Middle_River_Platform_Synopsis.pdf

PDF 23 KB Posted

Attached to
RECONSTRUCTION OF MONITORING PLATFORM
Solicitation number
W912HN-17-Q-0009
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Synopsis

RECONSTRUCTION OF MONITORING PLATFORM

SAVANNAH HARBOR EXPANSION PROJECT MONITORING PROGRAM

W912HN-17-Q-0009

NAICS: 237990

Size Standard: $36.5M

This synopsis is for the replacement of platform structures located on Middle River in the Savannah Harbor. This acquisition is being offered as a total small-business set-aside and will result in a Fixed Price Contract Award. The construction magnitude for this project is between $100,000 and $250,000.

Description of Work: This effort is to replace an existing platform structure that was destroyed by Hurricane Matthew for collection of index velocity and water quality instrumentation. Work to be performed as follows:

1. Submit a work plan. The contractor will submit a work plan to USACE for approval for the platform replacement. The work plan should include (at a minimum):

• detailed work plan & schedule, including staging area requirements

• deployment methods & location

• equipment details & requirements, including the floating plant to be used

• accident prevention plan in accordance with EM 385-1-1

• environmental protection plan

• applicable permit/encroachment requirements

2. Removal of Debris. The debris associated with the platform within 500 ft of the original location referenced above shall be removed by the contractor. The debris shall become the property of the contractor and shall be removed from the site.

3. Replacement of One (1) Monitoring Platform. The platform must be reconstructed and must meet the following qualifications.

• Water depth must be at least 15 feet at a datum of MLLW (Mean Lower Low Water)

• Platform must be located no closer than 150 feet from the left bank.

• Platform must be located no farther than 200 feet from the left bank.

• Platform must not pose a hindrance to navigation

• Platform needs a clearance of 12 feet above the water line at Mean High Water

(MHW).

4. Task 4: Reporting. A comprehensive report will be compiled after completion of the reconstruction.

Evaluation Criteria: The contract will be solicited and procured using Simplified Acquisition Procedures.

NOTE: This solicitation will be issued in electronic format only and is anticipated to be available on or about December 07, 2016. Please note that the proposal due date will be specified in the solicitation when issued. No additional media (CD-ROM, floppy disks, faxes, etc.) will be provided. Any prospective Offeror must register in the System for Award Management (SAM) at https://www.sam.gov. After completing SAM registration, interested Contractors and their subcontractors must then register at https://www.fbo.gov in order to obtain solicitation documents, plans and specifications for this solicitation. Contractors that have an existing account should be able to use their existing logins to search for the solicitation number once it is released at https://www.fbo.gov. It is the Offeror’s responsibility to check the Internet address provided as necessary for any amendments that may be posted to this solicitation. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. Contractual Questions should be forwarded to Contract Specialist, Matthew Schoewe at Matthew.M.Schoewe@usace.army.mil or to the attention of Contracting Officer, Bruce Helms at Bruce.A.Helms@usace.army.mil. The contracting office address is 100 West Oglethorpe Avenue, Savannah Georgia, 31401.

https://www.sam.gov/ https://www.fbo.gov/ https://www.fbo.gov/ mailto:Matthew.M.Schoewe@usace.army.mil mailto:Bruce.A.Helms@usace.army.mil

File details come from the government source that posted it. Updated .