEAL

SEE SHEET CS507

FOR FML PENETRATION DETAIL,

SLOPESLOPE

BOOT CLAMPS

STAINLESS STEEL

SLEEVE SEAL

(TYP)

BUNA-N BOOT SEAL

VALVE AND CAP

1/2" SLEEVE DRAIN WITH BALL

ANCHOR

CONCRETE DEADMAN

WELDED TO PIPE SLEEVE

" THICK STEEL RING 2

12" X

SLOPE

CONTAINMENT BERM

BERM

CONTAINMENT

D1

BERM DIKE WALL PENETRATION DETAIL (EXTERIOR)

SCALE: NO SCALE

D7

BERM DIKE WALL PENETRATION DETAIL (INTERIOR)

SCALE: NO SCALE

D5

BERM DIKE WALL PENETRATION DETAIL (CENTER)

SCALE: NO SCALE

6. SUPPORT CARRIER PIPE IN SLEEVE WITH NON-CONDUCTIVE SUPPORTS SPACED A MAXIMUM OF 10' APART.

5. FOR CONTAINMENT BERM AND FML PENETRATION INFORMATION, SEE CIVIL SHEETS.

SEGMENTED ELASTOMERIC SEAL MANUFACTURER BEFORE SELECTING SLEEVE PIPE SIZE.

SEGMENTED ELASTOMERIC SEAL. CONFIRM DIMENSIONS WITH SELECTED MECHANICALLY ADJUSTABLE

4. SEE CHART FOR CARRIER AND SLEEVE PIPE DIMENSION COMBINATIONS FOR MECHANICALLY ADJUSTABLE

3. ENSURE THAT THE CONCRETE DEADMAN ANCHOR DOES NOT INTERFERE WITH PIPE SUPPORT STRUCTURES.

2. CONCRETE DEADMAN ANCHOR SHALL BE CENTERED ON THE CONTAINMENT BERM.

1. SLOPE SLEEVE PIPING TO ALLOW FOR DRAINAGE THROUGH SLEEVE DRAIN.

NOTES:

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXUMS507.dwg

9:47:39 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

U M

S .d w g

C

M A

R G

R A

V E

A

K Y

H N

A

K Y

H N

M

IC

H A

E L T S

M

IT

H P

B

R M D

IK

E W

A L L P

E N

E T

R A

T

IO

N

MS507

R

E V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

TO 3% MAX.

SLOPE DOWN 1.5%

FTP-2

36" MANWAY

(TYP.)

STRIKER PLATE

FOOT VALVE

DATUM PLATE.

LIQUID LEVEL INDICATOR

SAME ELEVATION AS

DATUM PLATE. TO BE AT

1" GAP

INTERSTITIAL SPACE

MONITOR FOR

LEAK DETECTION

WATER DRAW-OFF

ATG SYSTEM

4" FLANGE FOR

NORMAL VENT

OV-1

OVERFILL VALVE

MINIMUM 10" FLANGE

CLOCK GAUGE

VENT

EMERGENCY

1"

4"

GAUGING HATCH

4" SAMPLING AND

EMERGENCY VENT

TESTER

MANUAL

FLOW SWITCH

FOR 3% SLOPE

MANWAYS, AND VAULT

CORRECT PUMPWAYS,

2'-0" DIA.

OVERFILL VALVE AT TOP

2" FILL LINE WITH

AT 95% FILL

OVERFILL VALVE

FLOAT CLOSES

MANUALTESTER.

FLOAT WITH

FOR PAD DIMENSIONS

SEE CIVIL SHEET CS504

CHECK VALVE

BALL VALVE

CAPACITY

5 GALLONS MIN.

LID

DRAIN VALVE

A1

SECTION

SCALE: NO SCALE

E7

SPILL BUCKET DETAIL

SCALE: NO SCALE

E1

4000 GALLON WASTEWATER TANK DETAIL

SCALE: NO SCALE

A7

MS508

MS508

A1

LADDER

ELECTRIC PUMP

VENT (MAIN)

EMERGENCY

STEEL TANK

U.L. 2085 DOUBLE WALL

CAP

" VENT WITH2

ATG SYSTEM

4" FLANGE FOR

MONITOR

DETECTION

LEAK

STRAINER

OV-2

N.O. BALL VALVE

SUPPORT (TYP.)

SMALL BORE PIPE

FLOW SWITCH

CHECK FEATURE (CV-8)

VALVE WITH

FLOW CONTROL

AAV

(INTERSTITIAL)

EMERGENCY VENT

FTP-2

FOR PAD DIMENSIONS

SEE CIVIL SHEET CS504

PG

PG

CONNECTORWITH DUSTCAP (TYP)

2" PIPE AND 2" MALE CAM TYPE

1"

2"

2"

MAV

WITH DROP TUBE

4" GAUGE HATCH

PG

PG

VALVE (TYP)

PRESSURE RELIEF

MAV

PG

N.C.SPILL BUCKET

N.C. N.C.

N.C.

