amd5.pdf

PDF 119 KB Posted

Attached to
MATOC TBUP Federal contract opportunity
Solicitation number
W912HN-15-R-0002
Issued by
Department of the Army Corps of Engineers Engineering District Savannah

About this file

Amd 5

View the file

Other files for this federal contract opportunity

Other files attached to MATOC TBUP, newest first.
File Type Posted
15R02vol1.pdf PDF
15R02vol1.pdf PDF
amd4.pdf PDF
15R02vol1.pdf PDF
15R02vol2.pdf PDF
amd3.pdf PDF
15R02Ph1.pdf PDF
Amd2.pdf PDF
15R02_PPQ_Summary.pdf PDF
amd1.pdf PDF
15R02_SF330.pdf PDF
15R02_Fillable_PPQ.pdf PDF
15R02Ph1.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. The purpose of this amendment is to open discussions w ith Phase II Offerors. Attachments include revised bid Schedule A, and revised seed task order bid Schedule B.

B. Wage Determination has also been updated. All other terms and conditions remain unchanged.

C. Date and Time for receipt of revised proposals is scheduled for 24 May 2017 at 4:00 p.m., EST.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-May-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-15-R-0002

X 9B. DATED (SEE ITEM 11)

10-Dec-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-May-2017

CODE

US ARMY ENGINEER DISTRICT SAVANNAH

100 W OGLETHORPE AVENUE

SAVANNAH GA 31401-3640

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN-15-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 01 15 - LIST OF DRAWING SHEETS

The following have been modified:

WAGE DETERMINATION

General Decision Number: GA170161 05/12/2017 GA161

Superseded General Decision Number: GA20160161

State: Georgia

Construction Type: Building

County: Muscogee County in Georgia.

http://www.wdol.gov/dba.aspx

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

The required response date/time has changed from 21-Apr-2017 02:00 PM to 24-May-2017 04:00 PM.

The following have been added by full text:

SCHEDULE A

The following have been modified:

SCHEDULE B

ATTACHMENT 1

REVISED Seed Task Order Pricing Schedule B

W912HN-15-R-0002

Project Number 69750

Bldg. 3335 Starship Barracks TBUP, Fort Benning, GA

0001 BASE – Informational CLIN for Company Operations Areas, Large Classrooms (2) Covered Training Areas, Laundry Rooms, Sleeping Bay Areas and Cadre Support Spaces for Bldg. 3335

0001AA Design Company Operations Areas, Large Classrooms (2), Covered Training Areas, Laundry Rooms, Sleeping Bay Areas and Cadre Support Spaces for Bldg. 3335 1 JOB $___________________

0001AB Construct Company Operations Areas, Large Classrooms (2), Covered Training Areas, Laundry Rooms, Sleeping Bay Areas and Cadre Support Spaces for Bldg. 3335 1 JOB $___________________

0002 BASE – Informational CLIN for Standing Seam Metal Roof for Bldg. 3335

0002AA Design Standing Seam Metal Roof for Bldg. 3335 1 JOB $___________________

0002AB Construct Standing Seam Metal Roof for Bldg. 3335 1 JOB $___________________

0003 BASE – Informational CLIN for Exterior Insulation Finish System (EFIS) for Bldg. 3335

0003AA Design Exterior Insulation Finish System (EFIS) for Bldg.

3335 1 JOB $___________________

0003AB Construct Exterior Insulation Finish System (EIFS) for Bldg. 3335 1 JOB $___________________

0004 BASE – Informational CLIN for Required Site Work and Required Utility Infrastructure Repairs and Upgrades From Within the Building Five Foot Line to Utility Main Lines for Bldg. 3335

0004AA Design for Required Site Work and Required Utility Infrastructure Repairs and Upgrades From Within the Building Five Foot Line to Utility Main Lines for Bldg.

3335 1 JOB $___________________

0004AB Construct Required Site Work and Required Utility Infrastructure Repairs and Upgrades From Within the Building Five Foot Line to Utility Main Lines for Bldg.

3335 1 JOB $___________________

SUBTOTAL for CLINS 0001 through 0004AB SUBTOTAL $___________________

Bonding rate rate %______

HOOH rate rate %______

FOOH rate rate %______

0005 Contractor Manpower Reporting (CMR) $___________________

TOTAL BASE BID (ITEMS 0001 THROUGH 0005 INLCUDING RATES) $___________________

Contract Duration Shall Not Exceed 650 Calendar Days

Note 1: Contractor Manpower Reporting (CMR) is a one-time charge and there should be no direct charge for recurring reporting. The Contractor is referred to the CMR website for further instructions: https://cmra/army/mil. This may be a charge covered in overhead and therefore not separately priced, in which case you may enter “NSP” at

CLIN 0005.

Note 2: Include bonding, HOOH, and FOOH rates into CLINs 0001AA-0004AB

(End of Summary of Changes) https://cmra/army/mil

File details come from the government source that posted it. Updated .