AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Reconstruction of Monitoring Platform Savannah Harbor Expansion Project

The purpose of this amendment is to address questions and answ ers as w ell as adjust the period of performance to 60 calendar days upon issuance of NTP.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Jan-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-17-Q-0009

X 9B. DATED (SEE ITEM 11)

22-Dec-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jan-2017

CODE

US ARMY CORPS OF ENGINEERS

100 WEST OGLETHORPE AVE.

SAVANNAH GA 31401-3640

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN-17-Q-0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

The required response date/time has changed from 23-Jan-2017 11:00 AM to 30-Jan-2017 01:00 PM.

The Issued By organization has changed from

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

100 WEST OGLETHORPE AVE

SAVANNAH GA 31401-3640

to

US ARMY ENGINEER DISTRICT, SAVANNAH

100 WEST OGLETHORPE AVE.

SAVANNAH GA 31401-3640

The contractor period of performance end date has increased by 9 days from 51 days to 60 days.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

BID SCHEDULE SUMMARY

Round all priced line items (0001 through 0004) to two (2) decimal places.

TOTAL BID (Items 0001-0004) $ ____________________________________

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. Proposals should be E-mailed to gerard.f.leo@usace.army.mil by 1:00 p.m. eastern time on January 30, 2017. Please courtesy copy Mr. Bruce Helms at bruce.a.helms@usace.army.mil.

NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule (Both Unit Prices and CLIN Totals). Failure to do so will disqualify the Offeror.

NOTE NO. 3. Contract performance time is a maximum of 60 calendar days after issuance of Notice to Proceed. The Contract duration is inclusive of weather days listed in item 8 of the “Additional Contract Requirements Section”.

NOTE NO. 4. LIQUIDATED DAMAGES will be assessed at $568.12 per day

NOTE NO. 5. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NOTE NO. 6. Magnitude of Construction for Funded CLIN 0001 through 0004 is between $100,000 and $250,000 dollars.

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS:

1. Who May Submit: The requirement will be advertised as a 100% Small Business Set- Aside; any legally organized firm considered a Small Business under the applicable NAICS Code may submit a proposal. The applicable NAICS Code for the subject work is 237990 with a small business size standard of $36.5M.

2. What To Submit:

2.1. Completed CLIN Schedule (To include individual CLINS and completed Summary Calculation)

– Found above

2.2. Detailed narrative describing the intended method/approach of completing the project. The narrative shall be no more than one page in length. The use of this narrative will be utilized to determine an understanding of the scope, along with determining that the proposed price is considered fair and reasonable in accordance with FAR 13.106-3.

2.3. Completed Contractor Information Sheet – Found below.

3. How to Submit: Proposals shall be submitted via email to gerard.f.leo@usace.army.mil by 1:00 p.m.

eastern time on Monday, January 30, 2017. Please Courtesy Copy Mr. Bruce A. Helms at Bruce.A.Helms@usace.army.mil.

BASIS OF AWARD:

The award will be made to the lowest priced, responsible, responsive quote, with a responsibility determination.

CONTRATOR INFORMATION

CONTRACTOR:_____________________________________________

DUNS NO.: ______________________________________________

CAGE CODE: ______________________________________________

TAX ID NO.: ______________________________________________

E-MAIL: ______________________________________________

PHONE NO.: ______________________________________________

DATE OF QUOTE: __________________________________________

Quote Prepared By:

(Printed Name and Title) (Signature)

The Contractor, by signing this document, understands and complies with the requirements listed in the Statement of Work (SOW) and shall provide the necessary labor and equipment to meet or exceed the necessary requirements.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following Delivery Schedule item for CLIN 0004 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

51 dys. ADC 1 U.S. ARMY ENGINEER DISTRICT, SAVANNAH

JESSICA POWER

100 WEST OGLETHORPE AVE

SAVANNAH GA 31401-3640

(912) 652-5271 FOB: Destination

W912HN

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

60 dys. ADC 1 U.S. ARMY ENGINEER DISTRICT, SAVANNAH

JESSICA POWER

100 WEST OGLETHORPE AVE

SAVANNAH GA 31401-3640

(912) 652-5271 FOB: Destination

W912HN

ADDT'L CONTRACT REQUIREMENTS

1. UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL

The Contractor shall not accept any instructions issued by any person, employed by the Government or otherwise, other than the Contracting Officer or the Contracting Officer’s Representative (COR) acting within the limits of the COR’s Authority. See the Contracting Officer’s Representative clause of this contract.