RELIEF VALVE

" VENT2

GRADE

TANK SADDLE

STRIKER PLATE

CHECK VALVE (CV-5)

2" NON-SURGE

SWITCH

FLOW

A7

SECTION

SCALE: NO SCALE

PG

LPD

M A

V

SLOPE

SLOPE

SLOPE

LPD

LPD

PUMP, FTP-2

FUEL TRANSFER

F4

MS502

F4

MS502

FLOAT SWITCH ASSEMBLY

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXUMS508.dwg

9:47:03 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

U M

S .d w g

C

M A

R G

R A

V E

A

K Y

H N

A

K Y

H N

M

IC

H A

E L T S

M

IT

H P .E

S E

C T

IO

N S A

N D D

E T

A

IL

S

W A

S T

E W

A T

E R T

A N

K

MS508

R

E V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

A4

SB308

EXTENTS

BASE SLAB

A1

SB308

ABOVE

COLUMNS

CANOPY

N

2'-0"

TANK

OFFLOAD DROP

TANK

OFFLOAD DROP

OFFLOADS

10" Ø FROM

HOUSE

8" Ø TO PUMP

GRATING (NOTE 15)

THROUGH

APPURTENANCE

TANK

NOTE 13.

SHEET S-502 AND

SEE DETAIL E5 ON

CONTROL JOINTS.

NOTES.

PLATFORM. SEE

EXTENTS OF

APPROXIMATE

@ 12" O.C., T&B

DIRECTION OF #9's

T&B

#7's @ 12" O.C., DIRECTION OF

A

B

C

1 2

C J

L O

N G

IT

U D

IN

L

CJ

TRANSVERSE

C J

L O

N G

IT

U D

IN

L

CJ

TRANSVERSE

A P

P R

O X (N

O T

E

A P

P R

O X (N

O T

E

D8

SB308

SLAB JOINTS

JOINTS WITH

ALIGN WALL

11'-2" 11'-2"14'-8"3'-6" 3'-6"

44'-0"

TYP. NOTE 5.

TO PLATFORM

STAIRS DOWN

E3

SB308

CORNERS

TYP. AT

SUMP.

SHOWN, CENTERED ON

SLAB AT EACH FACE AS

LONG, CAST INTO BASE

PROVIDE (8) #7 BARS 6'-8"

TRANSITION

BEGIN 1:1

A7

SB308

SUMP PIT

2'x2'x3' DEEP

NOTE 14.

VENT. SEE

6" VERTICAL

ACCESS.

15.PROVIDE GRATING PENETRATIONS FOR ALL TANK APPURTENANCES THAT REQUIRE OPPERATOR

14.RUN 6" VENT PIPE THROUGH GRATING AND THROUGH CANOPY. SEE SHEET A-130.

CONTROL JOINTS AS NEEDED TO CLEAR TANK SUPPORTS.

PLATFORM SUPPORTS SHALL NOT BE LOCATED ON CONTROL JOINTS, ADJUST SPACING OF TRANSVERSE

13.COORDINATE PLATFORM SUPPORT LOCATIONS WITH CONTROL JOINTS AND MECHANICAL EQUIPMENT.

12.REFERENCE UFGS 05 50 13 FOR MATERIAL SPECIFICATIONS AND FINISH REQUIREMENTS.

WHICHEVER IS MORE SEVERE.

POINT OF THE TOP OF THE RAIL OR 50 LBS PER FOOT APPLIED IN ANY DIRECTION TO TOP OF THE RAIL, HANDRAILS AND GUARDRAILS TO RESIST A CONCENTRATED LOAD OF 200 LBS IN ANY DIRECTION AT ANY

11.STEEL HANDRAILS AND GUARDRAILS SHALL COMPLY WITH OSHA 29 CFR 1910.28 AND 1910.29. DESIGN

CONSISTING OF 1/4 INCH STEEL FLAT BARS NOT LESS THAN 4 INCHES HIGH.

PROVIDE TOE-PLATE AT OPEN-SIDED EDGES OF FLOOR GRATING TO PLATFORM FRAMING MEMBERS, 10.FABRICATE GRATING PLATFORMS WITH NOSING THAT MATCHES ON GRATING TREADS AT LANDINGS.

WITH BOLTS.

STEEL PLATE CARRIER AT EACH END FOR STRINGER CONNECTIONS. SECURE TREADS TO STRINGERS

9. FABRICATE GRATING TREADS WITH STEEL PLATE NOSING ON ONE EDGE AND WITH STEEL ANGLE OR

LESS STRENGTH THAN TO CARRY SAFELY A MOVING CONCENTRATED LOAD OF 300 POUNDS.

8. PLATFORMS SHALL BE DESIGNED AND CONSTRUCTED TO CARRY A LIVE LOAD OF 100 PSF BUT NEVER OF

WILL BE EXPOSED AFTER INSTALLATION.

FINISHING. WELD PERMANENT CONNECTIONS. FINISH WELDS FLUSH AND SMOOTH ON SURFACES THAT

7. CLEAN METAL SURFACES FREE FROM MILL SCALE, FLAKE RUST AND RUST PITTING PRIOR TO SHOP

6. BEFORE FABRICATION, OBTAIN NECESSARY FIELD MEASUREMENTS AND VERIFY TANK DIMENSIONS.

EXCLUDE WATER.

