amd2.pdf
PDF 365 KB Posted
- Attached to
- Construct Tanker Truck Delivery System
- Solicitation number
- W912HN18R3007
About this file
W912HN-18-R-3007 AMD2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amd8.pdf | ||
| 18R3007vol3.PDF | ||
| amd7.pdf | ||
| 18R3007vol1.PDF | ||
| W912HN-18-R-3007_AMD7.PDF | ||
| 18R3007vol1.PDF | ||
| amd6.pdf | ||
| 18R3007vol1.PDF | ||
| amd4.pdf | ||
| 18R3007vol2.PDF | ||
| 18R3007vol3.PDF | ||
| W912HN-18-R-3007_AMD2.pdf | ||
| 18R3007vol1.PDF | ||
| amd1.pdf | ||
| 18R3007vol1.PDF | ||
| 18R3007vol3.PDF | ||
| 18R3007vol2.PDF | ||
| 18R3007vol1.PDF | ||
| W912HN-18-R-3007.PDF |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Please see Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN18R3007
X 9B. DATED (SEE ITEM 11)
13-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jul-2018
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN18R3007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
A. CONTRACT CHANGES:
52.222-34 (Project Labor Agreement) has been removed, as it was added in error.
Proposal due date has been extended until 2:00pm EDT on 31 July 2018.
B. TECHNICAL SPECIFICATION CHANGES: The revised and added Sections listed below (revised and added by Amendment No. 0002) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out.
Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). Deleted Sections are also indicated below.
Revised Sections Revised Sections (cont.) Added Sections Deleted Sections 01 33 29 32 01 19 01 11 00 05 59 10 02 41 00 32 12 16 01 14 00 26 23 00 04 20 00 32 16 13 01 30 00 05 50 13 32 17 23 26 24 13 07 27 26 32 92 23 07 52 00 33 01 50.01 22 00 00 33 08 53 23 05 93 33 09 53 23 07 00 33 52 43.11 26 00 00.00 20 33 52 43.13 26 08 00 33 52 43.14 26 12 19.10 33 56 13.13 31 00 00
C. CONTRACT DRAWINGS – File No. 126-925-01:
Sheets CD103, MS100, MS420, MS430, MS501, MS503, MS504, MS505, MS507, MS508, SB103, SB303, A-511, M-110, M-201, M-202, M-301, EP240, and ET501with Revision 1 dated 16 JULY 2018 are hereby added to and made a part of the Contract Drawings.
W912HN18R3007
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 20-Jul-2018 02:00 PM to 31-Jul-2018 02:00 PM.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been deleted:
52.222-34
(End of Summary of Changes)
File details come from the government source that posted it.