2. U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL, EM 385-

1-1

This paragraph applies to contracts and purchase orders that require the contractor to comply with EM 385-1-1 (e.g., contracts that include the Accident Prevention clause at FAR 52.236-13 and/or other safety provisions). EM 385-1- 1 and its changes are available at http://www.hq.usace.army.mil. (At the HQ homepage, select Safety and Occupational Health.) The Contractor shall be responsible for complying with the current edition and all changes posted on the web through the date that is 10 calendar days prior to the date offers are due. If the solicitation is amended to extend the time set for receipt of offers, the 10 calendar days rule stated above shall be applied against the amended date. (For example, if offers are due on 10 April, all changes posted on or before 31 March shall apply to the contract. If the time for receipt of offers is extended from 10 April to 20 April, all changes posted on or before 10 April shall apply to the contract.)

3. REQUIRED INSURANCE (Oct 2012 SAS) (Ref. FAR 28.307)

(a) The Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:

1. Comprehensive and Employer's Liability Insurance: Coverage in an amount not less $100,000 or in the amount required by the State law in which the work is to be performed under this contract, whichever is greater.

2. Comprehensive General Liability Insurance: Coverage in an amount not less than $500,000 per occurrence.

3. Automobile Liability Insurance: $200,000 per person and $500,000 per occurrence for bodily injury liability and $20,000 property damage liability.

4. Vessel liability: When contract performance involves use of vessels, the contracting officer shall require vessel collision liability and protection and indemnity liability insurance.

(b) Prior to the commencement of work hereunder, the Contractor shall furnish to the Contracting Officer a certificate or written statement of the above-required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation, or any material change in the policies adversely affecting the interests of the Government in such insurance, shall not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed and in no event less than 30 days after written notice thereof to the Contracting Officer.

(c) The Contractor agrees to insert the substance of this clause, including this subparagraph (c), in all subcontracts hereunder.

4. DESIGNATED BILLING OFFICE (APR 1989 CESAS-RM)

Invoices will be mailed to:

U.S. Army Corps of Engineers, Savannah District Attn: CESAS-PM-C (Jessica Power) 100 West Oglethorpe Avenue Savannah, GA 31401-3604

5. DESIGNATED PAYMENT OFFICE (AUG 1998 CESAS-RM-F)

Payment will be made by:

U.S. Army Corps of Engineers Finance Center ATTN: CEFC-AO-P 5720 Integrity Drive Millington, TN 38054-5005

6. PRECONSTRUCTION CONFERENCE (OCT 1988 SAS) (Ref. FAR 36.305)

1) PRECONSTRUCTION CONFERENCE In accordance with FAR 36.305:

(a) A preconstruction conference will be arranged by the Contracting Officer after award of contract and before commencement of work. The Area/Resident Engineer will notify the Contractor of the time and date set for the meeting. At this conference, the Contractor shall be oriented with respect to Government procedures and line of authority, contractual, administrative, and construction matters.

(b) The Contractor shall provide the following prior to this conference, in completed form a Certificate of Insurance, plus the following items in either completed or draft form: Schedule Work Plan (including staging area requirements, deployment methods, and location), Equipment List (including floating plant), Accident Prevention Plan (use format shown in Attachment 1 to SECTION 00800) Environmental Protection Plan, All applicable permits/encroachment requirements, Letter Appointing Superintendent (with resume) , Letter Appointing Quality Control Manager (w/qualifications)

(c) A letter of record will be written documenting all items discussed at the conference, and a copy will be furnished by the CO to all in attendance.

7. SUBMITTAL OF MODIFICATION COST ESTIMATE PROPOSALS (MAR 1992 SAS)

(Ref. DFARS 52.236-7000) When submittals of Cost Estimate Proposals are required for additions or deletions to work under this contract by modification, the Contractor shall use DA Form 5418-R titled "Cost Estimate Analysis" (see Attachment 1 to SECTION 00800). A separate assemblage will be prepared for submittal by each trade affected by the proposed work.

8. TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (APR 1991 OCE)

(a) This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the contract clause entitled DEFAULT (FIXED PRICE CONSTRUCTION). In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

(b) The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all-weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORKDAYS BASED ON 5-DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

6 6 5 4 5 7 9 8 5 2 3 6

(c) Upon acknowledgment of the Notice to Proceed and continuing through-out the contract, the Contractor will record on the daily Contractor Quality Control report the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled workday. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day in each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph (b) above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather workdays, and issue a modification in accordance with the contract clause entitled DEFAULT (FIXED PRICE

CONSTRUCTION).

9. WAGE RATES

The applicable Wage Determination for the subject work is GA160129 08/12/2016 GA129 and may be found at Wage Determination can be found at www.wdol.gov.These rates and benefits are the minimums to be paid employees hereunder. This Wage Decision contains only one skill classification, so the awarded contractor will need to submit for all/any additional classifications required to begin/complete work on this project as appropriate.

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days after notice to proceed is issued by the Contracting Officer. The time stated for completion shall include final cleanup of the premises.

(End of clause)

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been added by full text:

QUESTIONS & ANSWER

This document is for a single tracking method of inquiries into W912HN-17-Q-0009. The rollup will be structured with the most recent inquiries listed first. The inquiries will be separated by the date in which the inquiries were answered.

Questions & Answers W912HN-17-Q-0009 20 January 2017

Question 1: Will a site visit be possible?

Answer 1: The platform site is located in the river so bidders are able to reach it on their own by boat at any time.

Question 2: What are the Crane Operator Certification requirements?

Answer 2: All crane and barge requirements are listed in the Corps Safety Manual EM 385-1-1 version 2014 which is available online at http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

Question 3: Typically, with the type pile installation required for this project the pile is water jetted down for several feet to assure correct placement then driven to refusal. Will this be acceptable for this project?

Answer 3: No, this method will not be accepted.

Question 4: Is any sub surface soil information available for the area where the platform will be installed? In other words, what type soil are we driving the piles into?

Answer 4: We do not have sub surface soil data for this location.

Question 5: Since Hurricane Matthew marine equipment needed for this work is in very high demand.

Would the USACE issue NTP for construction after the marine equipment delivery can be scheduled??

Answer 5: NTP is typically issued 10 calendar days after contract award. The winning contractor will need to schedule marine equipment based on this information.

Question 6: The requirement for the administrative submittals, in particular the Dive Plan is 5 days.

This is not enough time to develop the submittals and the Dive Plan. Could this time be extended to 15 days?

Answer 6: NTP is typically issued 10 calendar days after contract award. The period of performance is 60 calendar days after issuance of NTP and time for submittals has been accounted for within this 60 day period. Please note that diving is not a requirement for this solicitation and is only mentioned as one option for debris removal.

Question 7: After the Dive Plan is approved the debris from the old platform must be removed from the bottom of the river. This is not enough time to mobilize the dive team and marine equipment.

Additionally, this is not enough time to remove debris from the bottom of the river that is in an unknown condition. Debris removal and construction could be dependent on visibility in the water and the magnitude of the water current and/or the tidal water flow. Would the USACE allow 15 days after the approval of the dive plan to have the debris removed from the bottom?

Answer 7: See answer to question 6.

A survey of underwater conditions at the site will be conducted on Tuesday, 24 January 2017 with the survey data forthcoming. Additionally, if you experience adverse weather that makes working conditions unsafe, it would be most likely considered an impacted weather day and the contractor would be able to request a mod for impacted weather days per the contract.

Question 8: Is debris other than the debris from the destroyed platform to be removed from the bottom?

Answer 8: A survey of underwater conditions at the site will be conducted on Tuesday, 24 January 2017 with the survey data forthcoming. All debris shown in the survey will need to be removed unless otherwise specifically stated.

Question 9: Has a USACE Survey Boat examined the debris conditions in the area to be cleared? This would help quantify the amount of underwater work required and potentially reduce cost.

Answer 9: A survey of underwater conditions at the site will be conducted on Tuesday, 24 January 2017 with the survey data forthcoming.

Question 10: If an old pile is broken off, is the piece remaining in the soil to be removed?

Answer 10: A survey of underwater conditions at the site will be conducted on Tuesday, 24 January 2017 with the survey data forthcoming. All debris shown in the survey will need to be removed unless otherwise specifically stated.

Question 11: Are engineered stability calculations required for the barge and crane?