CLEATS, WELDED OR BOLTED TO THE STRINGER. CLOSE EXPOSED ENDS. FORM ALL EXPOSED JOINTS TO

D. SUPPORT STEEL GRATING ON ANGLE CLEATS WELDED TO STRINGERS OR TREADS WITH INTEGRAL

WELDING IS NOT PRACTICABLE. SCREW OR SCREW-TYPE CONNECTIONS ARE NOT PERMITTED.

C. PROVIDE STEEL STAIRS OF WELDED CONSTRUCTION EXCEPT THAT BOLTS MAY BE USED WHERE

NEVER OF LESS STRENGTH THAN TO CARRY SAFELY A MOVING CONCENTRATED LOAD OF 300 POUNDS.

B. FIXED STAIRWAYS SHALL BE DESIGNED AND CONSTRUCTED TO CARRY A LIVE LOAD OF 100 PSF BUT

STAIRS SHALL COMPLY WITH OSHA 29 CFR 1910.25.

TREADS, LANDINGS, COLUMNS, HANDRAILS, AND NECESSARY BOLTS AND OTHER FASTENINGS. STEEL

A. PROVIDE HOT-DIPPED GALVANIZED STEEL STAIRS FOR AST COMPLETE WITH STINGERS, GRATING

NECESSARY BOLTS AND OTHER FASTENERS.

ON THE DRAWINGS COMPLETE WITH STRINGERS, GRATING TREADS, LANDINGS, HANDRAILS, AND

5. PROVIDE STEEL STAIRS FOR PLATFORM ACCESS FROM THE TOP OF VAULT WALL (EL. 90'-0") AS SHOWN

GRATING, SHALL BE PAINTED YELLOW.

BELOW THE MANWAY HATCHES. ANY APPURTENANCES OR MANWAYS, WHICH STICK ABOVE THE

GRATES THAT ALLOW ACCESS TO THE TANK APPURTENANCES. GRATING ELEVATION SHALL BE SET

ACCESS TO THE TANK MANHOLES AND GAUGES. THE CATWALK SHALL BE DESIGNED WITH REMOVABLE

4. THE PLATFORM SHALL BE WIDE ENOUGH TO SATISFY EM 385-1-1 REQUIREMENTS AND ALLOW PROTECTED

DIVIDED BY 360 (L/360).

BEAMS AND THE TOP OF THE TANK. LIVE LOAD DEFLECTIONS SHALL BE LIMITED TO THE CLEAR SPAN

3. A MINIMUM CLEAR DISTANCE OF 1" SHALL BE PROVIDED BETWEEN THE BOTTOM OF THE PLATFORM

ELEVATIONS AND ADDITIONAL DETAILS.

2. SEE SHEETS MS100, MS420, CS503, & CG103 FOR PIPING PLAN, GRADE AND PIPE CENTERLINE

TANK. SEE SPECIFICATION 05 50 13 FOR ADDITIONAL INFORMATION.

WITH GUARDRAILS, CENTERED ABOVE AND ALONG THE FULL LENGTH OF THE HORIZONTAL STORAGE

1. IT IS THE RESPONSIBILITY OF THE METAL BUILDING MANUFACTURER TO DESIGN A PLATFORM, COMPLETE

DROP TANK VAULT NOTES:

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXVSB103.dwg

9:40:11 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

V S

B .d w g

W

B O

E C

K

A

M O

U S

E L

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

C A

N O

P Y F

O U

N D

A T

IO

N P

L A

N

O F F

L O

A D D

R O

P T

A N

K V

A U

L T

SB103

0 2' 4'1'A1

OFFLOAD DROP TANK VAULT FOUNDATION PLAN

SCALE: 1/2" = 1'-0"

A

M O

U S

E L

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

PIPE SUPPORT TYPE

SEE SCHEDULE FOR

(TYP.)

W12X26

B.F. (U.N.O.)

4 #5 BARS E.W.,

IN PIER. (TYP.)

MATCH VERT. REINF.

#7 BAR W/ STD. HOOK

TOP OF PIER

@ 6" AT

SPACE TIES

SUPPORT

TYPE "A" PIPE

TOP OF PIER

@ 6" AT

SPACE TIES

TOP FACE

#4 @ 12" O.C., E.W., VERT. BARS.

PIER. DO NOT PROVIDE #7

CONTINUOUS TO TOP OF

#7 DOWELS WITH STD. HOOK

LESS THAN 104'-0" PROVIDE

IF PIPE CENTERLINE ELEVATION IS

NOTE:

HEADED ANCHOR BOLTS

FOUR 3/4" DIA. A307

PIPE

4", 6" OR 8"

OF SLAB (TYP.)

#4 @ 12" O.C. TOP

REINF. IN PIER. (TYP.)

HOOK MATCH VERT.

#7 DOWELS W/STD.

FOR PIPE DIAMETER

SEE SCHEDULE SHT. S-601

SCHEDULE ON SHT. S-212)

CONCRETE PIER (SEE

B.F. REINFORCING AND LENGTH

SEE SCHEDULE SHT. S-601 FOR

FOR PIPE DIAMETER

SEE SCHEDULE SHT. S-601

HEADED ANCHOR BOLTS

FOUR 3/4" DIA. A307

PIPE

1" GROUT

PIPE

6 #7 BARS

ROUGHEN SURFACE

SUPPORT

TYPE "A" PIPE

PIPE

12 #7 BARS

ROUGHEN SURFACE

PIPE

PS-10

BASE DETAIL ON SHT. SB306

SEE TYPICAL COLUMN

SCHEDULE ON SHT. S-601

8" OR 6" PIPE SEE

W8X24 BRACKET

CL

CL

CL

CL

TYP.

FLANGES

BOTH

L

EL. VARIES

SEE SCHEDULE SHEET S-601

SEE SCHEDULE

EL. VARIES

H P

IP

E C E

L E

V

F

IN

F

L R E

L E

V

H P

IP

E C E

L E

V

F

IN

F

L R E

L E

V

TYP.

EL. 108'-0"

ELEV. VARIES

F O

R P

IP

E

F O

R P

IP

E

F O

R P

IP

E

ELEV. VARIES

C L

R

F O

R P

IP

E

F O

R P

IP

E

L A

P

T Y

P

ELEV. VARIES

1'-0"1'-6"

2'-0" 2'-0"

4'-0"x4'-0"

C L

R

LENGTH

REINFORCING AND

S-601 FOR B.F.

SEE SCHEDULE SHT.

2'-0"

4'-0"

5'-0"

C L

R

H P

IP

E C E

L E

V F

IN

F

L R E

L E

V

L H P

IP

E C E

L E

V F

IN

F

L R E

L E

V

L

L

WITHIN 5"

3 #3 BARS

WITHIN 5"

3 #3 BARS

F2

SB307

SHEET S-601

SEE SCHEDULE

EL. VARIES

PER ACI 318

TIES @ 14 O.C.

SPACE #3 COLUMN

WITHIN TOP 5"

3 #3 CLOSED TIES

(TYP.)

TYPE "C" PIPE SUPPORT

ANCHOR BOLTS

7/8" DIA. A307 THREADED

TOP OF SLAB (TYP.)

#4 @ 12" O.C.

NECESSARY

@ JOINT IF

BEND END UPREINF. IN PIER. (TYP.)

HOOK. MATCH VERT.

#7 DOWELS W/STD.

JOINT

EXPANSION

DIMENSIONS

FOR ADDITIONAL INFORMATION AND

NOTE: SEE SECTION E4 ON SHEET SB303

PER ACI 318

TIES @ 14 O.C.

SPACE #3 COLUMN

PIER. (TYP.)

MATCH VERT. REINF. IN

#7 DOWELS W/STD. HOOK.

FOR PIPE DIAMETER

SEE SCHEDULE SHT. S-601

FOR PIPE DIAMETER.

SEE SCHEDULE SHEET S-601

W12X26 (TYP.)

PIPE PIPE

ROUGHEN SURFACE

24 #7 BARS

PS-11

1" GROUT

2" PIPE

TYPE "C" PIPE SUPPORT

ROUGHEN SURFACE

12 #7 BARS

PS-15

W8X24

CL CL

CL

H P

IP

E C E

L E

V

F

IN

F

L R E

L E

V

ELEV. VARIES ELEV. VARIES

15 #5, E.W., B.F.

ELEV. VARIES

2'-0"

1'-6"

B.F. REINFORCING AND LENGTH

SEE SCHEDULE SHEET S-601 FOR

THICKENED SLAB - 7'-0"x7'-0" 1'-6"

3'-8"

C L

R

1'-0"1'-6"11"

9"

9'-8" 1'-6" 1'-0"

C L

R

1'-8" 1'-8"

2'-4" 2'-6"

5"

L H P

IP

E C E

L E

V F

IN

F

L R E

L E

V

EL. 108'-0"

L

EL. 104'-6"

EL. 108'-0"

L H P

IP

E C E

L E

V F

IN

F

L R E

L E

V

SB307

F2

F5

SB307

WITHIN TOP 5"

3 #3 CLOSED TIES

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXVSB303.dwg

9:34:52 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J

U L

C X

V S

B .d w g

W

B O

E C

K

A

M O

U S

E L

A

M O

U S

E L

S H

E E

T O

F

P

IP

E S

U P

P O

R T S

E C

T

IO

N S A

N D D

E T

A

IL

S

SB303

E2

PIPE SUPPORT SECTION

SCALE: 1/2" = 1'-0" 0 2' 4'1' E4

PIPE SUPPORT SECTION

SCALE: NTS 0 2' 4'1'E8

PIPE SUPPORT SECTION

SCALE: 1/2" = 1'-0"

0 2' 4'1'A2

PIPE SUPPORT SECTION

SCALE: 1/2" = 1'-0"

A5

PIPE SUPPORT SECTION

SCALE: NTS 0 2' 4'1'A8

PIPE SUPPORT SECTION

SCALE: 1/2" = 1'-0"

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

PIPE THRU ROOF

METAL FL BOOT

FLASHING BOOT OR

FLEXIBLE EPDM PIPE

FLANGED SLEEVE

LOW END AND INTEGRAL

DOWN OVER RIBS AT

METAL TRAY TURN

METAL ROOF

STANDING SEAM

MAMBRANE

LEAK BARRIER

VAPOR, AIR, AND

STRUCTURE - SEE STR

STEEL ROOF DECK

COMPOSITE CONCRETE/

W /P

IP

E D

IA

V A

R

IE

S /2

M

IN

BASE DIA. VARIES W/PIPE DIA.