Answer 11: All crane and barge requirements are listed in the Corps Safety Manual EM 385-1-1 version 2014 which is available online at http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

Question 12: What is the value of the load de-rating for the crane capacity on the barge?

Answer 12: All crane and barge requirements are listed in the Corps Safety Manual EM 385-1-1 version 2014 which is available online at http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

Question 13: What are the crane certification requirements?

Answer 13: All crane and barge requirements are listed in the Corps Safety Manual EM 385-1-1 version 2014 which is available online at http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

Question 14: Does the barge have to be certified by any third party or independent agencies?

Answer 14: All crane and barge requirements are listed in the Corps Safety Manual EM 385-1-1 version 2014 which is available online at http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

Question 15: What are "Applicable permit requirements" as noted in Paragraph 3.0, Task 1 of the work plan? Reference Page 30 in the RFP.

Answer 15: Applicable permit requirements were previously acquired for the original construction of the platform. It is the responsibility of the contractor to validate that all permitting is still current and usable for this reconstruction effort.

Questions & Answers W912HN-17-Q-0009 18 January 2017

Question 1: Can one individual fulfill both positions as QCM and Superintendent?

Question 2: Are there any requirements for SSHO? If so can they have any other roles?

Combined Answer: One individual can fulfill both positions as QCM and Superintendent. They can also act as SSHO as long as they meet the requirements stated in the EM 385-1-1 (See Section 00 73 00 – Supplementary Conditions).

Questions & Answers W912HN-17-Q-0009 30 December 2016

Question 1: Is there a bid/perf. Bond required for project solicitation W912HN-17-Q-0009?

Answer 1: No bid or performance bond is due, but protections are due after award as listed in the 52.228 clause included in the solicitation

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

RECONSTRUCTION OF MONITORING PLATFORM

SAVANNAH HARBOR EXPANSION PROJECT MONITORING PROGRAM

1.0 INTRODUCTION

Extensive hydrodynamic and hydrologic modeling has been done to estimate as well as possible major impacts to the harbor as a result of the harbor deepening. In 2006, the EFDC and WASP models were enhanced to allow evaluation of various deepening scenarios and a variety of other changes in the estuary system. The model was calibrated to the most comprehensive available data at the time. Given the dynamic nature of the river, capability to collect better data and advancement in engineering methods, the model(s) needs to be updated to reflect current pre-project conditions as accurately as possible. In order for that to be accomplished, a robust data set must be developed for model calibration.

To develop this dataset for calibration, thirteen (13) water quality sampling locations have been identified in the vicinity of Savannah Harbor. Of these locations, four (4) stations required installation of platforms to hold the required monitoring equipment. These locations were identified and platforms were constructed. During Hurricane Matthew, the platform located on Middle River north of Dredge Material Containment Area (DMCA) 2A was destroyed.

2.0 GOAL

The goal of this SOW is the replacement of the existing structure that was destroyed by Hurricane Matthew for collection of index velocity and water quality instrumentation.

3.0 WORK TO BE PERFORMED

All work to be performed under this contract shall conform with requirements contained in the USACE EM 385-1-1 Safety and Health Requirements Manual dated 30 November 2014.

Task 1: Submit a Work Plan

The contractor will submit a work plan to USACE for approval for the platform replacement. The work plan should include (at a minimum):

detailed work plan & schedule, including staging area requirements deployment methods & location equipment details & requirements, including the floating plant to be used accident prevention plan in accordance with EM 385-1-1 (see below for additional details) environmental protection plan applicable permit/encroachment requirements

The floating plant will be inspected to assure compliance with the US Army Corps of Engineer’s Safety and Health Requirements Manual EM 385-1-1, 30 November 2014 or most recent version of EM385-1-1. This inspection will require completion of SAD Form 1437a-R, Safety Checklist for Floating Plant.

If it is determined that diving will be necessary to complete the tasks outlined in this scope of work then the contractor shall adhere to the following.

All diving shall be performed in strict accordance with the US Army Corps of Engineer's Safety and Health Requirements Manual EM 385-1-1, 30 November 2014 or most recent version of EM 385-1-1.