CLAMPING RING

STAINLESS STEEL

CLAMPING RING

COLLAR HOOD W/ S.S.

FABRICATED STORM

STAINLESS STEEL FIELD

WOOD NAILER

PRE-FAB ROOF CURB

METAL FLASHING

CLOSURE

ROOF PANEL END

SIDES

2X WOOD NAILERS 4

OPENING

STEEL ANGLE AT

AROUND OPENING

STEEL FRAME

CLOSURE

ROOF PANEL END

PANELS

1'-0" UNDER ROOF

EXTEND FLASHING

METAL ROOF

STANDING SEAM

WATER DIVERTER

REF. STRUCT

STEEL STRUCUTRE

REFER MECH SHEETS

1'-0" MIN.

M

IN

2'-0" IN ALL DIRECTIONS

FLASHNG EXTENDS

CONTINUATION

A3 THIS SHEET FOR

VENT PIPE - SEE DETAIL

MEMBRANE

VAPOR RETARDER

INSULATION

RIGID ROOF

ROOFING ASSEMBLY

MODIFIED BITUMEN

FIRESTOPPING

PIPE SLEEVE

W/ ROOF ASSEMBLY

SEALANT COMPATIBLE

ROOF DECK

@ 8-INCHES ABOVE

W/ S.S. CLAMPING RING

FLANGE SET IN BITUMEN

VENT PIPE FLASHING WITH

CONTINUATION

A7 THIS SHEET FOR

VENT PIPE - SEE DETAIL

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXVA-511.dwg

9:46:22 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

V A -5

.D

W G

B .R .G

M .D .M

M .D .M

B .R .G

O F E

D G

E D

E T

A

IL

S

P U

M P

H O

U S

E

A-511

PS

PLUMBING VENT THROUGH ROOF DETAIL

SCALE: 3" = 1'-0"

A3 6"0 3" 1'

SCALE: 3" = 1'-0"

ROOF EXHAUST FAN/PENTHOUSE DETAIL

SCALE: 3" = 1'-0"

F7

PLUMBING VENT THROUGH ROOF DETAIL

SCALE: 3" = 1'-0"

A7

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

CONTROL ROOM

MECH. ROOM

PUMP ROOM

M

PIT 3

FP-1FP-2FP-3FP-4

CV-1CV-2CV-3CV-4

(TYP)

MAV

MAV

MAV

IFIF

IF

IF

IF

IF

IF

IF

MAV

1"

1"

FSCV-1FSCV-2FSCV-3

FSCV-4

FSI-1FSI-2FSI-3FSI-4

1" 1"

2"

IF

IFIF

IF

MAV

IF

IF

IF

IFIF

SWING

F/S DOOR

MAV

MAV

RP-1

MAV

JP-1

MAV

2"

1"

1"

2"

2"

TP-1TP-2

FSR-1FSR-2

FSR-3

CV-5CV-6

MAV

MAV

MAV

(TYP.)

MAV

NC

NO

NONO NO

NONO NC

NO

1"

1"

2"

MAV

TRENCH

RUN IN

NC NO

NO

1"

2"

ABOVE

MAV

MAV

MAV

FSCV-5FSCV-6FSCV-7

PS-1

2"

M-301

A3/D2

M -3

D

M -3

D

A

M -3

M-303

A1

E

M -3

M -3

D

2"

2"

MAV

FILLSTANDS

10" FROM TRUCK

LINE

SLOW FILL

SEPARATOR

2" FILTER

HEADER

16" SUCTION

8" X 10" INCREASER

8"

2" PCV 8"X6" REDUCER

6"X4" REDUCER

PS-24

MAV

PS-22

8"

SIDING

8" FROM MILLER

2" DRAIN

PS-21

BPCV

PS-19

8" PS-20

SURGE TANK

40 GALLON

PS-23

SURGE TANK

40 GALLON

2" DRAIN BELOW

PS-14

PS-26

PS-13

PS-27

PS-25

PS-6

PS-6

PS-7

TANK NO. 4

8" TO OPERATING

TYPE III SYSTEM

10" TRANSFER TO

LINE

8" RETURN

PS-13

8"

PS-3

10" FROM BULK STORAGE

TANKS NO'S (2, 3, & 5)

8"

PS-26

TANKS NO'S (2, 3, & 5)

8" TO BULK STORAGE

1"

RECEIPT FILTER

SEPARATOR BYPASS

TANK RECEIPT

8" OPERATING

BULK TO BULK FILTERED

TRANSFER OR BULK TO

OPERATING FILTERED

TRANSFER

ROUTE PIPE

ALONG FLOOR

LINE

SLOW FILL

SEPARATOR

2" FILTER

10" ISSUE VENTURI

PIT-2

PIT-1

PS-15

REDUCER

10" x12"

M-503

SHEET

PS-2, SEE

MS502.

TANK, SEE DETAIL "A" SHEET

2" TO PRODUCT RECOVERY

DETAIL "A" SHEET MS502

RECOVERY TANK, SEE

2" FROM PRODUCT

FLOOR

ANCHOR TO

(TYP.)

BLIND FLANGE

PS-8

2" 6"

PS-9

PS-9

PUMP

JOCKEY

PS-10

PS-11

PS-10

PS-12

DPT-1 & 2

2"

8"

2"

FILLSTANDS

10" TO TRUCK

4"

IF

CONTROL VALVE

2" TO PRESSURE

VENTURI BELOW

VALVE, 4" RETURN

DEFUEL/FLUSH

TANK

RECOVER

PRODUCT

HEADER

DISCHARGE

12" PUMP

6"

6" 6"

PS-12

PS-12

PS-12

6"

TANKS NO'S 1 AND 4

16" FROM OPERATING

ALONG FLOOR

ROUTE PIPE

PS-27

PS-26

PS-4

6"

PS-1

8"

PS-17

PS-1

PS-5

SAMPLE

CONNECTION

PS-9

PS-9

TANK NO. 1

8" TO OPERATING

6" 6"

METER

RECEIPT FLOW

(TYP. OF 6)

FLOW CONTROLLER

VALVE (CV) W/RATE OF

NON-SURGE CHECK

TO RETURN LINE

8" CROSS CONNECTION

HAND WHEEL CHAIN.

SUPPORT FOR VALVE

PROVIDE HOOK ON PIPE

CONNECTION

SAMPLE

6"

ARCHITECTURAL.

SEE

OVER 2" DRAIN LINE.

PROVIDE RAMP

PS-18

TANKS

OFFLOAD DROP

8" FROM TRUCK

BULK RECEIPT

1200 GPM F/S

STRAINER

BASKET

ARCHITECTURAL.

DRAIN LINE. SEE

PROVIDE RAMP OVER 2"

PS-16

BULK RECEIPT

OPERATING TRANSFER OR

TRANSFER OR BULK TO

1200 GPM F/S BULK TO BULK

PS-16

NO'S 1 & 4 (ABOVE)

OPERATING TANK

TRANSFER TO

PIPING TO PIER FOR FS-16

ROUTE AND ANCHOR 2"

PS-16

PS-16

10"

PS-14

6"

6"

PS-15

6"

PS-8

PS-16

8"

FROM PRT

RETURN

2" PRODUCT

PS-16

IF

N

A1

PIPING PLAN

SCALE: 1/4"=1'-0" 0 4' 8'2'

PS-8 PS-8

8" 8" 8" 8"

PS-8

NO

MM

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXVM-110.dwg

9:44:15 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

V M -1

.d w g

C

M A

R G

R A

V E

A

K Y

H N

A

K Y

H N

M

IC

H A

E L T S

M

IT

H P .E

P

IP

IN

G P

L A

N

P U

M P

H O

U S

E

M-110

PS

R

E V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

N.O.

IF

N.O.

PSIG

0-300

MAV

8"

MAV

I34

I35 R11

R10

1"

1"

N.C.

MAV

8"

1"

MAV

8"

CV-1

MAV

CV-2

PSIG (TYP. FOR 7)

-30" W.C. VAC. TO 60

2"

IF

N.O.

D/FV-1

N.O.

6"

N.O.

PSIG

0-300

S

4"

8"

2"

PCV-1

2"N.O.

PSIG

0-300

2"

MAV

8"

CV-3CV-4

1" 12"

(TYP.)

BLEED

12"

MAV

"2

2"

MAV

2"

N.C.

N.O.

IF

MAV

IF

F S

C V -1

F S

C V -2

F S

C V -4

MAV

IF

PSIG

0-300

SSSS

MAV

S

4"

8"

200 PSIG

PIT

8"

1"

1"

SURGE TANK

2"

2"

AS STAINLESS STEEL. PIPING SHALL BE IN ACCORDANCE WITH SPECIFICATION 33 52 43.13.

3. ALL PIPING 2" AND SMALLER SHALL BE EXTERNALLY COATED CARBON STEEL UNLESS NOTED

STEEL IN ACCORDANCE WITH SPECIFICATION 33 52 43.13.

" AND LARGER SHALL BE INTERNALLY / EXTERNALLY COATED CARBON 2

12. ALL PIPING 2

1. SEE SHEET M-001 FOR NOTES, LEGEND

NOTES:

2"

6"6"6"

2"2"

2"

1"

1"1"1"

12"

2"

N.O. N.O. N.O.

N.O.N.O.N.O.N.O.

FSI-1

600 GPM

FSI-2

600 GPM

FSI-3

600 GPM

FSI-4

600 GPM

N.O.

16"

8"

N.O.

FP-2

GPM

1"

N.O.

"2

16"

8"

N.O.

FP-3

GPM

1"

N.O.

"2

16"

8"

N.O.

FP-4

PSIG

0-300

1"

6"

1"

N.O.

12"

"2

MAVMAVMAV

16"

IF

2"

2"

N.O.

2"

8"

N.O.

8"

2"

8"

1"

1"

N.O.

IF

IF

IF

2"

RP-1

2"

1"

JP-1

2"

2"

2"

PRODUCT RECOVERY TANK (4000 GAL.)