All diving shall conform to Section 30 of the Manual. Certification for scientific diving under the American Academy of Underwater Sciences is not adequate for this project. The Diver Personnel Qualifications (See 30 A.06-10), Dive Operation Plan (See 30.A.17), Contractor's Safe Practices Manual (See 30A. 16), Emergency Management Plan (See 30.A. 19), and Activity Hazards Analysis (See 30.A.18) shall be submitted to the District Dive Coordinator for review. More detail of these submittals is below. All items must be included in accordance with EM 385-1-1 prior to approval commencement of diving operations. The Dive Coordinator must accept the Diver Personnel Qualifications, Dive Operation Plan, Safe Practices Manual, Emergency Management Plan, and Activity Hazards Analysis prior to initiation of contract dive operations. The District Dive Coordinator will determine if a chase boat is required for this work effort.

The contractor shall submit the following items after award of the contract, with sufficient time allowed for review by the District Diving Coordinator, prior to performing the first dive:

a) Dive Operations Plan; to include all the items specified in paragraph 30.A.17 of EM 385-1-1. This plan shall contain information specific to the diving operations to be performed on each dive. A Dive Log shall be maintained for each dive undertaken to include name of diver, name of dive team members, diving mode, surface and underwater conditions, water depth and bottom time, and nature and description of work performed. A generalized, philosophical discussion of diving, or an enumeration of diving-related theory will NOT be accepted for the Dive Operations Plan.

b) Activity Hazard Analysis, pursuant to Paragraph 30.A.18 will be submitted. This must address specific hazards anticipated for each diving operation to be performed, and must specifically address other work of any kind being performed concurrently that could interface with or affect the diving operation, such as crane lifts, as well as methods for communications between such other work, crane operators, etc., and the divers. Applicable lock out, tag out, and safe clearance procedures must also be included in the Analysis.

c) Up-to-date resume denoting diving-related training and experience for each diver.

d) Medical certification from a physician as to each diver's fitness/suitability for diving, as required by paragraph 30.A.10 of EM 385-1-1. This certification must be from a licensed physician within the 12 months immediately preceding any dive performed under the contract, and must be renewed at 12-month intervals.

e) Proof of current CPR and First-Aid training for each member of the dive team, as required by paragraph 30.A.09 of EM 385-1-1.

f) Copies of certifications and/or documentation to demonstrate that any pressurized air tanks (SCUBA, Surface supplied air systems, "bail-out bottles", etc.) to be used by the divers have been visually inspected at 12-month intervals and hydrostatically tested at 5-year (60-month) intervals, as required by paragraph 30.C.02.f. (3) of EM 385-1-1. Breathing air supply hoses, helmets, and masks shall be visually inspected and meet specifications contained in paragraphs 30.F.06 and 30.F.07.

g) Copies of certifications and/or documentation to demonstrate that the compressor(s) used to provide breathing air for the divers have been tested at six-month intervals, and meet the air purity requirements specified in paragraph 30.F.05 of EM 385-1-1.

h) Identification of emergency and first aid equipment (first aid kit, oxygen resuscitation system, backboard) to be available at the dive location during any diving operations, pursuant to paragraph 30.F.11 of EM 385-1-1.

i) Emergency Management Plan, pursuant to paragraph 30.A.19. This must address emergency procedures, to include a means of notification, telephone numbers (for law enforcement, ambulance, hospital, doctors, and recompression chamber), nearest USCG emergency assistance and rescue center, and location of evacuation routes."

Task 2: Removal of Debris

The area of the destroyed gage is located on Middle River, just north of DMCA 2A and near Savannah River station 103+00, across from the Dixie Crystal sugar refinery.

The current condition of the platform as it sits below the waterline is currently unknown. The platform as constructed, the visible remains above the waterline of the destroyed platform, and the platform location is shown in Figures 1 – 3. The location of the platform coordinates are referenced in DMS and GASPFE.

Coordinates in NAD 1983 State Plane Georgia East FIPS 1001 Feet X 975625.9 Y 780872.1

Coordinates in WGS_1984 (DMS) Latitude 32° 8' 33.871" N Longitude 81° 8' 4.294" W

The debris associated with the platform within 500 ft of the original location referenced above shall be removed by the contractor. The debris shall become the property of the contractor and shall be removed from the site.

Task 3: Replacement of One (1) Monitoring Platform

The platform must be reconstructed and must meet the following qualifications described herein.

Water depth must be at least 15 feet at a datum of MLLW (Mean Lower Low Water) Platform must be located no closer than 150 feet from the left bank.