2"

PSIG

0-100

1"

MONITOR

LEAK DETECTION IF

GAUGING HATCH

SAMPLING &

VENT

PSIG

0-100

PG

PG

MANWAY

LADDER

0-100 PSIG

PSIG

S

OFFLOAD NO. 4

TRUCK

OFFLOAD NO. 3

TRUCK

OFFLOAD NO. 2

TRUCK

OFFLOAD NO. 1

TRUCK

PG

PG

OFFLOAD DROP TANKS (10,000 GAL EA.)

IF

IF

IF IF IF IF

8"

8"

PG PG

S

DP

PG PG

S

DP

PG PG

S

DP

PG PG

S

DP

8"

50 GPM

(FTP-1)

PUMP

TRANSFER

FUEL

MANUAL TESTER

FLOAT SWITCH W/

IF

OV-1 CLOSES AT 95% FILL LEVEL

GPM

8"

FSCV-7

FSCV-6

FSR-3 FSR-2

N.O.

1"

N.C.

1"

8" 1"

8" 1"

1200 GPM N.O. 1200 GPMN.O.

8"

1"

1"

2"

1"

1200 GPMN.O.

8"

1"

FSR-1

FSCV-5

1"

AAV

2" 2"

2"

2"

N.C.

IF

MAV CV-5

PG

MAV

CV-6

8" "2

10"

TP-1

GPM

PSIG

0-300

1"

6" 1"

N.O.

N.O.

10"

8" N.O.

TP-2

N.O.

8"

"2

MAV

2"

PSIG

0-300

IF

1"

IF

8"

2"

1"

1"

1" 2"

MAV

SEE SHEET M-202

FOR CONTINUATION,

IF IF

IF

IF

2"8"

16"

FILLSTAND NO. 1

TRUCK

FILLSTAND NO. 2

TRUCK

FILLSTAND NO. 3

TRUCK

FILLSTAND NO. 4

TRUCK

8"

N.O.

8"

8"

MAV

% - 3%2

1SLOPE DOWN 1

N.O. N.O.

N.O.

N.O.

N.C.

N.C.

6"

IF

IF

PLATE

ORIFICE

BLOCK VALVE (TYP.)

5 VALVE STAINLESS STEEL

MANIFOLD (TYP.)

2 VAVLE STAINLESS STEEL

8"

8"

4"

10"

PSIG2"

MAV

LIQUID LEVEL

INDICATOR

FLOAT SWITCH W/

MANUAL TESTER

10" ISSUE

VENTURI

SEE DETAILS

"B" & "H"

SHEET M-501

PRODUCT

RECOVERY

PUMP

10"

LOW POINT

DRAIN PIT

2" LPD

1/2 " TUBING & FITTINGS

VENT (TYP.)

(TYP. FOR 2), SEE DETAIL "J" SHEET M-501

PRESS INDICATING TRANSMITTER

MS-503

DETAIL "A" SHEET

ELEVATION SEE

FOR PLAN AND

TRUCK FILL STAND

STRAINER

D.B.B. PLUG VALVE

6" FULL PORT

VALVE

CHECK

10"

6" 10" 8"

0-100 PSIG

OV-4

0-100 PSIG

PRESSURE RESERVOIR

PUMP

ELECTRIC

10"

GAUGING HATCH

SAMPLING &

VENT

HOSE

MANWAY

LADDER

8"

8"

SIDING

FROM MILLER

8" TRANSFER

AND STOPS FUEL TRANSFER PUMP.

FLOAT SWITCH ASSEMBLY - STARTS

SHT. M-501

SEE DETAIL "A" & "H",

4" RETURN VENTURI

8"

OV-3

(OP-1,2) 400 GPM EA.

OFFLOAD PUMP

LEVEL ALARM AT 90% FULL LEVEL

AT 20% FULL LEVEL; SOUNDS HIGH

70% FULL LEVEL; STOPS BOTH PUMPS

FULL LEVEL; STARTS SECOND PUMP AT

PUMPS: STARTS FIRST PUMP AT 50%

AND STOPS THE FUEL OFFLOAD

FLOAT SWITCH ASSEMBLY STARTS

OFFLOAD PUMP

(OP-3,4) 400 GPM EA.

PUMP

JOCKEY

6"

SAMPLE CONN.

N.O.

TYP.

1" VALVE

F S

C V -4

F S

C V -3

1" 1"

2" 2"

12" 12" 12" 12"

1" 1" 1"

2" 2" 2" 2"

N.O.

8"

"2

16"

16"

2"

FP-1

GPM

1" 1" 1" 1"

PSIG

0-300

PSIG

0-300

PSIG

0-300

12" 12" 12"

6" 6"

1"

6"

BPCV-1

RELIEF VALVES

PUMPS, HEADERS, STRAINER, AND

DRAIN FROM FILTER SEPARATORS,

WATER DRAW-OFF

2" FILL

HOSE (TYP.)

ELECTRIC PUMP

STRAINER

TYPE III SYSTEM

10" TRANSFER TO

BALL VALVE

PIGGABLE D.B.B

SEE SHEET MS506 FOR DETAIL

PIG LAUNCHER CONNECTION,

8"

2" 2" 2"

8" 8"

TANK NO. 1

8" FILL TO OPERATING

2"

TANKS (2, 3, 5)

8" FILL TO BULK

BULK TANKS (2, 3, 5)

10" ISSUE FROM

GPM

ALL TANKS

16" ISSUE FROM

TANK NO. 4

8" FILL TO OPERATING

8"

8"

8"

6" 1"

10"

8"

8"

A7

FLOW DIAGRAM

SCALE: NO SCALE

10"

CV-9

CV-10

CV-12

CV-11

S S S

BALL VALVE

4" FULL PORT

PLUG VALVE

PORT D.B.B.