Platform must be located no farther than 200 feet from the left bank.

Platform must not pose a hindrance to navigation.

Platform needs a clearance of 12 feet above the water line at Mean High Water (MHW).

Timber piles used to support the platform must be pressure-treated select structural southern pine clean-peeled piles conforming to ASTM D25. Minimum butt circumference measured at 3 ft from the butt shall be 12 inches. Piles shall be in one piece. Splicing is not permitted.

Timber piles shall be treated with waterborne preservative in accordance with AWPA A2 and AWPA P5.

Timber piles shall be driven without interruption. Jetting is not permitted.

Treat cut, bored, dappled and damaged surfaces as specified in AWPA M4.

The ladder leading to the platform shall be constructed of construction grade materials suitable to the marine environment and shall conform to ANSI/American Ladder Institute (ALI) A14 series standards as applicable.

Cross-bracing shall be required on all four sides of the structure for stability.

Screws, bolts and fasteners shall be constructed of materials suitable to the marine environment

(stainless steel).

The platform shall be constructed of construction grade timber materials suitable to the marine environment and shall have a guardrail that includes toprails, midrails and posts. The guardrail system shall be surfaced as to prevent injury to a worker from punctures or lacerations and to prevent snagging of clothing.

Toprails, midrails and posts shall be constructed around the top of the platform similar to that shown in figure 1. The rails and posts shall have smooth surfaces along the top and both sides and shall have adequate handhold for grasping.

The height of the toprail shall have a vertical height of 42 +/-3 in from the upper surface of the toprail to the platform surface. The ends of the toprails shall not overhang the terminal posts or cause a projection hazard.

Toprails shall be capable of withstanding, without failure, a force of at least 200 lbs applied within 2 in of the top edge in any outward or downward direction at any point along the top edge. Midrails and intermediate vertical members shall be capable of withstanding, without failure, a force of at least 150 lbs.

The location of the platform coordinates are referenced in DMS and GASPFE. Platform shall be reconstructed as close to the destroyed structure as possible, while still meeting the aforementioned criterion.

Coordinates in NAD 1983 State Plane Georgia East FIPS 1001 Feet X 975625.9 Y 780872.1

Coordinates in WGS_1984 (DMS) Latitude 32° 8' 33.871" N Longitude 81° 8' 4.294" W

All original specification must be replicated, and are listed below for reference.

The platform will have composite decking and four pilings a minimum of 12” diameter, pressure-treated with chromated copper arsenate (CCA) at a retention rate of 2.5 pcf (pounds per cubic foot), suitable for salt water submersion. Polymer vinyl coating to reduce CCA leaching needs to be applied to the submerged part of piling and driven into the streambed bottom to a minimum depth of 15 feet.

Task 4: Reporting

A comprehensive report and as-built drawings will be compiled after completion of the reconstruction.

At a minimum, the report will include sections on:

Introduction with table of contents, list of tables, list of figures, as-built drawings, material list, scope, goals and objectives, major interruptions, etc.

Field Procedures and Protocols.

Float plan, boating procedures and safety policy

4.0 SCHEDULE

Platform reconstruction for monitoring should be installed within 40 days of NTP. Final reports will be submitted to the USACE no later than 20 days after platform reconstruction completion. All services shall be completed within the time frame specified in the individual tasks.

5.0 DELIVERABLES

All deliverables as described in Task 1.

Weekly progress reports.

A comprehensive report and as-built drawings as described in Task 4.

6.0 PROJECT MANAGEMENT

Project Manager:

Ms. Jessica Power US Army Corps of Engineers Savannah District

ATTN: PM-C

100 West Oglethorpe Avenue Savannah, Georgia 31401 Phone: 912-652-5271 Fax: 912-652-5819

Technical POC:

Ms. Beth Williams US Army Corps of Engineers Savannah District

ATTN: EN-H

100 West Oglethorpe Avenue Savannah, Georgia 31401 Phone: 912-652-5268 Fax: 912-652-5778

Financial POC:

Ms. Jean Anderson US Army Corps of Engineers Savannah District

ATTN: PM-C

100 West Oglethorpe Avenue Savannah, Georgia 31401 Phone: 912-652-5996 Fax: 912-652-5819

(End of Summary of Changes)