10" FULL

TYPE

BALANCE

50 PSI

TYPE

BALANCE

50 PSI

TYPE

BALANCE

50 PSI

TYPE

BALANCE

50 PSI

TYPE

BALANCE

50 PSI

\\nwofpcadd01\AEC_WS_001\SJ06\40000 Design Products\CAD_BIM\_Sheets\CXVM-201.dwg

9:43:20 AM 7/16/2018 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

V M -2

.d w g

C .R .M

A .P .K

A .P

K Y

H N

S H

E E

T O

R

F L

O W D

IA

G R

A M

M-201

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M D

T

J

U L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S A

V A

N N

A H D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E A

V E

N U

E

S A

V A

N N

A H G

E O

R G

IA

M A

Y

C A

T E

G O

R Y C

O D

E

F

IL

E N

A M

E

A N

S I

D

W

H N -1

-R -3

S E

Y M

O U

R J

O H

N S

O N A

F B

N O

R T

H C

A R

O L

IN

A

C O

N S

T R

U C

T T

A N

K E

R T

R U

C K D

E L

IV

E R

Y S

Y S

T

-9

-0

ISSUED FOR CONSTRUCTION

HLV-1

1"

1"

PSIG

PSIG

OPERATING TANK NO. 1

HLV-4

1"

PSIG

OPERATING TANK NO. 4

HLV-2

1"

PSIG

HLV-5

HLV-3

1"

PSIG

BULK / OPERATING TANK NO. 5

BULK / OPERATING TANK NO. 3

SEE SHEET M-201

FOR CONTINUATION,

AS STAINLESS STEEL. PIPING SHALL BE IN ACCORDANCE WITH SPECIFICATION 33 52 43.13.

6. ALL PIPING 2" AND SMALLER SHALL BE EXTERNALLY COATED CARBON STEEL UNLESS NOTED

STEEL IN ACCORDANCE WITH SPECIFICATION 33 52 43.13.

" AND LARGER SHALL BE INTERNALLY / EXTERNALLY COATED CARBON 2

15. ALL PIPING 2

4. 2" WASTE WATER PIPING IS NOT SHOWN ON THIS DIAGRAM.

3. ALL PIPING IS ABOVEGROUND INT/EXT COATED CARBON STEEL UNLESS OTHERWISE NOTED.

2. ALL TANKS ARE EXISTING, ALL PIPING AND TANK NOZZLES ARE NEW.

1. SEE SHEET M-001 FOR NOTES & LEGEND

NOTES:

1"

IF

IF

"A" SHT. MS501 (TYP.)

SYSTEM, SEE DETAIL

WATER DRAW-OFF

PSIG

BULK / OPERATING TANK NO. 2

EXISTING DIKE WALL (TYP.)

RUN PIPING THROUGH

EACH ISSUE AND FILL PIPE)

(TYP. OF 3 PER TANK FOR

FLEXIBLE BALL JOINTS

16"

WALL (TYP.)

EXISTING DIKE

EXISTING DIKE WALL (TYP.)

RUN PIPING THROUGH

PIPE SLEEVE

(TYP.)

PIPING (TYP.)

ABOVEGROUND

TRANSITION TO

NO. 4 FILL

8" TANK

NO. 1 FILL

8" TANK

ALL TANKS

16" TANK ISSUE

(NO'S. 2, 3 & 5) FILL

8" BULK TANK

10" BULK TANK

(NO'S. 2, 3 & 5) ISSUE

16"

(TYP.)

PIPE SLEEVE

10"

10"

8"

WALL (TYP.)

EXISTING DIKE

10"

10"

16"

(TYP.)

PIPE SLEEVE

8"

10"

16"

EACH ISSUE AND FILL PIPE)

(TYP. OF 3 PER TANK FOR

FLEXIBLE BALL JOINTS

10"

EXISTING DIKE WALL (TYP.)

RUN PIPING THROUGH

EXISTING DIKE

WALL (TYP.)

1"

8" 8"

(EXISTING)(EXISTING)(EXISTING)

(EXISTING)

(EXISTING)

1"

PSIG

1"

PSIG

1"

PSIG

1"

PSIG

N.C.

1"

N.C.

50 PSIG

1"

1"

N.C.

1"

1"

1"

N.C.

1"

1"

N.C.

A3

FLOW DIAGRAM

SCALE: NO SCALE

IF IF IF IF IF

200 PSIG BALANCE TYPE

BALANCE TYPE

50 PSIG

8"

8"

8" 8" 8"16" 10"

8"

8"

16"

16"

4"

2"

50 PSIG

16"

4"

2"

50 PSIG 50 PSIG

50 PSIG

16"

4"

2"

16" 16"

4" 4"

2" 2"

16" 16"

16"

16"

16"

8"

8"

\\nwofpcadd01\AEC_WS_001\SJ0…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.